Obra: Lugar: PAMPALCA - CARHUANCHO - CCACCENA Fecha: SETIEMBRE DEL 2012 METRADO TRANSPORTE 06 TRANSPORTE 06.01 TRANSPORTE DE MATERIAL EXCEDENTE <=1KM 9,215.74 06.02 TRANSPORTE DE MATERIAL EXCEDENTE >=1KM 2,560.09 MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA

description

edu

Transcript of Tranport Es

Page 1: Tranport Es

Obra:

Lugar: PAMPALCA - CARHUANCHO - CCACCENAFecha: SETIEMBRE DEL 2012

METRADO TRANSPORTE

06 TRANSPORTE

06.01 TRANSPORTE DE MATERIAL EXCEDENTE <=1KM 9,215.74 M3K

06.02 TRANSPORTE DE MATERIAL EXCEDENTE >=1KM 2,560.09 M3K

MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE SAN PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA

Page 2: Tranport Es

Obra: MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE SAN PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA

Lugar: PAMPALCA - CARHUANCHO - CCACCENA

Fecha: SETIEMBRE DEL 2012

TRANSPORTE DE MATERIAL EXCEDENTE A ELIMINAR

TRANSPORTE DE ESCOMBROS D<1KM 9,215.74 M3-KM

TRANSPORTE DE ESCOMBROS D>1KM 1,794.99 M3-KM

Estaca

BOTADERO DISTANCIA DE TRANSPORTE TRANSPORTE

TIPOCódigo

C.G. Acceso Dist. Total Libre Dist. Valorizada D<1 km D>1 km D<1km D>1Km

(Km) (Km) (Km) (Km) (Km) (Km) (Km) m3-km m3-km

1+400.00 33.00 B-1 0.00 0.1 1.50 0.12 1.38 1.00 0.38 33.00 12.54

3+700.00 41.05 B-2 4.00 0.1 0.40 0.12 0.28 0.28 0.00 11.49 0.00

4+260.00 54.70 B-2 4.00 0.1 0.36 0.12 0.24 0.24 0.00 13.13 0.00

4+480.00 57.20 B-2 4.00 0.1 0.58 0.12 0.46 0.46 0.00 26.31 0.00

5+940.00 36.75 B-4 11.00 0.1 5.16 0.12 5.04 1.00 4.04 36.75 148.47

5+960.00 34.55 B-2 4.00 0.1 2.06 0.12 1.94 1.00 0.94 34.55 32.48

5+980.00 33.25 B-2 4.00 0.1 2.08 0.12 1.96 1.00 0.96 33.25 31.92

6+000.00 126.65 B-3 6.20 0.1 0.30 0.12 0.18 0.18 0.00 22.80 0.00

6+020.00 129.20 B-3 6.20 0.1 0.28 0.12 0.16 0.16 0.00 20.67 0.00

6+040.00 36.40 B-3 6.20 0.1 0.26 0.12 0.14 0.14 0.00 5.10 0.00

6+060.00 38.20 B-3 6.20 0.1 0.24 0.12 0.12 0.12 0.00 4.58 0.00

6+080.00 40.10 B-3 6.20 0.1 0.22 0.12 0.10 0.10 0.00 4.01 0.00

6+100.00 38.85 B-3 6.20 0.1 0.20 0.12 0.08 0.08 0.00 3.11 0.00

6+120.00 40.60 B-3 6.20 0.1 0.18 0.12 0.06 0.06 0.00 2.44 0.00

6+140.00 47.90 B-3 6.20 0.1 0.16 0.12 0.04 0.04 0.00 1.92 0.00

