PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
01.00.00 OBRAS PROVISIONALES01.01.00 Cartel de indentificacin de Obra de 3.60 x 8.50 m. und
01.02.00 Alquiler de Almacn y Oficina mes
02.00.00 PAVIMENTOS
02.01.00 TRABAJOS PRELIMINARES02.01.01 Limpieza de Terreno Manual m2
Jr. Ricardo Palma
Jr. Abrahan Valdelomar
Jr. Jos Glvez
Av. Mariano Melgar
Jr. Pedro Ruz
02.01.02 Trazo, Nivel y Replanteo m2Jr. Ricardo Palma
Jr. Abrahan Valdelomar
Jr. Jos Glvez
Av. Mariano Melgar
Jr. Pedro Ruz
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
02.02.00 MOVIMIENTO DE TIERRAS02.02.01 Corte con Maquinaria en terreno natural hasta H=1.00 m m3
02.02.02 Perfilado, Nivelacin y compactacin de la subrasante en zonas de corte m2Jr. Ricardo Palma
Jr. Abrahan Valdelomar
Jr. Jos Glvez
Av. Mariano Melgar
Jr. Pedro Ruz
02.02.03 Mejoramiento de subrasante con over menor a 4" e=20cm m2Jr. Ricardo Palma
Jr. Abrahan Valdelomar
Jr. Jos Glvez
Av. Mariano Melgar
Jr. Pedro Ruz
02.02.04 Base Granular e=20cm m2Jr. Ricardo Palma
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
Jr. Abrahan Valdelomar
Jr. Jos Glvez
Av. Mariano Melgar
Jr. Pedro Ruz
02.03.00 CONCRETO SIMPLE02.03.01 Losa de Rodadura, Concreto f'c = 210 Kg/cm2, e=0.20 m. m2
Jr. Ricardo Palma
Jr. Abrahan Valdelomar
Jr. Jos Glvez
Av. Mariano Melgar
Jr. Pedro Ruz
02.03.02 Concreto en Uas para Pavimento Rgido, Concreto f'c = 210 Kg/cm2 m3Jr. Ricardo Palma
cuadra 06
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
cuadra 070.50
Jr. Abrahan Valdelomar
0.40
cuadra 060.25
Jr. Jos Glvez
cuadra 06
Av. Mariano Melgar
cuadra 14
cuadra 15
cuadra 15
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
Jr. Pedro Ruz
cuadra 03
02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2Jr. Ricardo Palma
cuadra 06
cuadra 07
Jr. Abrahan Valdelomar
cuadra 06
Jr. Jos Glvez
cuadra 06
Av. Mariano Melgar
cuadra 14
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
cuadra 15
cuadra 16
Jr. Pedro Ruz
cuadra 03
02.03.04 Levantamiento de Buzones Existentes a nivel de rasante und
BUZONES 7 AOS DE ANTIGEDADAV. MARIANO MELGARJR. PEDRO RUIZJR. ABRAHAN VALDELOMARJR. RICARDO PALMA
BUZONES 4 AOS DE ANTIGEDADJR. JOSE GALVEZMARIANO MELGAR - PEDRO RUIZJR- RICARDO PALMA
02.04.00 CURADO02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m2
02.05.00 JUNTAS02.05.01 Juntas de contraccin e=6mm m
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
02.05.02 Juntas de contruccin de 3/4" c/ pasajuntas m
AV. MARIANO MELGARC 14 - 15 - 16
JR. JOSE GALVEZC-4
JR. PEDRO RUIZC-5; C-4; C-3
JR. A. VALDELOMAR
JR. RICARDO PALMA
02.05.03 Juntas de contruccin de 3/4" sin pasajuntas en la interseccin de calles m
INTERS. M- MELGAR - JOSE B. ALCEDO
INTERS. M. MELGAR - JOSE GALVEZ
INTERS. M. MELGAR - F. VILLARREAL
INTERS. M. MELGAR - PEDRO RUIZ
INTERS. PEDRO RUIZ - A. VALDELOMAR
INTERS. PEDRO RUIZ - RICARDO PALMA
INTERS. PEDRO RUIZ - AV. CHACHAPOYAS
INTERS. R. PALMA - F. VILLARREAL
INTERS. A. VALDELOMAR - F. VILLARREAL
02.05.04 Juntas asflticas en pavimentos h=20 cm, e=1" m
M. MELGAR C-14M. MELGAR C-15M. MELGAR C-16JOSE GALVEZPEDRO RUIZ C -5PEDRO RUIZ C -4
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
PEDRO RUIZ C -3A. VALDELOMAR C-6RICARDO PALMA
02.06.00 ACERO LISO02.06.01 Dowels transversales con acero liso de 3/4" m
AV. MARIANO MELGAR
JR. JOSE GALVEZ
JR. F. VILLARREAL
JR. PEDRO RUIZ
JR. A. VALDELOMAR
JR. RICARDO PALMA
02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m
AV. MARIANO MELGAR C-14C-15C-16
JR. JOSE GALVEZC-4
JR. F. VILLAREAL
JR . PEDRO RUIZC-5C-4; C-3
JR. A VLADELOMARC-6
JR. RICARDO PALMAC-6C-7
02.07.00 SEALIZACION02.07.01 SEALIZACION HORIZONTAL
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
02.07.01.01 Pintado de Franjas en Pavimento - Sealizacion m2
LINEA CONTINUAAV. MARIANO MELGAR C.14AV. MARIANO MELGAR C.15AV. MARIANO MELGAR C.16JR. JOSE GALVEZ C. 4JR.PEDRO RUIZ 5JR.PEDRO RUIZ 4JR.PEDRO RUIZ 3JR.ABRAHAM VALDELOMAR C.6JR.RICARDO PALMA C.6JR.RICARDO PALMA C.7
LINEAS DE PASO PEATONALAV. MARIANO MELGAR C.14AV. MARIANO MELGAR C.15AV. MARIANO MELGAR C.16JR. JOSE GALVEZ C. 4JR.PEDRO RUIZ 5JR.PEDRO RUIZ 4JR.PEDRO RUIZ 3JR.ABRAHAM VALDELOMAR C.6JR.RICARDO PALMA C.6JR.RICARDO PALMA C.7
LINEA DE PAREAV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7
FLECHAS DIRECCIONALES CON GIROAV. MARIANO MELGAR C.14AV. MARIANO MELGAR C.15
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
AV. MARIANO MELGAR C.16JR. JOSE GALVEZ C. 4JR.PEDRO RUIZ 5JR.PEDRO RUIZ 4JR.PEDRO RUIZ 3JR.ABRAHAM VALDELOMAR C.6JR.RICARDO PALMA C.6JR.RICARDO PALMA C.7
02.07.02 SEALIZACION VERTICAL02.07.02.01 Sealizacin Preventiva de lado 0.60 x 0.60 und
AV. MARIANO MELGAR C.14AV. MARIANO MELGAR C.15AV. MARIANO MELGAR C.16JR. JOSE GALVEZ C. 4JR.PEDRO RUIZ 5JR.PEDRO RUIZ 4JR.PEDRO RUIZ 3JR.ABRAHAM VALDELOMAR C.6JR.RICARDO PALMA C.6JR.RICARDO PALMA C.7
02.08.00 ELIMINACION DE MATERIAL EXCEDENTE02.08.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
03.00.00 VEREDAS
03.01.00 TRABAJOS PRELIMINARES03.01.01 Limpieza de Terreno Manual m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
AV. MARIANO MELGAR C.14-A
AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
03.01.02 Trazo, Nivel y Replanteo m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
AV. MARIANO MELGAR C.14-A
AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
03.01.03 Demolicin de Vereda existente de concreto simple m2
CA. MARIANO MELGAR CUADRA 14Lado Izquierdo (A1)Lado Derecho (A2 + A3 + A4)A2A3
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
A4
CA. MARIANO MELGAR CUADRA 15Lado Izquierdo (A12 +A13)A12A13Lado Derecho (A14 + A15)A14A15
CA. MARIANO MELGAR CUADRA 16Lado Izquierdo (A16)Lado Derecho (A17)
CA. JOSE GALVEZ CUADRA 4 Lado Izquierdo (A5 +A6 +A7)A5A6A7
Lado Derecho (A8 +A9 +A10 +A11)A8A9A10A11
CA. PEDRO RUIZ CUADRA 3 Lado Izquierdo (A37 + A38)A37A38Lado Derecho (A39)A39
CA. PEDRO RUIZ CUADRA 4Lado Izquierdo (A28)Lado Derecho (A29 + A430)A29A30
CA. PEDRO RUIZ CUADRA 5Lado Izquierdo (A19 +A20 + A21 )A19A20A21Lado Derecho (A22 )
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
CA. ABRAHAM VALDEROMAR CUADRA 6Lado Izquierdo (A26 +A27)A26A27Lado Derecho (A25)
CA. RICARDO PALMA CUADRA 6Lado Izquierdo (A33)Lado Derecho (A31 +A32)A31A32
