EXCAVACIONES A MANO PARA CIMENTACIONES
FRANCO CEBALLOS SALAS
CONCEPTO UNIDAD CANTIDAD
MATERIALES
SUBTOTAL
MANO DE OBRACUADRILLA: 2 PEONES + 1 SOBRESTANTE JOR 0.4237RENDIMIENTO 2.36 M3/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.06
SUBTOTAL
RELLENO COMPACTADO EN CIMENTACIN, CON MATERIAL PRODUCTO DE LA EXCAVACIN
VALENZUELA ESCALANTE JULIETA
CONCEPTO UNIDAD CANTIDAD
MATERIALESAGUA M3 0.3
SUBTOTAL
MANO DE OBRA
JOR 0.1428RENDIMIENTO: 7 M3/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.05
CUADRILLA: 0.1 SOBRESTANTE + 1 OFICIAL ALBAIL + 2 AYUDANTES
SUBTOTAL
ROSAS ACOSTA MIGUEL ROSARIO
CONCEPTO UNIDAD CANTIDAD
MATERIALESno aplica
SUBTOTAL
MANO DE OBRACUADRILLA: 1 ofic alb + 1 ayud gral + .1 sobres JOR 0.07RENDIMIENTO: 14M2/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.3
SUBTOTAL
COSTOS BASICOScimbra para plantilla PT 4.59317585concreto fc=100kg/cm2 M3 0.1
SUBTOTAL
ENRACE DE TABIQUE DE JAL X MT LINEAL DE 40 CM DE ALTURA
LOPEZ ALGANDAR JESUS
CONCEPTO UNIDAD CANTIDAD
MATERIALESTABIQUE PZA 10
SUBTOTAL
MANO DE OBRACUADRILLA: 1 OF. ALBAIL + 1 AYUD. + 0.1 SOBRESTANTE JOR 0.02RENDIMIENTO 49.86 ML X JOR
ANALISIS DE PRECIO UNITARIO DE PLANTILLA DE CONCRETO EN CIMENTACION CON ESPESOR DE 10 CM CON FC=100KG/CM2
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORPALA , CUCHARA , MARTILLO , CARRETIYA % 0.04
SUBTOTAL
BASICOSMORTERO , CAL-ARENA PRO. 1:6 M3 0.0132
SUBTOTAL
FULANITO DE LA MASCADA ROSA
CONCEPTO UNIDAD CANTIDAD
MATERIALESNO APLICA
SUBTOTAL
MANO DE OBRACUADRILLA JOR 0.002
0.1 SOBREESTANTE, 1 OPERADOR, 1 AYUDANTERENDIMIENTO
456 M3 / JORNADA SUBTOTAL
EQUIPO Y HERRAMIENTA MENORMAQUINARIA: HR. 1
retroexcabadoraSUBTOTAL
BASICOSNO APLICA
SUBTOTAL
AXCABACION DE TERRENO A 2M DE PROFUNDIDAD AL AIRE LIBRE CON RETRO CON CAPASIDAD DE 0.76M3
ESPECIFICACIN: Fabricacion de un enrace de 42cm de alto por 1mL de bock de 15x20x40 cms. En 2 hiladas Juntiado con mortero cal-arena. Prop. 1:6. incluye todo
LUNA DURAN KAREM ESTEPHANIA
CONCEPTO UNIDAD CANTIDAD
MATERIALEStabique de block PZA 5
SUBTOTAL
MANO DE OBRACuad: 0.1 sob + 1of.albil.+ayudante JOR 0.1rend: 10m2/jor
SUBTOTAL
EQUIPO Y HERRAMIENTA MENOR
HERRAMIENTA MENOR % 4
SUBTOTALBSICOS:mortero cal-arena 1:6 M2 $ 0.03
SUBTOTAL
TOTAL CD:
