EFIAG CONSTRUCTORA.PLANILLA Nº1

OBRA:EDIFICIO POSEIDON

FISCALIZADOR:RUBRO: Acero de refuerzo f'y = 4200 Kg/cm2UNIDAD: kg

Mc fpeso n°

TIPODimensiones Long. Long. Peso

kg/m varillas a b c d g f Corte Desarrollo Kg

1,502 12 0.888 80.00 7.90 1.80 0.50 0.20 10.40 832.00 738.82

1,503 12 0.888 80.00 Z 7.90 0.30 0.20 8.40 672.00 596.74

1,504 10 0.617 82.00 I 18.00 18.00 1,476.00 910.69 INC.Traslape1,505 12 0.888 9.00 I 18.00 18.00 162.00 143.86 INC.Traslape1,506 16 1.578 32.00 C 7.90 0.30 0.20 8.40 268.80 424.17

1,507 10 0.617 256.00 O 0.34 0.24 0.34 0.24 0.12 0.12 1.40 358.40 221.13

1,508 14 1.208 8.00 I 18.00 18.00 144.00 173.95 INC.Traslape1,509 10 0.617 75.00 O 0.34 0.24 0.34 0.24 0.05 0.05 1.26 94.50 58.31

3,267.67 Kg.

1,301 12 0.888 31.00 C 9.25 1.50 0.15 10.90 337.90 300.06

1,302 12 0.888 31.00 C 9.25 0.80 0.15 10.20 316.20 280.79

1,303 10 0.617 48.00 I 6.80 6.80 326.40 201.39

1,304 12 0.888 9.00 I 15.00 15.00 135.00 119.88 INC.Traslape1,305 12 0.888 40.00 C 7.90 1.50 0.15 9.55 382.00 339.22

1,306 12 0.888 40.00 C 7.90 0.80 0.15 8.85 354.00 314.35

1,307 10 0.617 82.00 I 15.00 15.00 1,230.00 758.91 INC.Traslape1,308 14 1.208 16.00 C 7.90 0.40 0.15 8.45 135.20 163.32

1,309 12 0.888 8.00 C 7.90 0.40 0.15 8.45 67.60 60.03

1,310 10 0.617 128.00 O 0.34 0.24 0.34 0.24 0.12 0.12 1.40 179.20 110.57

1310 A 10 0.617 128.00 O 0.24 0.14 0.24 0.14 0.12 0.12 1.00 128.00 78.98

1,311 14 1.208 8.00 I 15.00 15.00 120.00 144.96 INC.Traslape1,312 10 0.617 70.00 O 0.24 0.14 0.24 0.14 0.10 0.10 0.96 67.20 41.46

2,913.92 Kg.

1,201 12 0.888 85.00 C 2.95 1.50 0.15 4.60 391.00 347.21

1,202 12 0.888 85.00 C 2.95 0.80 0.15 3.90 331.50 294.37

1,203 10 0.617 28.00 I 18.00 18.00 504.00 310.97 INC.Traslape1,204 12 0.888 8.00 I 18.00 18.00 144.00 127.87 INC.Traslape1,205 12 0.888 6.00 I 18.00 18.00 108.00 95.90 INC.Traslape1,206 10 0.617 85.00 C 0.24 0.34 0.24 0.24 0.07 0.07 1.20 102.00 62.93

1,239.25 Kg.

601 32 6.313 30.00 L 9.10 0.90 10.00 300.00 1,893.90 VIGA 2,3,4602 32 6.313 30.00 L 7.10 0.90 8.00 240.00 1,515.12 VIGA 2,3,4603 32 6.313 30.00 L 6.00 6.00 180.00 1,136.34 VIGA 2,3,4604 32 6.313 68.00 L 9.40 0.60 10.00 680.00 4,292.84 VIGA 2,3,4605 32 6.313 68.00 L 7.40 0.60 8.00 544.00 3,434.27 VIGA 2,3,4606 20 2.466 16.00 I 15.00 15.00 240.00 591.84 INC.Traslape607 10 0.617 1,654.00 O 1.40 0.90 1.40 0.90 0.12 0.12 4.84 8,005.36 4,939.31

