DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
PRELIMINARES
CAMPAMENTO 18 M2 UN 1,654,886 1,704,595 1,645,293 1,667,967 1,676,688 1,650,525 1,663,607 1,651,397 1,655,758 1,693,258
CAMPAMENTO 9 M2 UN 960,890 985,744 956,093 967,430 971,791 958,709 965,250 959,145 961,326 980,076
CERCA EN ALAMBRE DE PUA 4 HILOS ML 11,380 11,380 11,380 11,380 11,380 11,380 11,380 11,380 11,380 11,380
CERCA EN ALAMBRE DE PUA 5 HILOS ML 12,760 12,760 12,760 12,760 12,760 12,760 12,760 12,760 12,760 12,760
CERCA EN ALAMBRE DE PUA 6 HILOS ML 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745
CERCA EN TABLA H=2.30 M ML 53,608 53,608 53,608 53,608 53,608 53,608 53,608 53,608 53,608 53,608
CERCA EN TEJA DE ZINC H=1.80 M ML 37,974 38,514 37,870 38,116 38,211 37,927 38,069 37,936 37,983 38,391
CERCA EN TELA VERDE H = 2.10 M ML 17,719 18,260 17,615 17,861 17,956 17,672 17,814 17,681 17,729 18,136
DEMOLICIÓN ESCALERAS EN CONCRETO M2 63,831 63,831 63,831 63,831 63,831 63,831 63,831 63,831 63,831 63,831
DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,960 4,960 4,960 4,960 4,960 4,960 4,960 4,960 4,960 4,960
DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 7,048 7,048 7,048 7,048 7,048 7,048 7,048 7,048 7,048 7,048
DEMOLICIÓN ENCHAPE MURO M2 5,417 5,417 5,417 5,417 5,417 5,417 5,417 5,417 5,417 5,417
DEMOLICIÓN PAÑETE MURO M2 5,940 5,940 5,940 5,940 5,940 5,940 5,940 5,940 5,940 5,940
DEMOLICIÓN CIELO RASO FALSO M2 7,180 7,180 7,180 7,180 7,180 7,180 7,180 7,180 7,180 7,180
DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427
DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,907 10,907 10,907 10,907 10,907 10,907 10,907 10,907 10,907 10,907
DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 15,018 15,018 15,018 15,018 15,018 15,018 15,018 15,018 15,018 15,018
DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 22,198 22,198 22,198 22,198 22,198 22,198 22,198 22,198 22,198 22,198
DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 32,207 32,207 32,207 32,207 32,207 32,207 32,207 32,207 32,207 32,207
DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 39,823 39,823 39,823 39,823 39,823 39,823 39,823 39,823 39,823 39,823
DEMOLICIÓN PLACA MACIZA 0.15 M M2 32,439 32,439 32,439 32,439 32,439 32,439 32,439 32,439 32,439 32,439
DEMOLICIÓN PLACA MACIZA 0.20 M M2 45,569 45,569 45,569 45,569 45,569 45,569 45,569 45,569 45,569 45,569
DEMOLICIÓN PLACA MACIZA 0.25 M M2 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965
DEMOLICIÓN PLACA MACIZA 0.30 M M2 66,158 66,158 66,158 66,158 66,158 66,158 66,158 66,158 66,158 66,158
DEMOLICIÓN PLACA PISO 0.05 M M2 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,271
DEMOLICIÓN PLACA PISO 0.10 M M2 11,806 11,806 11,806 11,806 11,806 11,806 11,806 11,806 11,806 11,806
DEMOLICIÓN PLACA PISO 0.15 M M2 17,944 17,944 17,944 17,944 17,944 17,944 17,944 17,944 17,944 17,944
DEMOLICIÓN PLACA PISO 0.20 M M2 29,348 29,348 29,348 29,348 29,348 29,348 29,348 29,348 29,348 29,348
DEMOLICIÓN VIGAS Y COLUMNAS M3 185,832 185,832 185,832 185,832 185,832 185,832 185,832 185,832 185,832 185,832
DESCAPOTE A MAQUINA E=0.20 M M2 1,285 1,285 1,285 1,285 1,285 1,285 1,285 1,285 1,285 1,285
DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,635 4,635 4,635 4,635 4,635 4,635 4,635 4,635 4,635 4,635
DESMONTE APARATOS SANITARIOS UN 16,975 16,975 16,975 16,975 16,975 16,975 16,975 16,975 16,975 16,975
DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359
DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 9,140 9,140 9,140 9,140 9,140 9,140 9,140 9,140 9,140 9,140
DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 8,488 8,488 8,488 8,488 8,488 8,488 8,488 8,488 8,488 8,488
DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954
DESMONTE MUROS SECOS M2 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369
DESMONTE MARCOS Y PUERTAS UN 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103
DESMONTE VENTANAS M2 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359
LETRINA DE 2.0x1.0 UN 741,145 749,534 740,600 745,055 744,908 742,064 744,481 741,861 740,743 747,804LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
PRESICIÓNM2 8,787 8,787 8,787 8,787 8,787 8,787 8,787 8,787 8,787 8,787
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN1
1.7
1.8
1.9
1.10
1.11
1.12
1.1
1.2
1.3
1.4
1.5
1.6
1.19
1.20
1.21
1.22
1.23
1.24
1.13
1.14
1.15
1.16
1.17
1.18
1.31
1.32
1.33
1.34
1.35
1.36
1.25
1.26
1.27
1.28
1.29
1.30
1.37
1.38
1.39
1.40
1.41
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNREPLANTEO MANUAL DE CIMIENTOS M2 3,063 3,063 3,063 3,063 3,063 3,063 3,063 3,063 3,063 3,063
RED ELÉCTRICA PROVISIONAL L=50M UN 2,199,211 2,199,211 2,199,211 2,199,211 2,199,211 2,199,211 2,199,211 2,199,211 2,199,211 2,199,211
RED TELEFÓNICA PROVISIONAL UN 202,726 202,726 202,726 202,726 202,726 202,726 202,726 202,726 202,726 202,726
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 7,755 7,755 7,755 7,755 7,755 7,755 7,755 7,755 7,755 7,755
CIMIENTOS
BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 51,865 90,670 58,333 84,203 69,974 69,974 82,909 66,094 51,865 84,203
BASE ARENA CEMENTO 1:20 M3 196,897 250,123 186,625 210,904 220,242 192,228 206,235 193,161 197,830 237,984
DEMOLICIÓN CABEZAS DE PILOTES M3 237,827 237,827 237,827 237,827 237,827 237,827 237,827 237,827 237,827 237,827
DEMOLICIÓN CIMIENTO ENTERRADO M3 165,649 165,649 165,649 165,649 165,649 165,649 165,649 165,649 165,649 165,649
IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 18,083 18,083 18,083 18,083 18,083 18,083 18,083 18,083 18,083 18,083
SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 558,764 611,796 548,530 572,720 582,024 554,112 568,068 555,043 559,694 599,701
VIGA DE AMARRE EN CONCRETO 3500 PSI M3 564,094 619,070 553,486 578,561 588,206 559,272 573,739 560,236 565,059 606,532
ZAPATAS EN CONCRETO 3500 PSI M3 525,180 576,658 515,247 538,727 547,758 520,665 534,211 521,568 526,083 564,918
PILOTE DE MADERA D=20 CM ML 40,273 40,273 40,273 40,273 40,273 40,273 40,273 40,273 40,273 40,273PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 124,099 124,099 124,099 124,099 124,099 124,099 124,099 124,099 124,099 124,099
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 155,332 155,332 155,332 155,332 155,332 155,332 155,332 155,332 155,332 155,332
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 193,103 193,103 193,103 193,103 193,103 193,103 193,103 193,103 193,103 193,103
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 243,947 243,947 243,947 243,947 243,947 243,947 243,947 243,947 243,947 243,947
PILOTE HINCADO 25X25 ML 87,467 91,216 86,744 88,454 89,112 87,139 88,125 87,204 87,533 90,361
PILOTE HINCADO 30X30 ML 108,591 114,024 107,542 110,021 110,974 108,114 109,544 108,210 108,686 112,785
DADOS EN CONCRETO 3500PSI M3 514,024 565,501 504,090 527,570 536,601 509,508 523,055 510,411 514,927 553,761MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
MENOR DE 5 KM)ML 74,195 74,195 74,195 74,195 74,195 74,195 74,195 74,195 74,195 74,195
DESAGÜES E INSTALACIONES SUBTERRÁNEAS
SIFÓN PARA DRENAJE EN PVC DE 4" UN 31,379 31,709 31,315 31,466 31,524 31,350 31,437 31,356 31,385 31,634
SIFÓN EN PVC 6" UN 162,689 163,020 162,625 162,776 162,834 162,660 162,747 162,666 162,695 162,944
CAJA DE INSPECCIÓN DE 100X100 UN 372,199 415,423 372,768 397,700 391,853 382,143 395,256 379,989 368,394 407,086
CAJA DE INSPECCIÓN DE 40X40 UN 188,388 196,563 187,562 191,731 192,032 188,829 191,127 188,727 188,147 194,827
CAJA DE INSPECCIÓN DE 60X60 UN 212,360 225,484 211,008 217,686 218,208 213,029 216,713 212,873 211,985 222,692
CAJA DE INSPECCIÓN DE 80X80 UN 281,958 301,937 279,283 289,088 290,813 282,026 287,514 281,990 281,704 297,582
DUCTO ELÉCTRICO PVC 4" ML 83,492 83,790 83,541 83,740 83,631 83,631 83,730 83,601 83,442 83,740
POZO SÉPTICO ETERNIT 1000 LT UN 1,052,230 1,055,215 1,052,728 1,054,718 1,053,623 1,053,623 1,054,618 1,053,325 1,051,733 1,054,718
TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 96,381 100,034 95,676 97,343 97,984 96,061 97,022 96,125 96,445 99,201
TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 60,781 62,709 60,409 61,289 61,627 60,612 61,120 60,646 60,815 62,269
TUBERÍA DRENAJE PVC 110 ML 22,969 23,895 22,790 23,213 23,375 22,888 23,132 22,904 22,985 23,684
TUBERÍA DRENAJE PVC 160 ML 36,935 37,861 36,756 37,179 37,341 36,854 37,098 36,870 36,951 37,650
TUBERÍA DRENAJE PVC 200 ML 48,556 49,853 48,306 48,898 49,125 48,443 48,784 48,465 48,579 49,557
TUBERÍA DRENAJE PVC 250 ML 66,457 67,939 66,171 66,847 67,107 66,327 66,717 66,353 66,483 67,601
TUBERÍA DRENAJE PVC 315 ML 91,818 93,115 91,568 92,159 92,387 91,704 92,045 91,727 91,841 92,819
1.43
1.44
1.45
2
2.1
1.42
2.8
2.9
2.10
2.11
2.12
2.13
2.2
2.3
2.4
2.5
2.6
2.7
3.1
3.2
3.3
3.4
3.5
3.6
2.14
2.15
2.16
2.17
3
3.13
3.14
3.15
3.7
3.8
3.9
3.10
3.11
3.12
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNSISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
FILTRANTE)UN 790,083 804,903 787,223 793,983 796,583 788,783 792,683 789,043 790,343 801,523
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
FILTRANTE)UN 1,121,246 1,150,886 1,115,526 1,129,046 1,134,246 1,118,646 1,126,446 1,119,166 1,121,766 1,144,126
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
FILTRANTE)UN 1,468,846 1,528,126 1,457,406 1,484,446 1,494,846 1,463,646 1,479,246 1,464,686 1,469,886 1,514,606
ESTRUCTURAS EN CONCRETO
CASETÓN DE LONA 0.8 X 0.35 M2 34,450 34,450 34,450 34,450 34,450 34,450 34,450 34,450 34,450 34,450
CASETÓN DE LONA 0.80X0.70 M2 45,572 45,572 45,572 45,572 45,572 45,572 45,572 45,572 45,572 45,572
COLUMNAS 3500 PSI M3 691,344 742,821 681,411 704,891 713,922 686,828 700,375 687,732 692,247 731,081
CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 224,140 263,691 217,124 232,987 245,710 220,495 238,535 221,057 225,538 260,147ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
DE REFUERZO, CONCRETO DE 3500 PSIM2 84,128 89,126 83,163 85,443 86,320 83,689 85,005 83,777 84,216 87,986
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
DE REFUERZO, CONCRETO DE 3500 PSIM2 99,376 105,373 98,218 100,954 102,006 98,849 100,428 98,955 99,481 104,005
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 111,036 119,032 109,493 113,140 114,543 110,334 112,439 110,475 111,176 117,209
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 117,211 125,707 115,571 119,447 120,937 116,466 118,701 116,615 117,360 123,769
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 134,977 145,473 132,952 137,739 139,580 134,057 136,818 134,241 135,161 143,079
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 150,414 162,408 148,099 153,570 155,674 149,361 152,518 149,572 150,624 159,673
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 167,066 180,560 164,462 170,617 172,985 165,883 169,434 166,119 167,303 177,483
ENTREPISO VIGUETA PLACA M2 81,428 82,199 81,279 81,631 81,766 81,360 81,563 81,374 81,442 82,023
ESCALERA MACIZA 3500 PSI M3 811,908 863,385 801,974 825,454 834,485 807,392 820,939 808,295 812,811 851,645
MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 78,767 79,494 78,626 78,958 79,086 78,703 78,894 78,716 78,779 79,328
ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 68,337 73,485 67,344 69,692 70,595 67,886 69,240 67,976 68,427 72,311
ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 77,277 83,574 76,061 78,934 80,039 76,724 78,381 76,835 77,387 82,138
ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 90,522 98,419 88,998 92,600 93,985 89,829 91,907 89,968 90,661 96,618
MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 609,390 660,867 599,457 622,937 631,968 604,874 618,421 605,778 610,293 649,127
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 40,244 41,829 39,938 40,661 40,939 40,105 40,522 40,132 40,271 41,468
PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 245,755 268,745 241,318 251,805 255,838 243,738 249,788 244,142 246,158 263,502
ACERO FIGURADO 37000 PSI KG 3,280 3,280 3,280 3,280 3,280 3,280 3,280 3,280 3,280 3,280
ACERO FIGURADO 60000 PSI KG 3,445 3,445 3,445 3,445 3,445 3,445 3,445 3,445 3,445 3,445
REFUERZO MALLA ELECTROSOLDADA KG 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 726,138 777,616 716,205 739,685 748,716 721,623 735,169 722,526 727,042 765,876
TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 669,433 725,773 658,561 684,259 694,143 664,491 679,317 665,479 670,421 712,924
VIGA AÉREA 3500 PSI M3 723,123 774,601 713,190 736,670 745,701 718,608 732,154 719,511 724,027 762,861
VIGA CINTA 3500 PSI M3 707,306 758,783 697,373 720,852 729,884 702,790 716,337 703,694 708,209 747,043
3.16
3.17
3.18
4.5
4.6
4.7
4.8
4.9
4.10
4
4.1
4.2
4.3
4.4
4.17
4.18
4.19
4.20
4.21
4.22
4.11
4.12
4.13
4.14
4.15
4.16
4.23
4.24
4.25
4.26
4.27
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNVIGA CANAL EN CONCRETO 3500 PSI M3 873,632 925,109 863,698 887,178 896,209 869,116 882,663 870,020 874,535 913,369
BASE EN CONCRETO POBRE 1500 PSI M3 292,373 349,263 281,395 307,344 317,325 287,383 302,354 288,381 293,372 336,289
