http://www-d0.fnal.gov/~blevan/upgrade.html
L1CTT/PS Firmware Status
L1CTT/PS Firmware Status
SUNY at Stony BrookSUNY at Stony Brook
Collaboration Meeting, September 13, 2001, Fermilab Levan Babukhadia
After the October shutdown we must have
all DFE hardware and
all download infrastructure
in place; Otherwise we will NOT have the track/preshower trigger for some long time to come!
The Firmware group continues to concentrate on developing the VHDL code beyond the Occupancy Level only trigger firmware
I will concentrate on the CFT/CPSax firmware
Collaboration Meeting, September 13, 2001, Fermilab Levan Babukhadia
DFEA (80) : Jamieson
Occupancy Level firmware operational, tested with DataPump and AFEs
Track firmware done (4 FPGAs), MAX Pt design extensively tested with DataPump
New protocols nearly done Develop a software TestBench The L1 pipeline and the L2 output Backend (5-th) FPGA:
Rewrite the L1MUON track sorter with FIFOs instead of LIFOs
Add track isolation supportModify track/cluster matching engine
for single threshold CPS clusters Improve cluster finding (-bias)
Collaboration Meeting, September 13, 2001, Fermilab Levan Babukhadia
L1 CTOC (8) : Brian/Ricardo
Software TestBench in place Occupancy Level firmware operational,
extensively tested with TestBench and DataPump
Full CTOC firmware also in place, well tested with TestBench and DataPump except for the M/P and Cluster Counts.
New protocols done Synch studies with TestBench Add synchronization and L3 Sender via
L1FE and repeat TestBench and DataPump tests
Treatment of isolations, tau triggers, etc.
Collaboration Meeting, September 13, 2001, Fermilab Levan Babukhadia
CTTT (1) : Levan
Software TestBench in place Occupancy Level firmware with THT(3)
neoterms done and extensively tested with TestBench, including chaining CTTT with CTOC
Synchronization and L3 Sending implemented and tested in TestBench
New protocols done Add TTK(8)/TEL(4) neoterms next,
quadrant terms not very useful yet More extensive tests of synch and L3
Sending in TestBench Test & certify with DataPump Understand and test details of commu-
nications with TM Add the remaining neoterms
Collaboration Meeting, September 13, 2001, Fermilab Levan Babukhadia
L2 CTOC CFT (8) : Carsten
Software TestBench now in place, needs modifications for the L2
Started to test the design with limited number of TestVectors
Several modifications/improvements to VHDL code
New protocols done More extensive studies with TestBench
are needed Majority vote on turn/crossing number
(a la L1FE?); and event counter (?) Add L2 synchronization (hopefully not
very different from L1FE) Implement L2 L3 Sender Detecting a missing link (a la CTQD) L2 CTOC CPS: code exists and is
tested, will have to be revisited
Collaboration Meeting, September 13, 2001, Fermilab Levan Babukhadia
L2 CTQD CFT/CPS (4) : Steve
Both CFT and CPS designs are finished Software TestBench in place, needs
modifications for the L2 Designs tested in TestBench CFT design tested in DataPump with
limited number of TestVectors Detection of missing link implemented More extensive tests with TestBench
and DataPump are needed Review the L2 synchronization used Can not accept another event until
processing of a given event is done, and this should be Ok
Because of variable number of tracks, the L2 CTQD CPS data are by definition skewed by a lot as are the L2 CTOC CPS data; need to understand how to best deal with this issue…