FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
OE.2.3.2.3 Para la armadura de acero (ZAPATAS)UBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Totalz1 4 1/2'' 10.000 40.000 1.150 46.000
z2 1 1/2'' 14.000 14.000 1.450 20.300z3 1 1/2'' 16.000 16.000 1.550 24.800
z4 6 1/2'' 10.000 60.000 1.050 63.000
z5 1 1/2'' 40.000 40.000 0.450 18.000
z5 1 1/2'' 3.000 3.000 7.850 23.550TOTAL
OE.2.3.3.3 Para la armadura de acero ( VIGAS DE CIMENTACION)UBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Totalvigas de conexin
eje A, C tramo 3 a 1 2 5/8'' 2.000 4.000 6.870 27.480
2 5/8'' 2.000 4.000 6.870 27.480
2 3/8'' 41.000 82.000 1.220 100.040
CUADRO DE METRADOS
DiseoFierro
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje B tramo 3 a 1 1 5/8'' 3.000 3.000 6.870 20.610
1 5/8'' 2.000 2.000 6.870 13.740
1 3/8'' 41.000 41.000 1.220 50.020
eje 2 tramo A a C 1 5/8'' 2.000 2.000 8.420 16.840
1 1/2'' 1.000 1.000 8.420 8.420
1 5/8'' 2.000 2.000 8.420 16.840
1 3/8'' 48.000 48.000 1.220 58.560
eje 1 tramo A a C 1 5/8'' 4.000 4.000 8.420 33.680
1 5/8'' 3.000 3.000 8.420 25.260
1 3/8'' 48.000 48.000 1.120 53.760TOTAL
OE.2.3.6.1.3 Para la armadura de aceroUBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo TotalMURO DE CONTENCION 1 3/8'' 29.000 29.000 7.920 229.680
DiseoFierro
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
1 3/8'' 28.000 28.000 4.440 124.320
COL. ARRIOSTRE 1 1/2'' 4.000 4.000 4.400 17.600
1 3/8'' 29.000 29.000 1.180 34.220TOTAL
OE.2.3.7.3 Para la armadura de acero (COLUMNAS)PRIMER NIVEL
UBICACINcant.
CANTIDAD Long. Ml Elemento Total Diseo Total
C1, C2 4 5/8'' 4.000 16.000 4.960 79.360
4 1/2'' 2.000 8.000 4.960 39.680
4 3/8'' 26.000 104.000 1.180 122.720
C3, C4 2 5/8'' 4.000 8.000 4.960 39.680
2 1/2'' 4.000 8.000 4.960 39.680
2 3/8'' 26.000 52.000 1.380 71.760TOTAL
SEGUNDO NIVEL
DiseoFierro
DiseoFierro
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
UBICACINcant.
CANTIDAD Long. Ml Elemento Total Diseo Total
C1, C2 4 5/8'' 4.000 16.000 2.800 44.800
4 1/2'' 2.000 8.000 2.800 22.400
4 3/8'' 18.000 72.000 1.180 84.960
C3, C4 2 5/8'' 4.000 8.000 2.800 22.400
2 1/2'' 4.000 8.000 2.800 22.400
2 3/8'' 18.000 36.000 1.380 49.680
C5 1 5/8'' 4.000 4.000 4.560 18.240
1 1/2'' 4.000 4.000 4.560 18.240
1 3/8'' 23.000 23.000 1.380 31.740
C6, C7, C8 5 5/8'' 4.000 20.000 4.560 91.200
5 1/2'' 2.000 10.000 4.560 45.600
5 3/8'' 23.000 115.000 1.180 135.700
DiseoFierro
DiseoFierro
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
TOTAL
TERCER NIVELUBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Total
C1, C2 4 5/8'' 4.000 16.000 2.800 44.800
4 1/2'' 2.000 8.000 2.800 22.400
4 3/8'' 18.000 72.000 1.180 84.960
C3, C4 2 5/8'' 4.000 8.000 2.800 22.400
2 1/2'' 4.000 8.000 2.800 22.400
2 3/8'' 18.000 36.000 1.380 49.680
C5 1 5/8'' 4.000 4.000 2.800 11.200
1 1/2'' 4.000 4.000 2.800 11.200
1 3/8'' 18.000 18.000 1.380 24.840
C6, C7, C8 5 5/8'' 4.000 20.000 2.800 56.000
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
5 1/2'' 2.000 10.000 2.800 28.000
5 3/8'' 18.000 90.000 1.180 106.200TOTAL
PARAPETOSUBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Total
C1,C2, C3, C4, C5, C6, C7, C8 9 1/2'' 4.000 36.000 1.160 41.760
9 3/8'' 9.000 81.000 0.780 63.180
COL VORDE 3 1/2'' 4.000 12.000 1.410 16.920
3 3/8'' 5.000 15.000 0.480 7.200TOTAL
TOTAL COLUMNAS
OE.2.3.8.3 Para la armadura de acero (VIGAS)VIGAS PRIMER NIVEL
UBICACINcant.
CANTIDAD Long. Ml Elemento Total Diseo Total
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VIGA 104, 106
25/8'' 2.000 4.000 9.170 36.680
25/8'' 2.000 4.000 9.170 36.680
1/2'' 1.000 0.000 1.710 0.000
1/2'' 1.000 0.000 1.860 0.000
5/8'' 1.000 0.000 1.850 0.000
23/8'' 61.000 122.000 1.180 143.960
VIGA 105
15/8'' 2.000 2.000 9.170 18.340
15/8'' 2.000 2.000 9.170 18.340
1/2'' 1.000 0.000 1.100 0.000
1/2'' 1.000 0.000 1.100 0.0001 1/2'' 1.000 1.000 8.870 8.870
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOSVIGA 105
13/8'' 60.000 60.000 1.180 70.800
VIGA 101, 102
25/8'' 2.000 4.000 8.220 32.880
25/8'' 2.000 4.000 8.220 32.880
5/8'' 1.000 0.000 1.360 0.000
1/2'' 1.000 0.000 1.360 0.000
23/8'' 52.000 104.000 1.180 122.720
VIGA 103
15/8'' 2.000 2.000 8.220 16.440
15/8'' 3.000 3.000 8.220 24.660
5/8'' 2.000 0.000 1.210 0.000
5/8'' 2.000 0.000 1.210 0.000
13/8'' 58.000 58.000 1.540 89.320
VB-01
1 1/2'' 2.000 2.000 8.820 17.640
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VB-01 1 1/2'' 2.000 2.000 8.820 17.640
13/8'' 58.000 58.000 0.580 33.640
VB-02
11/2'' 2.000 2.000 3.980 7.960
11/2'' 2.000 2.000 3.980 7.960
1 3/8'' 29.000 29.000 0.880 25.520
VB-DUCTO
11/2'' 1.000 1.000 3.420 3.420
11/2'' 1.000 1.000 3.420 3.420
1 3/8'' 31.000 31.000 0.880 27.280TOTAL
VIGAS SEGUNDO NIVELUBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Total
VIGA 205, 207
25/8'' 2.000 4.000 13.720 54.880
25/8'' 2.000 4.000 13.720 54.880
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VIGA 205, 207 1/2'' 1.000 0.000 1.710 0.000
1/2'' 1.000 0.000 1.860 0.000
5/8'' 1.000 0.000 1.850 0.000
23/8'' 88.000 176.000 1.180 207.680
VIGA 206
15/8'' 3.000 3.000 13.720 41.160
15/8'' 2.000 2.000 13.720 27.440
1/2'' 1.000 0.000 1.100 0.000
1/2'' 1.000 0.000 1.100 0.0001 1/2'' 1.000 1.000 12.820 12.820
13/8'' 88.000 88.000 1.180 103.840
VIGA 201, 202
25/8'' 2.000 4.000 8.220 32.880
DiseoFierro
DiseoFierro
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VIGA 201, 202
25/8'' 2.000 4.000 8.220 32.880
5/8'' 1.000 0.000 1.360 0.000
1/2'' 1.000 0.000 1.360 0.000
23/8'' 52.000 104.000 1.180 122.720
VIGA 203
15/8'' 2.000 2.000 8.220 16.440
15/8'' 2.000 2.000 8.220 16.440
15/8'' 1.000 1.000 8.220 8.220
5/8'' 2.000 0.000 1.210 0.000
5/8'' 2.000 0.000 1.210 0.000
13/8'' 58.000 58.000 1.180 68.440
