SIAR-01-RGT-01-04e

download SIAR-01-RGT-01-04e

of 1

description

pintura industrial

Transcript of SIAR-01-RGT-01-04e

  • PROYECTO:

    REG. No.:

    FECHA DE EMISIN:

    NAME/Nombre:

    POSITION/Cargo:

    SIGNATURE/Firma:

    DATE/Fecha:

    OT / OS No.: I - 152527/01/2015

    TANQUE DE DIESEL CAP. 1000 glns.

    INFORME DE MEDICION DE ESPESORES AREA EXTERNA

    PRIMERA CAPA

    CONTRATISTA: INDUACERO CIA. LTDA.

    IAE-CORE-MEX-043 LOCACION:

    ORDEN DE COMPRA OC No.: I - 1525

    5,0 mils

    January 27, 2015 January 27, 2015 January 27, 2015

    Ing. Gustavo Poalacn Ing. Fernando Real Ing. Mg. Fredy Hidalgo

    Supervisor Control de Calidad NACE Coating Inspector Level 2

    CIP # 37562

    REVIEWED BY / Revisado por REVIEWED BY / Revisado por APPROVED BY / Aprobado por

    Area de 0 a 10 m2

    Puntos---------- 1 2 3

    EPS Primario Especific. Min. EPS 4,0 mils Mx. EPS

    3,82 mils 6,0 mils

    4 5

    1 4,9 mils 3,83 mils 4,13 mils 3,51 mils 5,9 milsEPS del primario

    Promedio de los puntos

    4,8 mils

    Area de 10 a 20 m2

    Puntos---------- 1 2 3 4

    PROMEDIO 4,8 mils 4,9 mils 4,4 mils 4,2 mils 5,6 mils

    3 4,03 mils 5,1 mils 3,3 mils 5,2 mils 5,0 mils

    2 5,6 mils 5,7 mils 5,8 mils

    5

    EPS del primario

    Promedio de los puntos

    1 3,73 mils 3,8 mils 4,86 mils 5,1 mils 6,0 mils

    2 4,28 mils

    4,7 milsPROMEDIO 4,0 mils 4,6 mils 4,1 mils 5,0 mils 5,9 mils

    4,97 mils 3,92 mils 3,98 mils 5,8 mils

    3 3,85 mils 5,0 mils 3,4 mils 5,8 mils 5,9 mils

    5,9 mils 4,7 mils

    Si Cumple Si cumple

    Primario

    Cumple Especificacion

    4,0 mils

    Si Cumple

    Evaluacion del EPS para las mediciones puntuales (MP)

    Minimo MP Mximo MP Promedio de MP