608 10 0.617 590.00 O 2.10 0.60 2.10 0.60 0.12 0.12 5.64 3,327.60 2,053.13

609 10 0.617 928.00 O 2.30 0.60 2.10 0.60 0.12 0.12 5.84 5,419.52 3,343.84

610 32 6.313 10.00 L 11.10 0.90 12.00 120.00 757.56

611 32 6.313 10.00 I 12.00 *8,0ML 12.00 120.00 757.56

612 32 6.313 10.00 I 4.00 4.00 40.00 252.52

613 32 6.313 24.00 L 11.40 0.60 12.00 288.00 1,818.14

614 32 6.313 8.00 I 8.00 *6,0ML 8.00 64.00 404.03

615 32 6.313 16.00 I 4.00 4.00 64.00 404.03

616 25 3.853 10.00 L 11.10 0.90 12.00 120.00 462.36

617 25 3.853 10.00 L 11.40 0.60 *8,0ML 12.00 120.00 462.36

618 25 3.853 20.00 L 11.40 0.60 12.00 240.00 924.72

619 25 3.853 20.00 I 8.00 *6,0ML 8.00 160.00 616.48

620 20 2.466 16.00 I 18.00 18.00 288.00 710.21 INC.Traslape621 20 2.466 16.00 I 18.00 18.00 288.00 710.21 INC.Traslape622 20 2.466 14.00 I 18.00 18.00 252.00 621.43 INC.Traslape

32,102.20 Kg.

ANCLAJE EN MURO D 25 3.853 175.00 L 4.60 0.40 5.00 875.00 3,371.38 Pared DerechaI 25 3.853 92.00 L 3.60 0.40 4.00 368.00 1,417.90 Pared IzquierdaP 25 3.853 57.00 L 4.60 0.40 5.00 285.00 1,098.11 Pared Posterior

5,887.39 Kg.860.34 CISTERNA

kg 46,270.77

ANEXOS CONSTRUCTORA EFIAG

CONTRATISTA: EFIAG. CONSTRUCTORA

CIMENTACION −6.15MURO#8 HASTA 16ML

"C"

Sub Total=

MURO#6 HASTA 14ML

Sub Total=

MURO#5 HASTA 17ML

Sub Total=

VIGAS DE LA PLATAFORMA −6,15(2,3,4)TERMINADAY(L,M)HASTA 17ML

VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (L) 17ML.VIGA (M) 17ML.VIGA (M) 17ML.VIGA (M) 17ML.VIGA (M) 17ML.

Sub Total=

Sub Total=

Tipo C Tipo I Tipo LTipo O

Tipo o´

Page 2: Acero en Rampa y Columnetas

CONTRATISTA

ANEXOS

FISCALIZADOR

Page 3: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº2

OBRA:EDIFICIO POSEIDON

FISCALIZADOR:RUBRO: Acero de refuerzo f'y = 4200 Kg/cm2UNIDAD: kg

Mc fpeso n°

TIPODimensiones Long. Long. Peso

kg/m varillas a b c d g f Corte Desarrollo Kg

CISTERNAVIGAS

a 12 0.888 16.00 C 8.30 0.10 0.10 8.50 136.00 120.77

b 12 0.888 6.00 C 8.90 0.10 0.10 9.10 54.60 48.48

d 12 0.888 12.00 C 8.30 0.10 0.10 8.50 102.00 90.58

x 10 0.617 200.00 O 0.14 0.14 0.14 0.14 0.07 0.07 0.70 140.00 86.38 Estribo (14x14)y 10 0.617 54.00 O 0.14 0.24 0.14 0.24 0.07 0.07 0.90 48.60 29.99 Estribo (14x24)z 10 0.617 112.00 O 0.14 0.34 0.14 0.34 0.07 0.07 1.10 123.20 76.01 Estribo (14x34)

452.21 Kg.ARMADO DE LA LOSA

10 12 0.888 14.00 C 8.90 0.10 0.10 9.10 127.40 113.13

11 12 0.888 15.00 C 8.30 0.10 0.10 8.50 127.50 113.22

12 12 0.888 14.00 C 1.00 0.10 0.10 1.20 16.80 14.92 Refuerzo (1/4L)13 12 0.888 14.00 C 2.00 0.10 0.10 2.20 30.80 27.35 Refuerzo (1/4L)14 12 0.888 14.00 C 2.00 0.10 0.10 2.20 30.80 27.35 Refuerzo (1/4L)15 12 0.888 14.00 C 1.00 0.10 0.10 1.20 16.80 14.92 Refuerzo (1/4L)16 12 0.888 15.00 C 2.20 0.10 0.10 2.40 36.00 31.97 Refuerzo (1/4L)17 12 0.888 15.00 C 2.30 0.10 0.10 2.50 37.50 33.30 Refuerzo (1/4L)18 12 0.888 15.00 C 2.20 0.10 0.10 2.40 36.00 31.97 Refuerzo (1/4L)