VIGA 204
25/8'' 2.000 4.000 8.220 32.880
25/8'' 2.000 4.000 8.220 32.880
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VIGA 2045/8'' 1.000 0.000 1.360 0.000
1/2'' 1.000 0.000 1.360 0.000
23/8'' 50.000 100.000 1.180 118.000
VB-01
1 1/2'' 2.000 2.000 8.820 17.640
11/2'' 2.000 2.000 8.820 17.640
13/8'' 58.000 58.000 0.580 33.640
VB-04
11/2'' 2.000 2.000 3.980 7.960
11/2'' 2.000 2.000 3.980 7.960
1 3/8'' 29.000 29.000 0.880 25.520
VB-03
11/2'' 2.000 2.000 4.250 8.500
11/2'' 2.000 2.000 4.250 8.500
1 3/8'' 27.000 27.000 0.880 23.760
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VB-DUCTO
11/2'' 1.000 1.000 3.420 3.420
11/2'' 1.000 1.000 3.420 3.420
1 3/8'' 31.000 31.000 0.880 27.280
VB-DUCTO der
11/2'' 1.000 1.000 1.080 1.080
11/2'' 1.000 1.000 1.080 1.080
1 3/8'' 5.000 5.000 0.880 4.400TOTAL
VIGAS TERCER NIVELUBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Total
VIGA 305, 307
25/8'' 2.000 4.000 13.720 54.880
25/8'' 2.000 4.000 13.720 54.880
1/2'' 1.000 0.000 1.710 0.000
1/2'' 1.000 0.000 1.860 0.000
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VIGA 305, 307
5/8'' 1.000 0.000 1.850 0.000
23/8'' 88.000 176.000 1.180 207.680
VIGA 306
15/8'' 2.000 2.000 13.720 27.440
15/8'' 2.000 2.000 13.720 27.440
1/2'' 1.000 0.000 1.100 0.000
1/2'' 1.000 0.000 1.100 0.0001 1/2'' 1.000 1.000 12.820 12.820
13/8'' 88.000 88.000 1.180 103.840
VIGA 301, 302
25/8'' 2.000 4.000 8.220 32.880
25/8'' 2.000 4.000 8.220 32.880
5/8'' 1.000 0.000 1.360 0.000
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VIGA 301, 302
1/2'' 1.000 0.000 1.360 0.000
23/8'' 52.000 104.000 1.180 122.720
VIGA 303
15/8'' 2.000 2.000 8.220 16.440
15/8'' 2.000 2.000 8.220 16.440
15/8'' 1.000 1.000 7.920 7.920
5/8'' 2.000 0.000 1.210 0.000
5/8'' 2.000 0.000 1.210 0.000
13/8'' 58.000 58.000 1.180 68.440
VIGA 304
25/8'' 2.000 4.000 8.220 32.880
25/8'' 2.000 4.000 8.220 32.880
5/8'' 1.000 0.000 1.360 0.000
1/2'' 1.000 0.000 1.360 0.000
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOSVIGA 304
23/8'' 50.000 100.000 1.180 118.000
VB-01
1 1/2'' 2.000 2.000 8.820 17.640
11/2'' 2.000 2.000 8.820 17.640
13/8'' 58.000 58.000 0.580 33.640
VB-04
11/2'' 2.000 2.000 3.980 7.960
11/2'' 2.000 2.000 3.980 7.960
1 3/8'' 29.000 29.000 0.880 25.520
VB-03
11/2'' 2.000 2.000 4.250 8.500
11/2'' 2.000 2.000 4.250 8.500
1 3/8'' 27.000 27.000 0.880 23.760
VB-DUCTO
11/2'' 1.000 1.000 3.420 3.420
11/2'' 1.000 1.000 3.420 3.420
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
VB-DUCTO
1 3/8'' 31.000 31.000 0.880 27.280
VB-DUCTO der
11/2'' 1.000 1.000 1.080 1.080
11/2'' 1.000 1.000 1.080 1.080
1 3/8'' 5.000 5.000 0.880 4.400TOTAL
TOTAL
OE.2.3.9.2.3 Para la armadura de acero (LOSA ALIGERADA)UBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Total
Losa A,B
1 1/2'' 1.000 1.000 8.200 8.200
1 3/8'' 1.000 1.000 8.200 8.200
1 1/4'' 2.000 2.000 7.900 15.800
Losa C, D
1 1/2'' 8.000 8.000 8.200 65.600
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
Losa C, D1 3/8'' 8.000 8.000 8.200 65.600
1 1/4'' 9.000 9.000 7.900 71.100
Losa E, F
1 1/2'' 8.000 8.000 5.950 47.600
1 3/8'' 8.000 8.000 5.950 47.600
1 1/4'' 9.000 9.000 5.650 50.850
Losa G, H
1 1/2'' 9.000 9.000 8.200 73.800
1 3/8'' 9.000 9.000 8.200 73.800
1 1/4'' 10.000 10.000 7.900 79.000
TOTAL
OE.2.3.10.3 Para la armadura de acero (ESCALERAS)UBICACIN
cant.CANTIDAD Long. Ml
Elemento Total Diseo Total
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
TRAMO 1 1 1/2'' 6.000 6.000 6.311 37.868
1 3/8'' 29.000 29.000 0.960 27.840
TRAMO 2, 4 2 1/2'' 6.000 12.000 3.784 45.407
2 3/8'' 19.000 38.000 0.960 36.480
TRAMO 3, 5 1 1/2'' 6.000 6.000 3.879 23.271
1 3/8'' 19.000 19.000 0.960 18.240
TOTAL
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
FACULTAD DE INGENIERIA CIVIL OBRA: COSTOS Y PRESUPUESTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: GABRIEL GRANILLA JALIRE
Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
46.46
20.50325.048
63.63
18.18
23.7855155.641 155.641
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
43.144
43.144
57.023
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
32.358
21.572
28.511
26.439
8.5042
26.439
33.379
52.878
39.658
30.643149.5566 8.5042 285.630 443.691
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
130.918
"VIVIENDA FAMILIAR"
70.862
17.776
19.505221.285 17.776 0.000 239.061
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
124.595
40.0768
69.950
62.298
40.077
40.903110.854 80.154 186.893 377.900
"VIVIENDA FAMILIAR"
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
70.336
22.624
48.427
35.168
22.624
28.318
28.637
18.422
18.092
143.184
46.056
77.349
"VIVIENDA FAMILIAR"
172.186 109.726 277.325 0.000 559.237
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
70.336
22.624
48.427
35.168
22.624
28.318
17.584
11.312
14.159
87.920
"VIVIENDA FAMILIAR"
28.280
60.534151.438 84.840 211.008 0.000 447.286
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
42.178
36.013
17.089
4.10440.117 59.267 99.383
474.593 333.987 675.226 0.000 1483.806
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
"VIVIENDA FAMILIAR"
57.588
57.588
0
0
0.000
82.057
28.794
28.794
0
0
8.959
"VIVIENDA FAMILIAR"
40.356
51.622
51.622
0.000
0.000
69.950
25.811
38.716
0.000
0.000
50.912
17.816
"VIVIENDA FAMILIAR"
17.816
19.175
8.040
8.040
14.546
3.454
3.454
15.550292.547 67.579 340.533 0.000 700.659
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
86.162
86.162
"VIVIENDA FAMILIAR"
0
0
0.000
118.378
64.621
43.081
0
0
12.948
59.189
51.622
"VIVIENDA FAMILIAR"
51.622
0.000
0.000
69.950
25.811
25.811
8.302
0.000
0.000
39.011
51.622
51.622
"VIVIENDA FAMILIAR"
0.000
0.000
67.260
17.816
17.816
19.175
8.040
8.040
14.546
8.585
8.585
13.543
"VIVIENDA FAMILIAR"