CA. RICARDO PALMA CUADRA 7Lado Izquierdo (A36)Lado Derecho (A34 + A35)A34A35
03.01.04 Demolicin de Vereda existente de concreto simple con una H= 1.00 m m2
CA. MARIANO MELGAR CUADRA 16Lado Derecho (A18)
Lado Derecho (A23 + A24 )A23A24
03.02.00 MOVIMIENTO DE TIERRAS03.02.01 Corte manual de terreno m3
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
03.02.02 Nivelacion y Apisonado en Veredas m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
03.02.03 Relleno Compactado C/ Material de prestamo (Afirmado) para base de vereda m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
03.03.00 CONCRETO SIMPLE03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. brua. m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
03.03.02 Concreto f'c=175 Kg/cm2 en rampas m2
AV. MARIANO MELGAR C.14-A
AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
03.03.03 Encofrado, descencofrado de Vereda. m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
AV. MARIANO MELGAR C.14-A
AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-B
JR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-B
03.04.00 JUNTAS Y BRUADO03.04.01 Junta de dilatacin 1" x 4" de concreto asfltico a 3.0 m m
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
03.04.02 Bruado de veredas m
AV. MARIANO MELGAR C.14-A
AV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
MARTILLOS EN OCHAVOSINTERS. M- MELGAR - JOSE B. ALCEDO
INTERS. M. MELGAR - JOSE GALVEZ
INTERS. M. MELGAR - F. VILLARREAL
INTERS. M. MELGAR - PEDRO RUIZ
INTERS. PEDRO RUIZ - A. VALDELOMAR
INTERS. PEDRO RUIZ - RICARDO PALMA
INTERS. PEDRO RUIZ - AV. CHACHAPOYAS
INTERS. R. PALMA - F. VILLARREAL
INTERS. A. VALDELOMAR - F. VILLARREAL
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
03.04.03 Bruado de rampas m
AV. MARIANO MELGAR C.14-A
AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
03.05.00 CURADO03.05.01 Curado de vereda con arena fina , durante 7 dias - 4 veces x da m2
03.06.00 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE03.06.01 Suministro y colocacin de encimado de cajas para agua und
LOTES EN TOTAL
03.06.02 Suministro y colocacin de encimado de cajas para desague undLOTES EN TOTAL
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE03.07.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
04.00.00 SARDINEL
04.01.00 TRABAJOS PRELIMINARES04.01.01 Limpieza de Terreno Manual m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
04.01.02 Trazo, Nivel y Replanteo m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
04.02.00 MOVIMIENTO DE TIERRAS04.02.01 Excavacion de sardineles hasta h=60 cm m3
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
04.03.00 CONCRETO SIMPLE 04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
04.03.02 Encofrado y Desencofrado m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
04.03.03 Acero Corrugado 3/8", fy=4200 kg/cm2 kg
04.03.04 Relleno de Juntas de Dilatacin con concreto asfaltico 1"x2" m en sardinel m
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
04.03.05 Tarrajeo pulido en sardineles m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
04.03.06 Curado de sardinel con arena fina, durante 7 dias - 4 veces x da m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
04.04.00 ELIMINACION DE MATERIAL EXCEDENTE04.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
05.00.00 CUNETAS RECTANGULARES
05.01.00 TRABAJOS PRELIMINARES05.01.00 Limpieza de Terreno Manual m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BUNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.02.00 Trazo, Nivel y Replanteo m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BUNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.02.00 MOVIMIENTO DE TIERRAS05.02.01 Excavacion de cunetas rectangulares hasta h=60 cm m3
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
UNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.03.00 CONCRETO SIMPLE05.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BUNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
UNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.03.02 Acero Corrugado 3/8", fy=4200 kg/cm2 kg
05.03.03 Encofrado y Desencofrado M2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BUNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.03.04 Tarrajeo pulido en Canaletas m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-B
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
UNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.03.05 Curado de sardinel y canaletas, durante 7 dias - 4 veces x da m2
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BUNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
UNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.03.06 Tapas de concreto para Cunetas Rectangulares m3
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BUNION DE AV. M.M. C 14-A Y BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BUNION DE AV. M.M. C 15 -A Y BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BUNION DE AV. M.M. C 16 -A Y BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BUNION DE AV.J.G. C 4 -A Y BJR.PEDRO RUIZ 5-AJR.PEDRO RUIZ 5-BUNION DE JR.PEDRO RUIZ 4-A Y 5-AUNION DE JR.PEDRO RUIZ 4-B Y 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BUNION DE JR.PEDRO RUIZ 4-A Y 3-AUNION DE JR.PEDRO RUIZ 4-B Y 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BUNION JR.ABRAHAM VALDELOMAR C.6-A Y BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-BUNION JR.RICARDO PAL,A C.7-A Y B
05.04.00 ELIMINACION DE MATERIAL EXCEDENTE05.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
06.00.00 MURO DE CONTENCION06.01.00 TRABAJOS PRELIMINARES
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
06.01.01 Limpieza de Terreno Manual m2
AV. MARIANO MELGAR C.16-A
JR. JOSE GALVEZ C. 4-A
06.01.02 Trazo, Nivel y Replanteo m2
AV. MARIANO MELGAR C.16-A
JR. JOSE GALVEZ C. 4-A
06.02.00 MOVIMIENTO DE TIERRAS06.02.01 Corte de Terreno Manual para Muro de Contencin m3
MARIANO MELGAR CDA 16LADO IZQUIERDO MURO H=1.00MJR.JOSE GALVEZLADO IZQUIERDO
06.02.02 Relleno con material de prstamo en Muro de Contencin m3
MARIANO MELGAR CDA 16LADO IZQUIERDO MURO H=1.00MJR.JOSE GALVEZLADO IZQUIERDO
06.03.00 CONCRETO SIMPLE06.03.01 Solado 1:10; C:A e = 4" m2
