Control de versiones
Fecha
Versin
revisada Descripcin Autor
25-Jun-13 V1.0 Draft E. Garca
22-Ago-13 V2.0 Revisin interna E. Garca
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page3, Total17
Contenido
1 Acerca de Este Captulo .................................................................................. 5
1.1 Propsito ................................................................................................... 5
1.2 Dirigido ...................................................................................................... 5
1.3 Organizacin ............................................................................................. 5
1.4 Referencias ................................................................................................ 5
2 Distribucin Interna ......................................................................................... 6
2.1 Acerca de este captulo ............................................................................ 6
2.2 Apariencia.................................................................................................. 6
2.3 Dimensiones y Peso ................................................................................. 6
2.3.1 Dimensiones y Peso .......................................................................... 6
2.3.2 Parmetros de Energa ...................................................................... 7
2.3.3 Distribucin Interna ........................................................................... 8
3 Estndar de Instalacin ITS1000M .................................................................. 9
3.1 Rectificador ETP48200 .............................................................................. 9
3.1.1 Apariencia .......................................................................................... 9
3.1.2 Breaker de entrada de energa AC .................................................... 9
3.1.3 Aterramiento del ETP48200 ............................................................. 10
3.1.4 Distribucin de breakers DC en el PDU .......................................... 10
3.1.5 Breakers para bateras .................................................................... 11
3.2 BBU3900 .................................................................................................. 11
3.3 Cableado de Alarmas Internas ............................................................... 11
3.4 Normas de Cableado .............................................................................. 13
3.4.1 Cable de energa AC ........................................................................ 13
3.4.2 Cable de energa DC RRUs ............................................................. 14
3.4.3 Cable de Energa DC BBU y ATN910 .............................................. 14
3.4.4 Cables de Transmisin .................................................................... 14
3.4.5 Cables de Fibra ptica .................................................................... 15
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page4, Total17
3.4.6 Cable de Aterramiento ..................................................................... 15
3.4.7 Cables de monitoreo para FAN y TEC ............................................ 15
3.5 Salida de Cables...................................................................................... 16
3.6 Anclaje e Instalacin de ITS1000M ........................................................ 17
3.6.1 Anclaje de la Base ............................................................................ 17
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page5, Total17
1 Acerca de Este Captulo
1.1 Propsito
Este documento presenta los estndares de instalacin para el gabinete
ITS1000M, describe posiciones del producto, y una gua rpida de
instalacin.
1.2 Dirigido
Este documento est dirigido a:
Ingenieros de Operacin y Mantenimiento
Ingenieros de red
Ingenieros de campo
Personal de instalacin y supervisin de estaciones base.
1.3 Organizacin
Este documento consta de 3 partes las cuales se detallan a continuacin:
1.4 Referencias
ITS1000M (Mini-shelter) Product Description (V100R003C00_03)
ITS1000M (Mini-shelter) Quick Installation Guide (V100R003C00_01)
Mini-shelter_Standard_Product_Fact_Sheet for TdPx
Capitulo Titulo Descripcin
Capitulo 1 Acerca de este documento
Describe el proposito ,organizacin
y referencias de la documentacin.
Capitulo 2
Distribucin Interna gabinete
ITS1000M
Describe la distribucin del gabinete
ITS1000M, y sus diversos mdulos.
Capitulo 3
Estandar de instalacion para
gabinete ITS1000M
Describe el estandar de instalacin del
gabinete ITS1000M.
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page6, Total17
2 Distribucin Interna
2.1 Acerca de este captulo
Este captulo describe las normas de instalacin del gabinete ITS1000M.
2.2 Apariencia
2.3 Dimensiones y Peso
2.3.1 Dimensiones y Peso
Parmetro Descripcin
Internal Dimensions (W x D x H) 800 mm (W) x 800 mm (D) x 1800 mm (H)
External Dimensions (W x D x H ) 905 mm (W) x 1135 mm (D) x 2110 mm (H)
Base Dimensions (W x D x H ) 900 mm (W) x 900 mm (D) x 200 mm (H)
Peso Neto del Gabinete 220Kg
Protection Level IP55 / IP34
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page7, Total17
2.3.2 Parmetros de Energa
Parmetro Descripcin
AC Input Voltage - Frecuency 220V/380V - 45Hz65Hz
Power Module Capability 50A
AC Input Circuit Breaker 110A
DC Output Circuit Breaker LLVD: 100A x 2, 20A x1; BLVD: 63A x 1,
32A x 1, 16A x 5
Battery Breaker 125A x 2
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page8, Total17
2.3.3 Distribucin Interna
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page9, Total17
3 Estndar de Instalacin ITS1000M
3.1 Rectificador ETP48200
3.1.1 Apariencia
3.1.2 Breaker de entrada de energa AC
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page10, Total17
3.1.3 Aterramiento del ETP48200
El cable de aterramiento del ETP48200 debe llegar hasta la barra del
Minishelter ubicada a la salida del mismo.