3.454
3.454
15.550
1.091
1.091
2.508419.110 99.222 538.133
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
86.162
86.162
0
0
"VIVIENDA FAMILIAR"
0.000
118.378
43.081
43.081
0
0
12.948
59.189
51.622
51.622
0.000
"VIVIENDA FAMILIAR"
0.000
69.950
25.811
25.811
7.999
0.000
0.000
39.011
51.622
51.622
0.000
0.000
"VIVIENDA FAMILIAR"
67.260
17.816
17.816
19.175
8.040
8.040
14.546
8.585
8.585
13.543
3.454
3.454
"VIVIENDA FAMILIAR"
15.550
1.091
1.091
2.508419.110 98.919 516.593
1130.766 265.721 1395.259 0.000 2791.746
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
8.282
4.674
4.266
66.256
"VIVIENDA FAMILIAR"
37.392
19.197
48.076
27.132
13.730
74.538
42.066
21.330
58.523 111.264 197.152 366.939
Total en Kg.1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1''
"VIVIENDA FAMILIAR"
38.246
15.869
45.861
20.794
23.504
10.397
47.059 107.611 154.670
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
"VIVIENDA FAMILIAR"
MANO DE OBRA DESCRIPCION
OPERARIO OFICIAL PEON
SANITARIASDESCRIPCION
ADEX FORMADOR DE EMPAQUE X 1/32 3H T/ AVIACIONALAMBRE NEGRO #16 AACERRADURA CANTOL BAO BLISTIER BRONCE PULIDOCINTA TEFLON METUSA 1/2" x 12MCODO FG 90 X1/2"CODO PP C/R 90 X 1/2" IPSCODO PP INSERTO 90 X 1/2" IPSCODO PVC SAL 45X4" DESAGUE (IM) CODO PVC SAL 45X2"(IM)CODO PVC SAL 90X2"(IM)CODO PVC SAP 90 X 1/2"(IM)CODO SAL PVC 90X1/2" IPSCODO SANITARIO PVC 4" (IM)CODO SANITARIO PVC 4"X2"(IM)COMBO DE GOMA 24 ONZ SCHUBERTDESAGUE PARA LAVATORIO DISCO D/CORTE P/CONCRETO 9" UYUSTOOLSDISCO DIAM CONTINUO D/CORTE P/CERAMICO 4-1/2" UYUSTOOLSHOJA DE SIERRA JABONERA KOVENKIT BASICO 1/2 BAO METUSALAVADERO 1 POZA C/ESC AC. INOX ORANGE 40 X75LAVATORIO TREBOL MANCORALENTES DE SEGURIDAD TRANSPARENTELLAVE LAVAT ITALGRIF PUNTA SAL CRMANGA PLASTICA 1.5 AMEZC DUCHA ITALGRIF PUNTA SAL C/SAL CRMEZC MONOC LAVAD MUEBLE PREMIER PICO ALTO CRMEZCLADOR DE LAVAORIO 40MMEZCLADORA DUCHA ITALGRIFMEZCLADORA LAVAT. 4"(ITALGRIF) PUNTA SAL CROM. GR 45NIPLE PP 1/2" X 1 1/2" IPSPEDESTAL TREBOL UNIVERSALPERCHERO KOVENPILON ESFERICO BOTADERO CIM36 1/2" 150 LBSPORTA CEPILLO KOVENPORTA ROLLO TRAD.KOVEN
REDUCCION SAL 4"X2"(IM)REGISTRO DE BRONCE 2" C/RREGISTRO DE BRONCE 4" C/RSELLARROSCA 50 cm3 HIDROSIKA BOOM X 500MLSUMIDERO DE BRONCE DE 3" C/RSUMIDERO DE BRONCE DE 4" C/ROSCATANQUE TREBOL SIFON JETTARRAJA DE 1/2"TAZA INOD TREBOL SIFON JET TEE PP 1/2" IPSTEE PVC 1/2" IPSTEE PVC SAL 2"X2"(IM)TEE PVC SAL 4"X4"(IM)TEE PVC SP 1/2"(IM)TEE SANIT SAL 4"X4"TOALLERO BARRA 60CM KOVENTRAMPA PVC COMPLETA RECORDTRAMPA SAL 2"(IM)TUBO ABASTO METUSA 1/2" X 1/2" X 40 TUBO DE ABASTO 1/2" X1TUBO PP 1/2"*6M SALADILLOTUBO PVC 1/2" IPSTUBO PVC SAL 2"X3MTUBO PVC SAL 4"X4"TUBO PVC SAP 1/2"TUBO ROSACADO PVC 1/2" X 5MTUBOS SIKAFLEX X 300 ML BLANCOU - AS SOPORT PARA LAVATORIO UNION SIMPLE SP DE 1/2" SAP (IM)UNION UNIVERSAL PP 1/2" IPSUNION UNIVERSAL PVC SAP 1/2"(IM)VALVULA 14 PES 1/2" LBS CIMVALVULA ESFERICA CIM14 PES 400 LBS 1/2"VAVULA PVC 1/2"YEE SAL 2"X2"(IM)YEE SAL 4"X2"(IM)YEE SAL 4"X4"(IM)
ELECTRICASDESCRIPCION
ABRAZ P/TUBO DE 2" SAP C/2 OREJA MENTALABRAZ P/TUBO DE 21/2" SAP C/1 OREJA METALAMARRACABLE BLANCO 8" CV-200 X 100 UND KSSBALASTRO ELECTRONICO 2X36W P/FLUORESCENTE TLD EB-C PHBROCA 3/8"CABLE THW-90 450/750V 10AWG INDECOCABLE THW-90 450/750V 12AWG INDECOCABLE THW-90 450/750V 14 AWG INDECO
CAJA OCTOGONAL P/EMPOT/PVC PAVCOCAJA PASE 12X12X4 P1/27 FG JORMENCAJA RECTANGULAR P/EMPOT/PVC PAVCOCAJA TOMA METAL ELSE 02 24AX40HX16P SIN CHAPA PESADOCINTA AISLANTE 1600 20MTS NEGRO 3MCONECTORES DE 1 1/2"CONECTORES DE 1"CURVA DE 1 1/2" SELCURVA DE 1" SELCURVA DE 2 1/2" 60MM LUZCURVA DE 2" 50MM LUZ TIPO PVC-U PESADOCURVA DE 3/4" SELCURVA DE 5/8" SELEQP FLUORESCENTE LINEAL 2X36W T765 ELECTROMAGNETICO CFLUORESCENTE LINEAL 36W F765 LUZ BLANCA PHILIPSFOCO AHORRADOR ESPIRAL ECOHOME TWISTER 15W LUZ BLANCAFOCO AHORRADOR GLOBO 30W E-27 LUZ DIA GLB30D NOVALAMFULMINANTE MARRONINTERRUPTOR SIMPLE P/EMPOTRAR MARFIL OPALUXINTERRUPTOR DOBLE 10A AVANT TICINOINTERRUPTOR SIMPLE 10A TICINOINTERRUPTOR SIMPLE P/EMPOTRAR 3 VIAS TICINOINTERRUPTOR TERMOMAG. RIEL BTDIN 2PX16A 220V 10KA TIINTERRUPTOR TERMOMAG. RIEL BTDIN 2PX20A 220V 10KA TIINTERRUPTOR TERMOMAG. RIEL BTDIN 2PX40A 220V 10KA TIINTERRUPTOR TRIPLE 10A TICINOLAMPARA AHORRADOE DECO GLOBO 42W ULIXLAMPARA DE EMERGENCIA LINEAL 90LEDSLAMPARA DE EMERGENCIA TIPO REFLECTOR 64LEDS 9HRS 910LAMPARA DE EMERGENCIA TIPO REFLECTOR LED 2X1 .8W/90MILLAVE N4 SANLEYLUMINARIA RECTANGULAR ALUMINIO P/ADOSAR REJILLA 2X36PEGAMENTO DORADO PERNOS 3/8" X1 + VOLD. PRESIONSOCKET DE TECHO OVAL BLANCO E-27 P21B TICINOSOCKET DE TECHO PLANO MARFIL E-27 TICINOSOCKET DE TECHO BAQUELITA 250V 21 NEW OPALUXTARUGO AZUL 5/6 X 1. 3/8"TARUGO NARANJA 11/4TERMINAL COMPRIMIBLE BARRIL CORTO CU/ES 1/0 AMG 50 MM2 OJAL 8.3MMTERMINAL COMPRIMIBLE BARRIL CORTO CU/ES 2 AMG 35 MM2 OJAL 8.3MMTERMOMAGNETICO FUERZA 3X150 AMP LSTIRAFON DE1/4 X2"TOMACORRIENTE DOBLE 16A TICINOTOMACORRIENTE DOBLE LINEA 15A TOMACORRIENTE PARA EMPOTRAR DOBLE UNIVERSAL C/L TIERTOMACORRIENTE PARA EMPOTRAR SIMPLW CJ1112 OPALUXTOMACORRIENTE SIMPLE 16A TICINO
TUBO DE 1"X3MTS SELTUBO DE 1.1/2"X3MTS LUZ SELTUBO DE 2 1/2" 60MMX 3MT TUBO DE 2" 50MM X3MTS PVC-U PESADO TUBO DE 3/4"X3MTS SELTUBO DE 5/8"X3MTS SELINTERRUPTOR DOBLE P/EMPOTRAR MARFIL
PINTURASDESCRIPCION
IMPRIMANTE DE 5GLNSSELLADOR DE 5GLNSSACO DE TIZA MOLIDACOLA SINTETICALIJA #40LIJA #80LIJA #120LIJA #100ESPONJA DUNLOPILLO X 6 UNPINTURA BLANCA (20L) PATOOLEO MATE BLANCOTHINERPINTURA ESMALTEPLANCHA DE EMPASTAR STANLEY
PISOSDESCRIPCION
