ITEM REGIONAL UNIDAD CANTIDAD VALORES

1 UBATE GLOBAL 1 185,808,636$

18,580,864$

9,290,432$

18,580,864$

2,972,938$

235,233,734$

2 AMAGA GLOBAL 1 272,810,725$

27,281,072$

13,640,536$

27,281,072$

4,364,972$

345,378,377$

3 CUCUTA GLOBAL 1 243,174,627$

24,317,463$

12,158,731$

24,317,463$

3,890,794$

307,859,077$

888,471,188$

TOTAL COSTO DIRECTO

A. 10%

I. 5%

U. 10%

U. 10%

U. 10%

I.V.A. (U) 16%

COSTO TOTAL DE MANTENIMIENTO DE 3 TORRES DE ENTRENAMIENTO

DESCRIPCION DEL COSTO

CUADRO RESUMEN

TOTAL COSTO DIRECTO

A. 10%

I. 5%

TOTAL COSTO DIRECTO

I.V.A. (U) 16%

COSTO TOTAL (UBATE)

FIRMA DEL PROPONENTE

COSTO TOTAL (CUCUTA)

I.V.A. (U) 16%

COSTO TOTAL (AMAGA)

A. 10%

I. 5%