408.13 Kg.

kg 860.34

ANEXOS CONSTRUCTORA EFIAG

CONTRATISTA FISCALIZADOR

CONTRATISTA: EFIAG. CONSTRUCTORA

Sub Total=

Sub Total=

Tipo C Tipo I Tipo LTipo O

Tipo o´

Page 4: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº 8

OBRA:EDIFICIO POSEIDON

FISCALIZADOR: Arq. Mario PazmiñoRUBRO: Acero de refuerzo f'y = 4200 Kg/cm2UNIDAD:kg

Mc fpeso n°

TIPODimensiones Long. Long.

kg/m varillas a b c d g f Corte Desarrollo

ACERO EN RAMPA DESDE NIVEL +0,36 HASTA NIVEL +1,504000 A 12 0.888 57.00 L 0.50 0.70 1.20 68.40

4000 B 12 0.888 23.00 L 0.34 0.30 0.64 14.72

4,000 12 0.888 15.00 L 0.55 1.25 1.80 27.00

4,001 10 0.617 30.00 O 0.14 0.13 0.14 0.13 0.05 0.05 0.64 19.20

4001 A 10 0.617 12.00 O 0.10 0.15 0.10 0.15 0.05 0.05 0.60 7.20

4,002 12 0.888 1.00 I 28.24 28.24

4,003 10 0.617 65.00 C 0.06 0.06 0.09 0.21 13.65

4,004 12 0.888 9.00 L 0.90 0.50 1.40 12.60

4,005 12 0.888 7.00 L 0.60 0.40 1.00 7.00

ACERO EN COLUMNETAS DE CERRAMIENTO EN NIVEL + 1,505,000 10 0.617 84.00 I 1.10 1.10 92.405,001 5 0.154 105.00 O 0.15 0.10 0.15 0.10 0.04 0.04 0.54 56.70

ACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 7,506,000 10 0.617 302.00 I 1.20 1.20 362.40

ACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 10,506,001 10 0.617 302.00 I 1.20 1.20 362.40

VALOR DE ESTA PLANILLA

EFIAG CONSTRUCTORA Arq. MARIO PAZMIÑO

CONTRATISTA FISCALIZACION

CONTRATISTA: EFIAG. CONSTRUCTORA

Sub Total

Sub Total

Page 5: Acero en Rampa y Columnetas

EFIAG CONSTRUCTORA.PLANILLA Nº 8

OBRA:EDIFICIO POSEIDON

Long. Peso UBICACIÓN DEL ACERO

Desarrollo Kg

ACERO EN RAMPA DESDE NIVEL +0,36 HASTA NIVEL +1,5068.40 60.74 MURO14.72 13.07 MURO27.00 23.98 VIGAS 5.92

19.20 11.85 ESTRIBOS EN VIGAS7.20 4.44 ESTRIBOS EN COLUMNAS

28.24 25.08 RIOSTRAS13.65 8.42 VINCHAS EN RIOSTRAS12.60 11.19 CHICOTES PARA ANCLAR MALLA7.00 6.22 CHICOTES PARA ANCLAR MALLA

164.99 Kg. A PlanillarACERO EN COLUMNETAS DE CERRAMIENTO EN NIVEL + 1,50 Ubicación del Acero

92.40 57.01 ACERO VERTICAL EN COLUMNAS 56.70 8.73 ESTRIBOS EN COLUMNAS

65.74 Kg. A PlanillarACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 7,50 Ubicación del Acero

362.40 223.60 REFUERZO EN LOSA223.60 Kg. A Planillar

ACERO EN VIGAS CON LUCES MAYORES A 6Mts. NIVEL + 10,50 Ubicación del Acero362.40 223.60 REFUERZO EN LOSA

223.60 Kg. A Planillar

VALOR DE ESTA PLANILLA 677.93 Kg.

Arq. MARIO PAZMIÑO

FISCALIZACION

Sub Total=