  • 314

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    AnlisisDetallados Urbanismo

    ACTIVIDADES PRELIMINARES URBANISMO

    CERRAMIENTO EN ALAMBRE DE PAS 5 HILOS H=2.50 mALAMBRE DE PAS GALV. 1/2` CAL. 12 m 5.20 1,742 19,318 16,120 16,120CUADRILLA ALBAILERA OF + AYUDANTE hc 0.45 7,421 7,421 7,421 7,421POSTE CERCA 10 X 10 CM 210 KG/CM2 un 0.35 7,000 7,000 7,000 7,000RELLENO CON MAT. DE EXCAVACIN m 0.02 218 218 218 218 16,381 33,957 30,759 30,759

    CERRAMIENTO EN MALLA VERDE H=2.00 mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.45 7,421 7,421 7,421 7,421POSTE CERCA 10 X 10 CM 210 KG/CM2 un 0.35 7,000 7,000 7,000 7,000TELA CERRAMIENTO OBRA (VERDE) m 1.00 1,400 1,700 1,800 1,300RELLENO CON MAT. DE EXCAVACIN m 0.02 218 218 218 218 16,039 16,339 16,439 15,939

    COMISIN DE TOPOGRAFA hCADENERO ms 0.01 11,334 11,334 11,334 11,334TOPGRAFO ms 0.01 17,000 17,000 17,000 17,000 28,334 28,334 28,334 28,334

    LOCALIZACIN TRAZADO Y REPLANTEO mCINTA METLICA h 0.15 95 95 95 95EQUIPO DE NIVELACIN h 0.15 443 443 443 443ESTACAS DE MADERA un 0.50 1,900 1,900 1,900 1,900ESTACIN ELECTRNICA TOTAL h 0.15 1,080 1,080 1,080 1,080MIRA AUTONIVELANTE h 0.15 195 195 195 195MOJN DE CONCR. un 0.05 332 332 332 332PUNTILLA CON CABEZA 1 lb 0.01 24 24 24 24COMISIN DE TOPOGRAFA h 1.00 28,334 28,334 28,334 28,334 32,402 32,402 32,402 32,402

    REPLANTEO GENERAL mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.02 330 330 330 330DURMIENTE ABARCO 4 M m 0.02 106 0 0 106DURMIENTE ABARCO 4 M m 0.02 0 0 180 0DURMIENTE ABARCO 4 M m 0.02 104 0 0 0DURMIENTE-ABARCO 4 M m 0.02 0 0 0 0PUNTILLA CON CABEZA 2 lb 0.02 62 62 68 62 602 392 578 498

    ACUEDUCTO

    CODO 45 PVC UNIN MECNICA 2 unCODO 45 PVC UNIN MEC. 2 un 1.00 14,678 14,678 14,678 14,678CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262 17,661 17,661 17,658 17,658

    CODO 45 PVC UNIN MECNICA 4 unCODO 45 PVC UNIN MEC. 4 un 1.00 53,756 53,756 53,756 53,756CUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524 58,815 58,815 58,809 58,809

    CODO 45 PVC UNIN MECNICA 8 unCODO 45 PVC UNIN MEC. 8 un 1.00 325,207 325,207 325,207 325,207CUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048 335,324 335,324 335,314 335,314

    CODO 45 PVC UNIN MECNICA 10 unCODO 45 PVC UNIN MEC. 10 un 1.00 685,753 685,753 685,753 685,753

    CUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048 695,870 695,870 695,860 695,860

    CODO 90 PVC UNIN MECNICA 4 unCODO 90 PVC UNIN MEC. 4 un 1.00 128,500 128,500 128,500 128,500CUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524 133,559 133,559 133,553 133,553

    CODO 90 PVC UNIN MECNICA 8 unCODO 90 PVC UNIN MEC. 8 un 1.00 405,950 405,950 405,950 405,950CUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048 416,067 416,067 416,057 416,057

    CODO 90 PVC UNIN MECNICA 10 unCODO 90 PVC UNIN MEC. 10 un 1.00 1,048,244 1,048,244 1,048,244 1,048,244CUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048 1,058,361 1,058,361 1,058,351 1,058,351

    COLLAR DE DERIVACIN PVC UNIN MECNICA 2 X 1/2 unCOLLAR DE DERIV. PVC UNIN MEC. 2 X1/2 un 1.00 4,636 4,636 4,636 4,636CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.03 393 393 393 393 8,657 8,657 8,653 8,653

    COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2 X 1/2 unCOLLAR DE DERIV. PVC UNIN MEC. 2 1/2X1/2 un 1.00 6,602 6,602 6,602 6,602CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.03 393 393 393 393 10,623 10,623 10,619 10,619

    COLLAR DE DERIVACIN PVC UNIN MECNICA 3 X 1/2 unCOLLAR DE DERIV. PVC UNIN MEC. 3 X1/2 un 1.00 9,227 9,227 9,227 9,227CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.03 393 393 393 393 13,248 13,248 13,244 13,244

    COLLAR DE DERIVACIN PVC UNIN MECNICA 4 X 1/2 unCOLLAR DE DERIV. PVC UNIN MEC. 4 X1/2 un 1.00 10,498 10,498 10,498 10,498CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.03 393 393 393 393 14,519 14,519 14,515 14,515

    COLLAR DE DERIVACIN PVC UNIN MECNICA 6 X 1/2 unCOLLAR DE DERIV. PVC UNIN MEC. 6 X1/2 un 1.00 13,345 13,345 13,345 13,345CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.03 393 393 393 393 17,366 17,366 17,362 17,362

    COLLAR DE DERIVACIN PVC UNIN MECNICA 6 X 2 unCOLLAR DE DERIV. PVC UNIN MEC. 6 X 2 un 1.00 13,345 13,345 13,345 13,345CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.03 393 393 393 393 17,366 17,366 17,362 17,362

    DOMICILIARIOS INCLUYE TUBERA 6 PVC mCODO TUBERA PVC 6` RDE 26 m 1.00 45,538 45,538 45,538 45,538CUADRILLA OFICIAL+2 AYUDANTES hc 2.00 45,118 45,118 45,118 45,118TUBO PVC 6 RDE 26 m 1.00 40,075 40,075 40,075 40,075ACARREO A DISTANCIA MAYOR A 2 KM un 0.42 35,695 35,694 35,694 35,695EXCAVACIONES A MANO DE ZANJAS m 0.53 8,041 8,041 8,041 8,041RELLENO TIPO 2 RECEBO m 0.53 23,048 18,852 22,419 17,706 197,515 193,319 196,885 192,173

  • 315EDICIN 164 SEPTIEMBRE - NOVIEMBRE 2012

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    Contina

    ACUEDUCTO

    TAPN PVC UNIN MECNICA 3 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262TAPN PVC UNIN MEC. 3 un 1.00 42,147 42,147 42,147 42,147 45,130 45,130 45,127 45,127

    TAPN PVC UNIN MECNICA 4 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524TAPN PVC UNIN MEC. 4 un 1.00 75,947 75,947 75,947 75,947 80,099 80,099 80,094 80,094

    TAPN PVC UNIN MECNICA 8 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TAPN PVC UNIN MEC. 8 un 1.00 188,280 188,280 188,280 188,280 198,397 198,397 198,387 198,387

    TEE PVC UNIN MECNICA 2 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262TEE PVC UNIN MACNICA 2 un 1.00 89,686 89,686 89,686 89,686 92,669 92,669 92,666 92,666

    TEE PVC UNIN MECNICA 4 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524TEE PVC UNIN MACNICA 4 un 1.00 148,221 148,221 148,221 148,221 153,280 153,280 153,274 153,274

    TEE PVC UNIN MECNICA 8 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TEE PVC UNIN MACNICA 8 un 1.00 572,785 572,785 572,785 572,785 582,902 582,902 582,892 582,892

    TEE PVC UNIN MECNICA 10 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TEE PVC UNIN MACNICA 10 un 1.00 920,900 920,900 920,900 920,900 931,017 931,017 931,007 931,007

    TUBERA PVC UNIN MECNICA RDE 26 2 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262TUBERA PVC UNIN MEC. RDE 26 2 ml 1.00 26,238 26,238 26,238 26,238 29,221 29,221 29,218 29,218

    TUBERA PVC UNIN MECNICA RDE 26 4 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.02 272 272 272 272LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524TUBERA PVC UNIN MEC. RDE 26 4 ml 1.00 95,336 95,336 95,336 95,336 96,132 96,132 96,132 96,132

    TUBERA PVC UNIN MECNICA RDE 26 8 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TUBERA PVC UNIN MEC. RDE 26 8 ml 1.00 347,444 347,444 347,444 347,444 357,561 357,561 357,551 357,551

    TUBERA PVC UNIN MECNICA RDE 26 10 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TUBERA PVC UNIN MEC. RDE 26 10 ml 1.00 540,805 540,805 540,805 540,805 550,922 550,922 550,912 550,912

    TUBERA PVC UNIN MECNICA 2 RDE 32.5 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262TUBERA ACUEDUCTO PVC 2 RDE 32 5 ml 1.00 43,100 43,100 43,100 43,100 46,083 46,083 46,080 46,080

    TUBERA UNIN MECANCA PVC 4 RDE 32.5 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524TUBERA ACUEDUCTO PVC 4 RDE 32 5 ml 1.00 76,442 76,442 76,442 76,442 80,594 80,594 80,589 80,589

    TUBERA UNIN MECNICA PVC 8 RDE 32.5 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TUBERA ACUEDUCTO PVC 8 RDE 32 5 ml 1.00 283,530 283,530 283,530 283,530 293,647 293,647 293,637 293,637

    TUBERA UNIN MECNICA PVC 10 RDE 32.5 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.08 1,048 1,048 1,048 1,048TUBERA ACUEDUCTO PVC 10 RDE 32 5 ml 1.00 443,200 443,200 443,200 443,200 453,317 453,317 453,307 453,307

    UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262UNIN RPIDA PVC UNIN MEC. 2 1/2 un 1.00 18,352 18,352 18,352 18,352 21,335 21,335 21,332 21,332

    UNIN RPIDA DE CONSTRUCCIN PVC 4 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530LUBRICANTE PVC 500 GRAMOS un 0.02 262 262 262 262UNIN RPIDA PVC UNIN MEC. 4 un 1.00 39,201 39,201 39,201 39,201 43,998 43,998 43,992 43,992

    UNIN RPIDA DE CONSTRUCCIN PVC 8 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.03 327 327 327 327UNIN RPIDA PVC UNIN MEC. 8 un 1.00 168,169 168,169 168,169 168,169 177,566 177,566 177,555 177,555

    UNIN REPARACIN PVC 4 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524UNIN REPARACIN PVC UNIN MEC. 4 un 1.00 32,670 32,670 32,670 32,670 37,729 37,729 37,723 37,723

