DE: ING. RICARDO ARMIJOS G. OBRA: TIENDA LISTO - PRIMAX 25 DE JULIO ASUNTO: COSTO DE LA SUPERESTRUCTURA FECHA. 3/22/2015 ANÁLISIS DE COSTOS DE LA ESTRUCTURA DETALLE DE ÁREAS INVOLUCRADAS. NIVELES PISO AREA TOTAL AREA DE ESCALERAS AREA DE CUBIERTA AREA DE LOSA N +3,78 P1 298.69 13.90 284.79 CUBIERTA 166.42 166.42 SUMAN: 465.11 13.90 166.42 284.79 RESUMEN DE RUBROS Y COSTOS UNITARIOS. 1. SUPERESTRUCTURA. PARA UN EDIFICIO. RENDIMIENTO CANTIDAD COSTO UNITARIO VALOR TOTAL ($) (Kg/m2) 1. CONTRATISTA METÁLICO: Perfilería de acero $ 62,300.68 1a. PERFILERÍA METÁLICA- LOSA y CUBIERTA: 29.60 13,768.42 kg 2.80 $/kg $ 38,551.58 1b. PERFILERÍA METÁLICA- COLUMNAS/PILARES/PLACAS BASE 22.49 6,403.68 kg 2.80 $/kg $ 17,930.29 1c. PERFILERÍA METÁLICA- PANTALLA 975.37 kg 2.80 $/kg $ 2,731.03 1d. PERFILERÍA METÁLICA- ESCALERAS 9.38 731.12 kg 3.60 $/kg $ 2,632.03 1e. ACERO-ESPIGAS 0.45 207.16 kg 2.20 $/kg $ 455.75 2. CONTRATISTA METÁLICO: Steel Deck + Conectores+ Malla Elec. $ 4,900.16 2a. STEEL PANEL DE PISO. e=0.76mm. 123.00 m2 15.00 $/m2 $ 1,845.05 2a. STEEL PANEL DE Cubierta e=0.45mm. 166.44 m2 12.00 $/m2 $ 1,997.28 2b. CONECTORES DE CORTE EN VIGAS: 123.00 m2 3.60 $/m2 $ 442.81 123.00 m2 5.00 $/m2 $ 615.02 3. OBRA CIVIL: Acero de Refuerzo + Volumen de Hormigón $ 5,742.25 1.00 kg/m2 284.79 kg 2.20 $/kg $ 626.54 3d. HORMIGÓN EN LOSAS, fc=240kg/cm2: 0.100 m3/m2 28.48 m3 130.00 $/m3 $ 3,702.27 3e. HORMIGÓN EN ESCALERAS, fc=210kg/cm2: 0.080 m3/m2 1.11 m3 120.00 $/m3 $ 133.44 3g. HORMIGÓN EN COLUMNAS, fc=280kg/cm2: Piedra 1/2". Rev.=15cm 8.00 m3 160.00 $/m3 $ 1,280.00 1. COSTO SUPERESTRUCTURA: $ 72,943.09 Suman: 22,085.74 kg Notas: Los costos unitarios de los itemes 1 y 2 serán revisados por el contratista metálico. Los costos unitarios del ítem 3 deberá ser revisado por el contratista general. El costo es determinado a partir de la placa de anclaje hacia arriba. 2c. MALLA ELECTROSOLDADA Ø5.5 C/150/150mm 3b. ACERO DE REFUERZO NEGATIVO EN LOSAS: Ø10c/0.30

description

ANÁLISIS DE PESOS

Transcript of Tiendas Listo Plaza Dañin 60may2015

PPTODE:ING. RICARDO ARMIJOS G.OBRA:TIENDA LISTO - PRIMAX 25 DE JULIOASUNTO:COSTO DE LA SUPERESTRUCTURA FECHA.3/22/15

ANLISIS DE COSTOS DE LA ESTRUCTURA

DETALLE DE REAS INVOLUCRADAS.

