CONSORCIO COLOSO 2014
DESCRIPCION MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
Conformación de la calzada existente 3,137,866.67 1,568,933.33
6,490,000.00 25,960,000.00 19,470,000.00
Terraplen 63,651,426.67 31,825,713.33
18,887,293.33 9,443,646.67
21,083,333.33 10,541,666.67
6,250,000.00 25,000,000.00 18,750,000.00
Excavaciónes varias sin clasificar 7,679,370.00 15,358,740.00 15,358,740.00 7,679,370.00
Excavación manual Seca en material común 1,378,406.17 2,756,812.33 2,756,812.33 1,378,406.17
Concreto clase F 1,732,372.00 1,732,372.00 1,732,372.00
50,166,299.25 50,166,299.25 50,166,299.25 50,166,299.25
Concreto clase D para Box-coulvert 23,444,036.00 23,444,036.00 23,444,036.00 23,444,036.00 11,722,018.00
Concreto clase D para Placa Huella 52,811,774.44 52,811,774.44 52,811,774.44 52,811,774.44 26,405,887.22
Concreto clase G para placa Huella 50,676,360.00 50,676,360.00 50,676,360.00 50,676,360.00 25,338,180.00
Relleno para estructuras 1,802,233.85 3,604,467.69 3,604,467.69 2,703,350.77
Subbase Granular 35,958,347.00 35,958,347.00 35,958,347.00 35,958,347.00
LICITACION PUBLICA No.001 DE 2014 “MEJORAMIENTO, MANTENIMIENTO Y CONSERVACION DE LA VIA EL OJITO – SAN ANTONIO – EL CERRUCHO, MUNICIPIO DE COLOSO, DEPARTAMENTO DE SUCRE”
Mejoramiento de la calzada existente con material seleccionado
Excavacion de la explanación, canales y prestamos
Transporte de materiales provenientes de la explanación, canales y préstamos para distancias mayores a mil metros (1000 m).
Transporte de material seleccionado para mejoramiento de la calzada existente
Acero de refuerzo de fy = 4.200 Kg / cm 2 (60.000 PSI)
Cunetas de concreto fundidas en lugar 13,448,766.00 26,897,532.00 26,897,532.00 26,897,532.00 26,897,532.00
Roceria 177,494.00 177,494.00
TOTAL COSTO DIRECTO 16,055,360.67 393,624,211.53 351,635,533.54 263,406,740.72 252,616,592.55 93,066,967.99 ADMINISTRACION 20% 3,211,072.13 78,724,842.31 70,327,106.71 52,681,348.14 50,523,318.51 18,613,393.60 IMPREVISTO 5% 802,768.03 19,681,210.58 17,581,776.68 13,170,337.04 12,630,829.63 4,653,348.40 UTILIDAD 5% 802,768.03 19,681,210.58 17,581,776.68 13,170,337.04 12,630,829.63 4,653,348.40 TOTAL COSTO DE OBRA 20,871,968.87 511,711,474.99 457,126,193.60 342,428,762.94 328,401,570.32 120,987,058.39
Revisión de estudios y diseños8,800,000.00
IVA 16% 1,408,000.00TOTAL COSTOS ESTUDIOS 10,208,000.00
Obras Complementarias y/o PAGA 4,082,485.45 4,082,485.45
4,082,485.45 4,082,485.45
TOTAL OFERTA ECONOMICA 35,162,454.32 515,793,960.44 457,126,193.60 342,428,762.94 328,401,570.32 120,987,058.39 PORCENTAJE MENSUAL 1.95% 28.66% 25.40% 19.02% 18.25% 6.72%PORCENTAJE ACUMULADO 1.95% 30.61% 56.01% 75.03% 93.28% 100.00%
____________________________________________ING. ARMANDO BULA OTERO
REPRESENTANTE LEGAL CONSORCIO COLOSO 2014
TOTAL COSTO OBRAS COMPLEMENTARIAS Y/O PAGA
Top Related