    UNIN REPARACIN PVC 8 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524UNIN REPARACIN PVC UNIN MEC. 8 un 1.00 140,172 140,172 140,172 140,172 149,765 149,765 149,755 149,755

    UNIN REPARACIN PVC 10 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.50 9,070 9,070 9,059 9,059LUBRICANTE PVC 500 GRAMOS un 0.04 524 524 524 524UNIN REPARACIN PVC UNIN MEC. 10 un 1.00 250,452 250,452 250,452 250,452 260,045 260,045 260,035 260,035

    UNIN REPARACIN UNIN Z PVC 6 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.90 16,325 16,325 16,306 16,306UNIN DE REPARACIN PVC 6 un 1.00 147,842 147,842 147,842 147,842 164,167 164,167 164,148 164,148

    VLVULA COMPUERTA ELSTICA 6 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.28 5,079 5,079 5,073 5,073VLVULA DE COMPUERTA ELSTICA BETA 6 un 1.00 532,440 532,440 532,440 532,440 537,519 537,519 537,513 537,513

    VLVULA COMPUERTA ELSTICA 8 unCUADRILLA INSTALAC. OF + AYUDANTE hc 0.32 5,804 5,804 5,798 5,798VLVULA DE COMPUERTA ELSTICA BETA 8 un 1.00 776,700 776,700 776,700 776,700 782,504 782,504 782,498 782,498

    ALCANTARILLADO EXCAVAC. Y RELLENOS

    ENTIBADO TIPO 1 (1/7 UTILIZACIONES) mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.30 4,947 4,947 4,947 4,947MADERA ROLLIZA D=0.15 M m 0.04 0 0 0 480MADERA ROLLIZA D=0.15 M m 0.04 0 0 544 0MADERA ROLLIZA D=0.15 M m 0.04 0 470 0 0MADERA ROLLIZA D=0.15 M m 0.04 400 0 0 0PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.29 0 0 0 5,585PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.29 0 6,032 0 0PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.29 0 0 4,176 0PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.29 6,187 0 0 0PUNTILLA CON CABEZA 2 lb 0.04 124 124 136 124VIGA ORDINARIO 0.2 X 0.1 X 4 M un 0.14 3,500 0 0 0VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.14 0 2,100 0 0VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.14 0 0 0 6,300VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.14 0 0 0 0 15,158 13,673 9,803 17,436

    ENTIBADO TIPO 2 (1/7 UTILIZACIONES) mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.73 12,038 12,038 12,038 12,038MADERA ROLLIZA D=0.15 M m 0.09 0 0 0 1,080MADERA ROLLIZA D=0.15 M m 0.09 0 0 1,224 0MADERA ROLLIZA D=0.15 M m 0.09 0 1,058 0 0MADERA ROLLIZA D=0.15 M m 0.09 900 0 0 0

  • 316

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    ALCANTARILLADO EXCAVAC. Y RELLENOS

    PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.79 0 0 0 15,213PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.79 0 16,432 0 0PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.79 0 0 11,376 0PLANCHN ABARCO 0.2 X 0.04 X 3 M m 0.79 16,853 0 0 0PUNTILLA CON CABEZA 2 lb 0.09 279 279 306 279VIGA ORDINARIO 0.2 X 0.1 X 4 M un 0.14 3,500 0 0 0VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.14 0 2,100 0 0VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.14 0 0 0 6,300VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.14 0 0 0 0 33,570 31,906 24,944 34,910

    ENTIBADO TIPO 3 (1/7 UTILIZACIONES) mCODALES METLICOS W 8 X 17 un 0.08 1,320 1,320 1,320 1,320CUADRILLA ALBAILERA OF + AYUDANTE hc 0.74 12,203 12,203 12,203 12,203PERFIL 2 W8 X 17 m 0.11 6,675 6,675 6,675 6,675PERFIL METLICO W8 X 17 m 0.22 13,349 13,349 13,349 13,349PUNTILLA CON CABEZA 2 lb 0.09 279 279 306 279VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.26 0 0 0 11,700VIGA ORDINARIO 0.2 X 0.1 X 4 M un 0.26 6,500 0 0 0VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.26 0 3,900 0 0VIGA ORDINARIO 0.2 X 0.1 X 4 M m 0.26 0 0 0 0 40,325 37,725 33,853 45,525

    RELLENO CON MATERIAL DE EXCAVACIN mHORA AYUDANTE hc 1.80 10,924 10,924 10,924 10,924 10,924 10,924 10,924 10,924

    RELLENOS DE VALLADOS mAGUA lt 10.00 200 200 0 200HORA AYUDANTE hc 0.70 4,248 4,248 4,248 4,248RAJN m 0.40 11,680 0 0 0RAJN - B/QUILLA. m 0.40 0 0 26,000 0RAJN - MEDELLN m 0.40 0 0 0 11,400RAJN DE PIEDRA m 0.40 0 6,000 0 0 16,128 10,448 30,248 15,848

    RELLENO DE VALLADOS EN RAJN mAGUA lt 10.00 200 200 0 200HORA AYUDANTE hc 0.70 4,248 4,248 4,248 4,248RAJN m 0.40 11,680 0 0 0RAJN - B/QUILLA. m 0.40 0 0 26,000 0RAJN - MEDELLN m 0.40 0 0 0 11,400RAJN DE PIEDRA m 0.40 0 6,000 0 0 16,128 10,448 30,248 15,848

    RELLENO TIPO 2 RECEBO mBASE GRAN. MEDELLN m 1.25 0 0 0 31,588HORA AYUDANTE hc 0.30 1,821 1,821 1,821 1,821RECEBO COMN m 1.25 41,666 0 0 0ROCA MUERTA 5 M3 m 1.25 0 33,750 0 0ZAHORRA B-200 m 1.25 0 0 40,479 0 43,487 35,571 42,299 33,408

    RELLENO TIPO 4 SUB-BASE B200 mHORA AYUDANTE hc 0.30 1,821 1,821 1,821 1,821SUB-BASE GRAN. B/QUILLA. m 1.30 0 0 46,280 0SUB-BASE GRAN. BOGOT m 1.30 88,972 0 0 0SUB-BASE GRAN. CALI m 1.30 0 42,900 0 0SUB-BASE GRAN. MEDELLN m 1.30 0 0 0 27,144 90,793 44,721 48,101 28,965

    RELLENO TIPO 5 TRITURADO GRUESO mHORA AYUDANTE hc 0.30 1,821 1,821 1,821 1,821TRITURADO GRUESO - B/QUILLA. m 1.03 0 0 56,444 0TRITURADO GRUESO - BOGOT m 1.03 46,618 0 0 0TRITURADO GRUESO - CALI m 1.03 0 36,050 0 0TRITURADO GRUESO - MEDELLN m 1.03 0 0 0 41,818 48,439 37,871 58,265 43,639

    RELLENO TIPO 6 RAJN-PIEDRA mHORA AYUDANTE hc 0.30 1,821 1,821 1,821 1,821RAJN m 1.25 36,500 0 0 0RAJN - B/QUILLA. m 1.25 0 0 81,250 0RAJN - MEDELLN m 1.25 0 0 0 35,625RAJN DE PIEDRA m 1.25 0 18,750 0 0 38,321 20,571 83,071 37,446

    RELLENO TIPO 7 ARENA DE PEA mARENA DE PEA m 1.03 61,800 0 0 0ARENA DE REVOQUE (AMARILLA) m 1.03 0 0 27,995 0ARENA FINA 5 M3 m 1.03 0 38,883 0 0

    ARENA LAVADA DE PEA m 1.03 0 0 0 26,286HORA AYUDANTE hc 0.30 1,821 1,821 1,821 1,821 63,621 40,703 29,816 28,106

    ALCANTARILLADO SUMIDEROS Y POZOS

    CILIND. O CUERPO PARA POZO DE INSPECC. E=0.25 H=1.00M unARENA DE PEA m 0.56 33,600 0 0 0ARENA DE REVOQUE m 0.56 0 0 0 14,000ARENA FINA m 0.56 0 21,140 0 0ARENA TURBACO m 0.56 0 0 19,656 0CEMENTO GRIS kg 168.00 92,400 80,640 75,600 75,600GEOTEXTIL PAVCO NO TEJIDO 2000 m 5.98 28,447 28,447 28,447 28,447HIERRO FIG G-60 5/8 kg 8.96 15,680 15,680 15,680 15,680LADRILLO RECOCIDO OSCURO un 616.00 0 0 0 308,000LADRILLO RECOCIDO OSCURO B/QUILLA. un 616.00 0 0 246,400 0LADRILLO RECOCIDO OSCURO BOGOT un 616.00 258,720 0 0 0LADRILLO RECOCIDO OSCURO CALI un 616.00 0 277,200 0 0PASOS POZO INSPECCIN un 9.96 229,080 229,080 229,080 229,080 657,927 652,187 614,863 670,807

    CILIND. O CUERPO PARA POZO DE INSPECC.E=0.37 H=1.00M unARENA DE PEA m 0.90 54,000 0 0 0ARENA DE REVOQUE m 0.90 0 0 0 22,500ARENA FINA m 0.90 0 33,975 0 0CEMENTO GRIS kg 248.64 136,752 119,347 111,888 111,888CUADRILLA OFICIAL+2 AYUDANTES hc 8.00 180,472 180,472 180,472 180,472GEOTEXTIL PAVCO NO TEJIDO 2000 m 6.83 32,490 32,490 32,490 32,490LADRILLO RECOCIDO OSCURO un 911.68 0 0 0 455,840LADRILLO RECOCIDO OSCURO B/QUILLA. un 911.68 0 0 364,672 0LADRILLO RECOCIDO OSCURO BOGOT un 911.68 382,906 0 0 0LADRILLO RECOCIDO OSCURO CALI un 911.68 0 410,256 0 0PASOS POZO INSPECCIN un 8.96 206,080 206,080 206,080 206,080 992,700 982,621 895,602 1,009,270

    CUBIERTA Y ACCESO unARENA GRUESA m 0.17 0 9,010 0 0ARENA LAVADA DE RO m 0.17 7,140 0 0 0ARENA LAVADA JUAN ACOSTA m 0.17 0 0 5,950 0ARENA LAVADA PARA CONCR. m 0.17 0 0 0 4,338ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CEMENTO GRIS kg 56.00 30,800 26,880 25,200 25,200CUADRILLA OFICIAL+2 AYUDANTES hc 6.00 135,354 135,354 135,354 135,354TAPA PARA POZO DIAMETRO 70 CM. un 1.00 114,500 114,500 114,500 114,500TRANSPORTE % 4.00 17,544 17,462 17,272 17,208 456,138 454,006 449,076 447,400