ESPECIFICACIN: Fabricacion de un enrace de 42cm de alto por 1mL de bock de 15x20x40 cms. En 2 hiladas Juntiado con mortero cal-arena. Prop. 1:6. incluye todo
EXCAVACIONES A MANO PARA CIMENTACIONESUN:M3$293.50
FRANCO CEBALLOS SALAS
C.U. IMPORTE
SUBTOTAL $0.00
$653.50 $276.89
SUBTOTAL $276.89
$276.89 $16.61
SUBTOTAL $16.61
RELLENO COMPACTADO EN CIMENTACIN, CON MATERIAL PRODUCTO DE LA EXCAVACINUN:M3$175.29
VALENZUELA ESCALANTE JULIETA
C.U. IMPORTE
$10.00 $3.00$0.00$0.00$0.00
SUBTOTAL $3.00
$1,149.07 $164.09
SUBTOTAL $164.09
$164.09 $8.20$0.00
SUBTOTAL $8.20TOTAL: $175.29
UN:M3$231.62
ROSAS ACOSTA MIGUEL ROSARIO
C.U. IMPORTE
SUBTOTAL
$882.37 $61.77
SUBTOTAL $61.77
$61.77 $1.85SUBTOTAL $1.85
$6.39 $29.35$1,386.52 $138.65
SUBTOTAL $168.00
ENRACE DE TABIQUE DE JAL X MT LINEAL DE 40 CM DE ALTURAUN:ML
$59.32LOPEZ ALGANDAR JESUS
C.U. IMPORTE
$3.50 $35.00
SUBTOTAL $35.00
$882.37 $17.65
ANALISIS DE PRECIO UNITARIO DE PLANTILLA DE CONCRETO EN CIMENTACION CON ESPESOR DE 10 CM
SUBTOTAL $17.65
$17.65 $0.71
SUBTOTAL $0.71
$452.40 $5.97
SUBTOTAL $5.97
m3$7.94
FULANITO DE LA MASCADA ROSA
C.U. IMPORTE
SUBTOTAL $0.00
$842.63 $1.69
SUBTOTAL $1.69
$350.00 $6.25
SUBTOTAL $6.25
$0.00
SUBTOTAL $0.00
UN:M3$184.55
AXCABACION DE TERRENO A 2M DE PROFUNDIDAD AL AIRE LIBRE CON RETRO CON CAPASIDAD DE
ESPECIFICACIN: Fabricacion de un enrace de 42cm de alto por 1mL de bock de 15x20x40 cms. En 2 hiladas Juntiado con mortero cal-arena. Prop. 1:6. incluye todo
LUNA DURAN KAREM ESTEPHANIA
C.U. IMPORTE
$15.00 $75.00
SUBTOTAL $75.00
$882.37 $88.24
SUBTOTAL $88.24
$88.24 $3.53
SUBTOTAL $3.53
$ 452.40 $ 14.25
SUBTOTAL $17.78
TOTAL CD: $184.55
ENJARRE CON MORTERO CEMENTO-ARENA PROPORCIN 1:6
SELMAR FABIAN ALVAREZ CARDENAS
CONCEPTO UNIDAD CANTIDAD
MATERIALES
AGUA PARA HUMEDECER MURO Y CURADO DEL REPELLADO M3 0.05
SUBTOTAL
MANO DE OBRACUADRILLA: 1 OF. ALBAIL + 1 PEON + 0.1 SOBRESTANTE JOR 0.052RENDIMIENTO 19 M2/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 2
SUBTOTAL
BASICOSMORTERO CEMENTO-ARENA 1:6 M3 0.022DESPERDICIO % 3
SUBTOTAL
ENJARRE CON MORTERO CEMENTO-ARENA PROPORCIN 1:6UN:M2$73.29
SELMAR FABIAN ALVAREZ CARDENAS
C.U. IMPORTE
$100.00 $5.00
SUBTOTAL $5.00
$864.70 $44.96
SUBTOTAL $44.96
$44.96 $0.90
SUBTOTAL $0.90
$989.90 $21.78$21.78 $0.65
SUBTOTAL $22.43
METRO LINEAL DE CONTRATRABE DE 15 X 30 CM
PADILLA RAMIREZ CLAUDIA
CONCEPTO UNIDAD
MATERIALESN. A.