CEMENTO PORTLAND IPPEGAMENTO EN POLVO GRIS EXTERIORESPEGAMENTO EN POLVO GRIS INTERIORESPORCELANATO SS 60X60 BEIGE NANO 1.44M2PORCELANATO FB 60X60 SUPER BLACK NANO 1.44 M2WAYPE CARDADO X 250 GRRODOPLAST 8.5 MMRODOPLAST MAX ALMENDRA 9.5MMCRUCETAS DE 3MM(100UND)CRUCETAS CON TOMADOR 2MM(200)MAQUINA CORTA MANUAL STAR 60 N PLUS S/E + ESCLISTELO 40X5 TURIN KANTUPARED 20X30 BLANCO BASIC 1.5M2PARED 20X30 BEIGE BASIC 1.5M2FRAGUA CREMAFRAGUA BEIGEFRAGUA CHAMPAGNEFRAGUA PORC MARRONLAPIZ DE VIDRIO NARANJA BRILLANTEPISO 45X45 PRISMA 2.08 M2 SLPISO 60X60 GERVASONI BEIGE 1.44 M2 SLPISO 45X45 TOMASSO 2.08M2 SLPISO 45X45 MADERA AUSTIN NATURAL 2.03M2 CL
PISO 45X45 BLANCO LSO 2.08 M2 SCOPPISO MAD LIRIA NATURAL 45X45 UNI SM PISO 45X45 ARENAM SCOP 2.08M2PORCELANATO DC 60X60 MARRON ARANDI NANO FRAGUA PREM BLANCA
OTROSDESCRIPCION
VARILLA DE TUBO RECTANGULAR DE 3 1/4" X 1 1/2"PERFIL A MATE ALUMINIOPERNO ANCLAJE INODTUERCA M6VARILLA M6CLAVIJA DE 1"
MANO DE OBRA UND CANT P.U TOTAL P.u
HH S/. 16.01 13.5677966HH S/. 13.50 11.440678HH S/. 12.12 10.2711864
SANITARIASUND CANT P.U TOTAL P.u
UND S/. 5.00 S/. 0.00 4.23728814KG S/. 3.00 2.54237288UND S/. 33.90 S/. 0.00 28.7288136UND S/. 1.30 S/. 0.00 1.10169492UND S/. 0.89 S/. 0.00 0.75423729UND S/. 0.90 S/. 0.00 0.76271186UND S/. 7.80 S/. 0.00 6.61016949UND S/. 4.05 S/. 0.00 3.43220339UND S/. 1.20 S/. 0.00 1.01694915UND S/. 1.30 S/. 0.00 1.10169492UND S/. 1.07 S/. 0.00 0.90677966UND S/. 7.80 S/. 0.00 6.61016949UND S/. 1.10 S/. 0.00 0.93220339UND S/. 6.40 S/. 0.00 5.42372881UND S/. 12.00 S/. 0.00 10.1694915UND S/. 10.90 S/. 0.00 9.23728814UND S/. 33.00 S/. 0.00 27.9661017UND S/. 12.00 S/. 0.00 10.1694915UND S/. 5.00 S/. 0.00 4.23728814UND S/. 20.90 S/. 0.00 17.7118644UND S/. 54.90 S/. 0.00 46.5254237UND S/. 89.90 S/. 0.00 76.1864407UND S/. 47.90 S/. 0.00 40.5932203UND S/. 5.00 S/. 0.00 4.23728814UND S/. 32.90 S/. 0.00 27.8813559UND S/. 3.40 S/. 0.00 2.88135593UND S/. 104.90 S/. 0.00 88.8983051UND S/. 103.60 S/. 0.00 87.7966102UND S/. 98.90 S/. 0.00 83.8135593UND S/. 104.90 S/. 0.00 88.8983051UND S/. 60.50 S/. 0.00 51.2711864UND S/. 1.00 S/. 0.00 0.84745763UND S/. 46.80 S/. 0.00 39.6610169UND S/. 17.90 S/. 0.00 15.1694915UND S/. 24.20 S/. 0.00 20.5084746UND S/. 20.90 S/. 0.00 17.7118644UND S/. 24.90 S/. 0.00 21.1016949
UND S/. 3.40 S/. 0.00 2.88135593UND S/. 2.00 S/. 0.00 1.69491525UND S/. 9.30 S/. 0.00 7.88135593UND S/. 13.50 S/. 0.00 11.440678UND S/. 27.00 S/. 0.00 22.8813559UND S/. 6.20 S/. 0.00 5.25423729UND S/. 9.40 S/. 0.00 7.96610169UND S/. 91.20 S/. 0.00 77.2881356UND S/. 15.00 S/. 0.00 12.7118644UND S/. 164.30 S/. 0.00 139.237288UND S/. 1.30 S/. 0.00 1.10169492UND S/. 9.40 S/. 0.00 7.96610169UND S/. 2.30 S/. 0.00 1.94915254UND S/. 7.00 S/. 0.00 5.93220339UND S/. 1.40 S/. 0.00 1.18644068UND S/. 13.70 S/. 0.00 11.6101695UND S/. 30.90 S/. 0.00 26.1864407UND S/. 15.90 S/. 0.00 13.4745763UND S/. 7.50 S/. 0.00 6.3559322UND S/. 9.50 S/. 0.00 8.05084746UND S/. 14.90 S/. 0.00 12.6271186UND S/. 33.50 S/. 0.00 28.3898305UND S/. 33.50 S/. 0.00 28.3898305UND S/. 9.80 S/. 0.00 8.30508475UND S/. 22.90 S/. 0.00 19.4067797UND S/. 11.80 S/. 0.00 10UND S/. 10.50 S/. 0.00 8.89830508UND S/. 23.50 S/. 0.00 19.9152542UND S/. 6.30 S/. 0.00 5.33898305UND S/. 0.80 S/. 0.00 0.6779661UND S/. 2.50 S/. 0.00 2.11864407UND S/. 1.78 S/. 0.00 1.50847458UND S/. 21.50 S/. 0.00 18.220339UND S/. 19.47 S/. 0.00 16.5UND S/. 7.80 S/. 0.00 6.61016949UND S/. 2.80 S/. 0.00 2.37288136UND S/. 6.10 S/. 0.00 5.16949153UND S/. 10.10 S/. 0.00 8.55932203
ELECTRICASUND CANT P.U TOTAL
UND S/. 2.45 S/. 0.00 2.07627119UND S/. 3.00 S/. 0.00 2.54237288BLS S/. 13.00 S/. 0.00 11.0169492UND S/. 16.80 S/. 0.00 14.2372881UND S/. 13.00 S/. 0.00 11.0169492UND S/. 1.99 S/. 0.00 1.68644068UND S/. 1.34 S/. 0.00 1.13559322UND S/. 0.88 S/. 0.00 0.74576271
UND S/. 0.90 S/. 0.00 0.76271186UND S/. 24.00 S/. 0.00 20.3389831UND S/. 0.90 S/. 0.00 0.76271186UND S/. 55.00 S/. 0.00 46.6101695UND S/. 4.70 S/. 0.00 3.98305085UND S/. 0.90 S/. 0.00 0.76271186UND S/. 0.30 S/. 0.00 0.25423729UND S/. 3.30 S/. 0.00 2.79661017UND S/. 0.85 S/. 0.00 0.72033898UND S/. 17.00 S/. 0.00 14.4067797UND S/. 8.70 S/. 0.00 7.37288136UND S/. 0.40 S/. 0.00 0.33898305UND S/. 0.40 S/. 0.00 0.33898305UND S/. 48.00 S/. 0.00 40.6779661UND S/. 4.20 S/. 0.00 3.55932203UND S/. 10.50 S/. 0.00 8.89830508UND S/. 17.50 S/. 0.00 14.8305085CAJA S/. 21.00 S/. 0.00 17.7966102UND S/. 3.00 S/. 0.00 2.54237288UND S/. 8.70 S/. 0.00 7.37288136UND S/. 5.60 S/. 0.00 4.74576271UND S/. 3.50 S/. 0.00 2.96610169UND S/. 34.50 S/. 0.00 29.2372881UND S/. 34.50 S/. 0.00 29.2372881UND S/. 47.50 S/. 0.00 40.2542373UND S/. 13.50 S/. 0.00 11.440678UND S/. 13.00 S/. 0.00 11.0169492UND S/. 60.00 S/. 0.00 50.8474576UND S/. 85.00 S/. 0.00 72.0338983UND S/. 79.00 S/. 0.00 66.9491525UND S/. 8.50 S/. 0.00 7.20338983UND S/. 75.00 S/. 0.00 63.559322GLN S/. 85.00 S/. 0.00 72.0338983UND S/. 1.50 S/. 0.00 1.27118644UND S/. 5.20 S/. 0.00 4.40677966UND S/. 6.30 S/. 0.00 5.33898305UND S/. 2.00 S/. 0.00 1.69491525UND S/. 0.10 S/. 0.00 0.08474576UND S/. 0.15 S/. 0.00 0.12711864UND S/. 2.00 S/. 0.00 1.69491525PZA S/. 1.50 S/. 0.00 1.27118644UND S/. 380.00 S/. 0.00 322.033898UND S/. 0.30 S/. 0.00 0.25423729UND S/. 9.50 S/. 0.00 8.05084746UND S/. 8.90 S/. 0.00 7.54237288UND S/. 4.00 S/. 0.00 3.38983051UND S/. 3.00 S/. 0.00 2.54237288UND S/. 6.60 S/. 0.00 5.59322034
UND S/. 5.30 S/. 0.00 4.49152542UND S/. 10.10 S/. 0.00 8.55932203UND S/. 37.50 S/. 0.00 31.779661UND S/. 25.00 S/. 0.00 21.1864407UND S/. 2.70 S/. 0.00 2.28813559UND S/. 2.80 S/. 0.00 2.37288136UND S/. 4.50 S/. 0.00 3.81355932
PINTURASUND CANT P.U TOTAL
BALDE S/. 91.00 S/. 0.00 77.1186441BALDE S/. 86.00 S/. 0.00 72.8813559SACO S/. 40.00 S/. 0.00 33.8983051GLN S/. 19.00 S/. 0.00 16.1016949HOJA S/. 2.40 S/. 0.00 2.03389831HOJA S/. 2.20 S/. 0.00 1.86440678HOJA S/. 1.90 S/. 0.00 1.61016949HOJA S/. 1.90 S/. 0.00 1.61016949UND S/. 4.90 S/. 0.00 4.15254237BALDE S/. 129.00 S/. 0.00 109.322034GLN S/. 44.00 S/. 0.00 37.2881356GLN S/. 22.90 S/. 0.00 19.4067797UND S/. 3.00 S/. 0.00 2.54237288UND S/. 18.00 S/. 0.00 15.2542373