3.1.4 Distribucin de breakers DC en el PDU
Para caso 2G+3G
Para Caso LTE
FREE FREE FAN RRU 1 RRU 2 RRU 3 RRU 4 RRU 5 RRU 6 BBU BAT 1 BAT 2
100A 100A 20A 63A 32A 16A 16A 16A 16A 16A 125A 125A
BAT1 BAT2LLVD BLVD
FREE FREE FAN FREE TEC RRU 1 RRU 2 RRU 3 ATN910I BBU BAT 1 BAT 2
100A 100A 20A 63A 32A 16A 16A 16A 16A 16A 125A 125A
BAT1 BAT2LLVD BLVD
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page11, Total17
3.1.5 Breakers para bateras
3.2 BBU3900
La BBU3900 se anclar debajo del DCDU, de no estar instalado este
elemento, dejar el espacio de una unidad de rack entre el ETP48200 y la
BBU3900, como se muestra en la figura.
3.3 Cableado de Alarmas Internas
El cableado de los sensores se realizar a los respectivos puertos asignados
en la tarjeta UIM02C.
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page12, Total17
Luego de esto se debe colocar el cable de monitoreo desde el puerto
EXT_ALM 0 de la tarjeta UPEU en la BBU3900 hacia los puertos
ALM1-ALM8 de la tarjeta UIM02C. Tal como se muestra en la imagen.
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page13, Total17
3.4 Normas de Cableado
3.4.1 Cable de energa AC
El cable que suministra la energa AC, ser conectado al rectificador
ETP48200, tal como se muestra en la figura. El cable a usar es un
vulcanizado de 3 hilos de 25mm2.
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page14, Total17
3.4.2 Cable de energa DC RRUs
Los cables de energa DC para las RRUs debern ser conectados a los
breakers BLVD, usando primero los 3 primeros de 16A (Caso LTE) o los
de 63A, 32A y los 4 siguientes de 16A (Caso 2G+3G).
3.4.3 Cable de Energa DC BBU y ATN910
El cable de energa DC de la BBU y ATN910I debern ser colocados en
los breaker de 16A BLVD (Solo en caso LTE).
3.4.4 Cables de Transmisin
El cable de TX, dependiendo de su posicin en la BBU (Cable E1s o
cable Ethernet) sers peinado y sujetos hacia el lado correspondiente,
teniendo en cuenta que deben salir por un mismo punto del gabinete
Minishelter.
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page15, Total17
3.4.5 Cables de Fibra ptica
Los cables de FO, dependiendo de su posicin en la BBU (Conectados a
la GTMU, WBBP o LBBP) sern peinados y sujetos hacia el lado
correspondiente, teniendo en cuenta que deben salir del gabinete
agrupados y nunca por la misma salida que cables de TX, energa u
otros.
3.4.6 Cable de Aterramiento
El aterramiento del gabinete se realizar usando la barra de tierra que
bien ubicada en el lateral del Minishelter.
3.4.7 Cables de monitoreo para FAN y TEC
Para los cables de monitoreo del FAN y el TEC, favor utilizar estos
puertos de la tarjeta UIM02C
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page16, Total17
3.5 Salida de Cables
La salida de cables del gabinete Minishelter, se har por las aberturas que tiene
en la parte baja, se debe respetar el orden indicado y luego de colocados los
cables correspondientes, estos debern ser sellados correctamente usando
sikaflex. A continuacin se muestra una imagen con la distribucin de cables.
Para el caso 2G+3G:
Para el caso LTE
Estndar de Instalacin Minishelter V2.0 Security Level
2013-08-23 Huawei Proprietary - Restricted Distribution Page17, Total17
3.6 Anclaje e Instalacin de ITS1000M
3.6.1 Anclaje de la Base