EBS Presentation 2-14-2

18
Efficient Building Systems, LLC e b s

Transcript of EBS Presentation 2-14-2

Page 1: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 1/18

Efficient Building Systems, LLCe b s

Page 2: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 2/18

e b sSTRUCTURAL

CONCRETE

FORMSEfficient Building Systems, LLC

The most efficient way

to build with concrete

Panelized Permanent Forms

Page 3: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 3/18

• Commercial and Residential.

• Custom Built Permanent Forms.

• Super Fast Construction.

• Environmentally Friendly.

• Cast-in-Place Concrete

Page 4: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 4/18

• Forms built on a structural steel stud frame.

• Clad on either side with variety of boards

depending on the application.

Non-Insulated Insulated Double-Insulated

Page 5: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 5/18

SD Series

(non-insulated)

ICR Series

(insulated)

Page 6: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 6/18

Our System

The forms, stacked in sequence, are delivered to

the site.

Page 7: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 7/18

Our System

The forms are craned into place and easily assembled.

Page 8: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 8/18

Our System

Reinforcing steel is placed into the forms as they are

being installed.

Page 9: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 9/18

Our System

Concrete is pumped into the forms and vibrated.

Page 10: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 10/18

COST BENEFITS,

- Complete Shell Solution

- No Material Waste.

- Low Labor Cost.

- Energy Savings

FAST INSTALLATION,- Large and Light Panels.

- Pre-assembled Corners.

- Built-in Openings.

- No field adjustments.

Page 11: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 11/18

QUALITY,

- Manufactured under strict Control.

- Sound Insulated

- Moisture Barrier

- Pest-Resistant

- Strong

EBS Advantages

FLEXIBILITY OF DESIGN,

- Forms are Custom Made.

- EBS offers; Walls, Beams,

Arches, Columns, Floors &

Roofs.

Page 12: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 12/18

Lower cost of structure

Lower foundation costs

Lower construction timeEasier and faster plumbing and electrical rough-in

Easier to modify walls

Lower cost of complete villa (10-15% precast)Lower cost of complete villa (4-7% conventional)

Increased living space (4-5%)

EBS Cost AdvantagesCompared to precast and conventional construction

(Based on cost of two story 350 m2 villa )

Page 13: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 13/18

Commercial

Page 14: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 14/18

International (Mexico)

Page 15: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 15/18

Residential

Page 16: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 16/18

Installed with Precision

Page 17: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 17/18

Build

Faster

Efficiently

Eliminating costly

delays

To last

Build

With

EBS

Page 18: EBS Presentation 2-14-2

7/25/2019 EBS Presentation 2-14-2

http://slidepdf.com/reader/full/ebs-presentation-2-14-2 18/18

Efficient Building Systems, LLC