PISOS 0UND CANT P.U TOTAL #VALUE!
BLS S/. 22.40 S/. 0.00 18.9830508BLS S/. 22.90 S/. 0.00 19.4067797BLS S/. 14.50 S/. 0.00 12.2881356CAJA S/. 43.06 S/. 0.00 36.4915254CAJA S/. 57.46 S/. 0.00 48.6949153GR S/. 2.90 S/. 0.00 2.45762712UND S/. 3.00 S/. 0.00 2.54237288UND S/. 3.85 S/. 0.00 3.26271186BLS S/. 5.00 S/. 0.00 4.23728814BLS S/. 6.38 S/. 0.00 5.40677966UND} S/. 370.00 S/. 0.00 313.559322UND S/. 9.30 S/. 0.00 7.88135593CAJA S/. 19.50 S/. 0.00 16.5254237CAJA S/. 23.85 S/. 0.00 20.2118644BLS S/. 6.27 S/. 0.00 5.31355932BLS S/. 5.90 S/. 0.00 5BLS S/. 5.90 S/. 0.00 5BLS S/. 6.90 S/. 0.00 5.84745763UND S/. 3.50 S/. 0.00 2.96610169CAJA S/. 47.63 S/. 0.00 40.3644068CAJA S/. 46.24 S/. 0.00 39.1864407CAJA S/. 60.49 S/. 0.00 51.2627119CAJA S/. 53.80 S/. 0.00 45.5932203
CAJA S/. 36.82 S/. 0.00 31.2033898CAJA S/. 31.00 S/. 0.00 26.2711864CAJA S/. 36.82 S/. 0.00 31.2033898CAJA S/. 57.46 S/. 0.00 48.6949153BLS S/. 4.50 S/. 0.00 3.81355932
OTROS 0UND CANT P.U TOTAL
UND S/. 68.00 S/. 0.00 57.6271186UND S/. 28.00 S/. 0.00 23.7288136UND S/. 2.70 S/. 0.00 2.28813559UND S/. 0.20 S/. 0.00 0.16949153UND S/. 5.00 S/. 0.00 4.23728814CAJA S/. 16.00 S/. 0.00 13.559322
S/. 11.23S/. 9.43S/. 8.51
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUDOE.1.1 OBRAS PROVSIONALES Y TRABAJOS PRELIMINARESOE.1.1.1 CONSTRUCCIONES PROVISIONALES
ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
OE.1.1.1.1 Oficinas1 3.000 3.000 9.000
OE.1.1.1.2 Almacenes1 9.000 2.000 18.000
OE.1.1.1.3 Casetas de Guardiania1 2.000 2.000 4.000
OE.1.1.1.6 Servicios Higinicos1 2.000 1.000 2.000
OE.1.1.1.7 Cercos1 12.000 3.000 36.000
OE.1.1.2 INSTALACIONES PROVISIONALES OE.1.1.2.1 AGUA PARA LA CONSTRUCCION
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
OE.1.1.2.1.1 Obtencion del Servicio1 1.000
OE.1.1.2.1.2 Almacenamiento y Distribucion1 1.000
OE.1.1.2.2 DESAGUE PARA LA CONSTRUCCIONUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
CUADRO DE METRADOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
cant. largo ancho altura Sub total cantidad 1 1.000
OE.1.1.2.3 ENERGIA ELCTRICA PROVISIONALUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad OE.1.1.2.3.1 Conexin e instalacion
1 1.000 OE.1.1.2.3.1 Consumo y mantenimiento
1 1.000
OE.1.1.3 TRABAJOS PRELIMINARES OE.1.1.3.1 LIMPIEZA DEL TERRENO
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
OE.1.1.3.1.2 Eliminacion de Maleza y Arbustos de Facil Extraccion1 8.000 12.000 96.000
OE.1.1.9 TRAZOS, NIVELES Y REPLANTEOUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad OE.1.1.9.1 Trazos, Niveles y Replanteo Preliminar
1 8.000 12.000 96.000 OE.1.1.9.2 Replanteo Durante el Proceso
1 288.000
OE.1.2 SEGURIDAD Y SALUD OE.1.2.1 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
OE.1.2.1.1 Equipos de proteccion indivudual1 30.000
OE.1.2.1.2 Equipos de proteccion Colectiva1 5.000
OE.2 ESTRUCTURASOE.2.1 MOVIMIENTO DE TIERRAS OE.2.1.1 NIVELACION DEL TERRENO OE.2.1.1.1 Nivelacion
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
1 12.000 8.000 96.000
OE.2.1.2 EXCAVACIONES OE.2.1.2.1 Excavaciones Simples
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
ZapatasZ1 (todas) 4 1.300 1.300 1.900 12.844 Z2 (todas) 1 1.600 1.600 1.900 4.864 Z3 (todas) 1 1.700 1.700 1.900 5.491 Z4 (todas) 6 1.200 1.200 1.600 13.824 CIMIENTOS DE M. CONTENCION 1 8.000 0.600 1.400 6.720 3
1 vigas de conexin
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje A tramo 3 a 2 1 2.060 0.600 1.400 1.730 1 eje B tramo 3 a 2 1 2.060 0.600 1.400 1.730 1 eje C tramo 3 a 2 1 2.060 0.600 1.400 1.730 1 eje A tramo 2 a 1 1 3.440 0.600 1.400 2.890 1
1 eje B tramo 2 a 1 1 3.667 0.600 1.400 3.080 1
1 eje C tramo 2 a 1 1 3.440 0.600 1.400 2.890 1
1 eje 2 tramo A a B 1 3.500 0.600 1.400 2.940 1
1 eje 2 tramo B a C 1 3.500 0.600 1.400 2.940 1
1 eje 1 tramo A a B 1 3.500 0.600 1.400 2.940 1
1 eje 1 tramo B a C 1 3.500 0.600 1.400 2.940 1
1 Cimientos corridosentre ejes 2-3 y ejes B-C 1 2.133 0.600 1.200 1.536 entre ejes 1-2 y ejes B-C 1 2.967 0.600 1.200 2.136 eje A tramo de 3 a 4 1 2.350 0.600 1.200 1.692 entre ejes 3-4 y ejes A-B 1 2.525 0.600 1.200 1.818 entre ejes 3-4 y ejes A-B (perp.) 1 0.280 0.600 1.200 0.202 entre ejes 3-4 y ejes B-C 1 2.650 0.600 1.200 1.908 entre ejes 3-4 y ejes A-B (perp.) 1 2.080 0.600 1.200 1.498 eje C tramo de 3 a 4 1 2.350 0.600 1.200 1.692 eje 4 tramo de A a B 1 2.200 0.600 1.200 1.584 eje 4 tramo de B a C 1 2.200 0.600 1.200 1.584
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje 3 tramo de A a C 1 2.200 0.600 1.200 1.584 eje 3 tramo de A a C (perp.) 1 0.280 0.600 1.200 0.202 ESCALERASdato de concreto 1 - INSTALACIONES SANITARIASinstalacion de aguared alimentacion 1 - desaguezanja de caja 3 a 2 1 - zanja de caja 2 a1 1 - aguas pluviales 1 -
OE.2.1.3 CORTESUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad
OE.2.1.4 RELLENOS OE.2.1.4.1 Relleno con Material Propio
ZapatasUBICACIN VOLUMEN
cant. EXCAVACION CONCRETO RELLENOZ1 4 2.576 1.107 1.47Z2 8 2.208 1.179 1.03
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
vigas de conexineje A tramo 4 a 3 1 2.550 0.350 0.350 0.312 2 eje A tramo 3 a 2 1 2.240 0.350 0.350 0.274 1 eje A tramo 2 a 1 1 3.950 0.350 0.400 0.553 2 eje B tramo 4 a 3 1 2.550 0.350 0.350 0.312 2 eje B tramo 3 a 2 1 2.240 0.350 0.350 0.274 2 eje B tramo 2 a 1 1 3.950 0.350 0.400 0.553 1 eje C tramo 4 a 3 1 2.550 0.350 0.350 0.312 2 eje C tramo 3 a 2 1 2.240 0.350 0.350 0.274 2 eje C tramo 2 a 1 1 3.950 0.350 0.400 0.553 2 eje 4 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 4 tramo B a C 1 3.550 0.350 0.400 0.497 1 eje 3 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 3 tramo B a C 1 3.550 0.350 0.400 0.497 1 eje 2 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 2 tramo B a C 1 3.550 0.350 0.400 0.497 1 eje 1 tramo A a B 1 5.000 0.350 0.500 0.875 1 eje 1 tramo B a C 1 3.550 0.350 0.400 0.497 1