SUBTOTALMANO DE OBRA
JOR
JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORPALA, MARTILLO, DOBLADOR, ETC. %
SUBTOTALBASICOSCONCRETO F'C=150 KG/CM2 M3SUMINISTRO Y HABILITADO DE ACERO DE 3/8" TONSUMINISTRO Y HABILITADO DE ACERO DE 1/4" KG
M2
BOJORQUEZ ENRIQUEZ JOSE ALFONSO
CONCEPTO UNIDAD
MATERIALES////// 0
0
SUBTOTAL
MANO DE OBRA
CUADRILLA COLADO: 1 OF. ALBAIL; 2 AYUDANTES; 1 SOBRESTANTE. RENDIMIENTO: 2.25 M/3*JORCUADRILLA CIMBRA: 1 OF. CARPINTERO; 1 AYUDANTE; 1 SOBRESTANTE. RENDIMIENTO: 9.44 M/L*JOR
SUMINISTRO Y HABILITADO DE MADERA PARA CIMBRA EN CONTRATRABE
ELABORACION DE COLUMNA DE 20X30CM DE 3M DE ALTURA DE CONCRETO DE FC=250KG/CM2 CON ARMADO DE 6 VARILLAS DE 3/8 Y ESTRIBOS @ 20CM. INCLUYE TODOS LOS TRABAJOS NECESARIOS.
JORRENDIMIENTO 20PZAS./JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %
SUBTOTAL
BASICOSCONCRETO DE FC=200KG/CM2CIMBRA EN COLUMNA M2SUMINISTRO Y HABILITADO DE ACERO KG.
SUBTOTAL
REALIZ: VALLE GONZLEZ ANA KARELY
CONCEPTO UNIDAD
MATERIALESNO APLICA
SUBTOTAL
MANO DE OBRACuadrilla: 1 sobr, 1of alb, 1ayud gral JORRendimiento: 10ml/JOR-cuad
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %
SUBTOTAL
BASICOSSuministro y habilitado de acero de 1/4" TONSuministro y habilitado de acero 3/8" TONFabricacin de concreto f'c=150kg/cm2 M3
CUADRILLA: 1 OF. ALBAIL + 1 AYUDANTE GENERAL + 0.1 SOBRESTANTE
M
ESPECIFICACIN: Elaboracin de columna intermedia de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los
trabajos necesarios.
Cimbra M2SUBTOTAL
GARCA MEZA YAJAIRA BERENICE
CONCEPTO UNIDAD
MATERIALESBLOCK PZA
SUBTOTAL
MANO DE OBRACUAD: 0.1 SOB + 1 OF ALB + 1 AYUD JORREND: 10M2/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %
SUBTOTAL
BSICOSMORTERO CAL-ARENA 1:6 M3
SUBTOTALTOTAL
KARINA NOHEMI MARTNEZ ESPINOZA
CONCEPTO UNIDAD
MATERIALESNO APLICA
SUBTOTAL
MANO DE OBRA
CUADRILLA: 0.10 SOBRESTANTE, 1 OF. ALBAIL, 1 AYUD, GRAL. JOR
Fabricacin de muro de block de 12 cm de espesor de 12x20x40 cms. Junteado de mortero cal-arena, prop 1:6, incluye todo
FABRICACIN DE TRABE DE 20 x 40 CMS. ARMADA CON 4 VARILLAS DE ACERO DE 3/8" Y ALAMBRN DE 1/4" @ 2O CMS. CONCRETO F'C= 200 KG/CM2; INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y
HERRAMIENTA Y TODOS LOS TRABAJOS NECESARIOS.
RENDIMIENTO: 10ML/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA:HERRAMIENTA MENOR %
SUBTOTALBASICOS :SUMINISTRO Y HABILATADO DE ALAMBRN 1/4" TONSUMINISTRO Y HABILATADO DE ACERO 3/8" TONFABRICACIN DE CONCRETO 200 KG/CM2 M3CIMBRA DE TRABE M2
SUBTOTAL
REALIZ: yisvi graciela fierro lastras
CONCEPTO UNIDAD
MATERIALESclavo 2 1/2" kg
SUBTOTAL
MANO DE OBRACuadrilla: .1 sobr, 1of alb, 1ayud gral JORRendimiento: 10ml/JOR-cuad
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %
SUBTOTAL
BASICOSSuministro y habilitado de acero de 1/4" TONSuministro y habilitado de acero 3/8" TON
ESPECIFICACIN: Elaboracin de castillo final 3 caras, de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los
trabajos necesarios.