NIVELESPISOAREA TOTALAREA DE ESCALERASAREA DE CUBIERTAAREA DE LOSA

N +3,78P1298.6913.90284.79

CUBIERTA166.42166.42

SUMAN:465.1113.90166.42284.79

PARQUEOS

AREA TOTALAREA DE ESCALERASPISO/NIVEL (m) (m)

N+0.00Cimentacin:217.740N+3.201ra planta:188.860N+6.40Losa de cubierta:90.950

SUMAN:497.55

INGRESO

AREA TOTALAREA DE ESCALERASPISO/NIVEL (m) (m)

N+0.00Cimentacin:24.0180N+3.20Cubierta:155.960

SUMAN:179.98

RESUMEN DE RUBROS Y COSTOS UNITARIOS.

1. SUPERESTRUCTURA. PARA UN EDIFICIO.RENDIMIENTOCANTIDADCOSTO UNITARIOVALORTOTAL ($)(Kg/m2) 1. CONTRATISTA METLICO: Perfilera de acero $ 62,300.68

1a. PERFILERA METLICA- LOSA y CUBIERTA: 29.6013,768.42 kg2.80 $/kg$ 38,551.58 1b. PERFILERA METLICA- COLUMNAS/PILARES/PLACAS BASE 22.496,403.68 kg2.80 $/kg$ 17,930.29 1c. PERFILERA METLICA- PANTALLA975.37 kg2.80 $/kg$ 2,731.03 1d. PERFILERA METLICA- ESCALERAS9.38731.12 kg3.60 $/kg$ 2,632.03 1e. ACERO-ESPIGAS 0.45207.16 kg2.20 $/kg$ 455.75

2. CONTRATISTA METLICO: Steel Deck + Conectores+ Malla Elec. $ 4,900.16 2a. STEEL PANEL DE PISO. e=0.76mm. 123.00 m215.00 $/m2$ 1,845.05 2a. STEEL PANEL DE Cubierta e=0.45mm. 166.44 m212.00 $/m2$ 1,997.28 2b. CONECTORES DE CORTE EN VIGAS: 123.00 m23.60 $/m2$ 442.81 2c. MALLA ELECTROSOLDADA 5.5 C/150/150mm123.00 m25.00 $/m2$ 615.02

3. OBRA CIVIL: Acero de Refuerzo + Volumen de Hormign$ 5,742.25 3b. ACERO DE REFUERZO NEGATIVO EN LOSAS: 10c/0.301.00 kg/m2284.79 kg2.20 $/kg$ 626.54

3d. HORMIGN EN LOSAS, fc=240kg/cm2: 0.100 m3/m228.48 m3130.00 $/m3$ 3,702.27 3e. HORMIGN EN ESCALERAS, fc=210kg/cm2: 0.080 m3/m21.11 m3120.00 $/m3$ 133.44

3g. HORMIGN EN COLUMNAS, fc=280kg/cm2: Piedra 1/2". Rev.=15cm 8.00 m3160.00 $/m3$ 1,280.001. COSTO SUPERESTRUCTURA: $ 72,943.09

Suman:22,085.74 kg

Notas:Los costos unitarios de los itemes 1 y 2 sern revisados por el contratista metlico.Los costos unitarios del tem 3 deber ser revisado por el contratista general.

El costo es determinado a partir de la placa de anclaje hacia arriba.

L VIGASTIENDA LISTO PLANTA ALTAVY2LONGITUDVLY/VLXLONGITUDVX1LONGITUDVSLONGITUDVXLONGITUDVYLONGITUDVY1LONGITUD112.912.88218857.3616.318.85229.6114.813.4512.9417.1599.532118.529.117.1524.3617.15182111.211.218.517.116.300000000959.350227.71115.8321835116.9618.85229.6

LOSAS OBRA: TIENDA LISTO - 25 DE JULIODE: ING. RICARDO ARMIJOS GALARZA.ASUNTO: CANTIDADES DE MATERIALESFECHA:MARZO 2015.