MAMPOSTERÍA
ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 24,606 25,994 24,338 24,971 25,214 24,484 24,849 24,508 24,630 25,677
ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 40,709 42,097 40,441 41,074 41,318 40,587 40,953 40,612 40,733 41,780
ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 28,523 28,854 28,460 28,610 28,668 28,494 28,581 28,500 28,529 28,779
ARCOS EN LADRILLO PRENSADO ML 132,681 133,342 132,553 132,855 132,971 132,623 132,797 132,635 132,693 133,191
DINTELES CONCRETO DE 2500 PSI 15x20 ML 36,122 37,708 35,816 36,540 36,818 35,983 36,400 36,011 36,150 37,346
DINTELES EN BLOQUE 0.15 M ML 22,169 22,897 22,029 22,361 22,488 22,105 22,297 22,118 22,182 22,731
ENCHAPES LADRILLO PRENSADO M2 82,236 83,558 81,981 82,584 82,816 82,120 82,468 82,143 82,259 83,257
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 76,178 81,463 75,157 77,569 78,496 75,714 77,105 75,807 76,270 80,258
MURO DRYWALL DOBLE CARA 0.12 M M2 74,262 74,262 74,262 74,262 74,262 74,262 74,262 74,262 74,262 74,262
MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 43,379 43,379 43,379 43,379 43,379 43,379 43,379 43,379 43,379 43,379
MURO DRYWALL DOBLE CARA 0.10 M M2 71,477 71,477 71,477 71,477 71,477 71,477 71,477 71,477 71,477 71,477
MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 41,986 41,986 41,986 41,986 41,986 41,986 41,986 41,986 41,986 41,986
MURO SUPERBOARD DOBLE CARA 0.10 M M2 83,158 83,158 83,158 83,158 83,158 83,158 83,158 83,158 83,158 83,158
MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 48,869 48,869 48,869 48,869 48,869 48,869 48,869 48,869 48,869 48,869
MURO SUPERBOARD DOBLE CARA 0.12 M M2 92,610 92,610 92,610 92,610 92,610 92,610 92,610 92,610 92,610 92,610
MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 53,594 53,594 53,594 53,594 53,594 53,594 53,594 53,594 53,594 53,594
MURO EN BLOQUE Nº 5 E=0.12 M M2 33,825 34,490 33,697 34,000 34,117 33,767 33,942 33,779 33,837 34,338
MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 20,314 20,646 20,250 20,402 20,460 20,285 20,372 20,291 20,320 20,571
MURO EN BLOQUE DE CONCRETO 0.10 M M2 43,790 44,233 43,705 43,907 43,984 43,751 43,868 43,759 43,798 44,132
MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 26,137 26,358 26,094 26,195 26,234 26,117 26,175 26,121 26,140 26,308
MURO EN BLOQUE DE CONCRETO 0.12 M M2 49,179 49,622 49,094 49,296 49,374 49,140 49,257 49,148 49,187 49,521
MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 29,362 29,584 29,319 29,420 29,459 29,343 29,401 29,347 29,366 29,533
MURO EN BLOQUE DE CONCRETO 0.20 M M2 83,357 85,572 82,929 83,940 84,328 83,163 83,746 83,201 83,396 85,067
MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 48,837 49,945 48,624 49,129 49,323 48,740 49,032 48,760 48,857 49,692
MURO EN BLOQUE Nº 4 E= 0.10 M M2 30,791 31,234 30,706 30,908 30,985 30,752 30,869 30,760 30,799 31,133
MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 18,534 18,756 18,492 18,593 18,632 18,515 18,573 18,519 18,538 18,705
MURO EN BLOQUE Nº 5 E=0.23 M M2 61,420 62,306 61,249 61,653 61,809 61,342 61,575 61,358 61,435 62,104
MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 36,751 37,194 36,665 36,867 36,945 36,712 36,828 36,720 36,759 37,093
MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 72,876 73,603 72,735 73,067 73,195 72,812 73,003 72,825 72,888 73,437
MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 43,801 44,165 43,731 43,897 43,961 43,769 43,865 43,776 43,807 44,082
MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 152,374 155,476 151,776 153,191 153,735 152,102 152,918 152,157 152,429 154,768
MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 90,691 92,241 90,391 91,099 91,371 90,555 90,963 90,582 90,718 91,888
MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 74,010 75,080 73,804 74,291 74,479 73,916 74,198 73,935 74,029 74,836
MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 44,368 44,903 44,265 44,509 44,603 44,321 44,462 44,331 44,378 44,781
MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 39,181 40,173 38,990 39,442 39,616 39,094 39,355 39,112 39,199 39,947
MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 23,611 24,107 23,515 23,741 23,828 23,567 23,698 23,576 23,620 23,994
MURO TOLETE COMÚN 0.06 M M2 27,908 28,351 27,823 28,025 28,103 27,869 27,986 27,877 27,916 28,250
MURO TOLETE COMÚN 0.06 M (LINEAL) ML 16,876 17,098 16,833 16,934 16,973 16,857 16,915 16,860 16,880 17,047
MURO TOLETE COMÚN 0.12 M M2 42,619 43,505 42,448 42,852 43,008 42,541 42,774 42,557 42,635 43,303
MURO TOLETE COMÚN 0.12 M (LINEAL) ML 25,868 26,311 25,782 25,984 26,062 25,829 25,945 25,837 25,876 26,210
4.29
5
5.1
5.2
5.3
4.28
5.10
5.11
5.12
5.13
5.14
5.15
5.4
5.5
5.6
5.7
5.8
5.9
5.22
5.23
5.24
5.25
5.26
5.27
5.16
5.17
5.18
5.19
5.20
5.21
5.34
5.35
5.36
5.37
5.38
5.39
5.28
5.29
5.30
5.31
5.32
5.33
5.40
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNMURO TOLETE COMÚN 0.25 M M2 81,894 83,223 81,638 82,244 82,477 81,778 82,127 81,801 81,918 82,920
MURO TOLETE COMÚN 0.25 M (LINEAL) ML 49,422 50,087 49,294 49,597 49,713 49,364 49,539 49,375 49,434 49,935
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 59,651 60,537 59,480 59,884 60,040 59,573 59,807 59,589 59,667 60,335
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 35,748 36,191 35,662 35,864 35,942 35,709 35,826 35,717 35,756 36,090
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 126,980 130,081 126,382 127,796 128,340 126,708 127,524 126,763 127,035 129,374
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 76,448 77,998 76,148 76,856 77,128 76,312 76,720 76,339 76,475 77,645
REMATES LADRILLO PRENSADO ML 26,118 26,448 26,054 26,205 26,263 26,089 26,176 26,094 26,123 26,373
SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 30,280 31,049 30,131 30,482 30,617 30,212 30,415 30,226 30,293 30,874
SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 51,004 52,030 50,806 51,274 51,454 50,914 51,184 50,932 51,022 51,796
LAVADA DE FACHADA M2 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160
PASAMANOS EN CONCRETO 2500 PSI ML 40,999 42,387 40,731 41,364 41,608 40,878 41,243 40,902 41,024 42,071
DOVELA, GROUTING 3000 PSI ML 8,409 8,409 8,409 8,409 8,409 8,409 8,409 8,409 8,409 8,409
ANCLAJE 3/8" L=30CM UN 11,109 11,109 11,109 11,109 11,109 11,109 11,109 11,109 11,109 11,109
ANCLAJE 1/2" L=50CM UN 14,462 14,462 14,462 14,462 14,462 14,462 14,462 14,462 14,462 14,462
ANCLAJE 5/8" L=70CM UN 20,307 20,307 20,307 20,307 20,307 20,307 20,307 20,307 20,307 20,307
ANCLAJE 3/4" L=70CM UN 30,306 30,306 30,306 30,306 30,306 30,306 30,306 30,306 30,306 30,306
ANCLAJE 1" L= 70CM UN 4,248 4,632 4,174 4,349 4,417 4,214 4,315 4,221 4,255 4,545
PAÑETES, REVOQUES Y REPELLOS
ENTRAMADO MADERA CIELO RASO M2 12,858 12,858 12,858 12,858 12,858 12,858 12,858 12,858 12,858 12,858
FILOS O DILATACIONES B/PLACA ML 4,863 5,193 4,799 4,950 5,008 4,834 4,921 4,840 4,869 5,118
FILOS O DILATACIONES S/MURO ML 5,798 6,128 5,734 5,885 5,943 5,769 5,856 5,775 5,804 6,053
GOTERA EN MORTERO 1:4 ML 6,931 7,262 6,867 7,018 7,076 6,902 6,989 6,908 6,937 7,186
IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 5,555 5,555 5,555 5,555 5,555 5,555 5,555 5,555 5,555 5,555
MALLA BAJO ENTRAMADO M2 10,963 10,963 10,963 10,963 10,963 10,963 10,963 10,963 10,963 10,963
PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,822 20,571 19,677 20,019 20,150 19,756 19,953 19,769 19,835 20,400
PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,956 12,331 11,884 12,055 12,121 11,923 12,022 11,930 11,963 12,245
PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,961 18,891 17,782 18,206 18,369 17,880 18,124 17,896 17,977 18,679
PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,781 11,247 10,692 10,904 10,985 10,741 10,863 10,749 10,790 11,140
PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,754 17,503 16,609 16,951 17,082 16,688 16,885 16,701 16,767 17,332
PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,178 10,552 10,106 10,276 10,342 10,145 10,243 10,151 10,184 10,467
PAÑETE CULATAS 1:4, E=2 CM M2 17,961 18,891 17,782 18,206 18,369 17,880 18,124 17,896 17,977 18,679
PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,781 11,247 10,692 10,904 10,985 10,741 10,863 10,749 10,790 11,140
PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 17,810 18,344 17,707 17,950 18,044 17,763 17,904 17,773 17,819 18,222
PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,705 10,972 10,653 10,775 10,822 10,682 10,752 10,686 10,710 10,911
PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,853 15,562 14,717 15,040 15,164 14,791 14,978 14,804 14,866 15,401
PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 9,000 9,354 8,932 9,093 9,156 8,969 9,062 8,975 9,006 9,274
PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,934 14,504 13,824 14,084 14,184 13,884 14,034 13,894 13,944 14,374
PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,540 8,825 8,485 8,615 8,665 8,515 8,590 8,520 8,545 8,760
PAÑETE LISO PLACAS 1:4, E=2 CM M2 18,575 19,505 18,395 18,820 18,983 18,493 18,738 18,509 18,591 19,293
PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 11,072 11,538 10,983 11,195 11,276 11,032 11,154 11,040 11,081 11,431
PAÑETE LISO PLACAS 1:5, E=2 CM M2 17,367 18,116 17,223 17,565 17,696 17,302 17,499 17,315 17,381 17,945
PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,469 10,843 10,397 10,567 10,633 10,436 10,534 10,443 10,475 10,758
PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,415 14,985 14,305 14,565 14,665 14,365 14,515 14,375 14,425 14,855
5.46
5.47
5.48
5.49
5.50
5.51
5.41
5.42
5.43
5.44
5.45
6
6.1
6.2
6.3
6.4
5.52
5.53
5.54
5.55
5.56
5.57
6.11
6.12
6.13
6.14
6.15
6.16
6.5
6.6
6.7
6.8
6.9
6.10
6.23
6.24
6.25
6.17
6.18
6.19
6.20
6.21
6.22
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNPAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,767 9,052 8,712 8,842 8,892 8,742 8,817 8,747 8,772 8,987
PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 18,069 18,817 17,924 18,266 18,397 18,003 18,200 18,016 18,082 18,647
PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,138 11,513 11,066 11,237 11,302 11,105 11,204 11,112 11,145 11,427
CUBIERTAS
AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 23,029 24,358 22,773 23,379 23,612 22,912 23,262 22,936 23,052 24,055AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
(INCLUYE TELA IMPERMEABLE)M2 69,481 72,124 68,971 70,177 70,640 69,249 69,945 69,296 69,528 71,521
BAJANTE PVC (AMAZONAS, RAINGO) ML 45,276 45,276 45,276 45,276 45,276 45,276 45,276 45,276 45,276 45,276
BAJANTE PVC AGUAS LLUVIAS D=3" ML 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964
BAJANTE PVC AGUAS LLUVIAS D=4" ML 28,237 28,237 28,237 28,237 28,237 28,237 28,237 28,237 28,237 28,237
CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 66,231 66,231 66,231 66,231 66,231 66,231 66,231 66,231 66,231 66,231
CABALLETE FIJO TEJA FIBROCEMENTO ML 51,813 51,813 51,813 51,813 51,813 51,813 51,813 51,813 51,813 51,813
CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 30,041 30,041 30,041 30,041 30,041 30,041 30,041 30,041 30,041 30,041
CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 69,420 69,420 69,420 69,420 69,420 69,420 69,420 69,420 69,420 69,420
CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 82,938 82,938 82,938 82,938 82,938 82,938 82,938 82,938 82,938 82,938
CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 121,991 121,991 121,991 121,991 121,991 121,991 121,991 121,991 121,991 121,991
CABALLETE CUBIERTA TERMOACÚSTICA ML 48,026 48,026 48,026 48,026 48,026 48,026 48,026 48,026 48,026 48,026
CANAL PVC AMAZONAS ML 66,637 66,637 66,637 66,637 66,637 66,637 66,637 66,637 66,637 66,637
CANAL PVC RAINGO ML 60,540 60,540 60,540 60,540 60,540 60,540 60,540 60,540 60,540 60,540
TEJA CANALETA 43 FIBROCEMENTO L=6M M2 107,852 107,852 107,852 107,852 107,852 107,852 107,852 107,852 107,852 107,852
TEJA CANALETA 90 FIBROCEMENTO L=6M M2 63,041 63,041 63,041 63,041 63,041 63,041 63,041 63,041 63,041 63,041
TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 46,263 46,263 46,263 46,263 46,263 46,263 46,263 46,263 46,263 46,263
CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 26,171 26,171 26,171 26,171 26,171 26,171 26,171 26,171 26,171 26,171
TEJA DE BARRO M2 49,510 51,163 49,191 49,945 50,235 49,365 49,800 49,394 49,539 50,786
TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 38,573 38,573 38,573 38,573 38,573 38,573 38,573 38,573 38,573 38,573
TEJA EN LÁMINA GALVANIZADA CAL 26 M2 35,350 35,350 35,350 35,350 35,350 35,350 35,350 35,350 35,350 35,350
TEJA FIBROCEMENTO Nº4 M2 29,691 29,691 29,691 29,691 29,691 29,691 29,691 29,691 29,691 29,691
TEJA FIBROCEMENTO No. 6 M2 29,082 29,082 29,082 29,082 29,082 29,082 29,082 29,082 29,082 29,082
TEJA FIBROCEMENTO No. 8 M2 29,303 29,303 29,303 29,303 29,303 29,303 29,303 29,303 29,303 29,303
TEJA TERMOACÚSTICA M2 41,351 41,351 41,351 41,351 41,351 41,351 41,351 41,351 41,351 41,351