    PLACA DE FONDO O BASE DE POZO DE INSPECC. DIAM.=1.70 M unACERO DE REFUERZO PDR-60 kg 80.64 141,120 141,120 141,120 141,120ARENA GRUESA m 0.56 0 29,680 0 0ARENA LAVADA DE RO m 0.56 23,520 0 0 0ARENA LAVADA JUAN ACOSTA m 0.56 0 0 19,600 0ARENA LAVADA PARA CONCR. m 0.56 0 0 0 14,291CEMENTO GRIS kg 224.00 123,200 107,520 100,800 100,800CUADRILLA OFICIAL+2 AYUDANTES hc 4.00 90,236 90,236 90,236 90,236GRAVILLA FINA 1/2 B/QUILLA. m 0.56 0 0 39,032 0GRAVILLA FINA 1/2 BOGOT m 0.56 21,840 0 0 0GRAVILLA FINA 1/2 CALI m 0.56 0 22,260 0 0GRAVILLA FINA 1/2 MEDELLN m 0.56 0 0 0 21,168HERRAMIENTA MENOR % 0.50 2,000 1,954 1,954 1,838 401,916 392,770 392,742 369,453

    PLACA DE FONDO O BASE DE POZO DE INSPECC. DIAM.O=1.95M unACERO DE REFUERZO PDR-60 kg 92.96 162,680 162,680 162,680 162,680ARENA GRUESA m 0.67 0 35,510 0 0ARENA LAVADA DE RO m 0.67 28,140 0 0 0ARENA LAVADA JUAN ACOSTA m 0.67 0 0 23,450 0ARENA LAVADA PARA CONCR. m 0.67 0 0 0 17,098CEMENTO GRIS kg 257.60 141,680 123,648 115,920 115,920CUADRILLA OFICIAL+2 AYUDANTES hc 5.00 112,795 112,795 112,795 112,795GRAVILLA FINA 1/2 B/QUILLA. m 0.67 0 0 46,699 0GRAVILLA FINA 1/2 BOGOT m 0.67 26,130 0 0 0GRAVILLA FINA 1/2 CALI m 0.67 0 26,633 0 0GRAVILLA FINA 1/2 MEDELLN m 0.67 0 0 0 25,326HERRAMIENTA MENOR % 0.50 2,357 2,306 2,308 2,169 473,782 463,572 463,852 435,988

  • 317EDICIN 164 SEPTIEMBRE - NOVIEMBRE 2012

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    ALCANTARILLADO SUMIDEROS Y POZOS

    Contina

    POZO DE INSPECCIN D=1.20 M unACERO DE REFUERZO PDR-60 kg 12.00 21,000 21,000 21,000 21,000ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 5.60 92,344 92,344 92,344 92,344CONCR. 1:2:4 ELABORADO EN OBRA m 0.35 99,027 76,346 78,050 70,615MURO TOLETE COMN E=0.25 M m 7.40 725,157 799,382 917,050 1,513,192PAETE IMPERMEABILIZADO 1:3 m 6.30 104,264 95,110 89,819 90,280 1,192,592 1,234,982 1,349,064 1,938,231

    POZO DE INSPECCIN D= 1.20 MH >1.50 M unACERO DE REFUERZO PDR-60 kg 8.00 14,000 14,000 14,000 14,000ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 2.24 36,938 36,938 36,938 36,938MURO TOLETE COMN E=0.25 M m 5.70 558,567 615,740 706,377 1,165,567PAETE IMPERMEABILIZADO 1:3 m 3.80 62,890 57,368 54,177 54,454 823,194 874,846 962,291 1,421,759

    POZO DE INSPECCIN D= 1.20 MH 1.00 1.50 M unACERO DE REFUERZO PDR-60 kg 8.00 14,000 14,000 14,000 14,000ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 2.24 36,938 36,938 36,938 36,938MURO TOLETE COMN E=0.25 M m 5.70 558,567 615,740 706,377 1,165,567PAETE IMPERMEABILIZADO 1:3 m 3.80 62,890 57,368 54,177 54,454 823,194 874,846 962,291 1,421,759

    POZO DE INSPECCIN D=1.20 MH 1.50 2.00 M unACERO DE REFUERZO PDR-60 kg 12.00 21,000 21,000 21,000 21,000ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 5.60 92,344 92,344 92,344 92,344CONCR. 1:2:4 ELABORADO EN OBRA m 0.35 99,027 76,346 78,050 70,615MURO TOLETE COMN E=0.25 M m 7.40 725,157 799,382 917,050 1,513,192PAETE IMPERMEABILIZADO 1:3 m 6.30 104,264 95,110 89,819 90,280 1,192,592 1,234,982 1,349,064 1,938,231

    POZO DE INSPECCIN D=1.20 MH 2.50 M unACERO DE REFUERZO PDR-60 kg 16.00 28,000 28,000 28,000 28,000ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 7.83 129,117 129,117 129,117 129,117CONCR. 1:2:4 ELABORADO EN OBRA m 0.50 141,467 109,065 111,500 100,878MURO TOLETE COMN E=0.25 M m 9.50 930,944 1,026,234 1,177,294 1,942,611PAETE IMPERMEABILIZADO 1:3 m 7.40 122,469 111,716 105,502 106,043 1,502,797 1,554,932 1,702,213 2,457,449

    POZO DE INSPECCIN D=1.50 MH 3.50 M unACERO DE REFUERZO PDR-60 kg 20.00 35,000 35,000 35,000 35,000ARO Y TAPA POZOS INSP EN HF un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 8.95 147,586 147,586 147,586 147,586CONCR. 1:2:4 ELABORADO EN OBRA m 0.60 169,761 130,878 133,800 121,054MURO TOLETE COMN E=0.25 M m 16.90 1,656,101 1,825,616 2,094,345 3,455,804PAETE IMPERMEABILIZADO 1:3 m 9.40 155,569 141,910 134,016 134,703 2,314,816 2,431,790 2,695,547 4,044,946

    POZO DE INSPECCIN D= 1.95 PLACA DE FONDO unCONCR. CORR. GRAVA COMN 2000 PSI m 0.15 40,194 46,110 44,520 32,490CONCR. CORR. GRAVA COMN 3000 PSI m 0.85 228,677 204,918 261,290 205,428CUADRILLA ALBAILERA OF + AYUDANTE hc 4.00 65,960 65,960 65,960 65,960HIERRO FIG G-60 1/2 kg 80.80 185,517 185,517 185,517 185,517 520,348 502,505 557,287 489,395

    SUMIDERO EN LADRILLO SL 100 unCONCR. CORR. GRAVA COMN 2000 PSI m 0.24 64,310 73,776 71,232 51,984CUADRILLA OFICIAL+2 AYUDANTES hc 6.00 135,354 135,354 135,354 135,354REJILLA Y MARCO HTA 0.7 X 0.3 un 1.00 80,938 80,938 80,938 80,938MORTERO 1:3 IMPERMEABILIZADO m 0.10 36,416 29,150 25,113 25,316MURO TOLETE COMN E = 0.12 M m 4.48 214,590 230,033 259,380 420,998 531,608 549,251 572,017 714,591

    SUMIDERO EN LADRILLO SL 250 unCONCR. CORR. GRAVA COMN 2000 PSI m 0.65 174,174 199,810 192,920 140,790CUADRILLA OFICIAL+2 AYUDANTES hc 8.00 180,472 180,472 180,472 180,472REJILLA Y MARCO HTA 0.7 X 0.3 un 1.00 80,938 80,938 80,938 80,938MORTERO 1:3 IMPERMEABILIZADO m 0.17 61,906 49,555 42,692 43,038MURO TOLETE COMN E = 0.12 M m 7.35 352,062 377,397 425,545 690,700 849,552 888,172 922,568 1,135,938

    SUMIDERO FUNDIDO EN SITIO SL-250 unCONCR. CORR. GRAVA COMN 2000 PSI m 0.24 64,310 73,776 71,232 51,984CONCR. CORR. GRAVA COMN 3000 PSI m 2.80 753,290 675,024 860,720 676,704CUADRILLA OFICIAL+2 AYUDANTES hc 16.00 360,944 360,944 360,944 360,944FORMALETA SUMIDEROS un 16.28 814,000 814,000 814,000 814,000HIERRO FIGURADO 1/2 A 60 kg 86.03 150,553 150,553 150,553 150,553

    HIERRO FIGURADO 1/4 A-37 kg 69.05 164,546 164,546 164,546 164,546REJILLA Y MARCO HTA 0.7 X 0.3 un 1.00 80,938 80,938 80,938 80,938 2,388,581 2,319,781 2,502,933 2,299,669

    SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 unCONCR. CORR. GRAVA COMN 2000 PSI m 0.15 40,194 46,110 44,520 32,490CONCR. CORR. GRAVA COMN 3000 PSI m 1.68 451,974 405,014 516,432 406,022CUADRILLA OFICIAL+2 AYUDANTES hc 12.00 270,708 270,708 270,708 270,708FORMALETA SUMIDEROS un 10.24 512,000 512,000 512,000 512,000HIERRO FIGURADO 1/2 A 60 kg 52.64 92,120 92,120 92,120 92,120HIERRO FIGURADO 1/4 A-37 kg 44.80 106,758 106,758 106,758 106,758REJILLA Y MARCO HTA 0.7 X 0.3 un 1.00 80,938 80,938 80,938 80,938 1,554,692 1,513,649 1,623,476 1,501,037

    SUMIDERO PREFABRICADO SL-100 unCUADRILLA ALBAILERA OF + AYUDANTE hc 3.00 49,470 49,470 49,470 49,470SUMIDERO PREFABRICADO SL-100 un 1.00 735,500 735,500 735,500 735,500TRANSPORTE % 4.00 31,399 31,399 31,399 31,399 816,369 816,369 816,369 816,369

    SUMIDERO PREFABRICADO SL-250 unCUADRILLA ALBAILERA OF + AYUDANTE hc 13.50 222,615 222,615 222,615 222,615SUMIDERO PREFABRICADO SL-250 un 1.00 1,100,000 1,100,000 1,100,000 1,100,000TRANSPORTE % 4.00 52,905 52,905 52,905 52,905 1,375,520 1,375,520 1,375,520 1,375,520

    ALCANTARILLADO TUBERA

    CODO 45 PVC ALCANTARILLADO 8 unCODO 45 PVC ALCANTAR. 8 un 1.00 60,765 60,765 60,765 60,765CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SOLDADURA PVC LIQUIDA 1/4 un 0.04 2,476 2,476 2,476 2,476 65,962 65,962 65,959 65,959

    CODO 45 PVC ALCANTARILLADO 16 unCODO 45 PVC ALCANTAR. 16 un 1.00 850,500 850,500 850,500 850,500CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,952 4,952 4,952 4,952 859,080 859,080 859,076 859,076

    CODO 90 PVC ALCANTARILLADO 8 unCODO 90 PVC ALCANTAR. 8 un 1.00 80,585 80,585 80,585 80,585CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SOLDADURA PVC LIQUIDA 1/4 un 0.04 2,476 2,476 2,476 2,476 85,782 85,782 85,779 85,779

    CODO 90 PVC ALCANTARILLADO 16 unCODO 90 PVC ALCANTAR. 16 un 1.00 772,310 772,310 772,310 772,310CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,952 4,952 4,952 4,952 780,890 780,890 780,886 780,886