LISTADO DE MATERIALESLOSA PLANTA ALTANOMBREANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTmmmmmmKG(U)KGVXPATINFL150X10X600070.65ASTM A3618.01,271.7010VIGAS52.2017.40PATINALMAFL400X6X6000113.04ASTM A369.01,017.368.70ALMAATFL60X6X600016.96ASTM A363.050.87ATIESADORES2.67ATPCFL400X6X6000113.04ASTM A360.4045.22PLACA DE CORTANTE0.33PCRFL20X6X60005.65ASTM A360.703.96PT RESPALDO0.63PRVYPATINFL150X10X600070.65ASTM A3614.00989.105VIGAS40.0013.33PATINALMAFL500X8X6000188.40ASTM A367.01,318.806.67ALMAATFL60X6X600016.96ASTM A362.033.91ATIESADORES1.67ATPCFL500X8X6000188.40ASTM A360.2037.68PLACA DE CORTANTE0.17PCRFL20X6X60005.65ASTM A360.402.26PT RESPALDO0.32PRVX1-VY1PATINFL240X12X6000135.65ASTM A366.00813.892VIGAS17.205.73PATINALMAFL600X8X6000226.08ASTM A363.0678.242.87ALMAATFL100X10X600047.10ASTM A360.837.68ATIESADORES0.80ATPCFL600X8X6000226.08ASTM A360.1022.61PLACA DE CORTANTE0.07PCRFL20X6X60005.65ASTM A360.201.13PT RESPALDO0.19PRVX2- CAJONPATINFL200X10X600094.20ASTM A362.50235.501VIGAS6.50ALMAFL450X6X6000127.17ASTM A362.5317.93VS1- VN-VBPATINFL120X6X600033.91ASTM A3635.001,186.9225VIGAS102.5634.19PATINALMAFL350X4X600065.94ASTM A3617.501,153.9517.09ALMAATFL50X5X600011.78ASTM A366.070.65ATIESADORES5.83ATL50X50X4FL100X4X600018.84ASTM A365.0094.20CONEXIN A CORTE5.00LVSPATINFL100X5X600023.55ASTM A3620.00471.0016VIGAS60.0020.00PATINALMAFL300X3X600042.39ASTM A3610.00423.9010.00ALMAATFL40X4X60007.54ASTM A365.037.68ATIESADORES3.20ATL50X50X4FL100X4X600018.84ASTM A365.0094.20CONEXIN A CORTE2.67LVB1-VN1PATINFL150X10X600070.65ASTM A366.00423.904VIGAS17.005.67PATINALMAFL400X6X6000113.04ASTM A363.00339.122.83ALMAATFL60X6X600016.96ASTM A361.525.43ATIESADORES1.07ATL50X50X4FL100X4X600018.84ASTM A361.1020.72CONEXIN A CORTE0.93L

SUMA11,219.50area298.69kg/m237.56

LOSA DECUBIERTANOMBREANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTmmmmmmKG(U)KGCORREASCORREASG200X50X15X2X600029.94ASTM A369.0269.46CORREASCORREASG200X50X15X3X600043.86ASTM A3612.0526.3211VIGAS30.00VCXCANALU250X60X3X600050.82ASTM A3620.01,016.404VIGAS19.00VCYCANALU250X60X3X600050.82ASTM A367.0355.742VIGAS13.50VCY1CANALU250X60X4X600076.20ASTM A365.0381.00

SUMA2,548.92area166.25kg/m215.33

COLUMNASOBRA: TIENDA LISTO - 25 DE JULIODE: ING. RICARDO ARMIJOS GALARZA.ASUNTO: CANTIDADES DE MATERIALESFECHA:MARZO 2015.

COLUMNAS

1. PLACAS DE ANCLAJE MARCAANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTMMMMMMKG(U)KGSECTOR EPB1PL600X20X50047.10ASTM A3612.00565.20PB/PPL550X15X45029.14ASTM A362.0058.29RGFL100X10X1000.79ASTM A36160.00125.60144 u PB1 / 16u PB/PTUERCAS0.40Grado 50.000.00ANILLOSPL50X5X500.098ASTM A36160.0015.70

1.764.79 kg

2. VARILLAS DE ANCLAJE

ESPESORLARGOPESO UNITCALIDAD TOTALPESO TOTMMMMKGFYKG

MV112X1200010.6544200 kg/cm20.00.00VA25X1200046.2404200 kg/cm28.0369.92(12 PLACAS * 12 VARILLAS * 0,6m) + ( 2 PLACAS * 8 VARILLAS * 0,6m)/12m2.369.92 kg