SOBRECIMIENTO vigas de conexineje A tramo 4 a 3 1 2.550 0.450 0.750 0.861 2 eje A tramo 3 a 2 1 2.240 0.450 0.750 0.756 1 eje A tramo 2 a 1 1 3.950 0.450 0.700 1.244 2 eje B tramo 4 a 3 1 2.550 0.450 0.750 0.861 2 eje B tramo 3 a 2 1 2.240 0.600 0.750 1.008 2 eje B tramo 2 a 1 1 3.950 0.600 0.700 1.659 1 eje C tramo 4 a 3 1 2.550 0.450 0.750 0.861 2
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje C tramo 3 a 2 1 2.240 0.450 0.750 0.756 2 eje C tramo 2 a 1 1 3.950 0.450 0.700 1.244 2 eje 4 tramo A a B 1 5.000 0.600 0.600 1.800 1 eje 4 tramo B a C 1 3.550 0.600 0.700 1.491 1 eje 3 tramo A a B 1 5.000 0.450 0.600 1.350 1 eje 3 tramo B a C 1 3.550 0.600 0.700 1.491 1 eje 2 tramo A a B 1 5.000 0.450 0.600 1.350 1 eje 2 tramo B a C 1 3.550 0.600 0.700 1.491 1 eje 1 tramo A a B 1 5.000 0.600 0.600 1.800 1 eje 1 tramo B a C 1 3.550 0.600 0.700 1.491 1 cimientos corridoseje A tramo de 4 a 6 1 4.260 0.450 0.400 0.767 eje B tramo de 5 a 6 1 2.540 0.450 0.400 0.457 eje B tramo de 5 a 6(perpendicular) 1 1.050 0.450 0.400 0.189 eje C tramo de 4 a 5 1 1.810 0.450 0.400 0.326 eje C tramo de 5 a 6 1 2.200 0.450 0.400 0.396 eje 6 tramo de A a B 1 4.400 0.450 0.400 0.792 eje 6 tramo de A a B(perpendicular) 2 1.100 0.450 0.400 0.396 eje 6 tramo de B a C 1 3.670 0.450 0.400 0.661 eje 6 tramo de B a C(perpendicular) 1 1.600 0.450 0.400 0.288 eje 5 tramo de B a C 1 1.970 0.450 0.400 0.355 entre ejes 2-3 y ejes A-B 1 3.700 0.450 0.400 0.666 entre ejes 1-2 y ejes A-B 1 5.400 0.450 0.400 0.972 entre eje 1 y ejes A-B 1 1.000 0.450 0.400 0.180 entre eje 1 y ejes B-C 1 - - - -
INSTALACIONES SANITARIASinstalacion de agua
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
red alimentacion 1 7.870 0.250 0.250 0.492 desaguezanja de caja 3 a 2 1 9.390 0.250 0.830 1.948 zanja de caja 2 a1 1 5.500 0.250 0.960 1.320 aguas pluviales 1 5.450 0.250 0.400 0.545
OE.2.1.5 NIVELACION INTERIOR Y APISONADOUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad TODO 1 8.000 12.000 96.000
OE.2.1.6 ELIMINACION DE MATERIAL EXCEDENTEUBICACIN VOLUMEN
cant. EXCAVACION RELLENO EXCEDENTEtodo 86.962 51.550 35.412
OE.2.2 OBRAS DE CONCRETO SIMPLE OE.2.2.1 CIMIENTOS CORRIDOS
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
Planta 1Eje B-C 1 6.050 0.400 0.800 1.936 1 Planta 2cad 1 10.240 0.800 8.192
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
OE.2.2.3 SOLADOSUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Planta 1Z1 4 1.300 1.300 0.100 0.676 Z2 1 1.600 1.600 0.100 0.256 Z3 1 1.700 1.700 0.100 0.289 Z4 6 1.200 1.200 0.100 0.864 Z5 1 8.000 0.600 0.100 0.480
OE.2.2.6 SOBRECIMIENTOS OE.2.2.6.1 Para el Concreto
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
vigas de conexinvc-1 2 3.500 0.150 1.250 1.313 vc-2 2 3.500 0.150 1.250 1.313 vc-4 3 2.060 0.150 1.250 1.159
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
vc-4 3 3.440 0.150 1.250 1.935
SobrecimientoPlanta 1 1 6.450 0.150 0.750 0.726 Planta 2cad 1 10.240 0.750 7.680
vc-4 2 1.200 0.150 1.250 0.450 vc-3 1 1.200 0.150 1.250 0.225
OE.2.2.6.1 Para el encofrado y DesencofradoUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad vigas de conexineje A tramo 1 a 3 (cara exterior) 1 6.300 0.350 2.205 (cara interior) 1 6.300 1.250 7.875 eje C tramo 1 a 3 (cara exterior) 1 6.300 0.350 2.205 (cara interior) 1 6.300 1.250 7.875 eje B tramo 1 a 3 (cara exterior) 1 3.300 0.350 1.155 (cara interior) 1 3.300 1.250 4.125 eje B tramo 1 a 3 (cara izquierda) 1 2.900 0.350 1.015 (cara derecha 1 2.900 0.350 1.015
eje 1 tramo A a C (cara exterior) 1 8.000 - - 0.350 2.800 - - (cara interior) 1 4.300 - - 1.250 5.375 - -
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
(cara interior) 1 3.700 1.250 4.625 eje 2 tramo A a C (cara exterior) 1 4.200 1.250 5.250 (cara interior) 1 4.200 1.250 5.250 (cara exterior) 1 3.800 0.350 1.330 (cara interior) 1 3.800 0.350 1.330 planta 2vc-4 6 1.200 - - 0.350 2.520 - -
cimientos corridoseje B-C tramo de 1-3 (cara exterior) 1 6.450 0.350 2.258 (cara interior) 1 6.450 0.350 2.258 PLANTA 2eje 4 tramo de A a C(exterior) 1 6.770 0.350 2.370 2 eje 4 tramo de A a C(interior) 1 3.600 0.750 2.700 (cara interior) 1 3.170 0.750 2.378 eje 3 tramo de A a C (cara exterior) 1 6.560 0.750 4.920 (cara interior) 1 6.560 0.750 4.920 eje A tramo de 3 a 4 2 4.350 0.350 3.045 eje A tramo de 3 a 4 5 4.350 0.750 16.313
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
OE.2.2.9 FALSO PISOUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad PRIMER NIVEL 1 1.000 46.328 46.328 PATIO TRACERO 1 1.000 28.424 28.424
OE.2.3 OBRAS DE CONCRETO ARMADO OE.2.3.2 ZAPATAS OE.2.3.2.1 Para el concreto
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
z1 4 1.300 1.300 0.400 2.704 z2 1 1.600 1.600 0.400 1.024 z3 1 1.700 1.700 0.400 1.156 z4 6 1.200 1.200 0.400 3.456 z5 6 8.000 0.600 0.400 11.520
OE.2.3.2.3 para la armadura de acero
OE.2.3.3 VIGAS DE CIMENTACION OE.2.3.3.1 Para el concreto
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
vigas de conexin
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje A tramo 3 a 2 1 2.060 0.250 0.400 0.206 eje A tramo 2 a 1 1 3.440 0.250 0.400 0.344 eje B tramo 3 a 2 1 2.060 0.250 0.400 0.206 eje B tramo 2 a 1 1 3.440 0.250 0.400 0.344 eje C tramo 3 a 2 1 2.060 0.250 0.400 0.206 eje C tramo 2 a 1 1 3.440 0.250 0.400 0.344 eje 2 tramo A a B 1 3.630 0.250 0.400 0.363 eje 2 tramo B a C 1 3.630 0.250 0.400 0.363 eje 1 tramo A a B 1 3.630 0.250 0.500 0.454 eje 1 tramo B a C 1 3.630 0.250 0.500 0.454