MARIANO MELGAR CDA 16LADO IZQUIERDO MURO H=1.00MJR.JOSE GALVEZLADO IZQUIERDO
06.04.00 CONCRETO ARMADO06.04.01 Encofrado y Desencofrado de Muro de contencin m2
MARIANO MELGAR CDA 16LADO IZQUIERDO MURO H=1.00MJR.JOSE GALVEZLADO IZQUIERDO
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg
06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contencin m3
MARIANO MELGAR CDA 16LADO IZQUIERDO MURO H=1.00MMURO H=1.00MJR.JOSE GALVEZLADO IZQUIERDO
06.05.00 JUNTAS06.05.01 Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m. m
06.06.00 ELIMINACION DE MATERIAL EXCEDENTE06.06.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
07.00.00 AREAS VERDES07.01.00 Corte superficial para jardineras hasta 0.20 m m2
07.02.00 Acarreo de material excedente dp
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR. JOSE GALVEZC-4 - AC-4 - AC-4 - BC-4 - B
JR. PEDRO RUIZC-5 - AC-5 - AC-5 - BC-5 - B
C-4 - AC-4 - AC-4 - BC-4 - B
C-3 - AC-3 - AC-3 - BC-3 - B
JR. A. VALDELOMARC-6 - AC-6 - AC-6 - BC-6 - B
JR. RICARDO PALMAC-6 - AC-6 - AC-6 - BC-6 - B
C-7 - AC-7 - AC-7 - BC-7 - B
07.05.00 Arborizacion con plantones und
AV. MARIANO MELGAR C.14-AAV. MARIANO MELGAR C.14-BAV. MARIANO MELGAR C.15-AAV. MARIANO MELGAR C.15-BAV. MARIANO MELGAR C.16-AAV. MARIANO MELGAR C.16-BJR. JOSE GALVEZ C. 4-AJR. JOSE GALVEZ C. 4-BJR.PEDRO RUIZ 5-A
PLANILLA DE METRADOS
OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBAUBIC. : BAGUA GRANDEFECHA : JUNIO 2015
PART. DESCRIPCIN UND
JR.PEDRO RUIZ 5-BJR.PEDRO RUIZ 4-AJR.PEDRO RUIZ 4-BJR.PEDRO RUIZ 3-AJR.PEDRO RUIZ 3-BJR.ABRAHAM VALDELOMAR C.6-AJR.ABRAHAM VALDELOMAR C.6-BJR.RICARDO PALMA C.6-AJR.RICARDO PALMA C.6-BJR.RICARDO PALMA C.7-AJR.RICARDO PALMA C.7-B
07.06.00 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3Acarreo de material excedente
08.00.00 VARIOS
08.01.00 Limpieza final de obra m2
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 1.00 1.00 1.00
1.00 1.00 1.00 4.00
1.00 1.00 6007.371.00 Area = 494.92 494.921.00 Area = 459.13 459.13
1.00 Area = 482.96 482.961.00
1.00 Area = 492.09 492.091.00
1.00 Area = 727.07 727.071.00 Area = 754.20 754.20
Area = 784.23 784.23
1.00 Area = 488.53 488.531.00 Area = 650.80 650.80
Area = 673.44 673.44
1.00 1.00 6007.371.00 Area = 494.92 494.921.00 Area = 459.13 459.13
1.00 Area = 482.96 482.961.00
1.00 Area = 492.09 492.091.00
1.00 Area = 727.07 727.071.00 Area = 754.20 754.20
Area = 784.23 784.23
1.00 Area = 488.53 488.531.00 Area = 650.80 650.80
Area = 673.44 673.44
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 1.00 7282.14
1.00 1.00 7282.14 7282.14
1.00 1.00 6007.371.00 Area = 494.92 494.921.00 Area = 459.13 459.13
1.00 Area = 482.96 482.961.00
1.00 Area = 492.09 492.091.00
1.00 Area = 727.07 727.071.00 Area = 754.20 754.20
Area = 784.23 784.23
1.00 Area = 488.53 488.531.00 Area = 650.80 650.80
Area = 673.44 673.44
1.00 6007.371.00 Area = 494.92 494.921.00 Area = 459.13 459.13
1.00 Area = 482.96 482.961.00
1.00 Area = 492.09 492.091.00
1.00 Area = 727.07 727.071.00 Area = 754.20 754.20
Area = 784.23 784.23
1.00 Area = 488.53 488.531.00 Area = 650.80 650.80
Area = 673.44 673.44
1.00 6007.371.00 Area = 494.92 494.921.00 Area = 459.13 459.13
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 Area = 482.96 482.961.00
1.00 Area = 492.09 492.091.00
1.00 Area = 727.07 727.071.00 Area = 754.20 754.20
Area = 784.23 784.23
1.00 Area = 488.53 488.531.00 Area = 650.80 650.80
Area = 673.44 673.44
1.00 6007.371.00 Area = 494.92 494.921.00 Area = 459.13 459.13
1.00 Area = 482.96 482.961.00
1.00 Area = 492.09 492.091.00
1.00 Area = 727.07 727.071.00 Area = 754.20 754.20
Area = 784.23 784.23
1.00 Area = 488.53 488.531.00 Area = 650.80 650.80
Area = 673.44 673.44
1.00 263.260.38 0.40 0.15 1755.06 263.26
1.00 7.681.00 76.321.00 8.101.00 7.681.00 76.601.00 8.10
1.00 8.091.00 77.59
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 8.0377.91
1.00 7.851.00 74.301.00 7.851.00 8.021.00 7.741.00 74.791.00 8.141.00 7.691.00 1.271.00 0.86
1.00 7.861.00 75.721.00 7.851.00 8.311.00 75.391.00 7.84
1.00 7.851.00 72.671.00 7.751.00 72.731.00 7.86
1.00 7.641.00 75.891.00 7.871.00 75.721.00 7.93
1.00 7.801.00 71.291.00 7.781.00 7.781.00 7.881.00 71.571.00 7.921.00 7.741.00 1.581.00 2.36
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 7.831.00 75.561.00 7.851.00 75.141.00 76.501.00 76.751.00 79.401.00 80.84
1.00 3504.61
1.00 76.32 76.321.00 76.60 76.60
1.00 77.59 77.591.00 77.91 77.91
1.00 177.93 177.9330.00 2.00 6.00 360.00
1.00 74.30 74.301.00 74.79 74.79
30.00 1.00 6.00 180.00
1.00 75.72 75.721.00 75.39 75.39
30.00 1.00 6.00 180.00
1.00 72.67 72.671.00 72.73 72.73
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 75.89 75.891.00 75.72 75.72
1.00 71.29 71.291.00 71.57 71.57
30.00 3.00 6.00 540.00
1.00 75.56 75.56
1.00 75.14 75.141.00 76.50 76.501.00 76.75 76.751.00 79.40 79.401.00 80.84 80.84
30.00 3.00 6.00 540.00
14.00
3.00 3.004.00 4.002.00 2.001.00 1.00
2.00 2.001.00 1.001.00 1.00
1.00 6007.371.00 6007.37 6007.37
1.00 1.00 2292.49
1.00 1372.80 1372.80
1.00 919.69 919.69
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 1.00 254.40
12.00 7.20 86.40
4.00 6.00 24.00
14.00 6.00 84.00
3.00 6.00 18.00
7.00 6.00 42.00
1.00 1.00 418.62
2.00 13.27 26.54
4.00 12.33 49.322.00 6.00 12.00
4.00 12.08 48.322.00 6.00 12.00
4.00 13.23 52.922.00 7.20 14.40
4.00 12.82 51.282.00 6.00 12.00
4.00 13.00 52.002.00 6.00 12.00
2.00 12.39 24.78
2.00 11.69 23.38
2.00 13.84 27.68
1.00 1.00 1902.45
Repeciticiones N de veces1.00 217.77 217.771.00 200.42 200.421.00 209.11 209.111.00 182.16 182.161.00 192.80 192.801.00 170.16 170.16
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 200.27 200.271.00 188.57 188.571.00 182.13 182.131.00 159.06 159.06
1.00 1.00 1372.80Repeciticiones N de veces
11.00 5.00 7.20 396.008.00 7.20 57.601.00 7.20 7.20
21.00 6.00 126.00
2.00 6.00 12.00
13.00 5.00 6.00 390.003.00 6.00 18.00
4.00 5.00 6.00 120.001.00 6.00 6.008.00 5.00 6.00 240.00
1.00 1.00 919.69
Repeciticiones N de veces
1.00 85.77 85.771.00 91.73 91.731.00 85.08 85.081.00 7.05 7.05
1.00 85.79 85.791.00 5.60 5.60
1.00 6.13 6.131.00 5.50 5.50
0.001.00 104.11 104.111.00 182.90 182.90
1.00 84.60 84.601.00 5.96 5.96
1.00 86.60 86.601.00 82.87 82.87
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