Fabricacin de concreto f'c=150kg/cm2 M3Suministro y habilitado de alambre cal 18 kgCimbra castillo 3 caras pt
SUBTOTAL
METRO LINEAL DE CONTRATRABE DE 15 X 30 CMUN:ML
$1,189.88
PADILLA RAMIREZ CLAUDIA
CANTIDAD C.U. IMPORTE
$0.00
SUBTOTAL $0.00
0.4444 $1,194.07 $530.64
0.1006 $929.91 $93.55
SUBTOTAL $624.19
0.0400 $530.64 $21.23$0.00
SUBTOTAL $21.23
0.3000 $1,272.19 $381.660.0023 $19,413.51 $44.260.0011 $15,827.52 $16.62
1.0000 $101.92 $101.92SUBTOTAL $544.46
UN:PZA$721.46
BOJORQUEZ ENRIQUEZ JOSE ALFONSO
CANTIDAD C.U. IMPORTE
0 $0.00 $0.000 $0.00 $0.00
SUBTOTAL $0.00
ELABORACION DE COLUMNA DE 20X30CM DE 3M DE ALTURA DE CONCRETO DE FC=250KG/CM2 CON ARMADO DE 6 VARILLAS DE 3/8 Y ESTRIBOS @ 20CM. INCLUYE TODOS LOS TRABAJOS NECESARIOS.
0.05 $882.37 $44.12
SUBTOTAL $44.12
3 $44.12 $1.32
SUBTOTAL $1.32
0.18 $1,309.04 $235.631 $124.99 $124.991 $315.40 $315.40
SUBTOTAL $676.02
UN:PZA$545.41
REALIZ: VALLE GONZLEZ ANA KARELY
CANTIDAD C.U. IMPORTE
SUBTOTAL $0.00
0.1 $882.30 $88.23
SUBTOTAL $88.23
3 $88.23 $2.65
SUBTOTAL $2.65
0.0008715 $15,827.51 $13.790.00224 $19,278.68 $43.18
0.3 $ 1,272.19 $381.66
ESPECIFICACIN: Elaboracin de columna intermedia de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los
1 $ 15.90 $15.90SUBTOTAL $454.53
UN:M2$257.48
GARCA MEZA YAJAIRA BERENICE
CANTIDAD C.U. IMPORTE
17 $9.00 $153.00SUBTOTAL $153.00
0.1 $882.37 $88.24
SUBTOTAL $88.24
0.04 $88.24 $3.53SUBTOTAL $3.53
0.0281 $452.40 $12.71SUBTOTAL $12.71
TOTAL $257.48
UN:ML$403.53
KARINA NOHEMI MARTNEZ ESPINOZA
CANTIDAD C.U. IMPORTE
SUBTOTAL $0.00
0.1 $882.37 $88.24
Fabricacin de muro de block de 12 cm de espesor de 12x20x40 cms. Junteado de mortero cal-arena, prop
FABRICACIN DE TRABE DE 20 x 40 CMS. ARMADA CON 4 VARILLAS DE ACERO DE 3/8" Y ALAMBRN DE 1/4" @ 2O CMS. CONCRETO F'C= 200 KG/CM2; INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y
HERRAMIENTA Y TODOS LOS TRABAJOS NECESARIOS.
SUBTOTAL $88.24
0.03 $88.24 $2.65
SUBTOTAL $2.65
0.00137 $18,046.60 $24.720.00239 $19,413.51 $46.40
0.08 $1,309.04 $104.721 $134.15 $134.15
SUBTOTAL $312.64
UN:PZA$462.51
CANTIDAD C.U. IMPORTE
0.2 $0.00 $0.00
$0.00
0.1 $0.00 $0.00
$0.00
3 $0.00 $0.00
$0.00
0.0008715 $15,827.51 $13.790.002228 $19,278.68 $42.95
ESPECIFICACIN: Elaboracin de castillo final 3 caras, de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los
0.3 $ 1,272.19 $381.660.2 $ 16.92 $3.38
$ 14.50 $20.72$462.51
ENTORTADO EN AZOTEAS
CERVANTES CUADRAS CRISTIAN OMAR
CONCEPTO UNIDAD CANTIDAD
MATERIALESN. A.
