Obra:
Lugar: PAMPALCA - CARHUANCHO - CCACCENAFecha: SETIEMBRE DEL 2012
METRADO TRANSPORTE
06 TRANSPORTE
06.01 TRANSPORTE DE MATERIAL EXCEDENTE <=1KM 9,215.74 M3K
06.02 TRANSPORTE DE MATERIAL EXCEDENTE >=1KM 2,560.09 M3K
MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE SAN PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA
Obra: MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE SAN PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA
Lugar: PAMPALCA - CARHUANCHO - CCACCENA
Fecha: SETIEMBRE DEL 2012
TRANSPORTE DE MATERIAL EXCEDENTE A ELIMINAR
TRANSPORTE DE ESCOMBROS D<1KM 9,215.74 M3-KM
TRANSPORTE DE ESCOMBROS D>1KM 1,794.99 M3-KM
Estaca
BOTADERO DISTANCIA DE TRANSPORTE TRANSPORTE
TIPOCódigo
C.G. Acceso Dist. Total Libre Dist. Valorizada D<1 km D>1 km D<1km D>1Km
(Km) (Km) (Km) (Km) (Km) (Km) (Km) m3-km m3-km
1+400.00 33.00 B-1 0.00 0.1 1.50 0.12 1.38 1.00 0.38 33.00 12.54
3+700.00 41.05 B-2 4.00 0.1 0.40 0.12 0.28 0.28 0.00 11.49 0.00
4+260.00 54.70 B-2 4.00 0.1 0.36 0.12 0.24 0.24 0.00 13.13 0.00
4+480.00 57.20 B-2 4.00 0.1 0.58 0.12 0.46 0.46 0.00 26.31 0.00
5+940.00 36.75 B-4 11.00 0.1 5.16 0.12 5.04 1.00 4.04 36.75 148.47
5+960.00 34.55 B-2 4.00 0.1 2.06 0.12 1.94 1.00 0.94 34.55 32.48
5+980.00 33.25 B-2 4.00 0.1 2.08 0.12 1.96 1.00 0.96 33.25 31.92
6+000.00 126.65 B-3 6.20 0.1 0.30 0.12 0.18 0.18 0.00 22.80 0.00
6+020.00 129.20 B-3 6.20 0.1 0.28 0.12 0.16 0.16 0.00 20.67 0.00
6+040.00 36.40 B-3 6.20 0.1 0.26 0.12 0.14 0.14 0.00 5.10 0.00
6+060.00 38.20 B-3 6.20 0.1 0.24 0.12 0.12 0.12 0.00 4.58 0.00
6+080.00 40.10 B-3 6.20 0.1 0.22 0.12 0.10 0.10 0.00 4.01 0.00
6+100.00 38.85 B-3 6.20 0.1 0.20 0.12 0.08 0.08 0.00 3.11 0.00
6+120.00 40.60 B-3 6.20 0.1 0.18 0.12 0.06 0.06 0.00 2.44 0.00
6+140.00 47.90 B-3 6.20 0.1 0.16 0.12 0.04 0.04 0.00 1.92 0.00
6+160.00 46.30 B-3 6.20 0.1 0.14 0.12 0.02 0.02 0.00 0.93 0.00
6+180.00 59.00 B-3 6.20 0.1 0.12 0.12 0.00 0.00 0.00 0.00 0.00
6+200.00 82.45 B-3 6.20 0.1 0.10 0.12 0.00 0.00 0.00 0.00 0.00
6+220.00 83.45 B-3 6.20 0.1 0.12 0.12 0.00 0.00 0.00 0.00 0.00
6+240.00 78.45 B-3 6.20 0.1 0.14 0.12 0.02 0.02 0.00 1.57 0.00
6+260.00 130.48 B-3 6.20 0.1 0.16 0.12 0.04 0.04 0.00 5.22 0.00
6+280.00 152.04 B-3 6.20 0.1 0.18 0.12 0.06 0.06 0.00 9.12 0.00
6+300.00 149.03 B-3 6.20 0.1 0.20 0.12 0.08 0.08 0.00 11.92 0.00
6+320.00 107.03 B-3 6.20 0.1 0.22 0.12 0.10 0.10 0.00 10.70 0.00
6+340.00 73.99 B-3 6.20 0.1 0.24 0.12 0.12 0.12 0.00 8.88 0.00