441.20
9.00 3.00 0.10 2.70 29.710.00 3.00 0.10 3.00
9.00 3.00 0.10 2.7010.00 3.00 0.10 3.0011.00 3.00 0.10 3.3010.00 3.00 0.10 3.0010.00 3.00 0.10 3.0010.00 3.00 0.10 3.0010.00 3.00 0.10 3.0010.00 3.00 0.10 3.00
18.00 4.00 0.50 36.00 33218.00 4.00 0.50 36.0018.00 4.00 0.50 36.0016.00 4.00 0.50 32.0016.00 4.00 0.50 32.0016.00 4.00 0.50 32.0016.00 4.00 0.50 32.0016.00 4.00 0.50 32.0016.00 4.00 0.50 32.0016.00 4.00 0.50 32.00
2.00 0.50 3.75 3.75 43.94.00 0.10 4.20 1.682.00 0.50 3.75 3.752.00 0.10 3.50 0.702.00 0.50 3.75 3.752.00 0.10 5.10 1.022.00 0.50 3.00 3.002.00 0.10 6.70 1.342.00 0.50 3.15 3.152.00 0.10 4.95 0.992.00 0.50 3.15 3.152.00 0.10 5.00 1.002.00 0.50 3.15 3.152.00 0.10 3.90 0.782.00 0.50 3.15 3.152.00 0.10 5.60 1.122.00 0.50 3.15 3.152.00 0.10 5.60 1.122.00 0.50 3.15 3.152.00 0.10 5.00 1.00
2.00 1.78 3.56 35.602.00 1.78 3.56
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
2.00 1.78 3.562.00 1.78 3.562.00 1.78 3.562.00 1.78 3.562.00 1.78 3.562.00 1.78 3.562.00 1.78 3.562.00 1.78 3.56
16.00
3.00 3.002.00 2.001.00 1.001.00 1.001.00 1.001.00 1.002.00 2.002.00 2.002.00 2.001.00 1.00
1.00 1.00 9102.68
factor de esponjamiento 1.25 7282.14 9102.68
1.00 1.00 2741.672741.67
133.99131.10140.83119.30120.14124.02109.34132.63118.70170.15152.76149.56138.50151.49117.03122.51110.56
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
117.6093.7497.87
1.00 2.36 1.20 2.83 2.831.00 1.90 1.20 2.28 2.281.00 2.02 1.20 2.42 2.421.00 2.55 1.20 3.06 3.061.00 2.26 1.20 2.71 2.711.00 2.13 1.20 2.56 2.561.00 2.24 1.20 2.69 2.691.00 2.21 1.20 2.65 2.651.00 2.76 1.20 3.31 3.311.00 2.09 1.20 2.51 2.511.00 1.80 1.20 2.16 2.161.00 1.54 1.20 1.85 1.851.00 1.70 1.20 2.04 2.041.00 1.47 1.20 1.76 1.761.00 2.48 1.20 2.98 2.981.00 2.20 1.20 2.64 2.641.00 1.10 1.20 1.32 1.321.00 1.80 1.20 2.16 2.161.00 1.50 1.20 1.80 1.801.00 2.00 1.20 2.40 2.401.00 1.85 1.20 2.22 2.221.00 1.81 1.20 2.17 2.171.00 1.73 1.20 2.08 2.081.00 2.93 1.20 3.52 3.521.00 2.56 1.20 3.07 3.071.00 2.66 1.20 3.19 3.191.00 4.13 1.20 4.96 4.961.00 3.53 1.20 4.24 4.241.00 2.84 1.20 3.41 3.411.00 2.68 1.20 3.22 3.221.00 2.58 1.20 3.10 3.101.00 2.46 1.20 2.95 2.951.00 2.64 1.20 3.17 3.171.00 2.83 1.20 3.40 3.401.00 3.02 1.20 3.62 3.621.00 2.55 1.20 3.06 3.061.00 2.64 1.20 3.17 3.171.00 2.84 1.20 3.41 3.411.00 2.92 1.20 3.50 3.501.00 2.31 1.20 2.77 2.771.00 AREA 20.76 20.76 20.761.00 2.61 1.20 3.13 3.131.00 2.52 1.20 3.02 3.021.00 2.42 1.20 2.90 2.901.00 2.61 1.20 3.13 3.131.00 2.51 1.20 3.01 3.011.00 2.41 1.20 2.89 2.891.00 2.38 1.20 2.86 2.86
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 2.59 1.20 3.11 3.111.00 2.76 1.20 3.31 3.311.00 2.80 1.20 3.36 3.361.00 2.79 1.20 3.35 3.351.00 2.77 1.20 3.32 3.321.00 2.63 1.20 3.16 3.161.00 2.68 1.20 3.22 3.221.00 2.71 1.20 3.25 3.251.00 2.66 1.20 3.19 3.191.00 2.45 1.20 2.94 2.941.00 2.99 1.20 3.59 3.59
1.00 1.00 2741.672551.82
133.99131.10140.83119.30120.14124.02109.34132.63118.70170.15152.76149.56138.50151.49117.03122.51110.56117.6093.7497.87
189.851.00 2.36 1.20 2.831.00 1.90 1.20 2.281.00 2.02 1.20 2.421.00 2.55 1.20 3.061.00 2.26 1.20 2.711.00 2.13 1.20 2.561.00 2.24 1.20 2.691.00 2.21 1.20 2.651.00 2.76 1.20 3.311.00 2.09 1.20 2.511.00 1.80 1.20 2.161.00 1.54 1.20 1.851.00 1.70 1.20 2.041.00 1.47 1.20 1.761.00 2.48 1.20 2.981.00 2.20 1.20 2.64
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 1.10 1.20 1.321.00 1.80 1.20 2.161.00 1.50 1.20 1.801.00 2.00 1.20 2.401.00 1.85 1.20 2.221.00 1.81 1.20 2.171.00 1.73 1.20 2.081.00 2.93 1.20 3.521.00 2.56 1.20 3.071.00 2.66 1.20 3.191.00 4.13 1.20 4.961.00 3.53 1.20 4.241.00 2.84 1.20 3.411.00 2.68 1.20 3.221.00 2.58 1.20 3.101.00 2.46 1.20 2.951.00 2.64 1.20 3.171.00 2.83 1.20 3.401.00 3.02 1.20 3.621.00 2.55 1.20 3.061.00 2.64 1.20 3.171.00 2.84 1.20 3.411.00 2.92 1.20 3.501.00 2.31 1.20 2.771.00 AREA 20.76 20.761.00 2.61 1.20 3.131.00 2.52 1.20 3.021.00 2.42 1.20 2.901.00 2.61 1.20 3.131.00 2.51 1.20 3.011.00 2.41 1.20 2.891.00 2.38 1.20 2.861.00 2.59 1.20 3.111.00 2.76 1.20 3.311.00 2.80 1.20 3.361.00 2.79 1.20 3.351.00 2.77 1.20 3.321.00 2.63 1.20 3.161.00 2.68 1.20 3.221.00 2.71 1.20 3.251.00 2.66 1.20 3.191.00 2.45 1.20 2.941.00 2.99 1.20 3.59
1.00 1.00 945.16
945.16
10.13 10.13
4.1318.23 34.99
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO12.63
46.71 67.6820.97
27.99 38.8710.88
11.92 35.3223.40
7.2510.21 28.3410.88
33.196.00 50.305.076.04
50.12 89.1939.07
54.17 54.17
67.79 67.79
44.70 53.658.95
7.97 30.715.2617.483.90 3.90
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
47.45 51.454.0075.84 75.84
85.82 85.82
66.75 71.714.96
33.99 33.99
36.60 61.3124.71
1.00 1.00 62.90
62.9010.02 10.02
26.44 52.8813.5012.94
1.00 1.00 1100.780.40 2751.95 1100.78
133.99131.10140.83119.30120.14124.02109.34132.63118.70180.43152.76149.56138.50151.49117.03122.51
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
110.56117.6093.7497.87
rampas 189.85
2751.952751.95 2751.95
133.99131.10140.83119.30120.14124.02109.34132.63118.70180.43152.76149.56138.50151.49117.03122.51110.56117.6093.7497.87
rampas 189.85
2751.952751.95
133.99131.1
140.83119.3
120.14124.02109.34132.63118.7
180.43152.76149.56138.5
151.49117.03122.51110.56
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
117.693.7497.87
rampas 189.85
2562.10
133.99 2562.10131.1
140.83119.3
120.14124.02109.34132.63118.7
180.43152.76149.56138.5
151.49117.03122.51110.56117.693.7497.87
189.85
189.851.00 2.36 1.20 2.831.00 1.90 1.20 2.281.00 2.02 1.20 2.421.00 2.55 1.20 3.061.00 2.26 1.20 2.711.00 2.13 1.20 2.561.00 2.24 1.20 2.691.00 2.21 1.20 2.651.00 2.76 1.20 3.311.00 2.09 1.20 2.511.00 1.80 1.20 2.161.00 1.54 1.20 1.851.00 1.70 1.20 2.041.00 1.47 1.20 1.761.00 2.48 1.20 2.981.00 2.20 1.20 2.641.00 1.10 1.20 1.321.00 1.80 1.20 2.16
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1.00 1.50 1.20 1.801.00 2.00 1.20 2.401.00 1.85 1.20 2.221.00 1.81 1.20 2.171.00 1.73 1.20 2.081.00 2.93 1.20 3.521.00 2.56 1.20 3.071.00 2.66 1.20 3.191.00 4.13 1.20 4.961.00 3.53 1.20 4.241.00 2.84 1.20 3.411.00 2.68 1.20 3.221.00 2.58 1.20 3.101.00 2.46 1.20 2.951.00 2.64 1.20 3.171.00 2.83 1.20 3.401.00 3.02 1.20 3.621.00 2.55 1.20 3.061.00 2.64 1.20 3.171.00 2.84 1.20 3.411.00 2.92 1.20 3.501.00 2.31 1.20 2.771.00 AREA 20.76 20.761.00 2.61 1.20 3.131.00 2.52 1.20 3.021.00 2.42 1.20 2.901.00 2.61 1.20 3.131.00 2.51 1.20 3.011.00 2.41 1.20 2.891.00 2.38 1.20 2.861.00 2.59 1.20 3.111.00 2.76 1.20 3.311.00 2.80 1.20 3.361.00 2.79 1.20 3.351.00 2.77 1.20 3.321.00 2.63 1.20 3.161.00 2.68 1.20 3.221.00 2.71 1.20 3.251.00 2.66 1.20 3.191.00 2.45 1.20 2.941.00 2.99 1.20 3.59