TEJA PLÁSTICA No.6 M2 36,330 36,330 36,330 36,330 36,330 36,330 36,330 36,330 36,330 36,330
TEJA ESPAÑOLA ETERNIT M2 66,632 66,632 66,632 66,632 66,632 66,632 66,632 66,632 66,632 66,632
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 123,219 123,219 123,219 123,219 123,219 123,219 123,219 123,219 123,219 123,219
TEJA SIN TRASLAPO M2 55,326 55,326 55,326 55,326 55,326 55,326 55,326 55,326 55,326 55,326
ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 34,373 34,373 34,373 34,373 34,373 34,373 34,373 34,373 34,373 34,373
ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 26,985 26,985 26,985 26,985 26,985 26,985 26,985 26,985 26,985 26,985ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
ESTRUCTURAL ABIERTO 4"x2", 15 MM)M2 47,272 47,272 47,272 47,272 47,272 47,272 47,272 47,272 47,272 47,272
FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 16,144 16,144 16,144 16,144 16,144 16,144 16,144 16,144 16,144 16,144
FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 19,467 19,467 19,467 19,467 19,467 19,467 19,467 19,467 19,467 19,467
MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 21,127 21,127 21,127 21,127 21,127 21,127 21,127 21,127 21,127 21,127
MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 27,262 27,262 27,262 27,262 27,262 27,262 27,262 27,262 27,262 27,262
BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 17,942 17,942 17,942 17,942 17,942 17,942 17,942 17,942 17,942 17,942
6.26
6.27
6.28
7.5
7.6
7.7
7.8
7.9
7.10
7
7.1
7.2
7.3
7.4
7.17
7.18
7.19
7.20
7.21
7.22
7.11
7.12
7.13
7.14
7.15
7.16
7.29
7.30
7.31
7.32
7.33
7.34
7.23
7.24
7.25
7.26
7.27
7.28
7.35
7.36
7.37
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 42,270 42,270 42,270 42,270 42,270 42,270 42,270 42,270 42,270 42,270
DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 292,371 292,371 292,371 292,371 292,371 292,371 292,371 292,371 292,371 292,371
CUBIERTA EN POLICARBONATO ALVEOLAR M2 330,966 330,966 330,966 330,966 330,966 330,966 330,966 330,966 330,966 330,966
CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 221,326 221,326 221,326 221,326 221,326 221,326 221,326 221,326 221,326 221,326
CORTASOL CELOSIA C-23 EN ALUZINC M2 236,724 236,724 236,724 236,724 236,724 236,724 236,724 236,724 236,724 236,724
MORTEROS Y CONCRETOS
CONCRETO 4000 PSI M3 414,904 469,232 404,420 429,201 438,732 410,138 424,435 411,091 415,857 456,841
CONCRETO 3500 PSI M3 362,114 412,092 352,470 375,266 384,034 357,730 370,882 358,607 362,991 400,694
CONCRETO 3000 PSI M3 359,124 410,611 349,188 372,673 381,706 354,607 368,157 355,511 360,027 398,868
CONCRETO 2500 PSI M3 320,327 373,186 310,126 334,237 343,511 315,690 329,600 316,617 321,254 361,130
CONCRETO 2000 PSI M3 299,043 353,076 288,616 313,262 322,741 294,303 308,522 295,251 299,991 340,752
CONCRETO 1500 PSI M3 271,943 327,176 261,284 286,478 296,168 267,098 281,633 268,067 272,912 314,579
MORTERO SECO 1:10 M3 231,052 276,675 222,247 243,058 251,062 227,050 239,056 227,850 231,852 266,269
MORTERO 1:4 ARENA LAVADA DE PEÑA M3 417,002 461,303 408,453 428,660 436,432 413,116 424,774 413,893 417,779 451,199
MORTERO 1:5 ARENA LAVADA DE PEÑA M3 359,513 395,167 352,633 368,896 375,151 356,386 365,768 357,011 360,139 387,035
MORTERO 1:3 ARENA LAVADA DE PEÑA M3 416,066 449,411 409,631 424,841 430,691 413,141 421,916 413,726 416,651 441,806
MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 601,786 635,131 595,351 610,561 616,411 598,861 607,636 599,446 602,371 627,526
CARPINTERÍA EN MADERA
BARANDA EN MADERA CEDRO MACHO ML 100,491 100,491 100,491 100,491 100,491 100,491 100,491 100,491 100,491 100,491
CHAZOS PARA CARPINTERÍA EN MADERA UN 3,410 3,740 3,346 3,497 3,555 3,381 3,468 3,386 3,415 3,665
DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 112,267 112,267 112,267 112,267 112,267 112,267 112,267 112,267 112,267 112,267
DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 137,691 137,691 137,691 137,691 137,691 137,691 137,691 137,691 137,691 137,691
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 200,941 200,941 200,941 200,941 200,941 200,941 200,941 200,941 200,941 200,941
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 223,700 223,700 223,700 223,700 223,700 223,700 223,700 223,700 223,700 223,700
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 246,486 246,486 246,486 246,486 246,486 246,486 246,486 246,486 246,486 246,486
HOJA PUERTA FORTEC 0.81 UN 163,805 163,805 163,805 163,805 163,805 163,805 163,805 163,805 163,805 163,805
HOJA PUERTA FORTEC 0.91 UN 185,738 185,738 185,738 185,738 185,738 185,738 185,738 185,738 185,738 185,738
HOJA PUERTA FORTEC 1.50 UN 273,468 273,468 273,468 273,468 273,468 273,468 273,468 273,468 273,468 273,468
HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 103,490 103,490 103,490 103,490 103,490 103,490 103,490 103,490 103,490 103,490
HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 137,486 137,486 137,486 137,486 137,486 137,486 137,486 137,486 137,486 137,486
HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 152,839 152,839 152,839 152,839 152,839 152,839 152,839 152,839 152,839 152,839
HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 389,712 389,712 389,712 389,712 389,712 389,712 389,712 389,712 389,712 389,712
PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 34,274 34,274 34,274 34,274 34,274 34,274 34,274 34,274 34,274 34,274
PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 21,239 21,239 21,239 21,239 21,239 21,239 21,239 21,239 21,239 21,239
VENTANERÍA EN MADERA CEDRO MACHO M2 81,013 81,013 81,013 81,013 81,013 81,013 81,013 81,013 81,013 81,013
CERRADURA DE ENTRADA PRINCIPAL UN 99,622 99,622 99,622 99,622 99,622 99,622 99,622 99,622 99,622 99,622
SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 77,360 77,360 77,360 77,360 77,360 77,360 77,360 77,360 77,360 77,360
SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 23,888 23,888 23,888 23,888 23,888 23,888 23,888 23,888 23,888 23,888
SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 23,888 23,888 23,888 23,888 23,888 23,888 23,888 23,888 23,888 23,888
SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 22,638 22,638 22,638 22,638 22,638 22,638 22,638 22,638 22,638 22,638
ESPEJO INCOLORO 3 MM SIN BISELAR M2 34,585 34,585 34,585 34,585 34,585 34,585 34,585 34,585 34,585 34,585
ESPEJO BISELADO INCOLORO 4 MM M2 42,892 42,892 42,892 42,892 42,892 42,892 42,892 42,892 42,892 42,892
7.41
7.42
8
8.1
8.2
7.38
7.39
7.40
8.9
8.10
8.11
9
9.1
8.3
8.4
8.5
8.6
8.7
8.8
9.8
9.9
9.10
9.11
9.12
9.13
9.2
9.3
9.4
9.5
9.6
9.7
9.20
9.21
9.22
9.23
9.24
9.14
9.15
9.16
9.17
9.18
9.19
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNVIDRIO ESMERILADO INCOLORO 4 MM M2 51,753 51,753 51,753 51,753 51,753 51,753 51,753 51,753 51,753 51,753
VIDRIO ESMERILADO INCOLORO 5 MM M2 62,275 62,275 62,275 62,275 62,275 62,275 62,275 62,275 62,275 62,275
VIDRIO TEMPLADO PULIDO 10 MM M2 294,082 294,082 294,082 294,082 294,082 294,082 294,082 294,082 294,082 294,082
VIDRIO TEMPLADO PULIDO 8 MM M2 205,473 205,473 205,473 205,473 205,473 205,473 205,473 205,473 205,473 205,473
VIDRIO TRANSPARENTE 3 MM M2 27,386 27,386 27,386 27,386 27,386 27,386 27,386 27,386 27,386 27,386
VIDRIO TRANSPARENTE 4 MM M2 35,140 35,140 35,140 35,140 35,140 35,140 35,140 35,140 35,140 35,140
VIDRIO TRANSPARENTE 5 MM M2 42,892 42,892 42,892 42,892 42,892 42,892 42,892 42,892 42,892 42,892
VIDRIO TRANSPARENTE 6 MM M2 53,968 53,968 53,968 53,968 53,968 53,968 53,968 53,968 53,968 53,968
CARPINTERÍA METÁLICA
CAJA CONTADOR DE AGUA UN 62,015 62,015 62,015 62,015 62,015 62,015 62,015 62,015 62,015 62,015
CELOSÍA ALUMINIO 100CM X 60 CM M2 173,394 173,394 173,394 173,394 173,394 173,394 173,394 173,394 173,394 173,394ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
(INCLUYE ANTICORROSIVO)ML 65,522 65,522 65,522 65,522 65,522 65,522 65,522 65,522 65,522 65,522
MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 116,796 116,796 116,796 116,796 116,796 116,796 116,796 116,796 116,796 116,796
MARCO TAPA CAJA DE INSPECCIÓN UN 109,987 109,987 109,987 109,987 109,987 109,987 109,987 109,987 109,987 109,987
MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 72,998 72,998 72,998 72,998 72,998 72,998 72,998 72,998 72,998 72,998
PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 172,288 172,288 172,288 172,288 172,288 172,288 172,288 172,288 172,288 172,288
PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 89,600 89,600 89,600 89,600 89,600 89,600 89,600 89,600 89,600 89,600
CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 5,367 5,367 5,367 5,367 5,367 5,367 5,367 5,367 5,367 5,367CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
TUBO ESTRUCTURAL GALVANIZADO 2")M2 80,436 80,436 80,436 80,436 80,436 80,436 80,436 80,436 80,436 80,436
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 33,135 33,135 33,135 33,135 33,135 33,135 33,135 33,135 33,135 33,135
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 442,491 442,491 442,491 442,491 442,491 442,491 442,491 442,491 442,491 442,491
DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 158,840 158,840 158,840 158,840 158,840 158,840 158,840 158,840 158,840 158,840
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
ELECTROSTÁTICAM2 177,708 177,708 177,708 177,708 177,708 177,708 177,708 177,708 177,708 177,708
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
PUERTAS Y ACCESORIOS)M2 403,124 403,124 403,124 403,124 403,124 403,124 403,124 403,124 403,124 403,124
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 103,996 103,996 103,996 103,996 103,996 103,996 103,996 103,996 103,996 103,996
PUERTA CORTINA INCLUYE ESMALTE M2 322,858 322,858 322,858 322,858 322,858 322,858 322,858 322,858 322,858 322,858
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,908 4,908 4,908 4,908 4,908 4,908 4,908 4,908 4,908 4,908
VENTANA EN ALUMINIO CORREDIZA M2 226,697 226,697 226,697 226,697 226,697 226,697 226,697 226,697 226,697 226,697
VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 99,111 99,111 99,111 99,111 99,111 99,111 99,111 99,111 99,111 99,111
REJILLA PISO 0.30 M M2 68,804 68,804 68,804 68,804 68,804 68,804 68,804 68,804 68,804 68,804
TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 72,521 72,521 72,521 72,521 72,521 72,521 72,521 72,521 72,521 72,521CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
KG 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590
9.25
9.32
10
10.1
10.2
10.3
9.26
9.27
9.28
9.29
9.30
9.31
10.10
10.11
10.12
10.13
10.14
10.15
10.4
10.5
10.6
10.7
10.8
10.9
10.22
10.23
10.16
10.17
10.18
10.19
10.20
10.21
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
KG 9,541 9,541 9,541 9,541 9,541 9,541 9,541 9,541 9,541 9,541
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE
KG 7,566 7,566 7,566 7,566 7,566 7,566 7,566 7,566 7,566 7,566
INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO
ACOMETIDA EN PVC 1/2" 5M UN 179,079 179,079 179,079 179,079 179,079 179,079 179,079 179,079 179,079 179,079
ACOMETIDA EN PVC 3/4" 5M UN 216,501 216,501 216,501 216,501 216,501 216,501 216,501 216,501 216,501 216,501
BAJANTE AGUAS LLUVIAS PVC 3" ML 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964
BAJANTE AGUAS LLUVIAS PVC 4" ML 28,237 28,237 28,237 28,237 28,237 28,237 28,237 28,237 28,237 28,237
BAJANTE AGUAS RESIDUALES PVC 3" ML 27,033 27,033 27,033 27,033 27,033 27,033 27,033 27,033 27,033 27,033
BAJANTE AGUAS RESIDUALES PVC 4" ML 34,711 34,711 34,711 34,711 34,711 34,711 34,711 34,711 34,711 34,711
BAJANTE AGUAS RESIDUALES PVC 6" ML 71,716 71,716 71,716 71,716 71,716 71,716 71,716 71,716 71,716 71,716
CONEXIÓN TANQUE ELEVADO PVC UN 180,199 180,199 180,199 180,199 180,199 180,199 180,199 180,199 180,199 180,199
INSTALACIÓN APARATO SANITARIO UN 34,959 34,959 34,959 34,959 34,959 34,959 34,959 34,959 34,959 34,959
INSTALACIÓN BOMBAS AGUA UN 485,978 485,978 485,978 485,978 485,978 485,978 485,978 485,978 485,978 485,978
INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543
LLAVE MANGUERA UN 28,375 28,375 28,375 28,375 28,375 28,375 28,375 28,375 28,375 28,375
NIPLE PASAMURO 2" UN 53,757 53,757 53,757 53,757 53,757 53,757 53,757 53,757 53,757 53,757
NIPLE PASAMURO 4" UN 80,400 80,400 80,400 80,400 80,400 80,400 80,400 80,400 80,400 80,400
PUNTO AGUA CALIENTE CPVC UN 68,065 68,065 68,065 68,065 68,065 68,065 68,065 68,065 68,065 68,065
PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 49,380 49,380 49,380 49,380 49,380 49,380 49,380 49,380 49,380 49,380
PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 52,590 52,590 52,590 52,590 52,590 52,590 52,590 52,590 52,590 52,590
PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 66,468 66,468 66,468 66,468 66,468 66,468 66,468 66,468 66,468 66,468
SALIDA SANITARIA PVC-S/PARAL 2" UN 53,748 53,748 53,748 53,748 53,748 53,748 53,748 53,748 53,748 53,748
SALIDA SANITARIA PVC-S/PARAL 3" UN 67,448 67,448 67,448 67,448 67,448 67,448 67,448 67,448 67,448 67,448
SALIDA SANITARIA PVC-S/PARAL 4" UN 72,195 72,195 72,195 72,195 72,195 72,195 72,195 72,195 72,195 72,195