OE.2.3.3.2 Para el encofrado y Desencofradoeje A tramo 3 a 2 1 2.060 0.400 0.824 eje A tramo 2 a 1 1 3.440 0.400 1.376 eje B tramo 3 a 2 1 2.060 0.400 0.824 eje B tramo 2 a 1 1 3.440 0.400 1.376 eje C tramo 3 a 2 1 2.060 0.400 0.824 eje C tramo 2 a 1 1 3.440 0.400 1.376 eje 2 tramo A a B 1 3.630 0.400 1.452 eje 2 tramo B a C 1 3.630 0.400 1.452 eje 1 tramo A a B 1 3.630 0.500 1.815 eje 1 tramo B a C 1 3.630 0.500 1.815
OE.2.3.3.3 Para la armadura de acero
OE.2.3.6 MUROS REFORZADOS OE.2.3.6.1.1 Para el concreto
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
cant. largo ancho altura Sub total cantidad
TODO 1 8.000 0.150 4.000 4.800
OE.2.3.6.1.2 Para el encofrado y Desencofradoeje A tramo 3 a 2 1 8.000 4.300 34.400
OE.2.3.6.1.3 Para la armadura de acero
OE.2.3.7 COLUMNAS OE.2.3.7.1 Para el concreto
PRIMER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad C1 2 0.250 0.400 4.400 0.880 C2 2 0.250 0.400 4.400 0.880 C3 1 0.250 0.500 4.400 0.550 C4 1 0.250 0.500 4.400 0.216
-
SEGUNDO NIVELC1 2 0.250 0.400 2.800 0.560 C2 2 0.250 0.400 2.800 0.560 C3 1 0.250 0.500 2.800 0.350 C4 1 0.250 0.500 2.800 0.350 C5 1 0.250 0.500 2.800 0.350 C6 2 0.250 0.400 2.800 0.560 C7 2 0.250 0.400 2.800 0.560
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
C8 1 0.250 0.400 2.800 0.280
TERCER NIVELC1 2 0.250 0.400 2.800 0.560 C2 2 0.250 0.400 2.800 0.560 C3 1 0.250 0.500 2.800 0.350 C4 1 0.250 0.500 2.800 0.350 C5 1 0.250 0.500 2.800 0.350 C6 2 0.250 0.400 2.800 0.560 C7 2 0.250 0.400 2.800 0.560 C8 1 0.250 0.400 2.800 0.280
AZOTEAC1 2 0.250 0.200 1.200 0.120 C2 2 0.250 0.200 1.200 0.120 C6 2 0.250 0.200 1.200 0.120 C7 2 0.250 0.200 1.200 0.120 C8 1 0.250 0.200 1.200 0.060
C-CONTORNO 3 0.200 0.150 1.200 0.108
OE.2.3.7.2 Para el encofrado y desencofradoPRIMER NIVEL
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
C1 2 0.250 0.400 4.400 5.720 C2 2 0.250 0.400 4.400 5.720 C3 1 0.250 0.500 4.400 3.300 C4 1 0.250 0.500 4.400 3.456
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
SEGUNDO NIVELC1 2 0.250 0.400 2.800 3.640 C2 2 0.250 0.400 2.800 3.640 C3 1 0.250 0.500 2.800 2.100 C4 1 0.250 0.500 2.800 2.100 C5 1 0.250 0.500 2.800 2.100 C6 2 0.250 0.400 2.800 3.640 C7 2 0.250 0.400 2.800 3.640 C8 1 0.250 0.400 2.800 1.820
TERCER NIVELC1 2 0.250 0.400 2.800 3.640 C2 2 0.250 0.400 2.800 3.640 C3 1 0.250 0.500 2.800 2.100 C4 1 0.250 0.500 2.800 2.100 C5 1 0.250 0.500 2.800 2.100 C6 2 0.250 0.400 2.800 3.640 C7 2 0.250 0.400 2.800 3.640 C8 1 0.250 0.400 2.800 1.820
AZOTEAC1 2 0.250 0.200 1.200 1.080 C2 2 0.250 0.200 1.200 1.080 C6 2 0.250 0.200 1.200 1.080 C7 2 0.250 0.200 1.200 1.080 C8 1 0.250 0.200 1.200 0.540
C-CONTORNO 3 0.200 0.150 1.200 1.260
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
OE.2.3.7.3 Para la armadura de acero
OE.2.3.8 VIGAS OE.2.3.8.1 Para el concreto
VIGAS PRIMER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 0.726 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 1.400 eje A, C tramo 3 a 2 2 3.410 0.250 0.400 0.682 eje B tramo 3 a 2 1 3.310 0.250 0.400 0.331 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 0.688 eje B tramo 2 a 1 1 3.670 0.250 0.400 0.367 eje A, B, C Volado 3 0.900 0.250 0.400 0.270 VB-01 1 8.000 0.250 0.200 0.400 3 VB-02 1 4.060 0.250 0.200 0.203 2 Viga contorno ducto 1 3.000 0.150 0.200 0.090
VIGAS SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 0.680 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 0.726 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 1.400 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 0.740 eje B tramo 4 a 3 1 3.410 0.250 0.400 0.341 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 0.756
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje B tramo 3 a 2 1 3.310 0.250 0.400 0.331 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 0.688 eje B tramo 2 a 1 1 3.670 0.250 0.400 0.367 eje A, B, C Volado 3 0.900 0.250 0.400 0.270 VB-01 1 8.000 0.250 0.200 0.400 3 VB-04 1 4.060 0.250 0.200 0.203 2 VB-05 1 4.150 0.250 0.200 0.208 2 Viga contorno ducto 1 3.000 0.150 0.200 0.090 Viga contorno ducto 1 0.560 0.150 0.200 0.017
VIGAS TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 0.680 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 0.726 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 1.400 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 0.740 eje B tramo 4 a 3 1 3.410 0.250 0.400 0.341 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 0.756 eje B tramo 3 a 2 1 3.310 0.250 0.400 0.331 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 0.688 eje B tramo 2 a 1 1 3.670 0.250 0.400 0.367 eje A, B, C Volado 3 0.900 0.250 0.400 0.270 VB-01 1 8.000 0.250 0.200 0.400 3 VB-04 1 4.060 0.250 0.200 0.203 2 VB-05 1 4.150 0.250 0.200 0.208 2 Viga contorno ducto 1 3.000 0.150 0.200 0.090 Viga contorno ducto 1 0.560 0.150 0.200 0.017
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
OE.2.3.8.2 Para el Encofrado y DesencofradoVIGAS PRIMER NIVEL
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 7.623 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 14.700 eje A, C tramo 3 a 2 2 3.410 0.250 0.400 7.161 eje B tramo 3 a 2 1 3.310 0.250 0.400 3.476 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 7.224 eje B tramo 2 a 1 1 3.670 0.250 0.400 3.854 eje A, B, C Volado 3 0.900 0.250 0.400 2.835 VB-01 1 8.000 0.250 0.200 5.200 3 VB-02 1 4.060 0.250 0.200 2.639 2 Viga contorno ducto 1 3.000 0.150 0.200 1.650