1970.10
lado n0172.27 0.30 21.68171.72 0.30 21.51675.23 0.30 22.56974.05 0.30 22.21573.7 0.30 22.1171.48 0.30 21.44475.24 0.30 22.572
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO75.28 0.30 22.58478.55 0.30 23.56578.23 0.30 23.46974.54 0.30 22.36275.39 0.30 22.61774.82 0.30 22.44675.36 0.30 22.60872.94 0.30 21.88273.59 0.30 22.07776.07 0.30 22.82176.12 0.30 22.83677.02 0.30 23.10676.66 0.30 22.998
1498.26 0.30 449.478
71.41 0.30 21.42373.01 0.30 21.90374.43 0.30 22.32974.84 0.30 22.45275.78 0.30 22.73472.68 0.30 21.80474.31 0.30 22.29373.23 0.30 21.96979.09 0.30 23.72779.73 0.30 23.91974.24 0.30 22.27275.71 0.30 22.71376.24 0.30 22.87274.02 0.30 22.20672.87 0.30 21.86172.79 0.30 21.83774.99 0.30 22.49776.42 0.30 22.92676.35 0.30 22.90579.32 0.30 23.796
1501.46 0.30 450.438
perimetro 19.34 0.30 5.80219.19 0.30 5.75719.24 0.30 5.77218.39 0.30 5.51717.86 0.30 5.35822.23 0.30 6.66918.45 0.30 5.53519.94 0.30 5.98220.38 0.30 6.11419.35 0.30 5.80516.13 0.30 4.83920.04 0.30 6.01229.67 0.30 8.90121.74 0.30 6.522
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO20.31 0.30 6.09321.85 0.30 6.55520.04 0.30 6.01220.04 0.30 6.01219.38 0.30 5.81419.57 0.30 5.87120.79 0.30 6.23723.81 0.30 7.14317.74 0.30 5.32221.05 0.30 6.31521.14 0.30 6.34220.45 0.30 6.13516.9 0.30 5.0722.54 0.30 6.762
625.20
25.00 1.20 30.0025.00 1.20 30.0026.00 1.20 31.2026.00 1.20 31.2027.00 1.20 32.4025.00 1.20 30.0026.00 1.20 31.2025.00 1.20 30.0027.00 1.20 32.4027.00 1.20 32.4026.00 1.20 31.2026.00 1.20 31.2027.00 1.20 32.4026.00 1.20 31.2026.00 1.20 31.2026.00 1.20 31.2026.00 1.20 31.2026.00 1.20 31.2027.00 1.20 32.4026.00 1.20 31.20
5503.00
23.00 9.60 220.801.00 7.42 7.4224.00 9.60 230.4025.00 9.60 240.0025.00 9.60 240.0023.00 9.60 220.8023.00 9.60 220.8024.00 9.60 230.402.00 3.95 7.9021.00 9.50 199.50
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
2.00 9.70 19.401.00 14.00 14.001.00 8.40 8.4025.00 9.60 240.001.00 10.72 10.721.00 5.90 5.9026.00 9.60 249.6024.00 9.60 230.401.00 7.00 7.0025.00 9.60 240.0024.00 9.60 230.401.00 4.76 4.7624.00 9.60 230.401.00 6.72 6.7223.00 9.60 220.801.00 12.16 12.1619.00 9.60 182.401.00 12.35 12.352.00 11.10 22.202.00 12.05 24.1025.00 9.60 240.001.00 4.32 4.3225.00 9.60 240.0025.00 9.60 240.00
25.00 9.60 240.001.00 4.32 4.32
2.00 26.94 53.88
4.00 29.70 118.80
4.00 30.95 123.80
1.00 20.00 20.001.00 27.35 27.352.00 6.80 13.60
4.00 28.56 114.24
4.00 28.90 115.60
2.00 26.50 53.00
2.00 23.63 47.26
2.00 28.55 57.10
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
890.40
11.00 1.20 13.209.00 1.20 10.809.00 1.20 10.8012.00 1.20 14.4011.00 1.20 13.2010.00 1.20 12.0010.00 1.20 12.0011.00 1.20 13.2013.00 1.20 15.6010.00 1.20 12.009.00 1.20 10.807.00 1.20 8.408.00 1.20 9.607.00 1.20 8.4012.00 1.20 14.4011.00 1.20 13.205.00 1.20 6.008.00 1.20 9.607.00 1.20 8.409.00 1.20 10.808.00 1.20 9.609.00 1.20 10.808.00 1.20 9.6014.00 1.20 16.8012.00 1.20 14.4012.00 1.20 14.4020.00 1.20 24.0018.00 1.20 21.6013.00 1.20 15.6013.00 1.20 15.6013.00 1.20 15.6011.00 1.20 13.2012.00 1.20 14.4014.00 1.20 16.8012.00 1.20 14.4012.00 1.20 14.4013.00 1.20 15.6013.00 1.20 15.6014.00 1.20 16.8011.00 1.20 13.2012.00 7.20 86.4012.00 1.20 14.4013.00 1.20 15.6011.00 1.20 13.2012.00 1.20 14.4012.00 1.20 14.4011.00 1.20 13.2011.00 1.20 13.2013.00 1.20 15.6013.00 1.20 15.6014.00 1.20 16.80
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
14.00 1.20 16.8014.00 1.20 16.8012.00 1.20 14.4012.00 1.20 14.4013.00 1.20 15.6014.00 1.20 16.8014.00 1.20 16.8014.00 1.20 16.80
2751.95
area 2562.10 2562.10area 189.85 189.85
149.00149.00 149.00
149.00149.00 149.00
1031.98
1.25 2751.95 0.30 1031.98
389.50
75.39 0.25 18.8576.73 0.25 19.1879.63 0.25 19.9177.08 0.25 19.2744.51 0.25 11.1374.19 0.25 18.5576.92 0.25 19.2376.25 0.25 19.0685.6 0.25 21.4087.93 0.25 21.9880.29 0.25 20.0782.53 0.25 20.6381.29 0.25 20.32
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO72.47 0.25 18.1278.76 0.25 19.6978.63 0.25 19.6681.12 0.25 20.2883.08 0.25 20.7782.71 0.25 20.6882.87 0.25 20.72
389.50
75.39 0.25 18.8576.73 0.25 19.1879.63 0.25 19.9177.08 0.25 19.2744.51 0.25 11.1374.19 0.25 18.5576.92 0.25 19.2376.25 0.25 19.0685.6 0.25 21.4087.93 0.25 21.9880.29 0.25 20.0782.53 0.25 20.6381.29 0.25 20.3272.47 0.25 18.1278.76 0.25 19.6978.63 0.25 19.6681.12 0.25 20.2883.08 0.25 20.7782.71 0.25 20.6882.87 0.25 20.72
233.70
75.39 0.25 0.60 11.3176.73 0.25 0.60 11.5179.63 0.25 0.60 11.9477.08 0.25 0.60 11.5644.51 0.25 0.60 6.6874.19 0.25 0.60 11.1376.92 0.25 0.60 11.5476.25 0.25 0.60 11.4485.6 0.25 0.60 12.8487.93 0.25 0.60 13.1980.29 0.25 0.60 12.0482.53 0.25 0.60 12.3881.29 0.25 0.60 12.1972.47 0.25 0.60 10.8778.76 0.25 0.60 11.8178.63 0.25 0.60 11.7981.12 0.25 0.60 12.17
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO83.08 0.25 0.60 12.4682.71 0.25 0.60 12.4182.87 0.25 0.60 12.43
194.75
75.39 0.125 9.4276.73 0.125 9.5979.63 0.125 9.9577.08 0.125 9.6444.51 0.125 5.5674.19 0.125 9.2776.92 0.125 9.6276.25 0.125 9.5385.6 0.125 10.7087.93 0.125 10.9980.29 0.125 10.0482.53 0.125 10.3281.29 0.125 10.1672.47 0.125 9.0678.76 0.125 9.8578.63 0.125 9.8381.12 0.125 10.1483.08 0.125 10.3982.71 0.125 10.3482.87 0.125 10.36
2025.37
75.39 1.30 98.0176.73 1.30 99.7579.63 1.30 103.5277.08 1.30 100.2044.51 1.30 57.8674.19 1.30 96.4576.92 1.30 100.0076.25 1.30 99.1385.6 1.30 111.2887.93 1.30 114.3180.29 1.30 104.3882.53 1.30 107.2981.29 1.30 105.6872.47 1.30 94.2178.76 1.30 102.3978.63 1.30 102.2281.12 1.30 105.4683.08 1.30 108.0082.71 1.30 107.5282.87 1.30 107.73
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
6006.3872 6006.39
130.25
25.00 0.25 6.2525.00 0.25 6.2526.00 0.25 6.5026.00 0.25 6.5027.00 0.25 6.7525.00 0.25 6.2526.00 0.25 6.5025.00 0.25 6.2527.00 0.25 6.7527.00 0.25 6.7526.00 0.25 6.5026.00 0.25 6.5027.00 0.25 6.7526.00 0.25 6.5026.00 0.25 6.5026.00 0.25 6.5026.00 0.25 6.5026.00 0.25 6.5027.00 0.25 6.7526.00 0.25 6.50