SUMAN 1+2:1,134.71 kg

1. PERFILERIA PARA LAS COLUMNAS MARCAANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTMMMMMMKG(U)KG

PT1150X150X4X6000136.59ASTM A366.0819.54CL1U300x125X8X6000201.21Fy= 50 ksi14.02,816.94COLUMNA TIPO 1: 10U4,00mCL2U350x125X10X6000273.18Fy= 50 ksi3.0819.54COLUMNA TIPO 2: 2U4.00 mMC4/CL1FL130X6X600036.74ASTM A3610.0367.38MC4/CL2FL180X6X600050.87ASTM A362.0101.74R LONGFL50X6X600014.13ASTM A3616.0226.08R BASEFL50X6X600014.13ASTM A363.042.39

5,193.61 kg

2. CONECTORES DE CORTE EN EL INTERIOR DE LAS COLUMNAS.CONECTORES DE CORTEESPESORLARGOPESO UNITCALIDAD TOTALPESO TOTMMMMKGFYKG

MC2 /CL1PT40X4X60007.54ASTM A368.060.29MC2/CL2PT40X4X60007.54ASTM A362.015.07

75.36 kg

TOTAL KG:6,403.68 kgAREA464.94 m2RELACION13.77 kg/m2

ESPIGASOBRA: TIENDA LISTO - 25 DE JULIODE: ING. RICARDO ARMIJOS GALARZA.ASUNTO: CANTIDADES DE MATERIALESFECHA:MARZO 2015.COLUMNAS PRINCIPALES CONEXIN DADO-COLUMNA METLICA (ESPIGAS)MARCAESPECIFICACIONANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTmmmmmmL=12m, KG(U)KGVARILLASA70620X1200029.5944200 kg/cm27.0207.16SUMAN 207.16 kg

ESCALERAOBRA: TIENDA LISTO - 25 DE JULIODE: ING. RICARDO ARMIJOS GALARZA.ASUNTO: CANTIDADES DE MATERIALESFECHA:MARZO 2015.LISTADO DE MATERIALESESCALERANOMBREANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTmmmmmmKG(U)KG

VEU250X50X3X600048.61ASTM A365.0243.04PELDAOU125X50X3X600030.94ASTM A367.0216.61PB ESCPL500X6X3007.07ASTM A362.0014.13VARILLASA70612X1200010.6544200 kg/cm23.537.29PT150X150X4X6000110.03ASTM A362.0220.05TOTAL731.12

RESUMEN KGOBRA: TIENDA LISTO - 25 DE JULIODE:ING. RICARDO ARMIJOS GALARZA.ASUNTO: CANTIDADES DE MATERIALESFECHA:MARZO 2015.

KGm2KG/m2DESCRIPCINMEZANINE1. VIGAS PLANTA ALTA11,219.50298.6937.56LOSA2. VIGAS CUBIERTA2,548.92166.2515.33LOSA3. COLUMNAS Y PLACAS6,403.68464.9413.77COL4. ESPIGAS207.16464.940.45ESP5. ESCALERA 731.1213.9052.60ESC6. PANTALLA 975.37104.009.38PANT

PESO TOTAL. SUMAN 1+2+3+4+5:22,085.74 kg724.3130.49

PANTALLAOBRA: TIENDA LISTO - 25 DE JULIODE:ING. RICARDO ARMIJOS GALARZA.ASUNTO: CANTIDADES DE MATERIALESFECHA:MARZO 2015.LISTADO DE MATERIALESPRIMAX 25 JULIONOMBREANCHOESPESORLARGOPESO UNITCALIDAD CANTIDADPESO TOTmmmmmmKG(U)KGPANTALLA FRONTALPT SUP-INF100X100X2X600036.93ASTM A367.00258.48CUERDA SUP100X100X2X600036.93ASTM A367.00258.48CUERDA INFU150X50X2X600022.92ASTM A367.00160.44REFUERZOSU150X50X2X600022.92ASTM A3613.00297.96SUMA 1975.37TOTAL 975.37

Hoja2abheAREA mm2AREA m2VOLUMENUNIDASUMA300400710106,400.000.10640.744821.4896300400410106,400.000.10640.425672.97921502507434,364.000.0343640.24054851.202745.67154