6+160.00 46.30 B-3 6.20 0.1 0.14 0.12 0.02 0.02 0.00 0.93 0.00

6+180.00 59.00 B-3 6.20 0.1 0.12 0.12 0.00 0.00 0.00 0.00 0.00

6+200.00 82.45 B-3 6.20 0.1 0.10 0.12 0.00 0.00 0.00 0.00 0.00

6+220.00 83.45 B-3 6.20 0.1 0.12 0.12 0.00 0.00 0.00 0.00 0.00

6+240.00 78.45 B-3 6.20 0.1 0.14 0.12 0.02 0.02 0.00 1.57 0.00

6+260.00 130.48 B-3 6.20 0.1 0.16 0.12 0.04 0.04 0.00 5.22 0.00

6+280.00 152.04 B-3 6.20 0.1 0.18 0.12 0.06 0.06 0.00 9.12 0.00

6+300.00 149.03 B-3 6.20 0.1 0.20 0.12 0.08 0.08 0.00 11.92 0.00

6+320.00 107.03 B-3 6.20 0.1 0.22 0.12 0.10 0.10 0.00 10.70 0.00

6+340.00 73.99 B-3 6.20 0.1 0.24 0.12 0.12 0.12 0.00 8.88 0.00

6+360.00 71.75 B-3 6.20 0.1 0.26 0.12 0.14 0.14 0.00 10.05 0.00

6+380.00 59.99 B-3 6.20 0.1 0.28 0.12 0.16 0.16 0.00 9.60 0.00

6+400.00 59.85 B-3 6.20 0.1 0.30 0.12 0.18 0.18 0.00 10.77 0.00

6+420.00 58.45 B-3 6.20 0.1 0.32 0.12 0.20 0.20 0.00 11.69 0.00

6+440.00 52.85 B-3 6.20 0.1 0.34 0.12 0.22 0.22 0.00 11.63 0.00

6+460.00 53.76 B-3 6.20 0.1 0.36 0.12 0.24 0.24 0.00 12.90 0.00

6+480.00 70.21 B-3 6.20 0.1 0.38 0.12 0.26 0.26 0.00 18.25 0.00

6+500.00 294.14 B-3 6.20 0.1 0.40 0.12 0.28 0.28 0.00 82.36 0.00

6+520.00 310.59 B-3 6.20 0.1 0.42 0.12 0.30 0.30 0.00 93.18 0.00

6+540.00 123.27 B-3 6.20 0.1 0.44 0.12 0.32 0.32 0.00 39.45 0.00

6+560.00 123.27 B-3 6.20 0.1 0.46 0.12 0.34 0.34 0.00 41.91 0.00

6+580.00 123.27 B-3 6.20 0.1 0.48 0.12 0.36 0.36 0.00 44.38 0.00

6+600.00 119.28 B-3 6.20 0.1 0.50 0.12 0.38 0.38 0.00 45.33 0.00

6+620.00 108.43 B-3 6.20 0.1 0.52 0.12 0.40 0.40 0.00 43.37 0.00

6+640.00 100.73 B-3 6.20 0.1 0.54 0.12 0.42 0.42 0.00 42.31 0.00

10+700.00 44.35 B-4 11.00 0.1 0.40 0.12 0.28 0.28 0.00 12.42 0.00

10+860.00 8.70 B-4 11.00 0.1 0.24 0.12 0.12 0.12 0.00 1.04 0.00

11+380.00 24.60 B-4 11.00 0.1 0.48 0.12 0.36 0.36 0.00 8.86 0.00

11+400.00 42.10 B-4 11.00 0.1 0.50 0.12 0.38 0.38 0.00 16.00 0.00

11+420.00 34.10 B-4 11.00 0.1 0.52 0.12 0.40 0.40 0.00 13.64 0.00

11+440.00 43.60 B-4 11.00 0.1 0.54 0.12 0.42 0.42 0.00 18.31 0.00

11+460.00 61.60 B-4 11.00 0.1 0.56 0.12 0.44 0.44 0.00 27.10 0.00

11+480.00 50.20 B-4 11.00 0.1 0.58 0.12 0.46 0.46 0.00 23.09 0.00

11+500.00 198.70 B-4 11.00 0.1 0.60 0.12 0.48 0.48 0.00 95.38 0.00

11+520.00 255.30 B-4 11.00 0.1 0.62 0.12 0.50 0.50 0.00 127.65 0.00

11+540.00 141.80 B-4 11.00 0.1 0.64 0.12 0.52 0.52 0.00 73.74 0.00

11+560.00 148.40 B-4 11.00 0.1 0.66 0.12 0.54 0.54 0.00 80.14 0.00

11+580.00 154.60 B-4 11.00 0.1 0.68 0.12 0.56 0.56 0.00 86.58 0.00

11+600.00 138.90 B-4 11.00 0.1 0.70 0.12 0.58 0.58 0.00 80.56 0.00

11+620.00 140.30 B-4 11.00 0.1 0.72 0.12 0.60 0.60 0.00 84.18 0.00

11+640.00 144.90 B-4 11.00 0.1 0.74 0.12 0.62 0.62 0.00 89.84 0.00

11+660.00 136.80 B-4 11.00 0.1 0.76 0.12 0.64 0.64 0.00 87.55 0.00

11+680.00 140.70 B-4 11.00 0.1 0.78 0.12 0.66 0.66 0.00 92.86 0.00

11+700.00 158.60 B-4 11.00 0.1 0.80 0.12 0.68 0.68 0.00 107.85 0.00

11+720.00 147.70 B-4 11.00 0.1 0.82 0.12 0.70 0.70 0.00 103.39 0.00

11+740.00 128.80 B-4 11.00 0.1 0.84 0.12 0.72 0.72 0.00 92.74 0.00

11+760.00 131.80 B-4 11.00 0.1 0.86 0.12 0.74 0.74 0.00 97.53 0.00

11+780.00 127.50 B-4 11.00 0.1 0.88 0.12 0.76 0.76 0.00 96.90 0.00

11+800.00 123.00 B-4 11.00 0.1 0.90 0.12 0.78 0.78 0.00 95.94 0.00

11+820.00 124.90 B-4 11.00 0.1 0.92 0.12 0.80 0.80 0.00 99.92 0.00

11+840.00 127.30 B-4 11.00 0.1 0.94 0.12 0.82 0.82 0.00 104.39 0.00

11+860.00 124.30 B-4 11.00 0.1 0.96 0.12 0.84 0.84 0.00 104.41 0.00

11+880.00 129.80 B-4 11.00 0.1 0.98 0.12 0.86 0.86 0.00 111.63 0.00

11+900.00 132.80 B-4 11.00 0.1 1.00 0.12 0.88 0.88 0.00 116.86 0.00

11+920.00 122.30 B-4 11.00 0.1 1.02 0.12 0.90 0.90 0.00 110.07 0.00

11+940.00 123.20 B-4 11.00 0.1 1.04 0.12 0.92 0.92 0.00 113.34 0.00

Excedente (m3)

Page 3: Tranport Es

Obra: MEJORAMIENTO DE LA CARRETERA: PAMPALCA – CARHUANCHO – CCACCENA, DISTRITO DE SAN PEDRO DE CORIS – CHURCAMPA - HUANCAVELICA

Lugar: PAMPALCA - CARHUANCHO - CCACCENA

Fecha: SETIEMBRE DEL 2012

TRANSPORTE DE MATERIAL EXCEDENTE A ELIMINAR

TRANSPORTE DE ESCOMBROS D<1KM 9,215.74 M3-KM

TRANSPORTE DE ESCOMBROS D>1KM 1,794.99 M3-KM

Estaca

BOTADERO DISTANCIA DE TRANSPORTE TRANSPORTE

TIPOCódigo

C.G. Acceso Dist. Total Libre Dist. Valorizada D<1 km D>1 km D<1km D>1Km

(Km) (Km) (Km) (Km) (Km) (Km) (Km) m3-km m3-km

Excedente (m3)

11+960.00 125.40 B-4 11.00 0.1 1.06 0.12 0.94 0.94 0.00 117.88 0.00

11+980.00 118.90 B-4 11.00 0.1 1.08 0.12 0.96 0.96 0.00 114.14 0.00

12+000.00 424.80 B-4 11.00 0.1 1.10 0.12 0.98 0.98 0.00 416.30 0.00

12+020.00 464.60 B-4 11.00 0.1 1.12 0.12 1.00 1.00 0.00 464.60 0.00

12+040.00 188.60 B-4 11.00 0.1 1.14 0.12 1.02 1.00 0.02 188.60 3.77

12+060.00 183.90 B-4 11.00 0.1 1.16 0.12 1.04 1.00 0.04 183.90 7.36

12+080.00 186.30 B-4 11.00 0.1 1.18 0.12 1.06 1.00 0.06 186.30 11.18

12+100.00 185.00 B-4 11.00 0.1 1.20 0.12 1.08 1.00 0.08 185.00 14.80

12+120.00 188.70 B-4 11.00 0.1 1.22 0.12 1.10 1.00 0.10 188.70 18.87

12+140.00 151.50 B-4 11.00 0.1 1.24 0.12 1.12 1.00 0.12 151.50 18.18

12+160.00 106.10 B-4 11.00 0.1 1.26 0.12 1.14 1.00 0.14 106.10 14.85

12+180.00 109.50 B-4 11.00 0.1 1.28 0.12 1.16 1.00 0.16 109.50 17.52

12+200.00 112.60 B-4 11.00 0.1 1.30 0.12 1.18 1.00 0.18 112.60 20.27

12+220.00 107.80 B-4 11.00 0.1 1.32 0.12 1.20 1.00 0.20 107.80 21.56

12+240.00 109.00 B-4 11.00 0.1 1.34 0.12 1.22 1.00 0.22 109.00 23.98

12+260.00 111.60 B-4 11.00 0.1 1.36 0.12 1.24 1.00 0.24 111.60 26.78

12+280.00 110.70 B-4 11.00 0.1 1.38 0.12 1.26 1.00 0.26 110.70 28.78

12+300.00 118.40 B-4 11.00 0.1 1.40 0.12 1.28 1.00 0.28 118.40 33.15

12+320.00 151.20 B-4 11.00 0.1 1.42 0.12 1.30 1.00 0.30 151.20 45.36

12+340.00 178.30 B-4 11.00 0.1 1.44 0.12 1.32 1.00 0.32 178.30 57.06

12+360.00 162.50 B-4 11.00 0.1 1.46 0.12 1.34 1.00 0.34 162.50 55.25

12+380.00 154.10 B-4 11.00 0.1 1.48 0.12 1.36 1.00 0.36 154.10 55.48

12+400.00 153.40 B-4 11.00 0.1 1.50 0.12 1.38 1.00 0.38 153.40 58.29

12+420.00 135.00 B-4 11.00 0.1 1.52 0.12 1.40 1.00 0.40 135.00 54.00

12+440.00 133.40 B-4 11.00 0.1 1.54 0.12 1.42 1.00 0.42 133.40 56.03

12+460.00 135.00 B-4 11.00 0.1 1.56 0.12 1.44 1.00 0.44 135.00 59.40

12+480.00 126.30 B-4 11.00 0.1 1.58 0.12 1.46 1.00 0.46 126.30 58.10

12+500.00 463.80 B-4 11.00 0.1 1.60 0.12 1.48 1.00 0.48 463.80 222.62

12+520.00 476.40 B-4 11.00 0.1 1.62 0.12 1.50 1.00 0.50 476.40 238.20

12+540.00 136.60 B-4 11.00 0.1 1.64 0.12 1.52 1.00 0.52 136.60 71.03

12+560.00 132.40 B-4 11.00 0.1 1.66 0.12 1.54 1.00 0.54 132.40 71.50

12+580.00 126.20 B-4 11.00 0.1 1.68 0.12 1.56 1.00 0.56 126.20 70.67

12+600.00 112.10 B-4 11.00 0.1 1.70 0.12 1.58 1.00 0.58 112.10 65.02

12+620.00 111.80 B-4 11.00 0.1 1.72 0.12 1.60 1.00 0.60 111.80 67.08

16+960.00 67.25 B-5 17.00 0.1 0.14 0.12 0.02 0.02 0.00 1.34 0.00

17+340.00 66.90 B-5 17.00 0.1 0.44 0.12 0.32 0.32 0.00 21.41 0.00

18+120.00 27.05 B-5 17.00 0.1 1.22 0.12 1.10 1.00 0.10 27.05 2.71

18+340.00 2.30 B-5 17.00 0.1 1.44 0.12 1.32 1.00 0.32 2.30 0.74

13,247.51 9,215.74 1,794.99

Volumen de material a eliminar a botaderos 13,247.51 m3

Transporte menor de 1 Km 9,215.74 m3-km

Transporte mayor de 1 Km 1,794.99 m3-km

Volumen material de alcantarillas considerado mayor de 1 km 765.10 m3

Distancia media 0.83 Km.

Notas:

1.- El cálculo para el transporte de escombros se ha realizado teniendo en cuenta su especificación técnica, la cual esta incluida en las Especificaciones para

Caminos no pavimentados de bajo volumen de tránsito.

2.- En los títulos de las columnas y demás palabras en color azul se deben ingresar los datos obtenidos de campo y del análisis de los escombros a eliminar.

3.- Notese que en la parte final, se incluye el transporte de escombros de obras de arte.

4.- El cuadro ubicado en la parte superior derecha, corresponde a la ubicación de los botaderos y control para evitar superar la capacidad del depósito.

5.- es obvio, que se tiene que buscar la menor distancia de transporte del escombro hacia el botadero, siempre que la capacidad de este último lo permita.

EXPLANACIONES