SALIDA SANITARIA PVC-S/SIFON 3" UN 60,066 60,066 60,066 60,066 60,066 60,066 60,066 60,066 60,066 60,066
RED SUMINISTRO CPVC 1/2" ML 10,157 10,157 10,157 10,157 10,157 10,157 10,157 10,157 10,157 10,157
RED SUMINISTRO CPVC 3/4" ML 14,339 14,339 14,339 14,339 14,339 14,339 14,339 14,339 14,339 14,339
RED SUMINISTRO PVC 1 1/2" ML 18,713 18,713 18,713 18,713 18,713 18,713 18,713 18,713 18,713 18,713
RED SUMINISTRO PVC 1" ML 11,535 11,535 11,535 11,535 11,535 11,535 11,535 11,535 11,535 11,535
RED SUMINISTRO PVC 1/2" ML 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875
RED SUMINISTRO PVC 2 1/2" ML 41,779 41,779 41,779 41,779 41,779 41,779 41,779 41,779 41,779 41,779
RED SUMINISTRO PVC 2" ML 26,695 26,695 26,695 26,695 26,695 26,695 26,695 26,695 26,695 26,695
RED SUMINISTRO PVC 3/4" ML 8,621 8,621 8,621 8,621 8,621 8,621 8,621 8,621 8,621 8,621
RED SANITARIA PVC-S 2" ML 20,585 20,585 20,585 20,585 20,585 20,585 20,585 20,585 20,585 20,585
RED SANITARIA PVC-S 3" ML 28,588 28,588 28,588 28,588 28,588 28,588 28,588 28,588 28,588 28,588
RED SANITARIA PVC-S 4" ML 38,815 38,815 38,815 38,815 38,815 38,815 38,815 38,815 38,815 38,815
RED SANITARIA PVC-S 6" ML 72,763 72,763 72,763 72,763 72,763 72,763 72,763 72,763 72,763 72,763
10.24
10.25
11
11.7
11.8
11.9
11.10
11.11
11.12
11.1
11.2
11.3
11.4
11.5
11.6
11.19
11.20
11.21
11.22
11.23
11.24
11.13
11.14
11.15
11.16
11.17
11.18
11.31
11.32
11.33
11.34
11.25
11.26
11.27
11.28
11.29
11.30
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNREGISTRO 1" UN 88,180 88,180 88,180 88,180 88,180 88,180 88,180 88,180 88,180 88,180
REGISTRO 1/2" UN 49,127 49,127 49,127 49,127 49,127 49,127 49,127 49,127 49,127 49,127
REGISTRO 3/4" UN 62,638 62,638 62,638 62,638 62,638 62,638 62,638 62,638 62,638 62,638
REGISTRO 1 1/2" UN 151,566 151,566 151,566 151,566 151,566 151,566 151,566 151,566 151,566 151,566
REGISTRO 2 1/2" UN 312,967 312,967 312,967 312,967 312,967 312,967 312,967 312,967 312,967 312,967
REGISTRO 2" UN 231,066 231,066 231,066 231,066 231,066 231,066 231,066 231,066 231,066 231,066
REVENTILACIÓN 2" ML 14,330 14,330 14,330 14,330 14,330 14,330 14,330 14,330 14,330 14,330
REVENTILACIÓN 3" ML 18,094 18,094 18,094 18,094 18,094 18,094 18,094 18,094 18,094 18,094
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
INSTALACIÓN)UN 140,781 140,781 140,781 140,781 140,781 140,781 140,781 140,781 140,781 140,781
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
ISNTALACIÓN)UN 229,527 229,527 229,527 229,527 229,527 229,527 229,527 229,527 229,527 229,527
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
INSTALACIÓN)UN 382,234 382,234 382,234 382,234 382,234 382,234 382,234 382,234 382,234 382,234
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 33,315 33,315 33,315 33,315 33,315 33,315 33,315 33,315 33,315 33,315
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS
Y SOPORTES)ML 39,254 39,254 39,254 39,254 39,254 39,254 39,254 39,254 39,254 39,254
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 50,434 50,434 50,434 50,434 50,434 50,434 50,434 50,434 50,434 50,434
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 57,191 57,191 57,191 57,191 57,191 57,191 57,191 57,191 57,191 57,191
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
ACCESORIOS Y SOPORTES)ML 73,587 73,587 73,587 73,587 73,587 73,587 73,587 73,587 73,587 73,587
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 85,633 85,633 85,633 85,633 85,633 85,633 85,633 85,633 85,633 85,633
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 126,122 126,122 126,122 126,122 126,122 126,122 126,122 126,122 126,122 126,122
PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 50,652 50,652 50,652 50,652 50,652 50,652 50,652 50,652 50,652 50,652
PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 50,859 50,859 50,859 50,859 50,859 50,859 50,859 50,859 50,859 50,859
ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 33,101 33,101 33,101 33,101 33,101 33,101 33,101 33,101 33,101 33,101
ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 40,733 40,733 40,733 40,733 40,733 40,733 40,733 40,733 40,733 40,733
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
2"ML 3,478 3,478 3,478 3,478 3,478 3,478 3,478 3,478 3,478 3,478
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A
2"ML 5,456 5,456 5,456 5,456 5,456 5,456 5,456 5,456 5,456 5,456
GABINETE TIPO III UN 842,071 842,071 842,071 842,071 842,071 842,071 842,071 842,071 842,071 842,071
GABINETE TIPO I UN 644,896 644,896 644,896 644,896 644,896 644,896 644,896 644,896 644,896 644,896
SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 2,142,666 2,142,666 2,142,666 2,142,666 2,142,666 2,142,666 2,142,666 2,142,666 2,142,666 2,142,666
SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,785,970 1,785,970 1,785,970 1,785,970 1,785,970 1,785,970 1,785,970 1,785,970 1,785,970 1,785,970
VÁLVULA MARIPOSA 3" UN 518,849 518,849 518,849 518,849 518,849 518,849 518,849 518,849 518,849 518,849
VÁLVULA MARIPOSA 4" UN 671,500 671,500 671,500 671,500 671,500 671,500 671,500 671,500 671,500 671,500
VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 258,681 258,681 258,681 258,681 258,681 258,681 258,681 258,681 258,681 258,681
11.35
11.36
11.43
11.44
11.45
11.46
11.47
11.48
11.37
11.38
11.39
11.40
11.41
11.42
11.55
11.56
11.57
11.58
11.59
11.60
11.49
11.50
11.51
11.52
11.53
11.54
11.61
11.62
11.63
11.64
11.65
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNINSTALACIONES ELÉCTRICAS
ACOMETIDA AÉREA 10 M. PVC UN 297,551 297,551 297,551 297,551 297,551 297,551 297,551 297,551 297,551 297,551
SALIDA LÁMPARA TOMA PVC COMPLETA UN 47,283 47,283 47,283 47,283 47,283 47,283 47,283 47,283 47,283 47,283
SALIDA LÁMPARA TOMA EMT COMPLETA UN 56,014 56,014 56,014 56,014 56,014 56,014 56,014 56,014 56,014 56,014
SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 62,144 62,144 62,144 62,144 62,144 62,144 62,144 62,144 62,144 62,144
SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 73,244 73,244 73,244 73,244 73,244 73,244 73,244 73,244 73,244 73,244
SALIDA TELÉFONO PVC COMPLETA UN 44,429 44,429 44,429 44,429 44,429 44,429 44,429 44,429 44,429 44,429
SALIDA TIMBRE PVC COMPLETA UN 50,666 50,666 50,666 50,666 50,666 50,666 50,666 50,666 50,666 50,666
STRIP TELEFÓNICO 10 PARES UN 116,686 116,686 116,686 116,686 116,686 116,686 116,686 116,686 116,686 116,686
SALIDA TOMA DOBLE PVC COMPLETA UN 45,638 45,638 45,638 45,638 45,638 45,638 45,638 45,638 45,638 45,638
SALIDA TRIFÁSICA PVC COMPLETA UN 104,941 104,941 104,941 104,941 104,941 104,941 104,941 104,941 104,941 104,941
SALIDA T.V PVC COMPLETA. UN 62,717 62,717 62,717 62,717 62,717 62,717 62,717 62,717 62,717 62,717
SALIDA BIFÁSICA C.N. UN 37,194 37,194 37,194 37,194 37,194 37,194 37,194 37,194 37,194 37,194
TABLERO PARCIAL 4 CIRCUITOS UN 78,272 78,272 78,272 78,272 78,272 78,272 78,272 78,272 78,272 78,272
TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 334,088 334,088 334,088 334,088 334,088 334,088 334,088 334,088 334,088 334,088
TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 445,252 445,252 445,252 445,252 445,252 445,252 445,252 445,252 445,252 445,252
TUBERÍA PVC CONDUIT 1/2" ML 2,884 2,884 2,884 2,884 2,884 2,884 2,884 2,884 2,884 2,884
TUBERÍA PVC CONDUIT 3/4" ML 3,806 3,806 3,806 3,806 3,806 3,806 3,806 3,806 3,806 3,806
TUBERÍA PVC CONDUIT 1" ML 5,927 5,927 5,927 5,927 5,927 5,927 5,927 5,927 5,927 5,927
TUBERÍA PVC CONDUIT 1 1/2" ML 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598
LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 222,813 222,813 222,813 222,813 222,813 222,813 222,813 222,813 222,813 222,813
LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 62,866 62,866 62,866 62,866 62,866 62,866 62,866 62,866 62,866 62,866
LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 85,257 85,257 85,257 85,257 85,257 85,257 85,257 85,257 85,257 85,257
LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 34,538 34,538 34,538 34,538 34,538 34,538 34,538 34,538 34,538 34,538
POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,140,840 1,140,840 1,140,840 1,140,840 1,140,840 1,140,840 1,140,840 1,140,840 1,140,840 1,140,840
POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 845,529 845,529 845,529 845,529 845,529 845,529 845,529 845,529 845,529 845,529
POSTE METÁLICO 6M UN 1,064,325 1,064,325 1,064,325 1,064,325 1,064,325 1,064,325 1,064,325 1,064,325 1,064,325 1,064,325
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 494,419 494,419 494,419 494,419 494,419 494,419 494,419 494,419 494,419 494,419
APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 89,935 89,935 89,935 89,935 89,935 89,935 89,935 89,935 89,935 89,935
LUMINARIA 70W SODIO UN 414,919 414,919 414,919 414,919 414,919 414,919 414,919 414,919 414,919 414,919
LUMINARIA 150W SODIO UN 519,238 519,238 519,238 519,238 519,238 519,238 519,238 519,238 519,238 519,238
REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,372,318 1,372,318 1,372,318 1,372,318 1,372,318 1,372,318 1,372,318 1,372,318 1,372,318 1,372,318
REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1,010,426 1,010,426 1,010,426 1,010,426 1,010,426 1,010,426 1,010,426 1,010,426 1,010,426 1,010,426
PISOS BASES
ALISTADO ENDURECIDO 1:3, E=0.04 M2 33,420 34,703 33,173 33,758 33,983 33,308 33,645 33,330 33,443 34,410
ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 33,331 34,613 33,083 33,668 33,893 33,218 33,556 33,241 33,353 34,321
ALISTADO PARA LISTÓN M2 11,931 12,187 11,881 11,998 12,043 11,908 11,976 11,913 11,935 12,129
ALISTADO PISOS 1:3, E=0.04 M2 23,951 26,516 23,456 24,626 25,076 23,726 24,401 23,771 23,996 25,931
ALISTADO TERRAZAS 1:3, E= 0.08 M2 71,893 74,458 71,398 72,568 73,018 71,668 72,343 71,713 71,938 73,873
CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 22,010 23,091 21,802 22,295 22,484 21,915 22,200 21,934 22,029 22,844
CONCRETO BASE GRADAS 2500 PSI M2 50,044 55,330 49,024 51,435 52,363 49,581 50,972 49,673 50,137 54,125
CONCRETO ESTRIADO RAMPAS 2500 PSI M2 70,271 78,728 68,639 72,496 73,980 69,529 71,755 69,677 70,419 76,799
12
12.1
12.2
12.3
12.4
12.5
12.12
12.13
12.14
12.15
12.16
12.17
12.6
12.7
12.8
12.9
12.10
12.11
12.24
12.25
12.26
12.27
12.28
12.29
12.18
12.19
12.20
12.21
12.22
12.23
13.2
13.3
13.4
13.5
13.6
13.7
12.30
12.31
12.32
13
13.1
13.8
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNMANTO FIBERGLASS 600X1 M2 24,838 24,838 24,838 24,838 24,838 24,838 24,838 24,838 24,838 24,838
PEGANTE MORTERO-CONCRETO M2 18,718 18,718 18,718 18,718 18,718 18,718 18,718 18,718 18,718 18,718
PERMA PLY 2 CAPAS M2 21,856 21,856 21,856 21,856 21,856 21,856 21,856 21,856 21,856 21,856
PLACA BASE CONCRETO 0.08 2500 PSI M2 41,064 45,821 40,146 42,316 43,150 40,647 41,898 40,730 41,147 44,736
PLACA BASE CONCRETO 0.10 2500 PSI M2 48,292 54,106 47,170 49,822 50,842 47,782 49,312 47,884 48,394 52,780
PLACA BASE CONCRETO 0.15 2500 PSI M2 70,442 79,428 68,708 72,807 74,384 69,654 72,019 69,812 70,600 77,379
TRITURADO FINO 1/2 M3 90,115 127,572 82,887 99,972 106,544 86,830 96,687 87,487 90,772 119,029
TRITURADO GRUESO 3/4 M3 91,033 135,577 86,731 109,563 110,905 93,745 106,305 93,123 89,615 126,151
PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 47,117 47,630 47,018 47,252 47,342 47,072 47,207 47,081 47,126 47,513
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 28,033 28,289 27,983 28,100 28,145 28,010 28,078 28,015 28,037 28,231
ADOQUÍN CONCRETO 6CM M2 53,381 54,664 53,134 53,719 53,944 53,269 53,606 53,291 53,404 54,371
ADOQUÍN CONCRETO 8CM M2 56,131 57,414 55,884 56,469 56,694 56,019 56,356 56,041 56,154 57,121
ADOQUÍN GRES PEATONAL M2 59,619 60,902 59,372 59,957 60,182 59,507 59,844 59,529 59,642 60,609BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
BLANCO. INCLUYE ALISTADOM2 62,188 62,701 62,089 62,323 62,413 62,143 62,278 62,152 62,197 62,584
GRAVILLA PARA GRADAS ML 30,121 30,748 30,000 30,286 30,396 30,066 30,231 30,077 30,132 30,605
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 135,777 138,085 135,331 136,384 136,789 135,574 136,182 135,615 135,817 137,559
ACABADO EN GRAVILLA LAVADA M2 37,948 39,458 37,656 38,345 38,610 37,815 38,213 37,842 37,974 39,114
GUARDAESCOBA EN GRANITO ML 35,513 35,513 35,513 35,513 35,513 35,513 35,513 35,513 35,513 35,513
GUARDAESCOBA EN GRAVILLA ML 8,340 8,967 8,219 8,505 8,615 8,285 8,450 8,296 8,351 8,824
GUARDAESCOBA PVC CARAMELO ML 7,756 7,756 7,756 7,756 7,756 7,756 7,756 7,756 7,756 7,756
GUARDAESCOBA PVC CEDRO ML 10,412 10,412 10,412 10,412 10,412 10,412 10,412 10,412 10,412 10,412
GUARDAESCOBA PINO CARIBE ML 8,589 8,589 8,589 8,589 8,589 8,589 8,589 8,589 8,589 8,589
GUARDAESCOBA CEDRO BLANCO ML 14,461 14,461 14,461 14,461 14,461 14,461 14,461 14,461 14,461 14,461
GUARDAESCOBA EN MADERA SAPAN ML 28,279 28,279 28,279 28,279 28,279 28,279 28,279 28,279 28,279 28,279
GUARDAESCOBA GRES Y CERÁMICA ML 7,460 7,460 7,460 7,460 7,460 7,460 7,460 7,460 7,460 7,460
LISTÓN M.H. AMARILLO M2 60,832 60,832 60,832 60,832 60,832 60,832 60,832 60,832 60,832 60,832
PASO ESCALERA GRANITO ML 97,426 99,222 97,080 97,899 98,214 97,269 97,741 97,300 97,458 98,812
