February 2005 Work Management Process
Alignment
Work Management Process Alignment Engineering
![Page 2: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/2.jpg)
MSS History
•Implemented in 1987•Mechanism to capture and manage information•Links various operations through a common database•Improved efficiency and accuracy of information being used
![Page 3: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/3.jpg)
Work Management System The Work Management
System is the focal point of the MSS System which monitors and tracks company wide work flow to insure proper planning and ultimate use of all resources.
![Page 4: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/4.jpg)
Work Management System
$140 Million67,000 Work Requests
1,000+ Employees Daily
![Page 5: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/5.jpg)
Work Management Work Requests Work Mgt
Construction Street Light Leased Lighting E, G, W
Distribution
Non-Work Mgt Substation Operations Telecom
![Page 6: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/6.jpg)
Work ManagementSubsystems
Closing
PlantAcct
ContractMgmt
CU/MU
WorkScheduling
Work Requesting
WMS
Design&
Estimating
![Page 7: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/7.jpg)
Major Responsibilities
ContractAnalysis
WRSchedules
SpecialCosts
WMSystemSupport
WMS
![Page 8: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/8.jpg)
Where we want to go…
![Page 9: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/9.jpg)
Vision
To be the Work Management Process Owner by providing highly accurate estimates, highly accurate schedules, and highly efficient customer support, thus improving the overall integrity of the WMS
![Page 10: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/10.jpg)
Mission To provide innovative, process-
driven services for the Work Management System and its’ users that make a positive contribution to the vision of MLGW and the mission of the Analysis, Strategy and Performance Department.
![Page 11: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/11.jpg)
Highlights for 2005 Improved confidence level of labor
standards Training Perceived contracts accuracy
(ACT) Work Management Process Team
![Page 12: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/12.jpg)
Organizational ChartDirector, ASPDana Jeanes
WM Engr Lvl IIIRuss Counce
BSEE
WM Engr Lvl IIILinda Whittaker
BSME
WM Engr Lvl IIIMartrice Anderson
BSME
Admin AsstStephanieRehnelt
WM Engr Lvl IThai Tran
BSIE
Work Management ProcessAlignment
SupportSusan Carter
SupportGuy Thomason
WM Engr Lvl IV(open)
WorkManagementSupervisor
Tonya Jordan
WM Engr Lvl IIIPhyllis Hunt
BSIE
![Page 13: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/13.jpg)
Workload Analysis
Work Management System Support Area Responsibilities Projected
Man Hours Financial Impact
CU/MU/CS - Creation and general maintenance - Field Observations/Time studies
850 2,000
Designer reports Provide Design vs Actual cost comparison reports to Engr. Mgrs/VPs 88
Crew Updates Update crew and labor rates for all WM crews 316
Automated Estimating Monitoring Monitor accuracy of Design and Estimating System in MSS 633
Work Management Training (construction crews and engineering) 400 Monitor/adjust costs of material purchases included in CUs 120 Truck Inventory Attend truck inventory meetings and assist with physical counts 288
WM Process Team Leader Between Depts (Monthly meetings) 192 New WM System Preliminary Design 1,000
Total Man Hours 5,887
$89,600,000
![Page 14: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/14.jpg)
Workload AnalysisResource Spreading
Area Responsibilities Projected Man Hours
Financial Impact
Monitor Resource Spreading Allocations (SL/Pavement Replacement) 210 Total Man Hours 210
$5,000,000
Work Request Schedules
Area Responsibilities Projected Man Hours
Financial Impact
Network Changes - MSS - BCIS
500 704
Organization Numbers Updates Maintain accurate organization numbers in Personnel Database (WRs) 100
Total Man Hours 1,304
![Page 15: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/15.jpg)
Workload AnalysisSpecial Projects
Area Responsibilities Projected Man Hours
Financial Impact
Develop New Training Manuals/Documents 528 Special Projects (1 month/yr for 4 engineers) 700
Total Man Hours 1,228
Schedule of Charges Area Responsibilities Projected
Man Hours Financial Impact
Schedule of Charges Update the E,G,& W Policy Costs that are charged to customers 485
Fixed Charges Update fixed estimates used by Customer Engr 110
Future Costs of Service Update estimates for OH service and UG meter costs use by Res. Engr. 15
Total Man Hours 610
$5,286,707
![Page 16: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/16.jpg)
Workload AnalysisManual Estimates
Area Responsibilities Projected Man Hours
Financial Impact
TDOT State Reimbursable Estimates Prepare documents and provide cost estimates for TDOT WRs 350
Non-Work Management Estimates Provide non-WM estimates for various engineering areas 100
$262,000
Total Man Hours 450
Contract Analysis Area Responsibilities Projected
Man Hours Financial Impact
Utilization Percentages Provide utilization percentages for E,G, W & SL construction contracts 88
Provide MLGW Bid for E,G & W construction contracts (3 contracts) 1188 Provide cost analysis of all construction contracts 440
Total Man Hours 1,716
$21,000,000
Total WMPA Projected Man Hours: 11,405
![Page 17: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/17.jpg)
# of people needed
7.3 Engineers
![Page 18: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/18.jpg)
“The Howard closing”
![Page 19: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/19.jpg)
Work Requesting
Work Request Creation Work Request Schedule Review Work Request Activity Completion
![Page 20: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/20.jpg)
Work Scheduling
Crew Data Work Request Network Schedules Work Management Users Database
![Page 21: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/21.jpg)
CU/MU Compatible Units Macro Units Construction Standards
![Page 22: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/22.jpg)
![Page 23: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/23.jpg)
![Page 24: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/24.jpg)
![Page 25: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/25.jpg)
![Page 26: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/26.jpg)
![Page 27: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/27.jpg)
Design & Estimating
CU/MU Entered Automated Estimating of Design
Cost
![Page 28: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/28.jpg)
Contract Management
Construction Contract Units Pavement Replacement
![Page 29: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/29.jpg)
Major Responsibilities WM Systems Support
Process owner 52,700 WM Work Requests $100 - $140 Million Dollars
CU/MU/CS Number of Compatible Units Electric: 6,765 Gas & JT: 3,674 Water: 3,538 Total: 13,977
![Page 30: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/30.jpg)
Major Responsibilities WM Systems Support (cont.)
Crew labor rates 266 Crews (Work Management Crews) 914 Individual Workers (Based on
Average Crew Sizes) Average Labor Rate for each crew:
$67.64 Average Equipment Rate for each crew:
$30.03
![Page 31: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/31.jpg)
Major Responsibilities WM Systems Support (cont.)
CU/MU trainingOver 550 WMS users
Design vs. Actual cost comparisons 12,729 Work Requests Design: $56.7 Million Actual: $56.2 Million Percent Difference: -0.89%
![Page 32: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/32.jpg)
Major Responsibilities Special Costs
Schedule of Charges 135 costs that we charge to any outside
entity TDOT estimates
5 estimates for the state of Tenn in 2004 Special non-work management
estimates 7 manual estimates performed in 2004
![Page 33: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/33.jpg)
Major Responsibilities Work Request Schedules
WR Scheduling Process and Networks 67,000 Work Requests 1,392 Work Request Networks 337 Work Request Activities
![Page 34: WMPA Lee Presentation](https://reader034.fdocuments.mx/reader034/viewer/2022042618/58aaad611a28abfa0e8b671b/html5/thumbnails/34.jpg)
Major Responsibilities Contract Analysis
Electric, gas, and water construction contracts
375 Contract Units $21 Million
Non-construction contractsApprox $10 Million