    CODO 90 PVC ALCANTARILLADO 24 unCODO 90 PVC ALCANTAR. 24 un 1.00 820,550 820,550 820,550 820,550CUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530SOLDADURA PVC LIQUIDA 1/4 un 0.16 9,904 9,904 9,904 9,904 834,989 834,989 834,984 834,984

    SILLA TEE PVC ALCANTARILLADO 10X4 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.04 1,519 1,519 1,519 1,519CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SILLA TEE PVC ALCANTAR. 10X4 un 1.00 54,555 54,555 54,555 54,555 65,695 65,695 65,692 65,692

    SILLA TEE PVC ALCANTARILLADO 10X6 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.04 1,519 1,519 1,519 1,519CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SILLA TEE PVC ALCANTAR. 10X6 un 1.00 54,555 54,555 54,555 54,555 65,695 65,695 65,692 65,692

    SILLA TEE PVC ALCANTARILLADO 16X4 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.08 3,039 3,039 3,039 3,039CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SILLA TEE PVC ALCANTAR. 16X4 un 1.00 139,620 139,620 139,620 139,620 153,187 153,187 153,183 153,183

    SILLA TEE PVC ALCANTARILLADO 16X6 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.08 3,039 3,039 3,039 3,039

  • 318

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    ALCANTARILLADO TUBERA

    CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SILLA TEE PVC ALCANTAR. 16X6 un 1.00 125,974 125,974 125,974 125,974 139,541 139,541 139,536 139,536

    SILLA TEE PVC ALCANTARILLADO 20X6 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.16 6,077 6,077 6,077 6,077CUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530SILLA TEE PVC ALCANTAR. 20X6 un 1.00 228,985 228,985 228,985 228,985 246,497 246,497 246,492 246,492

    SILLA YEE PVC ALCANTARILLADO 10X4 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.04 1,519 1,519 1,519 1,519CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SILLA YEE PVC ALCANTAR. 10X4 un 1.00 34,394 34,394 34,394 34,394 45,534 45,534 45,531 45,531

    SILLA YEE PVC ALCANTARILLADO 10X6 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.04 1,519 1,519 1,519 1,519CUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SILLA YEE PVC ALCANTAR. 10X6 un 1.00 42,595 42,595 42,595 42,595 53,735 53,735 53,732 53,732

    SILLA YEE PVC ALCANTARILLADO 16X4 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.08 3,039 3,039 3,039 3,039CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SILLA YEE PVC ALCANTAR. 16X4 un 1.00 0 0 0 0 13,567 13,567 13,562 13,562

    SILLA YEE PVC ALCANTARILLADO 16X6 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.08 3,039 3,039 3,039 3,039CUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SILLA YEE PVC ALCANTAR. 16X6 un 1.00 128,261 128,261 128,261 128,261 141,828 141,828 141,823 141,823

    SILLA YEE PVC ALCANTARILLADO 20X6 unABRAZADERA AJUSTABLE AMARRE un 2.00 6,900 6,900 6,900 6,900ADHESIVO CARTUCHO X 310ML un 0.16 6,077 6,077 6,077 6,077CUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530SILLA YEE PVC ALCANTAR. 20X6 un 1.00 219,792 219,792 219,792 219,792 237,304 237,304 237,299 237,299

    TUBERA CONCRETO CL II REF. 24 mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.40 6,596 6,596 6,596 6,596MORTERO CONVENCIONAL 2500 PSI m 0.02 6,450 6,840 6,370 6,277TRANSPORTE TUBERA kg 980.00 78,400 73,500 73,500 78,400TUBO CLASE II CONCR. REF 24 m 1.00 185,420 185,420 185,420 185,420 276,866 272,356 271,886 276,693

    TUBERA CONCRETO CL II REF. 44 mCUADRILLA OFICIAL+2 AYUDANTES hc 0.40 9,024 9,024 9,024 9,024MORTERO CONVENCIONAL 2500 PSI m 0.03 9,675 10,260 9,555 9,416TRANSPORTE TUBERA kg 2,790.00 223,200 209,250 209,250 223,200TUBO CLASE II CONCR. REFOR 44 m 1.00 503,084 503,084 503,084 503,084 744,983 731,618 730,913 744,723

    TUBERA PVC ALCANTARILLADO 8 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SOLDADURA PVC LIQUIDA 1/4 un 0.04 2,476 2,476 2,476 2,476TUBERA PVC ALCANTAR. 8 ml 1.00 32,457 32,457 32,457 32,457HERRAMIENTA MENOR % 1.00 377 377 377 377 38,031 38,031 38,027 38,027

    TUBERA PVC ALCANTARILLADO 12 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.15 2,721 2,721 2,718 2,718SOLDADURA PVC LIQUIDA 1/4 un 0.04 2,476 2,476 2,476 2,476TUBERA PVC ALCANTAR. 12 ml 1.00 69,765 69,765 69,765 69,765 74,962 74,962 74,959 74,959

    TUBERA PVC ALCANTARILLADO 16 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,952 4,952 4,952 4,952TUBERA PVC ALCANTAR. 16 ml 1.00 108,060 108,060 108,060 108,060 116,640 116,640 116,636 116,636

    TUBERA PVC ALCANTARILLADO REFORZADO 20 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.20 3,628 3,628 3,624 3,624SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,952 4,952 4,952 4,952TUBERA PVC ALCANTAR. REFORZADO 20 ml 1.00 176,416 176,416 176,416 176,416 184,996 184,996 184,992 184,992

    TUBERA PVC ALCANTARILLADO REFORZADO 24 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.25 4,535 4,535 4,530 4,530SOLDADURA PVC LIQUIDA 1/4 un 0.16 9,904 9,904 9,904 9,904TUBERA PVC ALCANTAR. REFORZADO 24 ml 1.00 227,194 227,194 227,194 227,194 241,633 241,633 241,628 241,628

    TUBERA PVC ALCANTARILLADO REFORZADO 27 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.30 5,442 5,442 5,435 5,435SOLDADURA PVC LIQUIDA 1/4 un 0.20 12,381 12,381 12,381 12,381TUBERA PVC ALCANTAR. REFORZADO 27 ml 1.00 272,948 272,948 272,948 272,948 290,770 290,770 290,764 290,764

    TUBERA PVC ALCANTARILLADO REFORZADO 33 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.40 7,256 7,256 7,247 7,247SOLDADURA PVC LIQUIDA 1/4 un 0.30 18,571 18,571 18,571 18,571TUBERA PVC ALCANTAR. REFORZADO 33 ml 1.00 407,327 407,327 407,327 407,327 433,154 433,154 433,145 433,145

    TUBERA PVC ALCANTARILLADO REFORZADO 36 mCUADRILLA INSTALAC. OF + AYUDANTE hc 0.40 7,256 7,256 7,247 7,247SOLDADURA PVC LIQUIDA 1/4 un 0.30 18,571 18,571 18,571 18,571TUBERA PVC ALCANTAR. REFORZADO 36 ml 1.00 580,556 580,556 580,556 580,556 606,383 606,383 606,374 606,374

    ANDENES Y SARDINELES

    ADOQUN DE GRES mADOQUN ESPAOL 20X10 SANTAF un 52.00 30,888 26,052 27,820 30,888ARENA DE PEA m 0.02 1,200 0 0 0ARENA DE REVOQUE (AMARILLA) m 0.02 0 0 544 0ARENA FINA 5 M3 m 0.02 0 755 0 0ARENA LAVADA DE PEA m 0.02 0 0 0 510CUADRILLA ALBAILERA OF + AYUDANTE hc 0.67 11,048 11,048 11,048 11,048 43,136 37,855 39,412 42,447

    ANDN ADOQUN DE GRES mACARREO A DISTANCIA MAYOR A 2 KM un 0.17 14,448 14,448 14,448 14,448ADOQUN DE GRES m 1.00 43,136 37,855 39,412 42,447BORDILLO PREFABRICADO A-80 m 0.20 7,194 6,836 6,670 6,650DESCAPOTE m 0.20 5,122 4,012 4,382 4,308EXCAVACIN MEC. P/SUBRASANTE m 0.21 1,973 1,973 1,973 1,973REPLANTEO GENERAL m 1.00 602 392 578 498 72,475 65,516 67,462 70,324

    ANDN CONCRETO 2500 EN SITIO 0.08 mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.48 7,915 7,915 7,915 7,915ACARREO A DISTANCIA MAYOR A 2 KM un 0.27 22,946 22,946 22,946 22,946BORDILLO PREFABRICADO A-80 m 0.48 17,266 16,406 16,008 15,961CONCR. 1:2:3 ELABORADO EN OBRA m 0.09 27,400 21,803 21,623 20,016DESCAPOTE m 1.00 25,608 20,058 21,908 21,538EXCAVACIN MEC. P/SUBRASANTE m 0.21 1,973 1,973 1,973 1,973REPLANTEO GENERAL m 1.00 602 392 578 498 103,711 91,494 92,953 90,848

    ANDN CONCRETO 2500 PSI SITIO mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.48 7,915 7,915 7,915 7,915ACARREO A DISTANCIA MAYOR A 2 KM un 0.27 22,946 22,946 22,946 22,946BORDILLO PREFABRICADO A-80 m 0.48 17,266 16,406 16,008 15,961CONCR. 1:2:3 ELABORADO EN OBRA m 0.09 27,400 21,803 21,623 20,016DESCAPOTE m 1.00 25,608 20,058 21,908 21,538EXCAVACIN MEC. P/SUBRASANTE m 0.21 1,973 1,973 1,973 1,973REPLANTEO GENERAL m 1.00 602 392 578 498 103,711 91,494 92,953 90,848

    ANDN CONCRETO 3500 PSI EN SITIO mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.48 7,915 7,915 7,915 7,915ACARREO A DISTANCIA MAYOR A 2 KM un 0.27 22,946 22,946 22,946 22,946BORDILLO PREFABRICADO A-80 m 0.48 17,266 16,406 16,008 15,961CONCR. 1:2:2 5 ELABORADO EN OBRA m 0.09 28,424 23,026 22,451 21,063DESCAPOTE m 1.00 25,608 20,058 21,908 21,538EXCAVACIN MEC. P/SUBRASANTE m 0.21 1,973 1,973 1,973 1,973REPLANTEO GENERAL m 1.00 602 392 578 498 104,735 92,717 93,780 91,895

    ANDN CONCRETO 3500 PSI EN SITIO 0.08 mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.48 7,915 7,915 7,915 7,915ACARREO A DISTANCIA MAYOR A 2 KM un 0.27 22,946 22,946 22,946 22,946BORDILLO PREFABRICADO A-80 m 0.48 17,266 16,406 16,008 15,961CONCR. 1:2:2 5 ELABORADO EN OBRA m 0.09 28,424 23,026 22,451 21,063DESCAPOTE m 1.00 25,608 20,058 21,908 21,538

