1 Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade PIQUES y CHIMENEAS: Diseño, Construcción y Operación PIQUES y CHIMENEAS: Diseño, Construcción y Operación Ph. D., P. Eng. TADEUSZ S. GOLOSINSKI [email protected] Consultor INTERCADE Junio 2008

description

OPTIMIZACION DE LA EXTRACCION DE MINERAL MINA SAN RAFAEL - PUNO

Transcript of I7PiquesDetraspaso

Page 1: I7PiquesDetraspaso

1

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

PIQUES y CHIMENEAS:Diseño, Construcción y Operación

PIQUES y CHIMENEAS:Diseño, Construcción y Operación

Ph. D., P. Eng. TADEUSZ S. GOLOSINSKI [email protected]

Consultor INTERCADEJunio 2008

Page 2: I7PiquesDetraspaso

2

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

7.PIQUES DE TRASPASO(Orepasses)

7.PIQUES DE TRASPASO(Orepasses)

Page 3: I7PiquesDetraspaso

3

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Chimeneas(Piques de Traspaso)

Chimeneas(Piques de Traspaso)

Orepasses

Page 4: I7PiquesDetraspaso

4

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Page 5: I7PiquesDetraspaso

5

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

CONSIDERATIONSCONSIDERATIONS

• Orepass size and shape.• Wall condition: smooth or rough?• Orientation: vertical or inclined.• Material size, shape and particle distribution.• Operational mode.

– Dump when full / empty.• Moisture condition.

Page 6: I7PiquesDetraspaso

6

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

HOW BIG OREPASS? HOW BIG OREPASS?

• Depends on various considerations.– See the slide above.

• Usually defined by D/d ratio.– D is pass dia, d is diameter of the largest particles.

• For ratios up to D/d < 3, problems are likely.• For ratios of D/d > 5 , problems are unlikely.• Example: EL Teniente.

– Largest rocks 1,5m; pass dia 3,5m, 1m x 1m grizzly.

Page 7: I7PiquesDetraspaso

7

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

LESSARD & HADJIGEORGIU SURVEY 2007

LESSARD & HADJIGEORGIU SURVEY 2007

Page 8: I7PiquesDetraspaso

8

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Page 9: I7PiquesDetraspaso

9

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Scalper (31)

Cone dump (18)

Grizzly (32)No control structure: 72

Page 10: I7PiquesDetraspaso

10

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

DUMPS: BLOCK SCREENINGDUMPS: BLOCK SCREENING

• Scalper.– High maintenance costs (operator “pushing through”, broken

bars plugging the orepass).– Large slabs can get through.

• Grizzlies.– Better retain big blocks.– Grid dimensions critical (bucket & muck size<<9.

• Cone plugs.– Low maintenance costs.– Easy to plug up.

• No structure (71/153).– Screens “spread out” material thus minimize impact forces ☺.

Page 11: I7PiquesDetraspaso

11

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

DRAW CONTROLSDRAW CONTROLS

• Chutes using control chains (61).• Control chains (35).• Chutes using control chains and an arc gate (21).• No control over flow (33).• Chutes using solid doors (2).• Ross feeder (1).

Page 12: I7PiquesDetraspaso

12

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Control chainswithout chute

Control chainsin a chute

Control chains andan arc gate

DRAWSDRAWS

Page 13: I7PiquesDetraspaso

13

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Length of excavated sectionsLength of excavated sections Inclination of excavated sectionsInclination of excavated sections

Minimum diameterMinimum diameter Number of finger raises per sectionNumber of finger raises per section

Page 14: I7PiquesDetraspaso

14

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

LENGTHS & EXCAVATION METHODSLENGTHS & EXCAVATION METHODS

Page 15: I7PiquesDetraspaso

15

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

MATERIAL HANG-UPSMATERIAL HANG-UPS

Interlocking arches Cohesive arches

Page 16: I7PiquesDetraspaso

16

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Page 17: I7PiquesDetraspaso

17

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Page 18: I7PiquesDetraspaso

18

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Page 19: I7PiquesDetraspaso

19

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

OREPASS SUPPORTOREPASS SUPPORT

• Ground conditions.• In-situ stress regime.• Mining induced

stresses.• Method of excavation.• Excavation dimensions.• Victinity of other

infrastructure.• Required transfer

capacity.• Access to install

support.• Design life.• Consequences of

failure.

Page 20: I7PiquesDetraspaso

20

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

TYPES OF GROUND SUPORTTYPES OF GROUND SUPORT

• Resin grouted rebar (116).• Resin grouted rebar and cemented grouted cables (9).• Resin-grouted cables (7).• Fibreglass rebar (8).• Resinn grouted rebar and split set (1).• No support (12).

Page 21: I7PiquesDetraspaso

21

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - [email protected] - Consultor Intercade

Note

Cavingfront determinesstressconditions

El TenienteSec. 4 Sur.