FLOOD SOLUTION AT
STESEN JAMBATAN TIMBANG SRI GA
PROF IR DR AMIR HASHIM BIN MOHD KASSIM S
NAME MATRIC N
ANISHA ADZIHAN BINTI BAKRI DF140013
FHATIHA ATIKA BINTI SULIMAN DF140079
NUR IZZATY BINTI AZNI DF140090
SITI FATIMAH BINTI BADRUDDIN DF140050
AN FATIN AFIFAH BINTI AN MOHD FAUZI DF140024
FC 32002 HY
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 2/14
STESEN JAMBATAN TIMBANG SRI
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 3/14
1.0 INTRODUCTION1.0 INTRODUCTION- A flood occurs when water overflows the land that's normally dry. This can happen in a
multitude of ways. Most common is when rivers or streams overflow their banks.
- Moving water has awesome damaging power.
- Bridges, houses, trees, and cars can be picked up and carried off
- The erosive force of moving water can drag dirt from under a building's foundation, causing i
to crack and tumble.
- Changes in rainfall patterns and rises in sea levels resulting from climate change may make
such flooding incidents more freuent and severe in the future.
- we cannot prevent the climatic causes of flooding, we can take measures to prepare for it and
reduce the resulting damage
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 4/14
.0 CASE OF STUDY .0 CASE OF STUDY
!or this pro"ect we decide to choose
#tesen $ambatan Timbang, #ri %ading
as our study area. #tesen $ambatan
Timbang, #ri %ading is near main route
to Ayer &itam and near palm oil
plantation. Because of it lower level
than main road near it, flood always
occur especially during raining season.
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 5/14
3.0 GOALS3.0 GOALS
. (rotect life and property.
). (romote public awareness.
*. +ncourage the development and
implementation of longterm, cost
effective and environsound
mitigation mentally pro"ects.
4.0 OBJECTIV4.0 OBJECTIV. To reduce damages from flooding to structures in
$ambatan Timbang #ri %ading
). To ensure a sustainable future to the in region of
Timbang #ri %ading
*. +valuate the effectiveness of measures that have
the parties involved
-. nform the public on the risk e/posure to natural
increase the public1s capability to prepare, respon
mitigate the impacts of these events.
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 6/14
5.0 JUSTIFICATION5.0 JUSTIFICATION. Concerned with to the problem of flooding
). 2nderstand in detail the e/isting planning system
*. 2nderstanding the role of the parties involved
.0PROBLEM STATEMENT.0PROBLEM STATEMENT
2rbani0ation is a process which is inseparable with the development of a country. t is al
development and process that leads to positive change in society towards moderni0ation of the
&owever, if development is unplanned and controlled, it can bring negative impact to the environ
general. Among the negative effects of the suatter problem, traffic congestion, environm
increased risk of flooding danger.
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 7/14
• SITE VISITS
3n 4 March )56, we had went to
the #tesen $ambatan Timbang #ri
%ading to carry out our pro"ect
report. 7e make our observation
throughout our site visit.
much water as one of the
problem.
7.0 METHODO
• OBSERVATION PROBLEM
• ORGANIZATION REPORT
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 8/14
.0 FACTORS
THE CONTINOUS OF
HEAVY RAINFALL
DRAINAGE
LOW-LYING AREA
AND TYPES OF SOIL
IMPERVIOUS AREA
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 9/14
1) THE CONTINOUS OF HEAVY RAINFALL
The rain continued without stopping would cause flooding. n lowlying areas, rain water will flo
8rainage filled with water will spill out, causing lowlying areas flooded.
2) DRAINAGE SYSTEM
The drainage system is not planned well. !loods that often hit the place due to lack of drainage sy
too small and shallow. The amount of water causes the water to spill out of the ditch caused a fl
that supposed to channel the water is also not maintained by the authorities.
3) LOW-LYING AREA AND TYPES OF SOIL
3ur study area is considered as lowlying area as the level is lower that the roadside. This is on
causing flood to occur. !urthermore, our study area is located near the palm tree plantations. The t
Clay which has a high potential to swell upon wetting and shrink upon drying. t consists of claye
have poor drainage properties, low bearing strength and can cause slope instability9landslides.
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 10/14
4) IMPERVIOUS AREA
The natural surface has been converted to impervious surfaces such as cement, tar, concrete and s
can not be absorbed as it should, the water will take time to flow into the drainage system. Then,
volume of water that flows rapidly will cause a drainage system full. The drainage system can
volume of water and cause water to spill out. This can cause flash flood to happen even when the
time.
5) WASTE LITTERING
The cause that can be attributed other than the four e/isting factors is waste littering by pe
responsible. Although this is not a ma"or cause, but we found out that this factor is also contribute
flooding in our study area. Through our observations, the waste in our study area is at a low
satisfactory. 7e can see the waste that should not be there. t looks like the trenches and ditches w
debris could interfere the water flow and current observations made we found that the water
smoothly because of restrictions or ob"ects :debris; that prevents the flow of water
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 11/14
!.0 SOLUTION!.0 SOLUTION
. Improve irrigation and
drainage systems.
2. Privatization projec
drainage and irrigat
maintenance.
The drain along Stesen Jambatan Timbang
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 12/14
3. Dispose of waste in the right place.
4. Maintain oil palm
There are a lot of rubbish being dumped into
a ditch close Stesen Jambatan Timbang
The Oil Palm along the
Timbang
8/16/2019 Projek Slides Presentation
http://slidepdf.com/reader/full/projek-slides-presentation 13/14
10.0 CONCLUSION#oil and rock type can influence what happens to precipitation when
ground. mpermeable soils and rocks such as clay or shale do not a
infiltrate, this forces water to run off. Thus, because of this problem we tr
with recommendation that can avoid #tesen $ambatan Timbang #ri %adi
flooding or will not flood again when the occurrence of rain. Through
learn more clearly about the planning process and provided recomm
improve the effectiveness of flood control at #tesen $ambatan Timbang #r