SUBTOTAL
MANO DE OBRA
CUADRILLA: 1 OF. ALBAIL + 1 AYUDANTE + 0.1 SOBRESTANTE JOR 0.0401RENDIMIENTO 24.93 M3 POR JORNADA
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4
SUBTOTAL
BASICOSMORTERO CEMENTO-ARENA PROPORCION 1:5 M2 0.05
SUBTOTAL
SUMINISTRO Y HABILITADO DE IMPERMEABILIZANTE EN AZOTEA
CONTRERAS LUQUE KARLA JANETH
CONCEPTO UNIDAD CANTIDAD
MATERIALESIMPERMEABILIZANTE COMEX TOP TOTAL SECADO RAPIDO 10 AOS GAL 0.375SELLADOR COMEX 5X1 REFORZADO LITRO 0.03
SUBTOTAL
MANO DE OBRACUADRILLA: AY GRAL + .1 SOB JOR 0.03RENDIMIENTO: 30M/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 2
SUBTOTAL
BASICOS
SUBTOTAL
ENTORTADO EN AZOTEAS
CERVANTES CUADRAS CRISTIAN OMAR
CONCEPTO UNIDAD CANTIDAD
MATERIALESNO HAY
SUBTOTAL
MANO DE OBRA
CUADRILLA: 1 OF. ALBAIL + 1 AUDANTE + 0.1 SOBRESTANTE JOR 0.0401RENDIMIENTO 24.93 M3 POR JORNADA
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4
SUBTOTAL
BASICOSMORTERO,CEMENTO AREPA PROPORCION 1-5 M2 0.05
SUBTOTAL
analisis de la boquilla del petril por metro lineal
MARIA DEL ROSARIO LERMA RUIZ
CONCEPTO UNIDAD CANTIDADMATERIALESarena M3 0.3166grava de 1 1/2" M3 0.3166tubo de pvc de 6" PZA 1agua M3 0.0055MANO DE OBRA SUBTOTALCUADRILLA: 1 OF. ALBAIL + 1 PEON + 0.1 SOBRESTANTERENDIMIENTO 16M/JOR
jor 0.0625
EQUIPO Y HERRAMIENTA MENOR SUBTOTALHERRAMIENTA MENOR
% 4
BASICOS SUBTOTALconcreto de 200 saco 2.7777
SUBTOTALTOTAL
ENTORTADO EN AZOTEASUN:M2$94.25
CERVANTES CUADRAS CRISTIAN OMAR
C.U. IMPORTE
SUBTOTAL $0.00
$882.36 $35.38
SUBTOTAL $35.38
$35.38 $1.42
SUBTOTAL $1.42
$1,149.00 $57.45
SUBTOTAL $57.45
SUMINISTRO Y HABILITADO DE IMPERMEABILIZANTE EN AZOTEA $140.71
CONTRERAS LUQUE KARLA JANETH
C.U. IMPORTE
$349.50 $131.06$96.00 $2.88
SUBTOTAL $133.94
$221.30 $6.64
UN: M
SUBTOTAL $6.64
$6.64 $0.13
SUBTOTAL $0.13
SUBTOTAL $0.00
ENTORTADO EN AZOTEASUN:M2$94.25
CERVANTES CUADRAS CRISTIAN OMAR
C.U. IMPORTE
SUBTOTAL $0.00
$882.36 $35.38
SUBTOTAL $35.38
$35.38 $1.42
SUBTOTAL $1.42
$1,149.00 $57.45
SUBTOTAL $57.45
analisis de la boquilla del petril por metro linealUN:M
$4,964.41
MARIA DEL ROSARIO LERMA RUIZ
C.U. IMPORTE
$180.00 $56.99$125.00 $39.58$550.00 $550.00$100.00 $0.55
SUBTOTAL $647.11
$882.37 $55.15
SUBTOTAL $55.15
$55.15 $220.59
SUBTOTAL $220.59$1,455.00 $4,041.55
SUBTOTAL $4,041.55TOTAL $4,964.41
LUCIA KARELY PEREZ CASTRO
CONCEPTO UNIDAD CANTIDAD
MATERIALESPISO VITROMEX 30 X 30 CMS M2 1CEMENTO CREST TON 0.004AGUA POTABLE M3 0.0015
SUBTOTAL
MANO DE OBRAOFICIAL AZULEJERO JOR 1AYUDANTE GENERAL JOR 1SOBRESTANTE JOR 0.1RENDIMIENTO M2/JOR 0.076
SUBTOTALEQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4
SUBTOTALBASICOSN. A.