VIGAS SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 7.140 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 7.623 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 14.700 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 7.770 eje B tramo 4 a 3 1 3.410 0.250 0.400 3.581 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 7.938 eje B tramo 3 a 2 1 3.310 0.250 0.400 3.476 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 7.224 eje B tramo 2 a 1 1 3.670 0.250 0.400 3.854
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
eje A, B, C Volado 3 0.900 0.250 0.400 2.835 VB-01 1 8.000 0.250 0.200 5.200 3 VB-04 1 4.060 0.250 0.200 2.639 2 VB-05 1 4.150 0.250 0.200 2.698 2 Viga contorno ducto 1 3.000 0.150 0.200 1.650 Viga contorno ducto 1 0.560 0.150 0.200 0.308
-
VIGAS TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad eje 4 tramo A a B, B a C 2 3.400 0.250 0.400 7.140 eje 3 tramo A a B, B a C 2 3.630 0.250 0.400 7.623 eje 2, 1 tramo A a B, B a C 4 3.500 0.250 0.400 14.700 eje A, C tramo 4 a 3 2 3.700 0.250 0.400 7.770 eje B tramo 4 a 3 1 3.410 0.250 0.400 3.581 eje A, C tramo 3 a 2 2 3.780 0.250 0.400 7.938 eje B tramo 3 a 2 1 3.310 0.250 0.400 3.476 eje A, C tramo 2 a 1 2 3.440 0.250 0.400 7.224 eje B tramo 2 a 1 1 3.670 0.250 0.400 3.854 eje A, B, C Volado 3 0.900 0.250 0.400 2.835 VB-01 1 8.000 0.250 0.200 5.200 3 VB-04 1 4.060 0.250 0.200 2.639 2 VB-05 1 4.150 0.250 0.200 2.698 2 Viga contorno ducto 1 3.000 0.150 0.200 1.650 Viga contorno ducto 1 0.560 0.150 0.200 0.308
OE.2.3.8.3 Para la armadura de acero
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
OE.2.3.9 LOSAS OE.2.3.9.2 LOSAS ALIGERADAS CONVENCIONALES OE.2.3.9.2.1 Para el concreto
TECHO DEL PRIMER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 0.050 0.136 losa A (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa B 1 3.630 0.750 0.050 0.136 losa B (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa C 1 3.630 3.670 0.050 0.666 losa C (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa D 1 3.630 3.670 0.050 0.666 losa D (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa E 1 3.630 3.560 0.050 0.646 losa E (viguetas) 2.5 12.923 0.100 0.150 0.485 Losa F 1 2.480 3.560 0.050 0.441 losa F (viguetas) 2.5 8.829 0.100 0.150 0.331
TECHO DEL SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 0.050 0.136 losa A (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa B 1 3.630 0.750 0.050 0.136 losa B (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa C 1 3.630 3.670 0.050 0.666
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
losa C (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa D 1 3.630 3.670 0.050 0.666 losa D (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa E 1 3.630 3.560 0.050 0.646 losa E (viguetas) 2.5 12.923 0.100 0.150 0.485 Losa F 1 1.480 3.560 0.050 0.263 losa F (viguetas) 2.5 5.269 0.100 0.150 0.198 Losa G 1 3.630 3.780 0.050 0.686 losa G (viguetas) 2.5 13.721 0.100 0.150 0.515 Losa H 1 3.630 3.780 0.050 0.686 losa H (viguetas) 2.5 13.721 0.100 0.150 0.515
TECHO DEL TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 0.050 0.136 losa A (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa B 1 3.630 0.750 0.050 0.136 losa B (viguetas) 2.5 2.723 0.100 0.150 0.102 Losa C 1 3.630 3.670 0.050 0.666 losa C (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa D 1 3.630 3.670 0.050 0.666 losa D (viguetas) 2.5 13.322 0.100 0.150 0.500 Losa E 1 3.630 3.560 0.050 0.646 losa E (viguetas) 2.5 12.923 0.100 0.150 0.485 Losa F 1 1.480 3.560 0.050 0.263 losa F (viguetas) 2.5 5.269 0.100 0.150 0.198 Losa G 1 3.630 3.780 0.050 0.686
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
losa G (viguetas) 2.5 13.721 0.100 0.150 0.515 Losa H 1 3.630 3.780 0.050 0.686 losa H (viguetas) 2.5 13.721 0.100 0.150 0.515
OE.2.3.9.2.2 Para el Encofrado y DesencofradoTECHO DEL PRIMER NIVEL
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
Losa A 1 3.630 0.750 2.723 Losa B 1 3.630 0.750 2.723 Losa C 1 3.630 3.670 13.322 Losa D 1 3.630 3.670 13.322 Losa E 1 3.630 3.560 12.923 Losa F 1 2.480 3.560 8.829
TECHO DEL SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 2.723 Losa B 1 3.630 0.750 2.723 Losa C 1 3.630 3.670 13.322 Losa D 1 3.630 3.670 13.322 Losa E 1 3.630 3.560 12.923 Losa F 1 1.480 3.560 5.269 Losa G 1 3.630 3.780 13.721 Losa H 1 3.630 3.780 13.721
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
TECHO DEL TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Losa A 1 3.630 0.750 2.723 Losa B 1 3.630 0.750 2.723 Losa C 1 3.630 3.670 13.322 Losa D 1 3.630 3.670 13.322 Losa E 1 3.630 3.560 12.923 Losa F 1 1.480 3.560 5.269 Losa G 1 3.630 3.780 13.721 Losa H 1 3.630 3.780 13.721
OE.2.3.9.2.3 Para la armadura de acero
OE.2.3.9.2.4 Para ladrillos bloques o elementos livianosTECHO DEL PRIMER NIVEL
UBICACIN ELEMENTOS ABERTURAS O DESCUENTOScant. largo ancho altura Sub total cantidad
Losa A 12.5 3.630 0.750 34.031 Losa B 12.5 3.630 0.750 34.031 Losa C 12.5 3.630 3.670 166.526 Losa D 12.5 3.630 3.670 166.526 Losa E 12.5 3.630 3.560 161.535 Losa F 12.5 2.480 3.560 110.360
TECHO DEL SEGUNDO NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad
Proyecto: "VIVIENDA FAMILIAR"Hecho por: Gabriel Granilla Jalire Revisado por: Ing. KATHERINE LLERENA TORREBLANCA
Ubicacin: Dist: CUSCO Prov: CUSCO Dpto: CUSCOFecha: 7 de mayo de 2015
CUADRO DE METRADOS
Losa A 12.5 3.630 0.750 34.031 Losa B 12.5 3.630 0.750 34.031 Losa C 12.5 3.630 3.670 166.526 Losa D 12.5 3.630 3.670 166.526 Losa E 12.5 3.630 3.560 161.535 Losa F 12.5 1.480 3.560 65.860 Losa G 12.5 3.630 3.780 171.518 Losa H 12.5 3.630 3.780 171.518
TECHO DEL TERCER NIVELUBICACIN ELEMENTOS ABERTURAS O DESCUENTOS
cant. largo ancho altura Sub total cantidad Losa A 12.5 3.630 0.750 34.031 Losa B 12.5 3.630 0.750 34.031 Losa C 12.5 3.630 3.670 166.526 Losa D 12.5 3.630 3.670 166.526 Losa E 12.5 3.630 3.560 161.535 Losa F 12.5 1.480 3.560 65.860 Losa G 12.5 3.