    Contina

  • 319EDICIN 164 SEPTIEMBRE - NOVIEMBRE 2012

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    ANDENES Y SARDINELES

    EXCAVACIN MEC. P/SUBRASANTE m 0.21 1,973 1,973 1,973 1,973REPLANTEO GENERAL m 1.00 602 392 578 498 104,735 92,717 93,780 91,895

    BORDE SEPARADOR VERDE A-130 mARENA DE PEA m 0.07 4,200 0 0 0ARENA DE REVOQUE (AMARILLA) m 0.07 0 0 1,903 0ARENA FINA 5 M3 m 0.07 0 2,643 0 0ARENA LAVADA DE PEA m 0.07 0 0 0 1,786BORDE SEPARADOR VERDE A-170 un 1.00 150,800 150,800 150,800 150,800CUADRILLA ALBAILERA OF + AYUDANTE hc 0.47 7,750 7,750 7,750 7,750MORTERO 1:4 m 0.01 2,897 2,372 2,088 2,115 165,647 163,564 162,541 162,452

    BORDE SEPARADOR VERDE A-170 mARENA DE PEA m 0.06 3,600 0 0 0ARENA DE REVOQUE (AMARILLA) m 0.06 0 0 1,631 0ARENA FINA 5 M3 m 0.06 0 2,265 0 0ARENA LAVADA DE PEA m 0.06 0 0 0 1,531BORDE SEPARADOR VERDE A-170 un 1.00 162,400 162,400 162,400 162,400CEMENTO GRIS kg 6.50 3,575 3,120 2,925 2,925CUADRILLA ALBAILERA OF + AYUDANTE hc 0.47 7,750 7,750 7,750 7,750 177,325 175,535 174,706 174,607

    BORDILLO DE 8 X 15 CM FUNDIDO EN CONCRETO mCONCR. CORR. GRAVA COMN 2500 PSI m 0.01 3,010 2,654 2,640 2,658CUADRILLA ALBAILERA OF + AYUDANTE hc 0.55 9,070 9,070 9,070 9,070FORMALETA SARDINEL d 0.82 656 656 656 656 12,736 12,379 12,366 12,384

    BORDILLO FUNDIDO EN SITIO 20 X 35 CM mCONCR. CORR. GRAVA COMN 2500 PSI m 0.08 24,080 21,231 21,120 21,264CUADRILLA ALBAILERA OF + AYUDANTE hc 0.79 13,027 13,027 13,027 13,027FORMALETA SARDINEL d 0.82 656 656 656 656 37,763 34,914 34,803 34,947

    CAUELA PREFABRICADA TIPO A A-120 mCAUELA PREFABRICADA REF. A-120 un 1.25 26,100 26,100 26,100 26,100CUADRILLA ALBAILERA OF + AYUDANTE hc 0.55 9,070 9,070 9,070 9,070MORTERO 1:6 m 0.01 2,281 1,822 1,613 1,593 37,451 36,992 36,783 36,763

    CRCAMO DE PROTECCIN PARA TUBERAS mACERO FIGURADO 60000 PSI 3/8 kg 13.00 22,750 22,750 22,750 22,750CONCR. CORR. GRAVA COMN 3000 PSI m 0.11 29,594 26,519 33,814 26,585CUADRILLA ALBAILERA OF + AYUDANTE hc 1.61 26,549 26,549 26,549 26,549LADRILLO RECOCIDO OSCURO un 72.00 0 0 0 36,000LADRILLO RECOCIDO OSCURO B/QUILLA. un 72.00 0 0 28,800 0LADRILLO RECOCIDO OSCURO BOGOT un 72.00 30,240 0 0 0LADRILLO RECOCIDO OSCURO CALI un 72.00 0 32,400 0 0MORTERO CONVENCIONAL 2000 PSI m 0.03 8,079 7,051 7,586 8,079 117,211 115,268 119,499 119,963

    CONTENEDOR DE RACES TIPO A B-20 unCUADRILLA ALBAILERA OF + AYUDANTE hc 5.00 82,450 82,450 82,450 82,450GRAVILLA FINA 1/2 B/QUILLA. m 0.05 0 0 3,485 0GRAVILLA FINA 1/2 BOGOT m 0.05 1,950 0 0 0GRAVILLA FINA 1/2 CALI m 0.05 0 1,988 0 0GRAVILLA FINA 1/2 MEDELLN m 0.05 0 0 0 1,890LADRILLO PRENSADO MACIZO SANTAF un 185.00 0 0 111,000 0LADRILLO TOLETE COMN un 185.00 0 0 111,000 0LADRILLO TOLETE COMN un 185.00 0 83,250 0 0LADRILLO TOLETE COMN un 185.00 0 0 0 231,805LADRILLO TOLETE COMN un 185.00 61,050 0 0 0TIERRA NEGRA m 1.58 49,178 49,178 49,178 49,178BORDE CONTENEDOR DE RACES A-70 m 4.80 162,281 152,191 146,753 147,267EXCAVACIN A MANO RECEBO (INCL RETIRO) m 0.14 7,647 7,647 7,647 7,647GEOTEXTIL NO TEJIDO PARA SUBRASANTE m 1.44 5,785 5,785 5,785 5,785MORTERO 1:3 m 0.19 61,769 51,123 45,472 46,002 432,109 433,611 562,770 572,024

    LOSETA PREFABRICADA A-20 mARENA DE REVOQUE m 1.00 0 0 0 25,000ARENA FINA m 1.00 0 37,750 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 1.00 0 0 39,500 0ARENA LAVADA DE PEA m 1.00 30,160 0 0 0CUADRILLA ALBAILERA OF + AYUDANTE hc 0.58 9,564 9,564 9,564 9,564LOSETA PREFABRICADA A-20 m 1.00 32,000 32,000 32,000 32,000MORTERO CONVENCIONAL 2500 PSI m 0.01 3,225 3,420 3,185 3,139 74,949 82,734 84,249 69,703

    LOSETA PREFABRICADA A-40 mARENA DE REVOQUE m 0.04 0 0 0 1,000ARENA FINA m 0.04 0 1,510 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.04 0 0 1,580 0ARENA LAVADA DE PEA m 0.04 1,206 0 0 0CUADRILLA ALBAILERA OF + AYUDANTE hc 0.80 13,192 13,192 13,192 13,192LOSETA PREFABRICADA A-40 m 1.00 36,686 36,686 36,686 36,686MORTERO CONVENCIONAL 2500 PSI m 0.01 3,225 3,420 3,185 3,139 54,309 54,808 54,643 54,017

    LOSETA PREFABRICADA A-60 mARENA DE REVOQUE m 0.04 0 0 0 1,000ARENA FINA m 0.04 0 1,510 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.04 0 0 1,580 0ARENA LAVADA DE PEA m 0.04 1,206 0 0 0CUADRILLA ALBAILERA OF + AYUDANTE hc 0.80 13,192 13,192 13,192 13,192LOSETA PREFABRICADA A-60 m 1.00 19,792 19,792 19,792 19,792MORTERO CONVENCIONAL 2500 PSI m 0.01 3,225 3,420 3,185 3,139 37,415 37,914 37,749 37,123

    PRADIZACIN mGRAMA KIKUYO m 1.00 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940

    RAMPA B-5 unCUADRILLA ALBAILERA OF + AYUDANTE hc 6.16 101,578 101,578 101,578 101,578LOSETA PREFABRICADA A-50 m 1.79 65,668 65,668 65,668 65,668LOSETA PREFABRICADA A-60 m 0.90 17,813 17,813 17,813 17,813PIEZA REMATE RAMPA A-105 un 2.80 133,818 133,818 133,818 133,818SARDINEL ESPECIAL RAMPA TIPO A A-100 un 2.80 103,286 103,286 103,286 103,286SARDINEL PREFABRICADO A-85 un 4.48 93,542 93,542 93,542 93,542VIBROCOMPACTADOR A GASOLINA d 0.14 3,080 3,080 3,080 3,080BORDILLO PREFABRICADO A-80 m 1.40 50,358 47,852 46,691 46,552MORTERO 1:4 m 0.11 31,867 26,087 22,971 23,266 601,011 592,724 588,448 588,603

    RELLENO FLUIDO PARA ANDENES mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.20 3,298 3,298 3,298 3,298RELLENO FLUIDO ANDENES 15 KG-CM2 m 0.11 25,773 29,506 29,150 25,773 29,071 32,804 32,448 29,071

    SARDINEL FUNDIDO IN-SITU H=0.20 M mCONCR. CORR. GRAVA COMN 3000 PSI m 0.03 8,071 7,232 9,222 7,250CUADRILLA ALBAILERA OF + AYUDANTE hc 0.46 7,585 7,585 7,585 7,585FORMALETA SARDINEL d 0.82 656 656 656 656 16,312 15,474 17,463 15,492

    SARDINEL FUNDIDO IN-SITU H=0.40 M mCONCR. CORR. GRAVA COMN 3000 PSI m 0.08 21,523 19,286 24,592 19,334CUADRILLA ALBAILERA OF + AYUDANTE hc 0.46 7,585 7,585 7,585 7,585FORMALETA SARDINEL d 0.82 656 656 656 656 29,764 27,528 32,833 27,576

    SARDINEL PREFABRICADO A-10 mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.29 4,782 4,782 4,782 4,782SARDINEL PREFABRICADO A-10 un 1.25 37,200 37,200 37,200 37,200SUB-BASE GRAN. B/QUILLA. m 0.20 0 0 7,120 0SUB-BASE GRAN. BOGOT m 0.20 13,688 0 0 0SUB-BASE GRAN. CALI m 0.20 0 6,600 0 0SUB-BASE GRAN. MEDELLN m 0.20 0 0 0 4,176MORTERO 1:3 m 0.01 3,251 2,691 2,393 2,421 58,921 51,273 51,495 48,579

    TABLETA PREFABRICADA 20 X 20 (PANOT) A-20 mARENA DE REVOQUE m 0.01 0 0 0 250ARENA FINA m 0.01 0 378 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.01 0 0 395 0ARENA LAVADA DE PEA m 0.01 302 0 0 0CUADRILLA ALBAILERA OF + AYUDANTE hc 0.68 11,213 11,213 11,213 11,213TABLETA PREFABRICADA PANOT A-60 m 1.00 44,080 44,080 44,080 44,080MORTERO 1:3 m 0.02 6,502 5,381 4,787 4,842 62,097 61,052 60,475 60,386

    TRAMO DE ANDN B-30 (ANCHO=1.50) mCONCR. CORR. GRAVA COMN 2500 PSI m 0.01 3,010 2,654 2,640 2,658CUADRILLA ALBAILERA OF + AYUDANTE hc 0.55 9,070 9,070 9,070 9,070LOSETA PREFABRICADA A-50 m 1.00 36,686 36,686 36,686 36,686LOSETA PREFABRICADA A-60 m 0.20 3,958 3,958 3,958 3,958SARDINEL A-10 un 0.66 19,906 19,906 19,906 19,906MORTERO 1:4 m 0.05 14,485 11,858 10,442 10,575 87,115 84,131 82,701 82,853