6+360.00 71.75 B-3 6.20 0.1 0.26 0.12 0.14 0.14 0.00 10.05 0.00
6+380.00 59.99 B-3 6.20 0.1 0.28 0.12 0.16 0.16 0.00 9.60 0.00
6+400.00 59.85 B-3 6.20 0.1 0.30 0.12 0.18 0.18 0.00 10.77 0.00
6+420.00 58.45 B-3 6.20 0.1 0.32 0.12 0.20 0.20 0.00 11.69 0.00
6+440.00 52.85 B-3 6.20 0.1 0.34 0.12 0.22 0.22 0.00 11.63 0.00
6+460.00 53.76 B-3 6.20 0.1 0.36 0.12 0.24 0.24 0.00 12.90 0.00
6+480.00 70.21 B-3 6.20 0.1 0.38 0.12 0.26 0.26 0.00 18.25 0.00
6+500.00 294.14 B-3 6.20 0.1 0.40 0.12 0.28 0.28 0.00 82.36 0.00
6+520.00 310.59 B-3 6.20 0.1 0.42 0.12 0.30 0.30 0.00 93.18 0.00
6+540.00 123.27 B-3 6.20 0.1 0.44 0.12 0.32 0.32 0.00 39.45 0.00
6+560.00 123.27 B-3 6.20 0.1 0.46 0.12 0.34 0.34 0.00 41.91 0.00
6+580.00 123.27 B-3 6.20 0.1 0.48 0.12 0.36 0.36 0.00 44.38 0.00
6+600.00 119.28 B-3 6.20 0.1 0.50 0.12 0.38 0.38 0.00 45.33 0.00
6+620.00 108.43 B-3 6.20 0.1 0.52 0.12 0.40 0.40 0.00 43.37 0.00
6+640.00 100.73 B-3 6.20 0.1 0.54 0.12 0.42 0.42 0.00 42.31 0.00
10+700.00 44.35 B-4 11.00 0.1 0.40 0.12 0.28 0.28 0.00 12.42 0.00
10+860.00 8.70 B-4 11.00 0.1 0.24 0.12 0.12 0.12 0.00 1.04 0.00
11+380.00 24.60 B-4 11.00 0.1 0.48 0.12 0.36 0.36 0.00 8.86 0.00
11+400.00 42.10 B-4 11.00 0.1 0.50 0.12 0.38 0.38 0.00 16.00 0.00
11+420.00 34.10 B-4 11.00 0.1 0.52 0.12 0.40 0.40 0.00 13.64 0.00
11+440.00 43.60 B-4 11.00 0.1 0.54 0.12 0.42 0.42 0.00 18.31 0.00
11+460.00 61.60 B-4 11.00 0.1 0.56 0.12 0.44 0.44 0.00 27.10 0.00
11+480.00 50.20 B-4 11.00 0.1 0.58 0.12 0.46 0.46 0.00 23.09 0.00
11+500.00 198.70 B-4 11.00 0.1 0.60 0.12 0.48 0.48 0.00 95.38 0.00
11+520.00 255.30 B-4 11.00 0.1 0.62 0.12 0.50 0.50 0.00 127.65 0.00
11+540.00 141.80 B-4 11.00 0.1 0.64 0.12 0.52 0.52 0.00 73.74 0.00
11+560.00 148.40 B-4 11.00 0.1 0.66 0.12 0.54 0.54 0.00 80.14 0.00
11+580.00 154.60 B-4 11.00 0.1 0.68 0.12 0.56 0.56 0.00 86.58 0.00
11+600.00 138.90 B-4 11.00 0.1 0.70 0.12 0.58 0.58 0.00 80.56 0.00
11+620.00 140.30 B-4 11.00 0.1 0.72 0.12 0.60 0.60 0.00 84.18 0.00
11+640.00 144.90 B-4 11.00 0.1 0.74 0.12 0.62 0.62 0.00 89.84 0.00
11+660.00 136.80 B-4 11.00 0.1 0.76 0.12 0.64 0.64 0.00 87.55 0.00
11+680.00 140.70 B-4 11.00 0.1 0.78 0.12 0.66 0.66 0.00 92.86 0.00
11+700.00 158.60 B-4 11.00 0.1 0.80 0.12 0.68 0.68 0.00 107.85 0.00
11+720.00 147.70 B-4 11.00 0.1 0.82 0.12 0.70 0.70 0.00 103.39 0.00
11+740.00 128.80 B-4 11.00 0.1 0.84 0.12 0.72 0.72 0.00 92.74 0.00