467.39
75.39 0.30 22.6276.73 0.30 23.0279.63 0.30 23.8977.08 0.30 23.1244.51 0.30 13.3574.19 0.30 22.2676.92 0.30 23.0876.25 0.30 22.8885.6 0.30 25.6887.93 0.30 26.3880.29 0.30 24.0982.53 0.30 24.7681.29 0.30 24.3972.47 0.30 21.7478.76 0.30 23.6378.63 0.30 23.5981.12 0.30 24.3483.08 0.30 24.9282.71 0.30 24.8182.87 0.30 24.86
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
623.19
75.39 0.40 30.1676.73 0.40 30.6979.63 0.40 31.8577.08 0.40 30.8344.51 0.40 17.8074.19 0.40 29.6876.92 0.40 30.7776.25 0.40 30.5085.6 0.40 34.2487.93 0.40 35.1780.29 0.40 32.1282.53 0.40 33.0181.29 0.40 32.5272.47 0.40 28.9978.76 0.40 31.5078.63 0.40 31.4581.12 0.40 32.4583.08 0.40 33.2382.71 0.40 33.0882.87 0.40 33.15
292.12
esponjamiento 1.25 233.70 292.12
1019.15
70.06 0.60 42.0471.72 0.60 43.0321.22 0.60 12.7371.88 0.60 43.1372.7 0.60 43.6222.93 0.60 13.7669.2 0.60 41.5270.15 0.60 42.0922.96 0.60 13.7872.96 0.60 43.7871.88 0.60 43.1319.92 0.60 11.9577.74 0.60 46.6476.73 0.60 46.0417.43 0.60 10.4618.24 0.60 10.9474.24 0.60 44.5474.04 0.60 44.42
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO79.54 0.60 47.7278.46 0.60 47.0818.31 0.60 10.9918.69 0.60 11.2171.52 0.60 42.9171.44 0.60 42.8622.03 0.60 13.2284.09 0.60 50.4586.72 0.60 52.0375.01 0.60 45.0175.31 0.60 45.1921.46 0.60 12.88
1019.15
70.06 0.60 42.0471.72 0.60 43.0321.22 0.60 12.7371.88 0.60 43.1372.7 0.60 43.6222.93 0.60 13.7669.2 0.60 41.5270.15 0.60 42.0922.96 0.60 13.7872.96 0.60 43.7871.88 0.60 43.1319.92 0.60 11.9577.74 0.60 46.6476.73 0.60 46.0417.43 0.60 10.4618.24 0.60 10.9474.24 0.60 44.5474.04 0.60 44.4279.54 0.60 47.7278.46 0.60 47.0818.31 0.60 10.9918.69 0.60 11.2171.52 0.60 42.9171.44 0.60 42.8622.03 0.60 13.2284.09 0.60 50.4586.72 0.60 52.0375.01 0.60 45.0175.31 0.60 45.1921.46 0.60 12.88
509.57
70.06 0.60 0.50 21.0271.72 0.60 0.50 21.52
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO21.22 0.60 0.50 6.3771.88 0.60 0.50 21.5672.7 0.60 0.50 21.8122.93 0.60 0.50 6.8869.2 0.60 0.50 20.7670.15 0.60 0.50 21.0522.96 0.60 0.50 6.8972.96 0.60 0.50 21.8971.88 0.60 0.50 21.5619.92 0.60 0.50 5.9877.74 0.60 0.50 23.3276.73 0.60 0.50 23.0217.43 0.60 0.50 5.2318.24 0.60 0.50 5.4774.24 0.60 0.50 22.2774.04 0.60 0.50 22.2179.54 0.60 0.50 23.8678.46 0.60 0.50 23.5418.31 0.60 0.50 5.4918.69 0.60 0.50 5.6171.52 0.60 0.50 21.4671.44 0.60 0.50 21.4322.03 0.60 0.50 6.6184.09 0.60 0.50 25.2386.72 0.60 0.50 26.0275.01 0.60 0.50 22.5075.31 0.60 0.50 22.5921.46 0.60 0.50 6.44
212.32
70.06 0.125 8.7671.72 0.125 8.9721.22 0.125 2.6571.88 0.125 8.9972.7 0.125 9.0922.93 0.125 2.8769.2 0.125 8.6570.15 0.125 8.7722.96 0.125 2.8772.96 0.125 9.1271.88 0.125 8.9919.92 0.125 2.4977.74 0.125 9.7276.73 0.125 9.5917.43 0.125 2.1818.24 0.125 2.2874.24 0.125 9.2874.04 0.125 9.2679.54 0.125 9.9478.46 0.125 9.81
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO18.31 0.125 2.2918.69 0.125 2.3471.52 0.125 8.9471.44 0.125 8.9322.03 0.125 2.7584.09 0.125 10.5186.72 0.125 10.8475.01 0.125 9.3875.31 0.125 9.4121.46 0.125 2.68
4871.438 4871.44
2038.30 2038.30
70.06 PERIMETRO= 1.2 84.0771.72 PERIMETRO= 1.2 86.0621.22 PERIMETRO= 1.2 25.4671.88 PERIMETRO= 1.2 86.2672.7 PERIMETRO= 1.2 87.2422.93 PERIMETRO= 1.2 27.5269.2 PERIMETRO= 1.2 83.0470.15 PERIMETRO= 1.2 84.1822.96 PERIMETRO= 1.2 27.5572.96 PERIMETRO= 1.2 87.5571.88 PERIMETRO= 1.2 86.2619.92 PERIMETRO= 1.2 23.9077.74 PERIMETRO= 1.2 93.2976.73 PERIMETRO= 1.2 92.0817.43 PERIMETRO= 1.2 20.9218.24 PERIMETRO= 1.2 21.8974.24 PERIMETRO= 1.2 89.0974.04 PERIMETRO= 1.2 88.8579.54 PERIMETRO= 1.2 95.4578.46 PERIMETRO= 1.2 94.1518.31 PERIMETRO= 1.2 21.9718.69 PERIMETRO= 1.2 22.4371.52 PERIMETRO= 1.2 85.8271.44 PERIMETRO= 1.2 85.7322.03 PERIMETRO= 1.2 26.4484.09 PERIMETRO= 1.2 100.9186.72 PERIMETRO= 1.2 104.0675.01 PERIMETRO= 1.2 90.0175.31 PERIMETRO= 1.2 90.3721.46 PERIMETRO= 1.2 25.75
2123.23
70.06 1.25 87.5871.72 1.25 89.65
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO21.22 1.25 26.5371.88 1.25 89.8572.7 1.25 90.8822.93 1.25 28.6669.2 1.25 86.5070.15 1.25 87.6922.96 1.25 28.7072.96 1.25 91.2071.88 1.25 89.8519.92 1.25 24.9077.74 1.25 97.1876.73 1.25 95.9117.43 1.25 21.7918.24 1.25 22.8074.24 1.25 92.8074.04 1.25 92.5579.54 1.25 99.4378.46 1.25 98.0818.31 1.25 22.8918.69 1.25 23.3671.52 1.25 89.4071.44 1.25 89.3022.03 1.25 27.5484.09 1.25 105.1186.72 1.25 108.4075.01 1.25 93.7675.31 1.25 94.1421.46 1.25 26.83
2972.52
70.06 1.75 122.6171.72 1.75 125.5121.22 1.75 37.1471.88 1.75 125.7972.7 1.75 127.2322.93 1.75 40.1369.2 1.75 121.1070.15 1.75 122.7622.96 1.75 40.1872.96 1.75 127.6871.88 1.75 125.7919.92 1.75 34.8677.74 1.75 136.0576.73 1.75 134.2817.43 1.75 30.5018.24 1.75 31.9274.24 1.75 129.9274.04 1.75 129.5779.54 1.75 139.2078.46 1.75 137.3118.31 1.75 32.04
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO18.69 1.75 32.7171.52 1.75 125.1671.44 1.75 125.0222.03 1.75 38.5584.09 1.75 147.1686.72 1.75 151.7675.01 1.75 131.2775.31 1.75 131.7921.46 1.75 37.56
41.62
70.06 0.35 0.07 1.7271.72 0.35 0.07 1.7621.22 0.35 0.07 0.5271.88 0.35 0.07 1.7672.7 0.35 0.07 1.7822.93 0.35 0.07 0.5669.2 0.35 0.07 1.7070.15 0.35 0.07 1.7222.96 0.35 0.07 0.5672.96 0.35 0.07 1.7971.88 0.35 0.07 1.7619.92 0.35 0.07 0.4977.74 0.35 0.07 1.9076.73 0.35 0.07 1.8817.43 0.35 0.07 0.4318.24 0.35 0.07 0.4574.24 0.35 0.07 1.8274.04 0.35 0.07 1.8179.54 0.35 0.07 1.9578.46 0.35 0.07 1.9218.31 0.35 0.07 0.4518.69 0.35 0.07 0.4671.52 0.35 0.07 1.7571.44 0.35 0.07 1.7522.03 0.35 0.07 0.5484.09 0.35 0.07 2.0686.72 0.35 0.07 2.1275.01 0.35 0.07 1.8475.31 0.35 0.07 1.8521.46 0.35 0.07 0.53
636.97
esponjamiento 1.25 509.57 636.9675
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
90.48
35.24 2.00 70.48
10.00 2.00 20.00
90.48
35.24 2.00 70.48
10.00 2.00 20.00
25.44
1.00 35.24 0.58 20.44
1.00 10.00 0.50 5.00
9.05
1.00 35.24 0.20 7.05
1.00 10.00 0.20 2.00
45.24
1.00 35.24 1.00 35.24
1.00 10.00 1.00 10.00
56.55
1.00 35.24 1.25 44.05
1.00 10.00 1.25 12.50
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
1097.9136 1097.91
20.36
1.00 35.24 0.20 1.00 7.051.00 35.24 1.00 0.25 8.81
1.00 10.00 0.20 1.00 2.001.00 10.00 1.00 0.25 2.50
5 1 5 5.00
21.80 21.80
2504.15AREA 2504.15
500.83AREA 2504.15 0.20 500.83 500.83
2504.15AREA 2504.15 2504.15