  • 320

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    ANDENES Y SARDINELES

    TRAMO DE ANDN B-40 (ANCHO=2.10) mCONCR. CORR. GRAVA COMN 2500 PSI m 0.01 3,010 2,654 2,640 2,658CUADRILLA ALBAILERA OF + AYUDANTE hc 1.30 21,437 21,437 21,437 21,437LOSETA PREFABRICADA A-50 m 1.20 44,023 44,023 44,023 44,023LOSETA PREFABRICADA A-60 m 0.24 4,750 4,750 4,750 4,750SARDINEL A-10 un 0.48 14,477 14,477 14,477 14,477MORTERO 1:4 m 0.07 20,279 16,601 14,618 14,805SUB-BASE PARA ANDENES m 0.36 14,318 17,219 33,599 16,190 122,294 121,161 135,545 118,340

    EXCAVACIONES

    DESCAPOTE mHORA AYUDANTE hc 0.16 971 971 971 971MANO DE OBRA AA hc 0.26 4,287 4,287 4,287 4,287VOLQUETA M3 vj 0.37 20,350 14,800 16,650 16,280 25,608 20,058 21,908 21,538

    DESCAPOTE A MANO E= 0.20 M mHORA AYUDANTE hc 1.50 9,104 9,104 9,104 9,104VOLQUETA 6 M3 vj 0.05 1,618 1,618 1,618 1,618 10,721 10,721 10,721 10,721

    EXCAVACIN A MANO EN TIERRA (INCL RETIRO) mHORA AYUDANTE hc 2.40 14,566 14,566 14,566 14,566 14,566 14,566 14,566 14,566

    EXCAVACIN A MANO RECEBO (INCL RETIRO) mHORA AYUDANTE hc 9.00 54,621 54,621 54,621 54,621 54,621 54,621 54,621 54,621

    EXCAVACIN MECNICA P/SUBRASANTE mOFICIAL d 0.01 397 397 397 397RETROEXCAVADORA 428 C h 0.15 9,000 9,000 9,000 9,000 9,397 9,397 9,397 9,397

    EXCAVACIONES A MANO DE ZANJAS mHORA AYUDANTE hc 2.50 15,173 15,173 15,173 15,173 15,173 15,173 15,173 15,173

    TALA Y DESENRAICE RBOLES MEDIANOS unCUADRILLA 2 OFICIALES CON PREST. d 1.25 208,415 208,415 208,415 208,415MOTOSIERRA d 0.50 4,150 4,150 4,150 4,150RETROEXCAVADORA 428 C h 0.30 18,000 18,000 18,000 18,000VOLQUETA 6 M3 vj 0.20 6,470 6,470 6,470 6,470 237,035 237,035 237,035 237,035

    MOBILIARIO URBANO

    BANCA EN CONCRETO M-40 unBANCA EN CONCR. M-40 un 1.00 88,160 88,160 88,160 88,160CUADRILLA ALBAILERA OF + AYUDANTE hc 1.29 21,272 21,272 21,272 21,272MORTERO CONVENCIONAL 3000 PSI m 0.01 3,459 3,459 3,459 3,459 112,891 112,891 112,891 112,891

    BANCA EN CONCRETO M-50 unBANCA EN CONCR. M-30 m 1.00 498,800 498,800 498,800 498,800CUADRILLA ALBAILERA OF + AYUDANTE hc 1.40 23,086 23,086 23,086 23,086MORTERO CONVENCIONAL 3000 PSI m 0.01 3,459 3,459 3,459 3,459 525,345 525,345 525,345 525,345

    BARRERA CICLORRUTAS A-130 mBARRERA CICLOR P/CONTINUA A-130 m 1.00 74,850 74,850 74,850 74,850CUADRILLA ALBAILERA OF + AYUDANTE hc 0.40 6,596 6,596 6,596 6,596MORTERO 1:3 m 0.00 650 538 479 484MORTERO 1:6 m 0.01 2,281 1,822 1,613 1,593SUB-BASE PARA ANDENES m 0.62 24,658 29,656 57,866 27,882 109,036 113,462 141,403 111,406

    BARRERA CICLORRUTAS A-140 mBARRERA CICLOR P/AISLADA A-140 m 1.00 74,850 74,850 74,850 74,850CUADRILLA ALBAILERA OF + AYUDANTE hc 0.50 8,245 8,245 8,245 8,245MORTERO 1:3 m 0.00 650 538 479 484MORTERO 1:6 m 0.01 2,281 1,822 1,613 1,593 86,026 85,455 85,187 85,172

    BOLARDO M 63 ALTO / HIERRO unBOLARDO M-63 - METLICO un 1.29 160,863 160,863 160,863 160,863CONCR. CORR. GRAVA COMN 1500 PSI m 0.01 2,830 2,066 2,720 2,621CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490 180,183 179,419 180,073 179,974

    BOLARDO M-60 CONCRETO unBOLARDO M-60 - CONCR. un 1.00 34,800 34,800 34,800 34,800CONCR. CORR. GRAVA COMN 1500 PSI m 0.06 16,980 12,398 16,317 15,726CUADRILLA ALBAILERA OF + AYUDANTE hc 2.80 46,172 46,172 46,172 46,172 97,952 93,370 97,289 96,698

    BOLARDO M-61 BAJO / CONCRETO unBOLARDO M-61 - BAJO - CONCR. un 1.00 32,480 32,480 32,480 32,480CONCR. CORR. GRAVA COMN 1500 PSI m 0.06 16,980 12,398 16,317 15,726CUADRILLA ALBAILERA OF + AYUDANTE hc 1.50 24,735 24,735 24,735 24,735 74,195 69,613 73,532 72,941

    BOLARDO M-62 BAJO / HIERRO unBOLARDO M-62 - BAJO - HIERRO un 1.00 130,000 130,000 130,000 130,000CONCR. CORR. GRAVA COMN 1500 PSI m 0.06 16,980 12,398 16,317 15,726CUADRILLA ALBAILERA OF + AYUDANTE hc 1.50 24,735 24,735 24,735 24,735 171,715 167,133 171,052 170,461

    BORDE CONTENEDOR DE RACES A-70 mBORDE CONTENEDOR DE RACES A-70 m 0.38 5,730 5,730 5,730 5,730CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490MORTERO 1:4 m 0.04 11,588 9,486 8,353 8,460 33,808 31,706 30,574 30,681

    BORDILLO PREFABRICADO A-80 mARENA DE PEA m 0.06 3,600 0 0 0ARENA DE REVOQUE (AMARILLA) m 0.06 0 0 1,631 0ARENA FINA 5 M3 m 0.06 0 2,265 0 0ARENA LAVADA DE PEA m 0.06 0 0 0 1,531BORDILLO PREFABRICADO A-80 un 1.00 20,880 20,880 20,880 20,880CEMENTO GRIS kg 6.50 3,575 3,120 2,925 2,925CUADRILLA ALBAILERA OF + AYUDANTE hc 0.48 7,915 7,915 7,915 7,915 35,970 34,180 33,351 33,251

    CANECA M-120 unCANECA 50CM H=75CM GRANO un 1.00 222,684 222,684 222,684 222,684CUADRILLA ALBAILERA OF + AYUDANTE hc 0.86 14,181 14,181 14,181 14,181MORTERO 1:5 m 0.01 2,564 2,075 1,807 1,833 239,429 238,940 238,672 238,698

    HIDRANTE LONDRES 4 EXTREMO LISO unCONCR. CORR. GRAVA COMN 3000 PSI m 0.02 5,381 4,822 6,148 4,834CUADRILLA ALBAILERA OF + AYUDANTE hc 3.50 57,715 57,715 57,715 57,715HIDRANTE LONDRES 4 EXTREMO LISO un 1.00 1,632,000 1,632,000 1,632,000 1,632,000 1,695,096 1,694,537 1,695,863 1,694,549

    HIDRANTE ROMA 4 EXTREMO LISO unCONCR. CORR. GRAVA COMN 3000 PSI m 0.02 5,381 4,822 6,148 4,834CUADRILLA ALBAILERA OF + AYUDANTE hc 3.50 57,715 57,715 57,715 57,715HIDRANTE ROMA 4 EXTREMO LISO un 1.00 1,366,800 1,366,800 1,366,800 1,366,800 1,429,896 1,429,337 1,430,663 1,429,349

    IMPLEMENTOS DEPORTIVOS unTUBOS Y MALLAS DE TENIS jg 1.00 950,000 1,110,000 1,110,000 1,110,000 950,000 1,110,000 1,110,000 1,110,000

    REJA DE CERRAMIENTO M-70 mCONCR. CORR. GRAVA COMN 3000 PSI m 0.09 24,213 21,697 27,666 21,751CUADRILLA ALBAILERA OF + AYUDANTE hc 0.30 4,947 4,947 4,947 4,947MANO DE OBRA BB h 2.50 45,348 45,348 45,348 45,348SOLDADURA 60.13 DE 1/8 kg 3.00 18,885 18,885 18,885 18,885TUBO CUADRADO DE 1 m 18.20 105,196 109,200 109,200 109,200TUBO RECTANGULAR MUEBLE 20X40MM un 1.00 2,450 2,450 2,450 2,450 201,038 202,527 208,496 202,581

    SEALIZACIN

    CEBRAS OBSTCULOS unESFERAS REFLECTIVAS kg 3.30 17,820 17,820 17,820 17,820MANO DE OBRA CC hh 0.42 7,964 7,964 7,964 7,964PINTURA ACRLICA DE DEMARCACIN gl 1.20 70,560 70,560 70,560 70,560 96,344 96,344 96,344 96,344

    FLECHAS TIPO FA unESFERAS REFLECTIVAS kg 0.52 2,808 2,808 2,808 2,808MANO DE OBRA CC hh 0.58 10,999 10,999 10,999 10,999PINTURA ACRLICA DE DEMARCACIN gl 0.19 11,172 11,172 11,172 11,172 24,979 24,979 24,979 24,979

    LNEA L-1 CINTA PREFORMADA mCINTA DEMARC REFLECTIVA rl 0.00 6,600 6,600 6,600 6,600MANO DE OBRA CC hh 0.07 1,327 1,327 1,327 1,327 7,927 7,927 7,927 7,927

  • 321EDICIN 164 SEPTIEMBRE - NOVIEMBRE 2012

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    SEALIZACIN

    LNEA L-3 TERMOPLSTICA mMANO DE OBRA CC hh 0.07 1,327 1,327 1,327 1,327RESINA TERMOPLSTICA 15 CM - 2.3 MM m 1.00 9,500 9,500 9,500 9,500 10,827 10,827 10,827 10,827

    LNEA TIPO L-1 mESFERAS REFLECTIVAS kg 0.01 54 54 54 54MANO DE OBRA CC hh 0.07 1,327 1,327 1,327 1,327PINTURA ACRLICA DE DEMARCACIN gl 0.02 1,176 1,176 1,176 1,176 2,557 2,557 2,557 2,557

    LNEA TIPO L-4 DE 0.60 X 7.00 M. mESFERAS REFLECTIVAS kg 0.06 324 324 324 324MANO DE OBRA CC hh 0.03 569 569 569 569PINTURA ACRLICA DE DEMARCACIN gl 0.18 10,584 10,584 10,584 10,584 11,477 11,477 11,477 11,477

    LNEA TIPO L-6 DE 0.40 X 4.00 M. mLNEA TIPO L-6 DE 0.40 X 4 M VA DE 8 M m 1.00 11,200 11,200 11,200 11,200MANO DE OBRA CC hh 0.50 9,482 9,482 9,482 9,482 20,682 20,682 20,682 20,682

    SEAL DOBLE DE CICLO RUTA unCONO TRAFICO DE 42 CMS un 1.00 22,360 22,360 22,360 22,360CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490MORTERO 1:3 m 0.01 3,251 2,691 2,393 2,421 42,101 41,541 41,243 41,271

    SEAL SENCILLA DE CICLO RUTA unCONO TRAFICO DE 50 CMS un 1.00 19,000 19,000 19,000 19,000CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490MORTERO 1:3 m 0.01 3,251 2,691 2,393 2,421 38,741 38,181 37,883 37,911

    SEALES DE TRNSITO INFORMATIVAS unCONCR. CORR. GRAVA COMN 2000 PSI m 0.20 53,592 61,480 59,360 43,320CUADRILLA ALBAILERA OF + AYUDANTE hc 1.30 21,437 21,437 21,437 21,437SEAL VERTICAL VIAL 75 CM un 1.00 271,126 271,126 271,126 133,400 346,155 354,043 351,923 198,157

    SEALES PREVENTIVAS Y REGLAMENTARIAS 60 X 60 CM unCONO TRFICO DE 70 CMS un 1.00 21,900 21,900 21,900 21,900CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490MORTERO 1:3 m 0.01 3,251 2,691 2,393 2,421 41,641 41,081 40,783 40,811

    SEALES PREVENTIVAS Y REGLAMENTARIAS 75 X 75 CM unCONO TRFICO DE 72 CMS un 1.00 27,800 27,800 27,800 27,800CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490MORTERO 1:3 m 0.01 3,251 2,691 2,393 2,421 47,541 46,981 46,683 46,711

    SEALES PREVENTIVAS Y REGLAMENTARIAS 90 X 90 CM unCONO TRFICO DE 1 M un 1.00 42,000 42,000 42,000 42,000CUADRILLA ALBAILERA OF + AYUDANTE hc 1.00 16,490 16,490 16,490 16,490MORTERO 1:3 m 0.01 3,251 2,691 2,393 2,421 61,741 61,181 60,883 60,911

    TACHAS REFLECTIVAS unCUADRILLA ALBAILERA OF + AYUDANTE hc 0.05 825 825 825 825TACHAS REFLECTIVAS un 1.00 7,200 7,200 7,200 7,200 8,025 8,025 8,025 8,025

    VAS BASES Y SUBBASES

    BASE ASFLTICA MDC-1 MODIF CON POLMEROS PLANTA mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO MODIFIC. CON POLM. TIPO 2 kg 120.00 297,840 297,840 297,840 297,840CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257

    GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 425,552 404,277 414,284 375,223

    BASE ASFLTICA MDC-1 ASFALTO MODIF mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO MODIFIC. CON POLM. TIPO 2 kg 120.00 297,840 297,840 297,840 297,840CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 425,552 404,277 414,284 375,223

    BASE ASFLTICA MDC-2 NORMALIZADO 70-90 mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO NORMALIZADO 60-70 kg 135.00 162,810 162,810 162,810 162,810CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.30 0 0 20,910 0GRAVILLA FINA 1/2 BOGOT m 0.30 11,700 0 0 0GRAVILLA FINA 1/2 CALI m 0.30 0 11,925 0 0GRAVILLA FINA 1/2 MEDELLN m 0.30 0 0 0 11,340PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 265,802 270,042 280,648 240,949

    BASE GRANULAR B-200 mRECEBO B-200 B/QUILLA. m 1.30 0 0 71,630 0RECEBO B-200 BOGOT m 1.30 43,333 0 0 0RECEBO B-200 CALI m 1.30 0 68,900 0 0RECEBO B-200 MEDELLN m 1.30 0 0 0 45,500 43,333 68,900 71,630 45,500

    BASE GRANULAR B-600 mRECEBO B-600 B/QUILLA m 1.30 0 0 59,121 0RECEBO B-600 BOGOT m 1.30 37,700 0 0 0RECEBO B-600 CALI m 1.30 0 68,900 0 0RECEBO B-600 MEDELLN m 1.30 0 0 0 45,500 37,700 68,900 59,121 45,500

    BASE GRANULAR MEJORADA CON CAL mCAL kg 0.07 56 56 56 56CARROTANQUE h 0.03 5,250 5,250 5,250 5,250MOTONIVELADORA CAT 120G h 0.07 8,393 8,393 8,393 8,393OFICIAL d 0.02 793 793 793 793RECEBO B-600 B/QUILLA m 1.33 0 0 60,486 0RECEBO B-600 BOGOT m 1.33 38,570 0 0 0RECEBO B-600 CALI m 1.33 0 70,490 0 0RECEBO B-600 MEDELLN m 1.33 0 0 0 46,550VIBROCOMPACTADOR A GASOLINA d 0.05 1,100 1,100 1,100 1,100 54,162 86,082 76,078 62,142

  • 322

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    VAS BASES Y SUBBASES

    Contina

    BASE GRANULAR MEJORADA CON CEMENTO AL 7% mCARROTANQUE h 0.03 5,250 5,250 5,250 5,250

    CEMENTO GRIS kg 148.96 81,928 71,501 67,032 67,032

    MOTONIVELADORA CAT 120G h 0.07 8,393 8,393 8,393 8,393

    OFICIAL d 0.02 793 793 793 793

    RECEBO B-600 B/QUILLA m 1.33 0 0 60,486 0

    RECEBO B-600 BOGOT m 1.33 38,570 0 0 0

    RECEBO B-600 CALI m 1.33 0 70,490 0 0

    RECEBO B-600 MEDELLN m 1.33 0 0 0 46,550

    VIBROCOMPACTADOR A GASOLINA d 0.06 1,320 1,320 1,320 1,320 136,254 157,747 143,274 129,338

    GEOTEXTIL NO TEJIDO PARA DRENAJES MATERIALES mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.05 825 825 825 825

    GEOTEXTIL TEJIDO 2100 m 1.00 4,855 4,855 4,855 4,855 5,680 5,680 5,680 5,680

    GEOTEXTIL NO TEJIDO PARA SUBRASANTE mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.05 825 825 825 825

    GEOTEXTIL PAVCO NO TEJIDO 1600 m 1.00 3,193 3,193 3,193 3,193 4,018 4,018 4,018 4,018

    GEOTEXTIL TEJIDO PARA SUBRASANTE mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.05 825 825 825 825

    GEOTEXTIL TEJIDO 2100 m 1.00 4,855 4,855 4,855 4,855 5,680 5,680 5,680 5,680

    RIEGO ASFAL. LQUIDO CURADO MEDIO MC 70 mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.08 1,319 1,319 1,319 1,319

    ECOPETROL BARRANCABERMEJA MD-12 lt 2.00 1,181,824 1,181,824 1,181,824 1,181,824 1,183,143 1,183,143 1,183,143 1,183,143

    SUB-BASE GRANULAR mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.06 989 989 989 989

    SUB-BASE GRAN. B/QUILLA. m 1.30 0 0 46,280 0

    SUB-BASE GRAN. BOGOT m 1.30 88,972 0 0 0

    SUB-BASE GRAN. CALI m 1.30 0 42,900 0 0

    SUB-BASE GRAN. MEDELLN m 1.30 0 0 0 27,144 89,961 43,889 47,269 28,133

    SUB-BASE GRANULAR CON CAL (IDU 13 A) mCAL kg 0.13 104 104 104 104

    CUADRILLA ALBAILERA OF + AYUDANTE hc 0.80 13,192 13,192 13,192 13,192

    SUB-BASE GRAN. B/QUILLA. m 1.33 0 0 47,348 0

    SUB-BASE GRAN. BOGOT m 1.33 91,025 0 0 0

    SUB-BASE GRAN. CALI m 1.33 0 43,890 0 0

    SUB-BASE GRAN. MEDELLN m 1.33 0 0 0 27,770 104,321 57,186 60,644 41,066

    SUB-BASE GRANULAR CON CEMENTO (IDU 13 A) mCEMENTO GRIS kg 114.00 62,700 54,720 51,300 51,300

    CUADRILLA ALBAILERA OF + AYUDANTE hc 0.80 13,192 13,192 13,192 13,192

    SUB-BASE GRAN. B/QUILLA. m 1.33 0 0 47,348 0

    SUB-BASE GRAN. BOGOT m 1.33 91,025 0 0 0

    SUB-BASE GRAN. CALI m 1.33 0 43,890 0 0

    SUB-BASE GRAN. MEDELLN m 1.33 0 0 0 27,770 166,917 111,802 111,840 92,262

    SUB-BASE PARA ANDENES mCARROTANQUE h 0.01 1,750 1,750 1,750 1,750

    CUADRILLA ALBAILERA OF + AYUDANTE hc 0.05 825 825 825 825

    MAT. GRAN. SUB BASE DE PAV - B/QUILLA. m 1.30 0 0 86,060 0

    MAT. GRAN. SUB BASE DE PAV - BOGOT m 1.30 32,500 0 0 0

    MAT. GRAN. SUB BASE DE PAV - CALI m 1.30 0 40,560 0 0

    MAT. GRAN. SUB BASE DE PAV - MEDELLN m 1.30 0 0 0 37,700

    MOTONIVELADORA CAT 120G h 0.03 3,597 3,597 3,597 3,597

    VIBROCOMPACTADOR A GASOLINA d 0.05 1,100 1,100 1,100 1,100 39,772 47,832 93,332 44,972

    VAS ASFALTOS

    BASE ASFLTICA mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.38 6,266 6,266 6,266 6,266

