Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
PIQUES y CHIMENEAS:Diseño, Construcción y Operación
PIQUES y CHIMENEAS:Diseño, Construcción y Operación
Ph. D., P. Eng. TADEUSZ S. GOLOSINSKI [email protected]
Consultor INTERCADEJunio 2008
2
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
7.PIQUES DE TRASPASO(Orepasses)
7.PIQUES DE TRASPASO(Orepasses)
3
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
Chimeneas(Piques de Traspaso)
Chimeneas(Piques de Traspaso)
Orepasses
4
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
5
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
CONSIDERATIONSCONSIDERATIONS
• Orepass size and shape.• Wall condition: smooth or rough?• Orientation: vertical or inclined.• Material size, shape and particle distribution.• Operational mode.
– Dump when full / empty.• Moisture condition.
6
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
HOW BIG OREPASS? HOW BIG OREPASS?
• Depends on various considerations.– See the slide above.
• Usually defined by D/d ratio.– D is pass dia, d is diameter of the largest particles.
• For ratios up to D/d < 3, problems are likely.• For ratios of D/d > 5 , problems are unlikely.• Example: EL Teniente.
– Largest rocks 1,5m; pass dia 3,5m, 1m x 1m grizzly.
7
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
LESSARD & HADJIGEORGIU SURVEY 2007
LESSARD & HADJIGEORGIU SURVEY 2007
8
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
9
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
Scalper (31)
Cone dump (18)
Grizzly (32)No control structure: 72
10
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
DUMPS: BLOCK SCREENINGDUMPS: BLOCK SCREENING
• Scalper.– High maintenance costs (operator “pushing through”, broken
bars plugging the orepass).– Large slabs can get through.
• Grizzlies.– Better retain big blocks.– Grid dimensions critical (bucket & muck size<<9.
• Cone plugs.– Low maintenance costs.– Easy to plug up.
• No structure (71/153).– Screens “spread out” material thus minimize impact forces ☺.
11
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
DRAW CONTROLSDRAW CONTROLS
• Chutes using control chains (61).• Control chains (35).• Chutes using control chains and an arc gate (21).• No control over flow (33).• Chutes using solid doors (2).• Ross feeder (1).
12
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
Control chainswithout chute
Control chainsin a chute
Control chains andan arc gate
DRAWSDRAWS
13
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
Length of excavated sectionsLength of excavated sections Inclination of excavated sectionsInclination of excavated sections
Minimum diameterMinimum diameter Number of finger raises per sectionNumber of finger raises per section
14
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
LENGTHS & EXCAVATION METHODSLENGTHS & EXCAVATION METHODS
15
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
MATERIAL HANG-UPSMATERIAL HANG-UPS
Interlocking arches Cohesive arches
16
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
17
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
18
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
19
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
OREPASS SUPPORTOREPASS SUPPORT
• Ground conditions.• In-situ stress regime.• Mining induced
stresses.• Method of excavation.• Excavation dimensions.• Victinity of other
infrastructure.• Required transfer
capacity.• Access to install
support.• Design life.• Consequences of
failure.
20
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
TYPES OF GROUND SUPORTTYPES OF GROUND SUPORT
• Resin grouted rebar (116).• Resin grouted rebar and cemented grouted cables (9).• Resin-grouted cables (7).• Fibreglass rebar (8).• Resinn grouted rebar and split set (1).• No support (12).
21
Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade
Note
Cavingfront determinesstressconditions
El TenienteSec. 4 Sur.