2504.15
AREA 54.31 54.31AREA 40.81 40.81AREA 63.85 63.85AREA 50.87 50.87
AREA 63.59 63.59AREA 53.57 53.57AREA 51.03 51.03AREA 34.42 34.42
AREA 27.56 27.56AREA 39.87 39.87AREA 40.8 40.8AREA 38.3 38.3
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
AREA 31.2 31.2AREA 43.82 43.82AREA 34.09 34.09AREA 48.41 48.41
AREA 66.47 66.47AREA 83.28 83.28AREA 113.31 113.31AREA 100.76 100.76
AREA 74.59 74.59AREA 63.66 63.66AREA 74.93 74.93AREA 84.53 84.53
AREA 59.87 59.87AREA 75.5 75.5AREA 62.62 62.62AREA 64.31 64.31
AREA 64.07 64.07AREA 67.56 67.56AREA 60.02 60.02AREA 71.31 71.31
AREA 67.23 67.23AREA 72.52 72.52AREA 69.54 69.54AREA 87.89 87.89
AREA 85.38 85.38AREA 72.52 72.52AREA 77.07 77.07AREA 68.71 68.71
227.00
11.00 11.0011.00 11.0012.00 12.0011.00 11.007.00 7.0011.00 11.0012.00 12.0012.00 12.0013.00 13.00
PLANILLA DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
: MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA: BAGUA GRANDE
CANT PIEZAMEDIDAS
AREA PESO PARCIAL TOTALLONG. ANCHO ALTO
12.00 12.0011.00 11.0012.00 12.0012.00 12.0011.00 11.0012.00 12.0011.00 11.0011.00 11.0012.00 12.0012.00 12.0011.00 11.00
626.04500.83 1.25 626.04
12226.44area 12,226.44 12,226.44
RESUMEN DE METRADOSOBRA
Item Descripcin Und.
01.00.00 OBRAS PROVISIONALES01.01.00 Cartel de indentificacin de Obra de 3.60 x 8.50 m. und01.02.00 Alquiler de Almacn y Oficina mes
02.00.00 PAVIMENTOS02.01.00 TRABAJOS PRELIMINARES02.01.01 Limpieza de Terreno Manual m202.01.02 Trazo, Nivel y Replanteo m202.02.00 MOVIMIENTO DE TIERRAS02.02.01 Corte con Maquinaria en terreno natural hasta H=1.00 m m302.02.02 Perfilado, Nivelacin y compactacin de la subrasante en zonas de corte m202.02.03 Mejoramiento de subrasante con over menor a 6" e=20cm m202.02.04 Base Granular e=20cm m202.03.00 CONCRETO SIMPLE02.03.01 Losa de Rodadura, Concreto f'c = 210 Kg/cm2, e=0.20 m. m202.03.02 Concreto en Uas para Pavimento Rgido, Concreto f'c = 210 Kg/cm2 m302.03.03 Encofrado y Desencofrado de Losa de Rodadura m202.03.04 Levantamiento de Buzones Existentes a nivel de rasante und02.04.00 CURADO02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m202.05.00 JUNTAS02.05.01 Juntas de contraccin e=6mm m02.05.02 Juntas de contruccin de 3/4" c/ pasajuntas m02.05.03 Juntas de contruccin de 3/4" sin pasajuntas en la interseccin de calles m02.05.04 Juntas asflticas en pavimentos h=20 cm, e=1" m02.06.00 ACERO LISO02.06.01 Dowels transversales con acero liso de 3/4" m02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m02.07.00 SEALIZACION02.07.01 SEALIZACION HORIZONTAL02.07.01.01 Pintado de Franjas en Pavimento - Sealizacion m202.07.02 SEALIZACION VERTICAL02.07.02.01 Sealizacin Preventiva de lado 0.60 x 0.60 und02.08.00 ELIMINACION DE MATERIAL EXCEDENTE
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
Item Descripcin Und.
02.08.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
03.00.00 VEREDAS03.01.00 TRABAJOS PRELIMINARES03.01.01 Limpieza de Terreno Manual m203.01.02 Trazo, Nivel y Replanteo m203.01.03 Demolicin de Vereda existente de concreto simple m203.01.04 Demolicin de Vereda existente de concreto simple con una H= 1.00 m m203.02.00 MOVIMIENTO DE TIERRAS03.02.01 Corte manual de terreno m303.02.02 Nivelacion y Apisonado en Veredas m203.02.03 Relleno Compactado C/ Material de prestamo (Afirmado) para base de vereda m203.03.00 CONCRETO SIMPLE03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. brua. m203.03.02 Concreto f 'c=175 kg/cm2 en Rampas m203.03.03 Encofrado, descencofrado de Vereda. m203.04.00 JUNTAS Y BRUADO03.04.01 Junta de dilatacin 1" x 4" de concreto asfltico a 3.0 m m03.04.02 Bruado de veredas m03.04.03 Bruado de rampas m03.05.00 CURADO03.05.01 Curado de vereda con arena fina , durante 7 dias - 4 veces x da m203.06.00 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE03.06.01 Suministro y colocacin de encimado de cajas para agua und03.06.02 Suministro y colocacin de encimado de cajas para desague und03.07.00 ELIMINACION DE MATERIAL EXCEDENTE03.07.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
04.00.00 SARDINEL04.01.00 TRABAJOS PRELIMINARES04.01.01 Limpieza de Terreno Manual m204.01.02 Trazo, Nivel y Replanteo m204.02.00 MOVIMIENTO DE TIERRAS04.02.01 Excavacion de sardineles hasta h=60 cm m304.03.00 CONCRETO SIMPLE 04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m304.03.02 Encofrado y Desencofrado m204.03.03 Acero Corrugado 3/8", fy=4200 kg/cm2 kg04.03.04 Relleno de Juntas de Dilatacin con concreto asfaltico 1"x2" m en sardinel m04.03.05 Tarrajeo pulido en sardineles m204.03.06 Curado de sardinel con arena fina, durante 7 dias - 4 veces x da m204.04.00 ELIMINACION DE MATERIAL EXCEDENTE
04.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
Item Descripcin Und.
05.00.00 CUNETAS RECTANGULARES05.01.00 TRABAJOS PRELIMINARES05.01.00 Limpieza de Terreno Manual m205.02.00 Trazo, Nivel y Replanteo m205.02.00 MOVIMIENTO DE TIERRAS05.02.01 Excavacion de cunetas rectangulares hasta h=60 cm m305.03.00 CONCRETO SIMPLE05.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m305.03.02 Acero Corrugado 3/8", fy=4200 kg/cm2 kg05.03.03 Encofrado y Desencofrado M205.03.04 Tarrajeo pulido en Cunetas rectangulares m205.03.05 Curado de sardinel y canaletas, durante 7 dias - 4 veces x da m205.03.06 Tapas de concreto para Cunetas Rectangulares m305.04.00 ELIMINACION DE MATERIAL EXCEDENTE
05.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
06.00.00 MURO DE CONTENCION06.01.00 TRABAJOS PRELIMINARES06.01.01 Limpieza de Terreno Manual m206.01.02 Trazo, Nivel y Replanteo m206.02.00 MOVIMIENTO DE TIERRAS06.02.01 Corte de Terreno Manual para Muro de Contencin m306.02.02 Relleno con material de prstamo en Muro de Contencin m306.03.00 CONCRETO SIMPLE06.03.01 Solado 1:10; C:A e = 4" m206.04.00 CONCRETO ARMADO06.04.01 Encofrado y Desencofrado de Muro de contencin m206.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contencin m306.05.00 JUNTAS06.05.01 Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m. m06.06.00 ELIMINACION DE MATERIAL EXCEDENTE
06.06.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3
07.00.00 AREAS VERDES07.01.00 Corte superficial para jardineras hasta 0.20 m m207.02.00 Acarreo de material excedente dp
Item Descripcin Und.
08.00.00 VARIOS08.01.00 Limpieza final de obra m2
RESUMEN DE METRADOS
Metrado
1.004.00
6,007.376,007.37
7,282.146,007.376,007.376,007.37
6,007.37263.26
3,504.6114.00
6,007.37
2,292.49254.40418.62
1,902.45
1,372.80919.69
441.20
16.00
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS
Metrado
9,102.68
2,741.672,741.67945.1662.90
1,100.782,751.952,751.95
2,562.10189.85
1,970.10
625.205503.00890.40
2,751.95
149.00149.00
1,031.98
389.50389.50
233.70
194.752,025.376,006.39130.25467.39623.19
292.12
Metrado
1,019.151,019.15
509.57
212.324871.442,038.302,123.232972.52
41.62
636.97
90.4890.48
25.449.05
45.24
56.551,097.91
20.36
5.00
21.80
2504.15500.83
2504.152504.15227.00
626.04
Metrado
12226.44
METRADO DE ACERO -MURO DE CONTENCION
N de Descripcin del Diseo de AceroPartida Elemento Estructural en el elemento estructural
MURO DE CONTENCIONACERO FY=4200 KG/CM2
0.3L= 40.00 39.92
0.10 0.10
0.1
1.50
0.2
MURO DE CONTENCIONACERO FY=4200 KG/CM2
0.3 0.25L= 40.00 39.92
0.10 0.10
0.1
1.50
0.2
MURO DE CONTENCIONACERO FY=4200 KG/CM2
0.25L= 40.00 39.92
0.10 0.10
0.2
1.00
0.2
MURO DE CONTENCIONACERO FY=4200 KG/CM2
0.2L= 40.00 39.92
3/8" @
3/8" @ 3/8" @
3/8" @
3/8" @
0.10 0.10
0.2
1.00
0.2
METRADO DE ACERO -MURO DE CONTENCION
Dimetro Longitud porRepeticioneCantidad de Elemento LONGITUD POR DIAMETRO DE VARILLA EN ML.varilla diseo del diseo Estructurales 1/4 3/8 1/2 5/8
3/8 40.12 6.00 1.00 240.72
3/8 1.80 134.00 1.00 241.20
3/8 40.12 6.00 1.00 240.72
3/8 1.80 161.00 1.00 289.80
3/8 40.12 5.00 1.00 200.60
3/8 1.40 161.00 1.00 225.40
3/8 40.12 6.00 1.00 240.72
3/8 1.40 201.00 1.00 281.40
Peso en kilogramos por metro lineal 0.22 0.56 0.99 1.55 Longitud total por dimetro, en metros lineales - 1,960.56 - - Total en kilogramos por dimetro - 1,097.91 - -
METRADO DE ACERO -MURO DE CONTENCION
LONGITUD POR DIAMETRO DE VARILLA EN ML.3/4 1
2.24 3.97 Total en kg - - - - 1,097.91
METRADO DE ACERO - CUNETAS RECTANGULARES
N de Descripcin del Diseo de AceroPartida Elemento Estructural en el elemento estructural
AV.MARIANO MELGARACERO FY=4200 KG/CM2
0.15L= 426.13 426.05
0.10 0.10
0.50 0.5
0.45
JR.JOSE GALVEZ0.15
L= 145.00 144.92
0.10 0.10
0.50 0.5
0.45
JR.RICARDO PALMA0.15
L= 343.00 342.92
0.10 0.10
0.50 0.5
0.45
JR.PEDRO RUIZ0.15
L= 496.00 495.92
0.10 0.10
1/4" @
1/4" @
1/4" @
1/4" @
0.50 0.5
0.45
JR.ABRAHAM0.15
L= 142.94 142.86
0.10 0.10
0.50 0.5
0.45
OTROS AV0.15
L= 66.21 66.13
0.10 0.10
0.50 0.5
0.45
1/4" @
1/4" @
METRADO DE ACERO - CUNETAS RECTANGULARES
Diseo de Acero Dimetro Longitud porRepeticioneCantidad de Elemento LONGITUD POR DIAMETRO DE VARILLA EN ML.en el elemento estructural varilla diseo del diseo Estructurales 1/4 3/8 1/2
1/4 426.25 4 1 1,705.00
1/4 1.45 2842 1 4,120.90
1/4 145.12 4 1 580.48
1/4 1.45 968 1 1,403.60
1/4 343.12 4 1 1,372.48
1/4 1.45 2288 1 3,317.60
1/4 496.12 4 1 1,984.48
1/4 1.45 3308 1 4,796.60
1/4 143.06 4 1 572.24
1/4 1.45 954 1 1,383.30
1/4 66.33 4 1 265.32
1/4 1.45 442 1 640.90
Peso en kilogramos por metro lineal 0.22 0.56 0.99 Longitud total por dimetro, en metros lineales 22,142.90 - - Total en kilogramos por dimetro 4,871.44 - -
METRADO DE ACERO - CUNETAS RECTANGULARES
LONGITUD POR DIAMETRO DE VARILLA EN ML.5/8 3/4 1
1.55 2.24 3.97 Total en kg - - - - - - 4,871.44
Pgina 93
METRADO DE ACERO - SARDINELES
N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de ElementoPartida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
SARDINELAV.MARIANO MELGAR
0.15L= 430.00 429.92 1/4 430.12 11.00 1.00
0.10 0.10
1/4 1.70 2,868.00 1.00
1.50
0.2
JR.JOSE GALVEZACERO FY=4200 KG/CM2
0.15L= 154.00 153.92 1/4 154.12 11.00 1.00
0.10 0.10
1/4 1.70 1,028.00 1.00
1.50
0.2
JR.PEDRO RUIZACERO FY=4200 KG/CM2
1/4" @
1/4" @
Pgina 94
METRADO DE ACERO - SARDINELES
N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de ElementoPartida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
0.15L= 404.50 404.42 1/4 404.62 8.00 1.00
0.10 0.10
1/4 1.20 2,698.00 1.00
1.00
0.2
JR.ABRAHAM VALDELOMARACERO FY=4200 KG/CM2
0.15L= 156.00 155.92 1/4 156.12 8.00 1.00
0.10 0.10
1/4 1.20 1,041.00 1.00
1.00
0.2
JR.RICARDO PALMAACERO FY=4200 KG/CM2
0.15L= 329.78 329.70 1/4 329.90 8.00 1.00
1/4" @
1/4" @
1/4" @
Pgina 95
METRADO DE ACERO - SARDINELES
N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de ElementoPartida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
0.10 0.10
1/4 1.20 2,200.00 1.00
1.00
0.2
Peso en kilogramos por metro linealLongitud total por dimetro, en metros linealesTotal en kilogramos por dimetro
Pgina 96
METRADO DE ACERO - SARDINELES
LONGITUD POR DIAMETRO DE VARILLA EN ML.1/4 3/8 1/2 5/8 3/4 1
4,731.32 4,875.60 1,695.32 1,747.60
Pgina 97
METRADO DE ACERO - SARDINELES
LONGITUD POR DIAMETRO DE VARILLA EN ML.1/4 3/8 1/2 5/8 3/4 1
3,236.96 3,237.60 1,248.96 1,249.20 2,639.20
Pgina 98
METRADO DE ACERO - SARDINELES
LONGITUD POR DIAMETRO DE VARILLA EN ML.1/4 3/8 1/2 5/8 3/4 1
2,640.00
0.22 0.56 0.99 1.55 2.24 3.97 Total en kg 27,301.76 - - - - - 6,006.39 - - - - - 6,006.39
Pgina 99
METRADO DE ACERO - TAPAS DE CANALETAS
N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de ElementoPartida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
TAPAS DE CUNETASAV.MARIANO MELGAR
0.15L= 1698.58 1698.50 1/4 1,698.50 3.00 1.00
1/4 0.35 11325.00 1.00
0.35
Peso en kilogramos por metro linealLongitud total por dimetro, en metros linealesTotal en kilogramos por dimetro
1/4" @
Pgina 100
METRADO DE ACERO - TAPAS DE CANALETAS
LONGITUD POR DIAMETRO DE VARILLA EN ML.1/4 3/8 1/2 5/8 3/4 1
5,095.50 3,963.75 0.22 0.56 0.99 1.55 2.24 3.97 Total en kg 9,059.25 - - - - - 1,993.04 - - - - - 1,993.04
METRADOS DETALLADOSRESUMEN DE METRADOSA MURO CONTENCIONA CANALETASA SARDINELESA TAPA DE CUNETAS