PIRLANES ALUMINIO ML 6,057 6,057 6,057 6,057 6,057 6,057 6,057 6,057 6,057 6,057
PIRLANES LADRILLO ML 26,515 27,176 26,387 26,689 26,805 26,457 26,631 26,468 26,526 27,025
PISO VINILO TRÁFICO RESIDENCIAL M2 37,719 37,719 37,719 37,719 37,719 37,719 37,719 37,719 37,719 37,719
PISO VINILO TRÁFICO PESADO M2 43,886 43,886 43,886 43,886 43,886 43,886 43,886 43,886 43,886 43,886
PULIDA LACADA PISO MADERA M2 40,116 40,116 40,116 40,116 40,116 40,116 40,116 40,116 40,116 40,116
TABLETA DE GRES 25X25 M2 40,905 41,418 40,806 41,040 41,130 40,860 40,995 40,869 40,914 41,301
TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 45,920 46,433 45,821 46,055 46,145 45,875 46,010 45,884 45,929 46,316
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,888 8,888 8,888 8,888 8,888 8,888 8,888 8,888 8,888 8,888
ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 41,452 42,443 41,260 41,713 41,887 41,365 41,626 41,382 41,469 42,217
JABONERA PORCELANA ACUARIO UN 16,928 16,928 16,928 16,928 16,928 16,928 16,928 16,928 16,928 16,928JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
JABONERA,CEPILLERA Y PERCHA SIMPLE)UN 101,502 101,502 101,502 101,502 101,502 101,502 101,502 101,502 101,502 101,502
REJILLA PLÁSTICA SOSCO 3X2 UN 8,051 8,051 8,051 8,051 8,051 8,051 8,051 8,051 8,051 8,051
13.14
13.15
13.16
14
14.1
13.9
13.10
13.11
13.12
13.13
14.8
14.9
14.10
14.11
14.12
14.13
14.2
14.3
14.4
14.5
14.6
14.7
14.20
14.21
14.22
14.23
14.24
14.25
14.14
14.15
14.16
14.17
14.18
14.19
14.26
14.27
14.28
14.29
14.30
14.31
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNREJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 18,486 18,486 18,486 18,486 18,486 18,486 18,486 18,486 18,486 18,486
REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 11,792 11,792 11,792 11,792 11,792 11,792 11,792 11,792 11,792 11,792
REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 11,452 11,452 11,452 11,452 11,452 11,452 11,452 11,452 11,452 11,452
REMATES BOCEL ALUMINIO ML 6,902 6,902 6,902 6,902 6,902 6,902 6,902 6,902 6,902 6,902
REMATES BOCEL PORCELANA ML 7,027 7,027 7,027 7,027 7,027 7,027 7,027 7,027 7,027 7,027
TAPA REGISTRO 20X20 UN 15,618 15,618 15,618 15,618 15,618 15,618 15,618 15,618 15,618 15,618
TAPA REGISTRO 6X6 UN 14,221 14,221 14,221 14,221 14,221 14,221 14,221 14,221 14,221 14,221
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 15,463 15,463 15,463 15,463 15,463 15,463 15,463 15,463 15,463 15,463
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
FUNDIDO EN SITIOM2 17,875 17,875 17,875 17,875 17,875 17,875 17,875 17,875 17,875 17,875
CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 54,004 54,517 53,905 54,139 54,229 53,959 54,094 53,968 54,013 54,400
MEDIA CAÑA EN GRANITO ML 63,997 63,997 63,997 63,997 63,997 63,997 63,997 63,997 63,997 63,997
PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 27,425 27,425 27,425 27,425 27,425 27,425 27,425 27,425 27,425 27,425
PINTURA ACRÍLICA PARA PISOS M2 10,846 10,846 10,846 10,846 10,846 10,846 10,846 10,846 10,846 10,846
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 84,173 84,173 84,173 84,173 84,173 84,173 84,173 84,173 84,173 84,173
GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 101,717 101,717 101,717 101,717 101,717 101,717 101,717 101,717 101,717 101,717
CIELO RASO
APLIQUE YESO ML 60,059 60,059 60,059 60,059 60,059 60,059 60,059 60,059 60,059 60,059
ARMADURA MADERA Y MALLA M2 29,069 29,069 29,069 29,069 29,069 29,069 29,069 29,069 29,069 29,069
CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 45,307 45,307 45,307 45,307 45,307 45,307 45,307 45,307 45,307 45,307
CIELO RASO DURACUSTIC M2 55,716 55,716 55,716 55,716 55,716 55,716 55,716 55,716 55,716 55,716
CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 41,539 41,539 41,539 41,539 41,539 41,539 41,539 41,539 41,539 41,539
CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 77,234 77,234 77,234 77,234 77,234 77,234 77,234 77,234 77,234 77,234
CORNISAS YESO ML 40,346 40,346 40,346 40,346 40,346 40,346 40,346 40,346 40,346 40,346
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 85,487 85,487 85,487 85,487 85,487 85,487 85,487 85,487 85,487 85,487
MALLA CON VENA M2 10,885 10,885 10,885 10,885 10,885 10,885 10,885 10,885 10,885 10,885
EXCAVACIONES Y RELLENOS
EXPLANACIÓN Y EXTENDIDA M3 4,547 4,547 4,547 4,547 4,547 4,547 4,547 4,547 4,547 4,547EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 17,474 17,474 17,474 17,474 17,474 17,474 17,474 17,474 17,474 17,474
EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 20,426 20,426 20,426 20,426 20,426 20,426 20,426 20,426 20,426 20,426EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 35,830 35,830 35,830 35,830 35,830 35,830 35,830 35,830 35,830 35,830
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 40,782 40,782 40,782 40,782 40,782 40,782 40,782 40,782 40,782 40,782
EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 67,329 67,329 67,329 67,329 67,329 67,329 67,329 67,329 67,329 67,329
RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227
RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 51,865 90,670 58,333 84,203 69,974 69,974 82,909 66,094 45,398 84,203
RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 97,528 138,283 89,663 108,253 115,403 93,953 104,678 94,668 98,243 128,988
14.32
14.33
14.34
14.35
14.36
14.37
14.44
14.45
14.46
15
15.1
14.38
14.39
14.40
14.41
14.42
14.43
15.8
15.9
16
16.1
16.2
15.2
15.3
15.4
15.5
15.6
15.7
16.9
16.3
16.4
16.5
16.6
16.7
16.8
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNRELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
MECÁNICAMENTEM3 147,903 205,655 160,383 144,861 204,362 173,318 199,188 156,502 179,785 205,655
AFRIMADO (NORMA INVIAS 311) M3 45,899 84,704 52,367 78,237 64,008 64,008 76,943 60,128 45,899 78,237
SUBBASE GRANULAR (NORMA INVIAS 320) M3 138,547 195,260 149,987 134,465 193,966 162,922 188,792 146,107 169,390 195,260
BASE GRANULAR (NORMA INVIAS 330) M3 148,580 206,333 161,060 145,538 205,039 173,995 199,865 157,180 180,463 206,333
APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 248,803 248,803 248,803 248,803 248,803 248,803 248,803 248,803 248,803 248,803
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
GRIFERÍA)UN 735,257 735,257 735,257 735,257 735,257 735,257 735,257 735,257 735,257 735,257
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 397,991 397,991 397,991 397,991 397,991 397,991 397,991 397,991 397,991 397,991
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 114,562 114,562 114,562 114,562 114,562 114,562 114,562 114,562 114,562 114,562
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
GRIFERÍA)UN 160,962 160,962 160,962 160,962 160,962 160,962 160,962 160,962 160,962 160,962
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
GRIFERÍA)UN 149,415 149,415 149,415 149,415 149,415 149,415 149,415 149,415 149,415 149,415
SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 330,109 330,109 330,109 330,109 330,109 330,109 330,109 330,109 330,109 330,109
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
GRIFERÍA)UN 845,733 845,733 845,733 845,733 845,733 845,733 845,733 845,733 845,733 845,733
SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 239,527 239,527 239,527 239,527 239,527 239,527 239,527 239,527 239,527 239,527
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A
BAÑERAUN 169,285 169,285 169,285 169,285 169,285 169,285 169,285 169,285 169,285 169,285
SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 66,807 66,807 66,807 66,807 66,807 66,807 66,807 66,807 66,807 66,807SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)UN 205,313 205,313 205,313 205,313 205,313 205,313 205,313 205,313 205,313 205,313
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)UN 302,914 302,914 302,914 302,914 302,914 302,914 302,914 302,914 302,914 302,914
PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 6,761 6,761 6,761 6,761 6,761 6,761 6,761 6,761 6,761 6,761
ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,515 2,515 2,515 2,515 2,515 2,515 2,515 2,515 2,515 2,515
ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,963 8,963 8,963 8,963 8,963 8,963 8,963 8,963 8,963 8,963
BARNIZ SOBRE MUEBLES M2 34,351 34,351 34,351 34,351 34,351 34,351 34,351 34,351 34,351 34,351
CARBURO SOBRE PAÑETES M2 4,701 4,701 4,701 4,701 4,701 4,701 4,701 4,701 4,701 4,701
COLORPLAST FACHADA SOBRE FACHADA M2 54,175 54,175 54,175 54,175 54,175 54,175 54,175 54,175 54,175 54,175
DEMARCACIÓN CON MARMOLINA ML 2,789 2,789 2,789 2,789 2,789 2,789 2,789 2,789 2,789 2,789
ESMALTE SOBRE LÁMINA LINEAL ML 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253
ESMALTE SOBRE LÁMINA LLENA M2 11,277 11,277 11,277 11,277 11,277 11,277 11,277 11,277 11,277 11,277
ESMALTE SOBRE MADERA LINEAL ML 3,273 3,273 3,273 3,273 3,273 3,273 3,273 3,273 3,273 3,273
ESMALTE SOBRE MADERA LLENA M2 11,894 11,894 11,894 11,894 11,894 11,894 11,894 11,894 11,894 11,894
16.10
16.11
16.12
16.13
17.6
17.7
17.8
17.9
17.10
17.11
17
17.1
17.2
17.3
17.4
17.5
18.3
18.4
18.5
18.6
18.7
18.8
17.12
17.13
18
18.1
18.2
18.9
18.10
18.11
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNESMALTE SOBRE MARCOS LÁMINA M2 4,696 4,696 4,696 4,696 4,696 4,696 4,696 4,696 4,696 4,696
ESMALTE SOBRE MARCOS MADERA M2 5,334 5,334 5,334 5,334 5,334 5,334 5,334 5,334 5,334 5,334
ESTUCO M2 5,656 5,656 5,656 5,656 5,656 5,656 5,656 5,656 5,656 5,656
ESTUCO (LINEAL) ML 3,534 3,534 3,534 3,534 3,534 3,534 3,534 3,534 3,534 3,534
ESTUCO Y VINILO 3 MANOS M2 12,555 12,555 12,555 12,555 12,555 12,555 12,555 12,555 12,555 12,555
ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,759 7,759 7,759 7,759 7,759 7,759 7,759 7,759 7,759 7,759
LACA PISOS MADERA M2 18,300 18,300 18,300 18,300 18,300 18,300 18,300 18,300 18,300 18,300
LÍNEAS TRÁFICO 0.10 ML 2,167 2,167 2,167 2,167 2,167 2,167 2,167 2,167 2,167 2,167
MARMOLINA SOBRE PAÑETE M2 9,937 9,937 9,937 9,937 9,937 9,937 9,937 9,937 9,937 9,937
TINTILLA SOBRE MADERA LINEAL ML 2,678 2,678 2,678 2,678 2,678 2,678 2,678 2,678 2,678 2,678
TINTILLA SOBRE MADERA LLENA M2 10,199 10,199 10,199 10,199 10,199 10,199 10,199 10,199 10,199 10,199
VINILO SOBRE PAÑETE 2 MANOS M2 5,727 5,727 5,727 5,727 5,727 5,727 5,727 5,727 5,727 5,727
VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML 3,589 3,589 3,589 3,589 3,589 3,589 3,589 3,589 3,589 3,589
WASH-PRIMER SOBRE ALUMNIO M2 17,773 17,773 17,773 17,773 17,773 17,773 17,773 17,773 17,773 17,773
PINTURA EPÓXICA M2 10,225 10,225 10,225 10,225 10,225 10,225 10,225 10,225 10,225 10,225
PINTURA EPÓXICA (LINEAL) ML 6,302 6,302 6,302 6,302 6,302 6,302 6,302 6,302 6,302 6,302
DOTACIONES DEPORTIVAS
CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 5,013,313 5,013,313 5,013,313 5,013,313 5,013,313 5,013,313 5,013,313 5,013,313 5,013,313 5,013,313CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)UN 8,857,720 8,857,720 8,857,720 8,857,720 8,857,720 8,857,720 8,857,720 8,857,720 8,857,720 8,857,720
CANCHA PARA MICROFÚTBOL (PAR) UN 2,317,959 2,317,959 2,317,959 2,317,959 2,317,959 2,317,959 2,317,959 2,317,959 2,317,959 2,317,959
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 7,575,518 7,575,518 7,575,518 7,575,518 7,575,518 7,575,518 7,575,518 7,575,518 7,575,518 7,575,518
CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 7,094,883 7,094,883 7,094,883 7,094,883 7,094,883 7,094,883 7,094,883 7,094,883 7,094,883 7,094,883
DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,167 2,167 2,167 2,167 2,167 2,167 2,167 2,167 2,167 2,167
TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 710,747 710,747 710,747 710,747 710,747 710,747 710,747 710,747 710,747 710,747
MALLA NYLON PETROLIZADA VOLEIBOL UN 71,110 71,110 71,110 71,110 71,110 71,110 71,110 71,110 71,110 71,110
SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,287,678 1,288,222 1,287,573 1,287,821 1,287,917 1,287,631 1,287,774 1,287,640 1,287,688 1,288,098
CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 561,816 574,688 559,332 565,203 567,462 560,687 564,074 560,913 562,042 571,752
INSTALACIONES RED GASES
TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 24,418 24,418 24,418 24,418 24,418 24,418 24,418 24,418 24,418 24,418
TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 36,185 36,185 36,185 36,185 36,185 36,185 36,185 36,185 36,185 36,185
TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 44,801 44,801 44,801 44,801 44,801 44,801 44,801 44,801 44,801 44,801
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 14,763 14,763 14,763 14,763 14,763 14,763 14,763 14,763 14,763 14,763
TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 17,826 17,826 17,826 17,826 17,826 17,826 17,826 17,826 17,826 17,826
TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 24,208 24,208 24,208 24,208 24,208 24,208 24,208 24,208 24,208 24,208
TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 21,646 21,646 21,646 21,646 21,646 21,646 21,646 21,646 21,646 21,646
TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 22,796 22,796 22,796 22,796 22,796 22,796 22,796 22,796 22,796 22,796
TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 28,441 28,441 28,441 28,441 28,441 28,441 28,441 28,441 28,441 28,441
VÁLVULA DE BOLA GAS 1/2" UN 14,478 14,478 14,478 14,478 14,478 14,478 14,478 14,478 14,478 14,478
18.15
18.16
18.17
18.18
18.19
18.20
18.12
18.13
18.14
18.27
19
19.1
19.2
19.3
18.21
18.22
18.23
18.24
18.25
18.26
19.10
20
20.1
20.2
20.3
19.4
19.5
19.6
19.7
19.8
19.9
20.10
20.4
20.5
20.6
20.7
20.8
20.9
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNVÁLVULA DE BOLA GAS 3/4" UN 19,000 19,000 19,000 19,000 19,000 19,000 19,000 19,000 19,000 19,000
VÁLVULA DE BOLA GAS 1" UN 29,274 29,274 29,274 29,274 29,274 29,274 29,274 29,274 29,274 29,274
VÁLVULA POLIETILENO GAS 1/2" UN 225,084 225,084 225,084 225,084 225,084 225,084 225,084 225,084 225,084 225,084
VÁLVULA POLIETILENO GAS 3/4" UN 259,093 259,093 259,093 259,093 259,093 259,093 259,093 259,093 259,093 259,093
VÁLVULA POLIETILENO GAS 1" UN 270,151 270,151 270,151 270,151 270,151 270,151 270,151 270,151 270,151 270,151
ACOMETIDA GAS 1/2" ML 250,888 250,888 250,888 250,888 250,888 250,888 250,888 250,888 250,888 250,888
INSTALACIONES RED VOZ Y DATOS
SENSOR DE HUMO FOTOELÉCTRICO UN 182,589 182,589 182,589 182,589 182,589 182,589 182,589 182,589 182,589 182,589
CABLE DETECTOR LINEAL DE CALOR ML 28,054 28,054 28,054 28,054 28,054 28,054 28,054 28,054 28,054 28,054
SIRENA DE 110 V UN 85,022 85,022 85,022 85,022 85,022 85,022 85,022 85,022 85,022 85,022
CÁMARA CCTV UN 214,195 214,195 214,195 214,195 214,195 214,195 214,195 214,195 214,195 214,195
PARLANTE-CIELO FALSO UN 42,462 42,462 42,462 42,462 42,462 42,462 42,462 42,462 42,462 42,462
AMPLIFICADOR 100W UN 471,115 471,115 471,115 471,115 471,115 471,115 471,115 471,115 471,115 471,115
AMPLIFICADOR 300W UN 1,172,066 1,172,066 1,172,066 1,172,066 1,172,066 1,172,066 1,172,066 1,172,066 1,172,066 1,172,066
ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 35,808 35,808 35,808 35,808 35,808 35,808 35,808 35,808 35,808 35,808
MICRÓFONO PG 48LC (INCLUYE BASE) UN 182,856 182,856 182,856 182,856 182,856 182,856 182,856 182,856 182,856 182,856
TOMA PARA MICRÓFONO UN 35,751 35,751 35,751 35,751 35,751 35,751 35,751 35,751 35,751 35,751
CABLE BLINDADO STEREO PARA MICRÓFONO ML 3,083 3,083 3,083 3,083 3,083 3,083 3,083 3,083 3,083 3,083
SPLITERS UN 5,205 5,205 5,205 5,205 5,205 5,205 5,205 5,205 5,205 5,205
TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000
TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 19,777 19,777 19,777 19,777 19,777 19,777 19,777 19,777 19,777 19,777
TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,604 25,604 25,604 25,604 25,604 25,604 25,604 25,604 25,604 25,604
BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 101,022 101,022 101,022 101,022 101,022 101,022 101,022 101,022 101,022 101,022
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 26,346 26,346 26,346 26,346 26,346 26,346 26,346 26,346 26,346 26,346
BANDEJA PORTACABLES PARA RACK UN 86,346 86,346 86,346 86,346 86,346 86,346 86,346 86,346 86,346 86,346
RACK 2' X 24" UN 149,253 149,253 149,253 149,253 149,253 149,253 149,253 149,253 149,253 149,253
RACK 3' X 24" UN 235,887 235,887 235,887 235,887 235,887 235,887 235,887 235,887 235,887 235,887
RACK 5' X 24" UN 292,419 292,419 292,419 292,419 292,419 292,419 292,419 292,419 292,419 292,419
RACK 7' X 24" UN 319,835 319,835 319,835 319,835 319,835 319,835 319,835 319,835 319,835 319,835
PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 466,511 466,511 466,511 466,511 466,511 466,511 466,511 466,511 466,511 466,511
PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 274,271 274,271 274,271 274,271 274,271 274,271 274,271 274,271 274,271 274,271
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 85,609 85,609 85,609 85,609 85,609 85,609 85,609 85,609 85,609 85,609
PATCH CORD 2M CATEGORÍA 6A UN 11,431 11,431 11,431 11,431 11,431 11,431 11,431 11,431 11,431 11,431
PATCH CORD 5M CATEGORÍA 6A UN 23,384 23,384 23,384 23,384 23,384 23,384 23,384 23,384 23,384 23,384
CABLE UTP CATEGORÍA 6A ML 4,082 4,082 4,082 4,082 4,082 4,082 4,082 4,082 4,082 4,082
CANALETA METÁLICA 4X6 CMS ML 28,673 28,673 28,673 28,673 28,673 28,673 28,673 28,673 28,673 28,673
CANALETA METÁLICA 4X10 CMS ML 29,980 29,980 29,980 29,980 29,980 29,980 29,980 29,980 29,980 29,980
CANALETA METÁLICA 6X10 CMS ML 30,633 30,633 30,633 30,633 30,633 30,633 30,633 30,633 30,633 30,633
CANALETA PLÁSTICA 13X7 MM ML 19,971 19,971 19,971 19,971 19,971 19,971 19,971 19,971 19,971 19,971
CANALETA PLÁSTICA 20X12 MM ML 22,120 22,120 22,120 22,120 22,120 22,120 22,120 22,120 22,120 22,120
CANALETA PLÁSTICA 32X12 MM ML 23,024 23,024 23,024 23,024 23,024 23,024 23,024 23,024 23,024 23,024
CANALETA PLÁSTICA 40X60 MM ML 38,897 38,897 38,897 38,897 38,897 38,897 38,897 38,897 38,897 38,897
SWITCH 10/100/1000 24 PUERTOS UN 504,562 504,562 504,562 504,562 504,562 504,562 504,562 504,562 504,562 504,562
20.11
20.12
20.13
20.14
20.15
21.4
21.5
21.6
21.7
21.8
21.9
20.16
21.1
21.1
21.2
21.3
21.16
21.17
21.18
21.19
21.20
21.21
21.10
21.11
21.12
21.13
21.14
21.15
21.28
21.29
21.30
21.31
21.32
21.33
21.22
21.23
21.24
21.25
21.26
21.27
21.34
21.35
21.36
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNSWITCH 10/100/1000 16 PUERTOS UN 258,615 258,615 258,615 258,615 258,615 258,615 258,615 258,615 258,615 258,615
SWITCH 10/100/1000 8 PUERTOS UN 71,885 71,885 71,885 71,885 71,885 71,885 71,885 71,885 71,885 71,885
CABLE TELEFÓNICO 2 PARES ML 1,495 1,495 1,495 1,495 1,495 1,495 1,495 1,495 1,495 1,495
CABLE TELEFÓNICO 10 PARES ML 6,917 6,917 6,917 6,917 6,917 6,917 6,917 6,917 6,917 6,917
CABLE TELEFÓNICO 20 PARES ML 10,349 10,349 10,349 10,349 10,349 10,349 10,349 10,349 10,349 10,349
CABLE TELEFÓNICO 40 PARES ML 17,302 17,302 17,302 17,302 17,302 17,302 17,302 17,302 17,302 17,302
CABLE TELEVISIÓN RG6 ML 3,193 3,193 3,193 3,193 3,193 3,193 3,193 3,193 3,193 3,193
ACOMETIDA TELEFÓNICA 1/2" ML 17,932 17,932 17,932 17,932 17,932 17,932 17,932 17,932 17,932 17,932
ACOMETIDA TELEFÓNICA 1" ML 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187
ACOMETIDA TELEVISIÓN 1" RG6" ML 15,686 15,686 15,686 15,686 15,686 15,686 15,686 15,686 15,686 15,686
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 12,550 12,550 12,550 12,550 12,550 12,550 12,550 12,550 12,550 12,550
BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 510,578 510,578 510,578 510,578 510,578 510,578 510,578 510,578 510,578 510,578
21.40
21.41
21.42
21.43
21.44
21.45
21.37
21.38
21.39
21.46
21.47
21.48
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNURBANISMOACUEDUCTO
CODO 45 PVC UNIÓN MECÁNICA 2" UN 7,658 7,658 7,658 7,658 7,658 7,658 7,658 7,658 7,658 7,658
CODO 45 PVC UNIÓN MECÁNICA 4" UN 74,706 74,706 74,706 74,706 74,706 74,706 74,706 74,706 74,706 74,706
CODO 45 PVC UNIÓN MECÁNICA 8" UN 421,274 421,274 421,274 421,274 421,274 421,274 421,274 421,274 421,274 421,274
CODO 45 PVC UNIÓN MECÁNICA 10" UN 899,202 899,202 899,202 899,202 899,202 899,202 899,202 899,202 899,202 899,202
CODO 90 PVC UNIÓN MECÁNICA 4" UN 103,002 103,002 103,002 103,002 103,002 103,002 103,002 103,002 103,002 103,002
CODO 90 PVC UNIÓN MECÁNICA 8" UN 628,038 628,038 628,038 628,038 628,038 628,038 628,038 628,038 628,038 628,038
CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,351,933 1,351,933 1,351,933 1,351,933 1,351,933 1,351,933 1,351,933 1,351,933 1,351,933 1,351,933
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 10,668 10,668 10,668 10,668 10,668 10,668 10,668 10,668 10,668 10,668
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 13,187 13,187 13,187 13,187 13,187 13,187 13,187 13,187 13,187 13,187
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 16,590 16,590 16,590 16,590 16,590 16,590 16,590 16,590 16,590 16,590
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 18,169 18,169 18,169 18,169 18,169 18,169 18,169 18,169 18,169 18,169
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806
TAPÓN PVC UNIÓN MECÁNICA 3" UN 88,070 88,070 88,070 88,070 88,070 88,070 88,070 88,070 88,070 88,070
TAPÓN PVC UNIÓN MECÁNICA 4" UN 101,995 101,995 101,995 101,995 101,995 101,995 101,995 101,995 101,995 101,995
TAPÓN PVC UNIÓN MECÁNICA 8" UN 315,716 315,716 315,716 315,716 315,716 315,716 315,716 315,716 315,716 315,716
TEE PVC UNIÓN MECÁNICA 2" UN 118,578 118,578 118,578 118,578 118,578 118,578 118,578 118,578 118,578 118,578
TEE PVC UNIÓN MECÁNICA 4" UN 195,473 195,473 195,473 195,473 195,473 195,473 195,473 195,473 195,473 195,473
TEE PVC UNIÓN MECÁNICA 8" UN 865,349 865,349 865,349 865,349 865,349 865,349 865,349 865,349 865,349 865,349
TEE PVC UNIÓN MECÁNICA 10" UN 997,055 997,055 997,055 997,055 997,055 997,055 997,055 997,055 997,055 997,055
TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 11,612 11,612 11,612 11,612 11,612 11,612 11,612 11,612 11,612 11,612
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 25,485 25,485 25,485 25,485 25,485 25,485 25,485 25,485 25,485 25,485
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 100,863 100,863 100,863 100,863 100,863 100,863 100,863 100,863 100,863 100,863
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 150,341 150,341 150,341 150,341 150,341 150,341 150,341 150,341 150,341 150,341
TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 24,501 24,501 24,501 24,501 24,501 24,501 24,501 24,501 24,501 24,501
TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 84,510 84,510 84,510 84,510 84,510 84,510 84,510 84,510 84,510 84,510
TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 125,371 125,371 125,371 125,371 125,371 125,371 125,371 125,371 125,371 125,371
UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 51,155 51,155 51,155 51,155 51,155 51,155 51,155 51,155 51,155 51,155
UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 206,326 206,326 206,326 206,326 206,326 206,326 206,326 206,326 206,326 206,326
UNIÓN REPARACION PVC 4" UN 59,709 59,709 59,709 59,709 59,709 59,709 59,709 59,709 59,709 59,709
UNIÓN REPARACIÓN PVC 8" UN 240,102 240,102 240,102 240,102 240,102 240,102 240,102 240,102 240,102 240,102
UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 143,603 143,603 143,603 143,603 143,603 143,603 143,603 143,603 143,603 143,603
UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 409,718 409,718 409,718 409,718 409,718 409,718 409,718 409,718 409,718 409,718
VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,098,685 1,098,685 1,098,685 1,098,685 1,098,685 1,098,685 1,098,685 1,098,685 1,098,685 1,098,685
VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,623,485 1,623,485 1,623,485 1,623,485 1,623,485 1,623,485 1,623,485 1,623,485 1,623,485 1,623,485
ALCANTARILLADO - EXCAVACIONES
ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,657 8,657 8,657 8,657 8,657 8,657 8,657 8,657 8,657 8,657
ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 19,757 19,757 19,757 19,757 19,757 19,757 19,757 19,757 19,757 19,757
RELLENO CON MATERIAL DE EXCAVACIÓN M3 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227
1.1
1.2
1.3
1.4
1.5
1.6
1
1.13
1.14
1.15
1.16
1.17
1.18
1.7
1.8
1.9
1.10
1.11
1.12
1.25
1.26
1.27
1.28
1.29
1.30
1.19
1.20
1.21
1.22
1.23
1.24
1.37
2
2.1
2.2
2.3
1.31
1.32
1.33
1.34
1.35
1.36
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNRELLENO TIPO 1 "GRAVILLA" M3 80,231 118,416 72,863 90,280 96,979 76,882 86,930 77,552 80,901 109,707
RELLENO TIPO 2 "RECEBO" M3 47,870 86,675 54,338 80,208 65,979 65,979 78,914 62,099 41,403 80,208
RELLENO TIPO 4 "SUBBASE B-200" M3 47,870 86,675 54,338 80,208 65,979 65,979 78,914 62,099 47,870 80,208
RELLENO TIPO 5 "TRITURADO GRUESO" M3 89,009 107,456 86,959 90,034 107,456 86,959 110,531 86,959 91,059 116,680
RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 55,133 73,939 53,044 56,178 73,939 53,044 77,073 53,044 57,223 83,342
RELLENO TIPO 7 "ARENA DE PEÑA" M3 97,862 140,840 89,568 109,172 116,712 94,092 105,402 94,846 98,616 131,038
ALCANTARILLADO - TUBERÍA
CODO 45 PVC ALCANTARILLADO 8" UN 94,151 94,151 94,151 94,151 94,151 94,151 94,151 94,151 94,151 94,151
CODO 45 PVC ALCANTARILLADO 16" UN 982,486 982,486 982,486 982,486 982,486 982,486 982,486 982,486 982,486 982,486
CODO 90 PVC ALCANTARILLADO 8" UN 123,069 123,069 123,069 123,069 123,069 123,069 123,069 123,069 123,069 123,069
CODO 90 PVC ALCANTARILLADO 16" UN 1,137,989 1,137,989 1,137,989 1,137,989 1,137,989 1,137,989 1,137,989 1,137,989 1,137,989 1,137,989
CODO 90 PVC ALCANTARILLADO 24" UN 793,098 793,098 793,098 793,098 793,098 793,098 793,098 793,098 793,098 793,098
SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 59,512 59,512 59,512 59,512 59,512 59,512 59,512 59,512 59,512 59,512
SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 93,461 93,461 93,461 93,461 93,461 93,461 93,461 93,461 93,461 93,461
SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790
SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 220,784 220,784 220,784 220,784 220,784 220,784 220,784 220,784 220,784 220,784
SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 354,508 354,508 354,508 354,508 354,508 354,508 354,508 354,508 354,508 354,508
SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 93,501 93,501 93,501 93,501 93,501 93,501 93,501 93,501 93,501 93,501
SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 93,501 93,501 93,501 93,501 93,501 93,501 93,501 93,501 93,501 93,501
SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790
SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790 220,790
SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 354,508 354,508 354,508 354,508 354,508 354,508 354,508 354,508 354,508 354,508
TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 357,443 357,443 357,443 357,443 357,443 357,443 357,443 357,443 357,443 357,443
TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 579,577 579,577 579,577 579,577 579,577 579,577 579,577 579,577 579,577 579,577
TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 929,795 929,795 929,795 929,795 929,795 929,795 929,795 929,795 929,795 929,795
TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 57,257 57,257 57,257 57,257 57,257 57,257 57,257 57,257 57,257 57,257
TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 299,321 299,321 299,321 299,321 299,321 299,321 299,321 299,321 299,321 299,321
TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 333,811 333,811 333,811 333,811 333,811 333,811 333,811 333,811 333,811 333,811
TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 926,525 926,525 926,525 926,525 926,525 926,525 926,525 926,525 926,525 926,525
TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 54,438 54,881 54,353 54,555 54,633 54,399 54,516 54,407 54,446 54,780
TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 271,469 271,469 271,469 271,469 271,469 271,469 271,469 271,469 271,469 271,469
TUBERÍA PVC ALCANTARILLADO 8" ML 41,023 41,023 41,023 41,023 41,023 41,023 41,023 41,023 41,023 41,023
TUBERÍA PVC ALCANTARILLADO 10" ML 58,055 58,055 58,055 58,055 58,055 58,055 58,055 58,055 58,055 58,055
TUBERÍA PVC ALCANTARILLADO 12" ML 83,817 83,817 83,817 83,817 83,817 83,817 83,817 83,817 83,817 83,817
TUBERÍA PVC ALCANTARILLADO 16" ML 128,679 128,679 128,679 128,679 128,679 128,679 128,679 128,679 128,679 128,679
TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 206,883 206,883 206,883 206,883 206,883 206,883 206,883 206,883 206,883 206,883
TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 301,266 301,266 301,266 301,266 301,266 301,266 301,266 301,266 301,266 301,266
TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 380,971 380,971 380,971 380,971 380,971 380,971 380,971 380,971 380,971 380,971
TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 500,790 500,790 500,790 500,790 500,790 500,790 500,790 500,790 500,790 500,790
TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 688,460 688,460 688,460 688,460 688,460 688,460 688,460 688,460 688,460 688,460
ALCANTARILLADO - SUMIDEROS Y POZOS
3
3.1
3.2
3.3
3.4
2.4
2.5
2.6
2.7
2.8
2.9
3.11
3.12
3.13
3.14
3.15
3.16
3.5
3.6
3.7
3.8
3.9
3.10
3.23
3.24
3.25
3.26
3.27
3.28
3.17
3.18
3.19
3.20
3.21
3.22
4
3.29
3.30
3.31
3.32
3.33
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNPLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)UN 554,526 585,418 548,564 562,655 568,075 551,815 559,945 552,358 555,067 578,372
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE
INTERNO E=1.5CM Y CAÑUELA)ML 539,528 555,867 536,375 543,828 546,694 538,095 542,395 538,382 539,815 552,141
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
(INCLUYE ARO Y TAPA HF)UN 589,641 610,235 585,666 595,060 598,673 587,834 593,254 588,195 590,002 605,538
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)UN 660,069 698,685 652,617 670,231 677,006 656,682 666,844 657,360 660,747 689,877
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE
INTERNO E=1.5CM Y CAÑUELA)ML 767,683 790,691 763,243 773,738 777,775 765,665 771,720 766,069 768,087 785,444
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
REFUERZO (INCLUYE ARO Y TAPA HF)UN 683,127 711,445 677,662 690,579 695,547 680,642 688,095 681,140 683,623 704,986
SUMIDERO EN LADRILLO SL-100 UN 807,010 821,155 804,281 810,732 813,216 805,768 809,490 806,018 807,260 817,930
SUMIDERO EN LADRILLO SL-250 UN 1,185,091 1,227,245 1,176,957 1,196,183 1,203,582 1,181,392 1,192,484 1,182,134 1,185,834 1,217,631
SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,643,786 1,725,778 1,627,965 1,665,363 1,679,747 1,636,594 1,658,170 1,638,033 1,645,225 1,707,078
SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,213,795 2,350,087 2,187,495 2,249,661 2,273,571 2,201,839 2,237,705 2,204,231 2,216,186 2,319,004
SUMIDERO PREFABRICADO SL-100 UN 1,498,707 1,498,707 1,498,707 1,498,707 1,498,707 1,498,707 1,498,707 1,498,707 1,498,707 1,498,707
SUMIDERO PREFABRICADO SL-250 UN 3,174,888 3,174,888 3,174,888 3,174,888 3,174,888 3,174,888 3,174,888 3,174,888 3,174,888 3,174,888NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)UN 112,449 113,115 112,320 112,624 112,741 112,390 112,566 112,402 112,460 112,963
ANDENES Y SARDINELES
ADOQUÍN DE ARCILLA 20X10X6CM M2 60,642 62,956 60,195 61,251 61,657 60,439 61,048 60,479 60,682 62,428
ADOQUÍN DE ARCILLA 20X10X8CM M2 71,718 74,032 71,271 72,327 72,733 71,515 72,124 71,555 71,758 73,504
ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 48,726 54,276 47,655 50,186 51,160 48,239 49,699 48,336 48,823 53,010
ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 52,799 58,206 51,756 54,222 55,171 52,325 53,748 52,420 52,894 56,973
ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 53,113 58,361 52,101 54,494 55,415 52,653 54,034 52,745 53,205 57,164
BORDE SEPARADOR VERDE A-170 ML 208,237 208,904 208,109 208,413 208,530 208,179 208,354 208,191 208,249 208,752
BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 15,124 15,790 14,995 15,299 15,416 15,065 15,241 15,077 15,136 15,638
BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 34,792 38,703 34,037 35,821 36,508 34,449 35,478 34,517 34,861 37,811
CAÑUELA PREFABRICADA TIPO A-120 ML 68,003 68,360 67,934 68,097 68,159 67,972 68,066 67,978 68,009 68,278
CONTENEDOR DE RAÍCES TIPO A B-20 UN 455,256 465,229 453,332 457,881 459,630 454,382 457,006 454,557 455,431 462,954
LOSETA PREFABRICADA A-40 M2 50,930 52,456 50,635 51,331 51,599 50,796 51,197 50,822 50,956 52,108
LOSETA PREFABRICADA A-60 M2 74,190 75,716 73,895 74,592 74,859 74,056 74,458 74,083 74,217 75,368
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 28,395 30,558 27,978 28,964 29,344 28,206 28,775 28,244 28,433 30,065
SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 46,415 50,791 45,570 47,567 48,334 46,031 47,183 46,108 46,492 49,793
SARDINEL PREFABRICADO A-10 ML 86,500 95,742 88,352 86,126 95,343 90,379 94,453 87,798 91,412 95,661
TABLETA PREFABRICADA A-20 (20X20CM ) M2 49,302 50,226 49,124 49,545 49,707 49,221 49,464 49,238 49,319 50,015
MOBILIARIO URBANO
BANCA EN CONCRETO M-40 UN 167,166 169,740 166,669 167,843 168,295 166,940 167,617 166,985 167,211 169,153
BANCA EN CONCRETO M-30 UN 547,193 550,797 546,497 548,141 548,774 546,877 547,825 546,940 547,256 549,975
BOLARDO M-63 ALTO/HIERRO UN 175,210 175,751 175,106 175,353 175,447 175,163 175,305 175,173 175,220 175,628
BOLARDO M-60 CONCRETO UN 133,687 136,776 133,090 134,500 135,042 133,416 134,229 133,470 133,741 136,071
4.1
4.2
4.3
4.4
4.5
4.12
4.13
5
5.1
5.2
4.6
4.7
4.8
4.9
4.10
4.11
5.9
5.10
5.11
5.12
5.13
5.14
5.3
5.4
5.5
5.6
5.7
5.8
6.3
6.4
5.15
5.16
6
6.1
6.2
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNBOLARDO M-61 BAJO/CONCRETO UN 135,159 138,248 134,563 135,972 136,514 134,888 135,701 134,942 135,213 137,544
BOLARDO M-62 BAJO/HIERRO UN 158,068 161,310 157,442 158,921 159,490 157,783 158,636 157,840 158,125 160,570
BORDE CONTENEDOR DE RAICES A-70 ML 49,253 51,025 48,911 49,720 50,031 49,098 49,564 49,129 49,284 50,621
BORDILLO PREFABRICADO A-80 ML 56,724 58,707 56,341 57,246 57,594 56,550 57,072 56,585 56,759 58,255
CANECA M-120 UN 255,339 255,782 255,254 255,456 255,533 255,300 255,417 255,308 255,347 255,681
CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 672,923 674,467 672,625 673,329 673,600 672,787 673,194 672,814 672,950 674,115
HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,762,738 2,763,767 2,762,539 2,763,009 2,763,189 2,762,647 2,762,918 2,762,665 2,762,756 2,763,533
HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,842,117 2,843,146 2,841,918 2,842,388 2,842,568 2,842,026 2,842,297 2,842,044 2,842,135 2,842,912
CICLOPARQUEADERO M100 TIPO 1 UN 397,612 398,692 397,403 397,896 398,086 397,517 397,801 397,536 397,631 398,446
CICLOPARQUEADERO M101 TIPO 2 UN 528,358 532,681 527,524 529,496 530,254 527,979 529,117 528,055 528,434 531,695
BANCA EN MADERA M-50 UN 436,619 436,619 436,619 436,619 436,619 436,619 436,619 436,619 436,619 436,619
PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 202,581 204,125 202,282 202,987 203,258 202,445 202,852 202,472 202,608 203,773
PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 471,494 472,602 471,280 471,786 471,980 471,397 471,688 471,416 471,514 472,349
POSTE HISTÓRICO M-131 UN 5,256,751 5,264,474 5,255,260 5,258,783 5,260,138 5,256,073 5,258,106 5,256,209 5,256,886 5,262,712
SEÑALIZACIÓN
LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 3,301 3,301 3,301 3,301 3,301 3,301 3,301 3,301 3,301 3,301
MARCA VIAL CON PINTURA EN FRÍO M2 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293
SEÑAL DOBLE DE CICLORUTA UN 369,890 370,224 369,826 369,978 370,037 369,861 369,949 369,867 369,896 370,148
SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 404,363 406,524 403,946 404,932 405,311 404,173 404,742 404,211 404,401 406,031
SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 261,070 261,404 261,006 261,158 261,217 261,041 261,129 261,047 261,076 261,328
SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 304,957 305,291 304,893 305,045 305,104 304,928 305,016 304,934 304,963 305,215
SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 413,722 414,056 413,658 413,810 413,869 413,693 413,781 413,699 413,728 413,980
TACHAS REFLECTIVAS UN 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053
SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,807 11,807 11,807 11,807 11,807 11,807 11,807 11,807 11,807 11,807TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
SUMINISTRO E INSTALACIÓN)UN 96,155 96,155 96,155 96,155 96,155 96,155 96,155 96,155 96,155 96,155
6.5
6.6
6.7
6.8
6.15
6.16
6.17
6.18
7
6.9
6.10
6.11
6.12
6.13
6.14
7.7
7.8
7.9
7.10
7.1
7.2
7.3
7.4
7.5
7.6
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNVÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES
1.1 201 PDEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 127,138 127,138 127,138 127,138 127,138 127,138 127,138 127,138 127,138 127,138
1.2 201 PDEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 44,161 44,161 44,161 44,161 44,161 44,161 44,161 44,161 44,161 44,161
1.3 200.1DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)HA 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096
1.4 200.2DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)HA 784,698 784,698 784,698 784,698 784,698 784,698 784,698 784,698 784,698 784,698
1.5 201.7DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 74,038 74,038 74,038 74,038 74,038 74,038 74,038 74,038 74,038 74,038
1.6 ***TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
PRESTAMOS, SOBREACARREOS Y DERRUMBESM3-KM 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210
2 NORMA INV EXPLANACIÓN Y EXCAVACIONES
2.1 210.1.1EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
PRÉSTAMOSM3 7,328 7,328 7,328 7,328 7,328 7,328 7,328 7,328 7,328 7,328
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 30,140 30,140 30,140 30,140 30,140 30,140 30,140 30,140 30,140 30,140
2.3 210.2.2EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
PRÉSTAMOSM3 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603
2.4 220.1 TERRAPLENES M3 13,237 13,237 13,237 13,237 13,237 13,237 13,237 13,237 13,237 13,237
2.5 221.1 PEDRAPLÉN COMPACTO M3 10,551 10,551 10,551 10,551 10,551 10,551 10,551 10,551 10,551 10,551
2.6 221.2 PEDRAPLÉN SUELTO M3 6,051 6,051 6,051 6,051 6,051 6,051 6,051 6,051 6,051 6,051
2.7 230.1MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
EXISTENTEM2 460 460 460 460 460 460 460 460 460 460
2.8 230.2MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
MATERIAL ADICIONADOM3 12,267 12,267 12,267 12,267 12,267 12,267 12,267 12,267 12,267 12,267
2.9 600.1EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES
A UNA DISTANCIA MENOR DE 5 KM)M3 18,871 18,871 18,871 18,871 18,871 18,871 18,871 18,871 18,871 18,871
2.10 600.2EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 52,513 52,513 52,513 52,513 52,513 52,513 52,513 52,513 52,513 52,513
2.11 600.3EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 65,392 65,392 65,392 65,392 65,392 65,392 65,392 65,392 65,392 65,392