11+760.00 131.80 B-4 11.00 0.1 0.86 0.12 0.74 0.74 0.00 97.53 0.00
11+780.00 127.50 B-4 11.00 0.1 0.88 0.12 0.76 0.76 0.00 96.90 0.00
11+800.00 123.00 B-4 11.00 0.1 0.90 0.12 0.78 0.78 0.00 95.94 0.00
11+820.00 124.90 B-4 11.00 0.1 0.92 0.12 0.80 0.80 0.00 99.92 0.00
11+840.00 127.30 B-4 11.00 0.1 0.94 0.12 0.82 0.82 0.00 104.39 0.00
11+860.00 124.30 B-4 11.00 0.1 0.96 0.12 0.84 0.84 0.00 104.41 0.00
11+880.00 129.80 B-4 11.00 0.1 0.98 0.12 0.86 0.86 0.00 111.63 0.00
11+900.00 132.80 B-4 11.00 0.1 1.00 0.12 0.88 0.88 0.00 116.86 0.00
11+920.00 122.30 B-4 11.00 0.1 1.02 0.12 0.90 0.90 0.00 110.07 0.00
11+940.00 123.20 B-4 11.00 0.1 1.04 0.12 0.92 0.92 0.00 113.34 0.00
Excedente (m3)
Obra: MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE SAN PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA
Lugar: PAMPALCA - CARHUANCHO - CCACCENA
Fecha: SETIEMBRE DEL 2012
TRANSPORTE DE MATERIAL EXCEDENTE A ELIMINAR
TRANSPORTE DE ESCOMBROS D<1KM 9,215.74 M3-KM
TRANSPORTE DE ESCOMBROS D>1KM 1,794.99 M3-KM
Estaca
BOTADERO DISTANCIA DE TRANSPORTE TRANSPORTE
TIPOCódigo
C.G. Acceso Dist. Total Libre Dist. Valorizada D<1 km D>1 km D<1km D>1Km
(Km) (Km) (Km) (Km) (Km) (Km) (Km) m3-km m3-km
Excedente (m3)
11+960.00 125.40 B-4 11.00 0.1 1.06 0.12 0.94 0.94 0.00 117.88 0.00
11+980.00 118.90 B-4 11.00 0.1 1.08 0.12 0.96 0.96 0.00 114.14 0.00
12+000.00 424.80 B-4 11.00 0.1 1.10 0.12 0.98 0.98 0.00 416.30 0.00
12+020.00 464.60 B-4 11.00 0.1 1.12 0.12 1.00 1.00 0.00 464.60 0.00
12+040.00 188.60 B-4 11.00 0.1 1.14 0.12 1.02 1.00 0.02 188.60 3.77
12+060.00 183.90 B-4 11.00 0.1 1.16 0.12 1.04 1.00 0.04 183.90 7.36
12+080.00 186.30 B-4 11.00 0.1 1.18 0.12 1.06 1.00 0.06 186.30 11.18
12+100.00 185.00 B-4 11.00 0.1 1.20 0.12 1.08 1.00 0.08 185.00 14.80
12+120.00 188.70 B-4 11.00 0.1 1.22 0.12 1.10 1.00 0.10 188.70 18.87
12+140.00 151.50 B-4 11.00 0.1 1.24 0.12 1.12 1.00 0.12 151.50 18.18
12+160.00 106.10 B-4 11.00 0.1 1.26 0.12 1.14 1.00 0.14 106.10 14.85
12+180.00 109.50 B-4 11.00 0.1 1.28 0.12 1.16 1.00 0.16 109.50 17.52
12+200.00 112.60 B-4 11.00 0.1 1.30 0.12 1.18 1.00 0.18 112.60 20.27
12+220.00 107.80 B-4 11.00 0.1 1.32 0.12 1.20 1.00 0.20 107.80 21.56
12+240.00 109.00 B-4 11.00 0.1 1.34 0.12 1.22 1.00 0.22 109.00 23.98
12+260.00 111.60 B-4 11.00 0.1 1.36 0.12 1.24 1.00 0.24 111.60 26.78
12+280.00 110.70 B-4 11.00 0.1 1.38 0.12 1.26 1.00 0.26 110.70 28.78
12+300.00 118.40 B-4 11.00 0.1 1.40 0.12 1.28 1.00 0.28 118.40 33.15