    ECOPETROL BARRANCABERMEJA MD-12 lt 0.80 472,730 472,730 472,730 472,730

    ECOPETROL BARRANCABERMEJA MDC-1 m 1.20 653,908 653,908 653,908 653,908

    EQUIPO DE LABORATORIO DE SUELOS d 0.01 6 6 6 6 1,132,910 1,132,910 1,132,910 1,132,910

    CALZADA EN ASFALTO (INCLUYE BASE Y SUB-BASE) mCUADRILLA ALBAILERA OF + AYUDANTE hc 0.40 6,596 6,596 6,596 6,596MAT. GRAN. SUB BASE DE PAV - B/QUILLA. m 0.21 0 0 13,902 0MAT. GRAN. SUB BASE DE PAV - BOGOT m 0.21 5,250 0 0 0MAT. GRAN. SUB BASE DE PAV - CALI m 0.21 0 6,552 0 0MAT. GRAN. SUB BASE DE PAV - MEDELLN m 0.21 0 0 0 6,090ACARREO A DISTANCIA MAYOR A 2 KM un 1.31 111,333 111,331 111,331 111,333BASE ASFLTICA m 0.04 45,316 45,316 45,316 45,316BASE GRAN. B-600 m 0.16 6,032 11,024 9,459 7,280DESCAPOTE m 0.20 5,122 4,012 4,382 4,308EXCAVACIN A MANO EN TIERRA (INCL RETIRO) m 0.74 10,779 10,779 10,779 10,779RELLENO TIPO 2 RECEBO m 0.70 30,441 24,899 29,610 23,386REPLANTEO GENERAL m 1.00 602 392 578 498RIEGO ASFAL. LQUIDO CURADO MEDIO MC 70 m 1.00 1,183,143 1,183,143 1,183,143 1,183,143RODAD. ASFLT.B-1350 m 0.04 963 963 963 963 1,405,577 1,405,007 1,416,059 1,399,692

    CONCR. ASFLT. MDC-1 ASFALTO MODIF. CON POLM. OBRA mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0SHELL BITUMEN 80-100 MDC 1 m 1.27 657,450 657,450 657,450 657,450CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164 690,544 690,544 690,544 686,004

    CONCRETO ASFLTICO MDC-1 MODIFI mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0SHELL BITUMEN 80-100 MDC 1 m 1.27 657,450 657,450 657,450 657,450CUADRILLA PARA PAVIM ASFALTICOS hc 0.06 21,042 19,766 20,366 18,023 709,422 708,146 708,746 701,863

    CONCRETO ASFLTICO MDC-2 NORM 70-90 OBRA mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0SHELL BITUMEN 80-100 MDC 2 m 1.27 657,450 657,450 657,450 657,450CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164 690,544 690,544 690,544 686,004

    CONCRETO ASFLTICO MDC-2 NORM 70-90 PLANTA mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO NORMALIZADO 60-70 kg 145.00 174,870 174,870 174,870 174,870COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164 285,496 264,221 274,228 235,167

    CONCRETO ASFLTICO MDC-2 NORM 70-90 mARENA DE REVOQUE m 1.00 0 0 0 25,000ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 1.00 0 37,750 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 1.00 0 0 39,500 0ARENA LAVADA DE PEA m 1.00 30,160 0 0 0ASFALTO NORMALIZADO 60-70 kg 145.00 174,870 174,870 174,870 174,870COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911

  • 323EDICIN 164 SEPTIEMBRE - NOVIEMBRE 2012

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    Contina

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    VAS ASFALTOS

    ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0CUADRILLA PARA PAVIM ASFALTICOS hc 0.06 21,042 19,766 20,366 18,023 325,487 308,248 320,081 268,526

    CONCRETO ASFLTICO MDC-2 NORMALIZADO mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0SHELL BITUMEN 80-100 MDC 2 m 1.27 657,450 657,450 657,450 657,450CUADRILLA PARA PAVIM ASFALTICOS hc 0.06 21,042 19,766 20,366 18,023 709,422 708,146 708,746 701,863

    CONCRETO ASFLTICO MDC-3 mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0SHELL BITUMEN 80-100 MDC 3 m 1.27 726,429 726,429 726,429 726,429CUADRILLA PARA PAVIM ASFALTICOS hc 0.06 21,042 19,766 20,366 18,023 778,401 777,124 777,725 770,842

    CONCR. ASFLT. MDC-3 MODIF. CON POLM. OBRA mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0SHELL BITUMEN 80-100 MDC 3 m 1.27 726,429 726,429 726,429 726,429CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164 759,522 759,522 759,522 754,983

    CONCR. ASFLT. MDC-3 MODIF CON POLM. PLANTA mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO MODIFIC. CON POLMER. TIPO 2 kg 140.00 347,480 347,480 347,480 347,480CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164 477,356 456,081 466,088 427,027

    CONCRETO ASFLTICO MDC-3 ASFALTO NORMAL mASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030FINISHER d 0.05 4,540 4,540 4,540 0CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164RODAD. ASFLT. MDC-3 NORM 70-90 m 1.27 399,596 372,576 385,285 335,678 432,690 405,670 418,379 364,232

    CONCRETO ASFLTICO MDC-3 NORM 70-90 PLANTA mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0

    ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0CUADRILLA PARA PAVIMENTOS ASFALTICOS hc 0.06 2,164 2,164 2,164 2,164 316,806 295,531 305,538 266,477

    CONCRETO ASFLTICO MDC-3 MODIF mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO MODIFIC. CON POLMER. TIPO 2 kg 140.00 347,480 347,480 347,480 347,480CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0CUADRILLA PARA PAVIM ASFALTICOS hc 0.06 21,042 19,766 20,366 18,023 496,235 473,683 484,291 442,886

    CONCRETO ASFLTICO MDC-3 NORMAL mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO DE LIGA kg 20.00 24,360 24,360 24,360 24,360ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350CILINDRO GALION CON RODILLO MATIC h 0.05 2,030 2,030 2,030 2,030COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434FINISHER d 0.05 4,540 4,540 4,540 0GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0CUADRILLA PARA PAVIM ASFALTICOS hc 0.06 21,042 19,766 20,366 18,023RODAD. ASFLT.MDC-3 ASFALTO 70-90 m 1.27 376,926 335,571 339,146 321,381 743,541 679,634 693,817 630,107

    CUADRILLA PARA PAVIM ASFALTICOS hcARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0

  • 324

    ANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLNANLISIS UM CANT. BOGOT CALI B/QUILLA MEDELLN

    DE

    TALL

    AD

    OS

    UR

    BA

    NIS

    MO

    VAS ASFALTOS

    ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930AYUDANTE d 0.13 6,312 6,312 6,312 6,312CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584OFICIAL d 0.75 29,752 29,752 29,752 29,752PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 350,706 329,431 339,438 300,377

    CUADRILLA PARA PAVIMENTOS ASFALTICOS hcAYUDANTE d 0.13 6,312 6,312 6,312 6,312OFICIAL d 0.75 29,752 29,752 29,752 29,752 36,064 36,064 36,064 36,064

    RODADURA ASFLTICA B-1350 mECOPETROL APIAY MDC-3 m 0.04 24,084 24,084 24,084 24,084 24,084 24,084 24,084 24,084

    RODADURA ASFLTICA MDC-3 ASFALTO NORM mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900 296,792 274,029 285,524 264,313

    RODADURA ASFLTICA MDC-3 ASFALTO 70-90 mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0ARENA DE RO BOGOT m 0.30 25,500 0 0 0ARENA DE RO CALI m 0.30 0 14,250 0 0ARENA DE RO MEDELLN m 0.30 0 0 0 7,448ARENA FINA m 0.30 0 11,325 0 0ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0ARENA LAVADA DE PEA m 0.30 9,048 0 0 0ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911ENERGA kw 4.48 1,434 1,434 1,434 1,434GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900 296,792 264,229 267,044 253,056

    RODADURA ASFLTICA MDC-3 ASFALTO 70-90 mARENA DE REVOQUE m 0.30 0 0 0 7,500ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0

    ARENA DE RO BOGOT m 0.30 25,500 0 0 0

    ARENA DE RO CALI m 0.30 0 14,250 0 0

    ARENA DE RO MEDELLN m 0.30 0 0 0 7,448

    ARENA FINA m 0.30 0 11,325 0 0

    ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0

    ARENA LAVADA DE PEA m 0.30 9,048 0 0 0

    ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930

    CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350

    COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911

    ENERGA kw 4.48 1,434 1,434 1,434 1,434

    GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0

    GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0

    GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0

    GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257

    GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0

    GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0

    GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0

    GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584

    PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900

    TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 314,642 293,367 303,374 264,313

    RODADURA ASFLTICA MDC-3 NORM 70-90 PLANTA mARENA DE REVOQUE m 0.30 0 0 0 7,500

    ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0

    ARENA DE RO BOGOT m 0.30 25,500 0 0 0

    ARENA DE RO CALI m 0.30 0 14,250 0 0

    ARENA DE RO MEDELLN m 0.30 0 0 0 7,448

    ARENA FINA m 0.30 0 11,325 0 0

    ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0

    ARENA LAVADA DE PEA m 0.30 9,048 0 0 0

    ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930

    CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350

    COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911

    ENERGA kw 4.48 1,434 1,434 1,434 1,434

    GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0

    GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0

    GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0

    GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257

    GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0

    GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0

    GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0

    GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584

    PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900

    TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 314,642 293,367 303,374 264,313

    RODADURA ASFLTICA MDC-3 NORMALIZADO mARENA DE REVOQUE m 0.30 0 0 0 7,500

    ARENA DE RO B/QUILLA. m 0.30 0 0 8,154 0

    ARENA DE RO BOGOT m 0.30 25,500 0 0 0

    ARENA DE RO CALI m 0.30 0 14,250 0 0

    ARENA DE RO MEDELLN m 0.30 0 0 0 7,448

    ARENA FINA m 0.30 0 11,325 0 0

    ARENA LAVADA (ARROYO DE PIEDRA) m 0.30 0 0 11,850 0

    ARENA LAVADA DE PEA m 0.30 9,048 0 0 0

    ASFALTO NORMALIZADO 60-70 kg 155.00 186,930 186,930 186,930 186,930

    CARGADOR 928G h 0.05 5,350 5,350 5,350 5,350

    COMBUSTIBLE CRUDO gl 5.91 19,911 19,911 19,911 19,911

    ENERGA kw 4.48 1,434 1,434 1,434 1,434

    GRAVILLA DE 3/4 B/QUILLA. m 0.28 0 0 18,480 0

    GRAVILLA DE 3/4 BOGOT m 0.28 23,800 0 0 0

    GRAVILLA DE 3/4 CALI m 0.28 0 9,800 0 0

    GRAVILLA DE 3/4 MEDELLN m 0.28 0 0 0 11,257

    GRAVILLA FINA 1/2 B/QUILLA. m 0.28 0 0 19,516 0

    GRAVILLA FINA 1/2 BOGOT m 0.28 10,920 0 0 0

    GRAVILLA FINA 1/2 CALI m 0.28 0 11,130 0 0

    GRAVILLA FINA 1/2 MEDELLN m 0.28 0 0 0 10,584

    PLANTA DE ASFALTP B.G. TM-20 tf-hr 0.05 13,900 13,900 13,900 13,900

    TRANSPORTE DE PTREOS m-km 29.75 17,850 19,338 17,850 0 314,642 293,367 303,374 264,313