SUBTOTAL
YAJAHIRA PIMIENTA PALMA
CONCEPTO UNIDAD CANTIDADMATERIALESAzulejo ceramico 20x20 M2 1
KG 0.069TON 0.004
Agua Potable M3 0.04SUBTOTAL
MANO DE OBRAAyudante General JOR 1Oficial Azulejero JOR 1Sobrestante JOR 0.1Rendimiento M2/JOR 0.9166
SUBTOTAL
COLOCACION DE PISO VITROMEX DE 30 X 30 CMS INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO
ESPECIFICACIN: RECUBRIMIENTO DE AZULEJO CERAMICO PARA BAO 20 X 20, INCLUYE SUMINISTRO Y COLOCACIN.
Adhesivoblancopremier antideslizamiento.Cementoblanco,marcaTolteca
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.03
SUBTOTAL
CONSTRUCCION DE CASA CON LEGOS DE 4 X 1 CM
FULANITO DE LA MASCADA ROSA
CONCEPTO UNIDAD CANTIDAD
MATERIALESPINTURA VINILICA LT 0.36
SUBTOTAL
MANO DE OBRA
JOR 0.02RENDIMIENTO 50 M2/JOR
SUBTOTAL
EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.33
SUBTOTAL
BASICOSANDAMIO PT 0.27
SUBTOTALTOTAL
CUADRILLA: 1 OF. PINTOR + 1 AYUDANTE GRAL + 0.1 SOBRESTANTE
UN: M2$142.21
LUCIA KARELY PEREZ CASTRO
C.U. IMPORTE
$55.00 $55.00$3,910.00 $15.64
$10.00 $0.02SUBTOTAL $70.66
$527.86 $527.86$311.70 $311.70$657.36 $65.74$905.30 $68.80
SUBTOTAL $68.80
$68.80 $2.75
SUBTOTAL $2.75
SUBTOTAL $0.00
UN:M3$1,024.97
YAJAHIRA PIMIENTA PALMA
C.U. IMPORTE
$145.00 $145.00$94.61 $6.53
$3,689.65 $14.76$100.00 $4.00
SUBTOTAL $170.29
$311.70 $311.70$527.86 $527.86$657.36 $65.74$905.30 $829.79
SUBTOTAL $829.79
COLOCACION DE PISO VITROMEX DE 30 X 30 CMS INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA Y
ESPECIFICACIN: RECUBRIMIENTO DE AZULEJO CERAMICO PARA BAO 20 X 20, INCLUYE SUMINISTRO Y
$829.79 $24.89SUBTOTAL $24.89
TOTAL C.D. $1,024.97
CONSTRUCCION DE CASA CON LEGOS DE 4 X 1 CMUN:PZA$41.38
FULANITO DE LA MASCADA ROSA
C.U. IMPORTE
$75.00 $27.00
SUBTOTAL $27.00
$521.30 $10.43
SUBTOTAL $10.43
$10.43 $0.03
SUBTOTAL $0.03
$14.50 $3.92
SUBTOTAL $3.92TOTAL $41.38
ROMERO MONTOYA EVELYN
CONCEPTO UNIDAD CANTIDAD
MATERIALESM2 1.05
SUBTOTAL
MANO DE OBRACUADRILLA: 1 OF. ALBAIL + 1 PEON + 0.1 SOBRESTANTE JOR 0.1RENDIMIENTO 10M2 /JOR
SUBTOTALEQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4
SUBTOTAL
BASICOSCONCRETO F"C=200KG/CM2 M2 0.1
SUBTOTAL
FABRICACION DE FIRME DE CONCRETO DE FC 200 kg/cm2 DE 10CM DE ESPESOR ARMADO CON MALLA ELECTROSOLDADA 6x6/10-10, SIN CONSIDERAR CIMBRA EN FRONTERAS
Mallaelectrosoldada66-10-10(1.02kg/m2).
UN:M2$238.54
ROMERO MONTOYA EVELYN
C.U. IMPORTE
13.4 14.07
SUBTOTAL $14.07
$882.36 $88.24
$88.24
$88.24 $3.53
$3.53
$1,327.04 $132.70
$132.70
FABRICACION DE FIRME DE CONCRETO DE FC 200 kg/cm2 DE 10CM DE ESPESOR ARMADO CON MALLA ELECTROSOLDADA 6x6/10-10, SIN CONSIDERAR CIMBRA EN FRONTERAS