12+320.00 151.20 B-4 11.00 0.1 1.42 0.12 1.30 1.00 0.30 151.20 45.36
12+340.00 178.30 B-4 11.00 0.1 1.44 0.12 1.32 1.00 0.32 178.30 57.06
12+360.00 162.50 B-4 11.00 0.1 1.46 0.12 1.34 1.00 0.34 162.50 55.25
12+380.00 154.10 B-4 11.00 0.1 1.48 0.12 1.36 1.00 0.36 154.10 55.48
12+400.00 153.40 B-4 11.00 0.1 1.50 0.12 1.38 1.00 0.38 153.40 58.29
12+420.00 135.00 B-4 11.00 0.1 1.52 0.12 1.40 1.00 0.40 135.00 54.00
12+440.00 133.40 B-4 11.00 0.1 1.54 0.12 1.42 1.00 0.42 133.40 56.03
12+460.00 135.00 B-4 11.00 0.1 1.56 0.12 1.44 1.00 0.44 135.00 59.40
12+480.00 126.30 B-4 11.00 0.1 1.58 0.12 1.46 1.00 0.46 126.30 58.10
12+500.00 463.80 B-4 11.00 0.1 1.60 0.12 1.48 1.00 0.48 463.80 222.62
12+520.00 476.40 B-4 11.00 0.1 1.62 0.12 1.50 1.00 0.50 476.40 238.20
12+540.00 136.60 B-4 11.00 0.1 1.64 0.12 1.52 1.00 0.52 136.60 71.03
12+560.00 132.40 B-4 11.00 0.1 1.66 0.12 1.54 1.00 0.54 132.40 71.50
12+580.00 126.20 B-4 11.00 0.1 1.68 0.12 1.56 1.00 0.56 126.20 70.67
12+600.00 112.10 B-4 11.00 0.1 1.70 0.12 1.58 1.00 0.58 112.10 65.02
12+620.00 111.80 B-4 11.00 0.1 1.72 0.12 1.60 1.00 0.60 111.80 67.08
16+960.00 67.25 B-5 17.00 0.1 0.14 0.12 0.02 0.02 0.00 1.34 0.00
17+340.00 66.90 B-5 17.00 0.1 0.44 0.12 0.32 0.32 0.00 21.41 0.00
18+120.00 27.05 B-5 17.00 0.1 1.22 0.12 1.10 1.00 0.10 27.05 2.71
18+340.00 2.30 B-5 17.00 0.1 1.44 0.12 1.32 1.00 0.32 2.30 0.74
13,247.51 9,215.74 1,794.99
Volumen de material a eliminar a botaderos 13,247.51 m3
Transporte menor de 1 Km 9,215.74 m3-km
Transporte mayor de 1 Km 1,794.99 m3-km
Volumen material de alcantarillas considerado mayor de 1 km 765.10 m3
Distancia media 0.83 Km.
Notas:
1.- El cálculo para el transporte de escombros se ha realizado teniendo en cuenta su especificación técnica, la cual esta incluida en las Especificaciones para
Caminos no pavimentados de bajo volumen de tránsito.
2.- En los títulos de las columnas y demás palabras en color azul se deben ingresar los datos obtenidos de campo y del análisis de los escombros a eliminar.
3.- Notese que en la parte final, se incluye el transporte de escombros de obras de arte.
4.- El cuadro ubicado en la parte superior derecha, corresponde a la ubicación de los botaderos y control para evitar superar la capacidad del depósito.
5.- es obvio, que se tiene que buscar la menor distancia de transporte del escombro hacia el botadero, siempre que la capacidad de este último lo permita.
EXPLANACIONES