2.12 600.4EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 12,018 12,018 12,018 12,018 12,018 12,018 12,018 12,018 12,018 12,018
2.13 600.4 PEXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 28,052 28,052 28,052 28,052 28,052 28,052 28,052 28,052 28,052 28,052
2.14 600.5EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877
2.15 600.5 PEXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 39,061 39,061 39,061 39,061 39,061 39,061 39,061 39,061 39,061 39,061
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,404 4,404 4,404 4,404 4,404 4,404 4,404 4,404 4,404 4,404
3.2 320.1 SUBBASE GRANULAR M3 149,727 216,222 161,167 142,291 214,649 176,897 208,357 156,448 184,762 216,222
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN3.3 330.1 BASE GRANULAR M3 159,760 227,295 172,240 153,364 225,722 187,970 219,430 167,521 195,835 227,295
3.4 365.1EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)M3 113,137 113,137 113,137 113,137 113,137 113,137 113,137 113,137 113,137 113,137
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,626 2,626 2,626 2,626 2,626 2,626 2,626 2,626 2,626 2,626
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 909 909 909 909 909 909 909 909 909 909
3.7 461.1PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
ASFÁLTICA M3 189,459 199,823 187,459 192,186 194,005 188,550 191,277 188,732 189,641 197,459
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 53,884 56,348 53,409 54,532 54,965 53,668 54,316 53,711 53,927 55,786
3.9 450.1 PMEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO
ASFÁLTICO)M3 542,762 566,962 544,275 491,337 523,100 557,887 536,712 554,862 518,562 545,787
3.10 450.2 PMEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO
ASFÁLTICO)M3 557,262 581,462 558,775 505,837 537,600 572,387 551,212 569,362 533,062 560,287
3.11 450.9 PMEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
ASFÁLTICO)M3 575,218 599,418 576,731 523,793 555,556 590,343 569,168 587,318 551,018 578,243
3.12 450.3 PMEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO
ASFÁLTICO)M3 600,762 624,962 602,275 549,337 581,100 615,887 594,712 612,862 576,562 603,787
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 279,397 346,932 291,877 273,001 345,359 307,607 339,067 287,158 315,472 346,932
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 268,978 335,473 280,418 261,542 333,900 296,148 327,608 275,699 304,013 335,473
3.15 311.1 AFIRMADO M3 50,092 97,282 57,957 89,417 72,114 72,114 87,844 67,395 50,092 89,417
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 9,683 10,410 9,542 9,874 10,002 9,619 9,810 9,632 9,695 10,244
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 3,917 4,281 3,847 4,013 4,077 3,885 3,981 3,892 3,924 4,198
3.18 500.1CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNM3 552,269 601,458 542,777 565,214 573,843 547,955 560,899 548,818 553,132 590,240
3.19 500.1CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNM3 581,152 632,543 571,234 594,676 603,692 576,644 590,168 577,546 582,054 620,822
3.20 500.1CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNM3 600,580 653,433 590,380 614,489 623,761 595,944 609,852 596,871 601,507 641,379
3.21 ***SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)ML 5,640 5,640 5,640 5,640 5,640 5,640 5,640 5,640 5,640 5,640
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 78,205 102,163 75,543 79,536 102,163 75,543 106,156 75,543 80,867 114,142
4 NORMA INV OBRAS DE ARTE
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 778,780 834,576 768,012 793,463 803,252 773,885 788,569 774,864 779,759 821,850
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 675,926 730,798 665,338 690,366 699,993 671,113 685,553 672,075 676,889 718,283
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 714,359 771,403 703,350 729,370 739,378 709,354 724,366 710,355 715,359 758,392
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 495,487 545,965 485,746 508,770 517,626 491,059 504,343 491,945 496,373 534,453
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 573,401 625,878 563,275 587,211 596,417 568,798 582,607 569,719 574,322 613,910
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 492,467 544,469 482,432 506,152 515,275 487,905 501,590 488,818 493,379 532,608
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 570,262 624,323 559,829 584,488 593,973 565,519 579,746 566,468 571,210 611,993
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 619,589 671,590 609,553 633,273 642,396 615,026 628,712 615,939 620,501 659,730
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 509,479 563,540 499,046 523,705 533,190 504,736 518,963 505,685 510,427 551,210
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 655,790 709,851 645,357 670,016 679,501 651,047 665,274 651,996 656,738 697,521
4.11 650 PSUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
ACERO A-36KG 9,564 9,564 9,564 9,564 9,564 9,564 9,564 9,564 9,564 9,564
4.12 650 PSUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
ACERO A-588 GRADO BKG 12,307 12,307 12,307 12,307 12,307 12,307 12,307 12,307 12,307 12,307
4.13 641.1 ACERO DE PREESFUERZO TON-M 1,446 1,446 1,446 1,446 1,446 1,446 1,446 1,446 1,446 1,446
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN4.14 621.1PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)ML 2,164,084 2,164,084 2,164,084 2,164,084 2,164,084 2,164,084 2,164,084 2,164,084 2,164,084 2,164,084
4.15 621.1 PPILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL,
REFUERZO Y ANILLOS)
ML 3,355,326 3,450,767 3,336,907 3,380,442 3,397,186 3,346,954 3,372,070 3,348,628 3,357,000 3,428,999
4.16 621.2BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
REFUERZO)M3 1,412,541 1,464,028 1,402,605 1,426,090 1,435,123 1,408,024 1,421,574 1,408,928 1,413,444 1,452,285
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 70,767 70,767 70,767 70,767 70,767 70,767 70,767 70,767 70,767 70,767
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 287,883 294,061 286,691 289,509 290,593 287,341 288,967 287,449 287,991 292,652
4.19 632 P BARANDA METÁLICA ML 341,454 341,454 341,454 341,454 341,454 341,454 341,454 341,454 341,454 341,454
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 13,719 13,719 13,719 13,719 13,719 13,719 13,719 13,719 13,719 13,719
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 417,689 501,174 412,022 456,216 455,121 426,465 450,472 424,516 418,644 483,916
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 102,072 126,030 99,410 103,403 126,030 99,410 130,023 99,410 104,734 138,009
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 56,850 100,410 64,110 93,150 77,178 77,178 91,698 72,822 49,590 93,150
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 338,082 392,655 327,550 352,443 362,017 333,294 347,656 334,252 339,039 380,208
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 310,401 351,533 303,177 319,416 333,332 306,589 326,252 307,158 311,938 348,494
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 317,498 358,630 310,274 326,514 340,429 313,686 333,350 314,255 319,035 355,592
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 323,171 363,599 316,083 332,001 345,794 319,421 338,899 319,977 324,696 360,721
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 330,269 370,696 323,180 339,099 352,891 326,518 345,996 327,075 331,793 367,818
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 448,646 502,034 438,343 462,696 472,062 443,963 458,012 444,899 449,583 489,857
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 524,889 580,391 514,178 539,495 549,232 520,020 534,626 520,994 525,862 567,732
4.31 681.1 GAVIÓN M3 147,109 169,978 144,568 148,379 169,978 144,568 173,789 144,568 149,650 181,412
4.32 681.1 GAVIÓN MALLA PVC M3 151,561 174,430 149,020 152,832 174,430 149,020 178,242 149,020 154,102 185,865
4.33 672.1BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
2500 PSIML 35,857 39,134 35,224 36,719 37,294 35,569 36,432 35,627 35,914 38,386
4.34 672.1BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
2500 PSIML 14,145 15,784 13,829 14,577 14,864 14,002 14,433 14,030 14,174 15,410
4.35 ***SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
(RESISTENCIA ÚLTIMA 25 KN)M2 8,193 8,193 8,193 8,193 8,193 8,193 8,193 8,193 8,193 8,193
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,702 11,702 11,702 11,702 11,702 11,702 11,702 11,702 11,702 11,702
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,766 15,766 15,766 15,766 15,766 15,766 15,766 15,766 15,766 15,766
4.38 ***SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
(RESISTENCIA ÚLTIMA 100 KN)M2 18,910 18,910 18,910 18,910 18,910 18,910 18,910 18,910 18,910 18,910
4.39 ***SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
(RESISTENCIA ÚLTIMA 165 KN)M2 24,311 24,311 24,311 24,311 24,311 24,311 24,311 24,311 24,311 24,311
4.40 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 5,880 5,880 5,880 5,880 5,880 5,880 5,880 5,880 5,880 5,880
4.41 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 6,705 6,705 6,705 6,705 6,705 6,705 6,705 6,705 6,705 6,705
4.42 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 6,970 6,970 6,970 6,970 6,970 6,970 6,970 6,970 6,970 6,970
4.43 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 4,956 4,956 4,956 4,956 4,956 4,956 4,956 4,956 4,956 4,956
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN4.44 ***
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482
4.45 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 6,094 6,094 6,094 6,094 6,094 6,094 6,094 6,094 6,094 6,094
4.46 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482
4.47 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 14,407 14,407 14,407 14,407 14,407 14,407 14,407 14,407 14,407 14,407
4.48 661.1SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO
Ø=36" CLASE I, INCLUYE EMBOQUILLADAML 513,576 514,310 513,434 513,769 513,898 513,511 513,704 513,524 513,588 514,143
4.49 660.3SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
DIÁMETRO 600 MMML 300,621 312,095 298,407 303,641 305,653 299,615 302,634 299,816 300,823 309,478
4.50 ***SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
DIÁMETRO 36"ML 718,305 718,305 718,305 718,305 718,305 718,305 718,305 718,305 718,305 718,305
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 115,700 161,075 123,263 153,513 136,875 136,875 152,000 132,338 115,700 153,513
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,445 3,445 3,445 3,445 3,445 3,445 3,445 3,445 3,445 3,445
4.53 ***GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
INSTALACIÓN) ML 69,992 69,992 69,992 69,992 69,992 69,992 69,992 69,992 69,992 69,992
4.54 ***GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
INSTALACIÓN) ML 106,607 106,607 106,607 106,607 106,607 106,607 106,607 106,607 106,607 106,607
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 459,166 514,668 448,455 473,772 483,509 454,297 468,903 455,271 460,140 502,009
4.56 682.1 P COLCHONETA RENO M3 160,826 183,695 158,285 162,097 183,695 158,285 187,507 158,285 163,367 195,130
4.57 *** TRINCHO EN MADERA M2 55,313 55,313 55,313 55,313 55,313 55,313 55,313 55,313 55,313 55,313
5 NORMA INV SEÑALIZACIÓN
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 3,301 3,301 3,301 3,301 3,301 3,301 3,301 3,301 3,301 3,301
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293
5.3 730.3 TOPE DEFENSA METÁLICA UN 68,228 68,228 68,228 68,228 68,228 68,228 68,228 68,228 68,228 68,228
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 56,735 56,735 56,735 56,735 56,735 56,735 56,735 56,735 56,735 56,735
5.5 730.1 DEFENSA METÁLICA ML 121,916 124,462 121,425 122,586 123,033 121,693 122,363 121,738 121,961 123,881
5.6 701.1SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
UNIDIRECCIONALESUN 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053
6 NORMA INV MANTENIMIENTO VIAL
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 750 750 750 750 750 750 750 750 750 750
6.2 801.6LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A
UNA DISTANCIA DE 5 KM
UN 104,282 104,282 104,282 104,282 104,282 104,282 104,282 104,282 104,282 104,282
6.3 801.7LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KMML 20,287 20,287 20,287 20,287 20,287 20,287 20,287 20,287 20,287 20,287
6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,118 6,118 6,118 6,118 6,118 6,118 6,118 6,118 6,118 6,118
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 356,750 356,750 356,750 356,750 356,750 356,750 356,750 356,750 356,750 356,750
6.6 801.4LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5 KM)M2 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636
DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,528 12,528 12,528 12,528 12,528 12,528 12,528 12,528 12,528 12,528
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 20,323 20,323 20,323 20,323 20,323 20,323 20,323 20,323 20,323 20,323
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 7,997 7,997 7,997 7,997 7,997 7,997 7,997 7,997 7,997 7,997
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES