TRA-AR-XX
-
Upload
isaac-mejia -
Category
Documents
-
view
5 -
download
1
description
Transcript of TRA-AR-XX
FormatoTRANSMITTAL - PROYECTO 25635 LAS BAMBAS
To: / Para:Overseas Bechtel Inc. Sucursal del PerDate:17-Jun-15Romn Reynoso Crispn / Evelin Rodrguez PeaDocument ControlTransmittal N:Email:[email protected] / [email protected] N:25635-220-HC1-VA30-00001Project:Las BambasTransmitted here with are: / Estamos transmitiendo los siguientes documentos para revisin y aprobacinCantidad de documentos:
ItemTNC Document NClient Document NDescription/ DescripcinRevDatePages1FBB-AMK-04125635-220-V11-VA30-00217IDENTIFICACIN Y EVALUACIN DE REQUISITOS LEGALES35/7/15932INFORME N001 HSE ARAMARK - BECHTEL - LAS BAMBAS 201525635-220-V11-VA30-00355INFORME DE CIERRE DE SEGURIDAD Y SALUD OCUPACIONAL26/14/15333PBB-AMK-01725635-220-V11-VA30-00229ALMACENAMIENTO Y MANIPULACIN DE PRODUCTOS QUMICOS212/20/14214
Please acknowledge receipt of the above documents by signing below and returning one copy of this transmittal form to TNC/ Por favor, acuso recibo de los documentos mencionados arriba, firmar debajo y devolver una copia de este formulario de verificacin de TNC.
Received By:(Signature)
(Printed name)Tittle:
Date:
Sheet2
Sheet3