002 CAMBIO DE REDES DE ALCANTARILLADO Y CONEXIONE Cliente: MUNICIPALIDAD PROVINCIAL DE HUARMEY Lugar: ANCASH-HUARMEY-HUARMEY ITEM Descripción 03.05 RELLENO DE ZANJA 03.05.01 03.05.02 03.05.03 03.05.04 03.05.05 04 TUBERIAS 04.01 SUMINISTRO E INSTALACION DE TUBERIAS 04.01.01 04.01.02 04.01.03 04.02 ALINEAMIENTO Y AJUSTE 04.02.01 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 200MM 04.02.02 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 250MM 04.02.03 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 315MM 07 PRUEBA HIDRAULICA 07.01 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4435 DN 200MM 07.02 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 250MM 07.03 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 315MM COSTO DIRECTO GASTOS GENERALES (10%) UTILIDAD (7%) SUBTOTAL IGV (18%) Presupuest o: 2501010 "MEJORAMIENTO Y AMPLIACIÓN DEL SISTEM HUA Subpresupu esto : RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 1,50 M DE PROF/PROM RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 2,00 M DE PROF RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 2,50 M DE PROF RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 3,50 M DE PROF RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 4,00 M DE PROF/PROM SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 DN 200MM S- 20 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 DN 250MM S- 20 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 DN 315MM S- 20

description

EEE

Transcript of val 1 - 11

Val 1 alcanPRESUPUESTOPresupuesto:2501010 "MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO EN LA CIUDAD DE HUARMEY HUARMEY ANCASH" Subpresupuesto :002 CAMBIO DE REDES DE ALCANTARILLADO Y CONEXIONES DOMICILIARIASCliente:MUNICIPALIDAD PROVINCIAL DE HUARMEYLugar:ANCASH-HUARMEY-HUARMEYCosto al 5/2/11

METRADO ELABORADO POR EL CONTRATISTAMETRADO ELABORADO POR LA COMISION AUDITORADIFERENCIAITEMDescripcinUnd.MetradoPrecio S/.Parcial S/.MetradoPrecio S/.Parcial S/.03.05 RELLENO DE ZANJA2,762,973.702,472,984.32289,989.3803.05.01 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 1,50 M DE PROF/PROMM317,212.5139.41678,345.0217,063.0439.41672,454.455,890.5703.05.02 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 2,00 M DE PROFM311,687.2342.20493,201.119,460.7542.20399,243.6093,957.5103.05.03 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 2,50 M DE PROFM39,606.6342.88411,932.299,280.8442.88397,962.2613,970.0303.05.04 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 3,50 M DE PROFM314,866.8343.75650,423.8111,965.1043.75523,473.24126,950.5703.05.05 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 4,00 M DE PROF/PROMM311,199.6547.24529,071.4710,157.7247.24479,850.7749,220.7004TUBERIAS403,504.93393,937.889,567.0504.01 SUMINISTRO E INSTALACION DE TUBERIAS375,266.48366,367.398,899.0904.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 DN 200MM S- 20M8,009.7735.54284,667.237,820.1735.54277,928.846,738.3804.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 DN 250MM S- 20M303.2059.7018,101.04297.1059.7017,736.87364.1704.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 DN 315MM S- 20M825.2587.8572,498.21804.8087.8570,701.681,796.5304.02 ALINEAMIENTO Y AJUSTE16,242.8015,858.84383.9604.02.01 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 200MMM8,009.771.5712,575.347,820.171.5712,277.67297.6704.02.02 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 250MM M303.203.25985.40297.103.25965.5819.8204.02.03 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 315MM M825.253.252,682.06804.803.252,615.6066.4607PRUEBA HIDRAULICA11,995.6511,711.64284.0107.01 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4435 DN 200MMM8,009.771.249,932.117,820.171.249,697.01235.1007.02 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 250MMM303.201.58479.06297.101.58469.429.6407.03 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 315MMM825.251.921,584.48804.801.921,545.2239.26COSTO DIRECTO3,178,474.282,878,633.84299,840.44GASTOS GENERALES (10%)317,847.43287,863.3829,984.04UTILIDAD (7%)222,493.20201,504.3720,988.83====================SUBTOTAL3,718,814.913,368,001.59350,813.31IGV (18%)669,386.68606,240.2963,146.40====================TOTAL PRESUPUESTO4,388,201.593,974,241.88413,959.71DIFERENCIA =413959.7087886604

Val 1 aguaPRESUPUESTOPresupuesto:2501010 "MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO EN LA CIUDAD DE HUARMEY HUARMEY ANCASH" Subpresupuesto :001 CAMBIO DE REDES DE AGUA POTABLE Y CONEXIONES DOMICILIARIASCliente:MUNICIPALIDAD PROVINCIAL DE HUARMEYLugar:ANCASH-HUARMEY-HUARMEYCosto al 5/2/11

METRADO VALORIZADO EN LA OBRAMETRADO CORREGIDOITEMDescripcinUnd.MetradoPrecio S/.Parcial S/.MetradoPrecio S/.Parcial S/.03.04 RELLENO DE ZANJA1,646,684.001,351,865.6303.04.01 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ, HASTA 1,20 M DE PROF/PROMM340,006.9041.161,646,684.0032,844.1641.161,351,865.63COSTO DIRECTO1,646,684.001,351,865.63GASTOS GENERALES (10%)164,668.40135,186.56UTILIDAD (7%)115,267.8894,630.59====================SUBTOTAL1,926,620.281,581,682.79IGV (18%)346,791.65284,702.90====================TOTAL PRESUPUESTO2,273,411.941,866,385.69DIFERENCIA =407026.2418539401