    UCG experience of ONGC

  • 8/4/2019 RK SAPRU Presentation

    2/23

    2

    For India, with 16% of global population;

    0.5% of worlds Petroleum reserve and ~10 % of worlds Coal reserve; with a

    8 -10% GDP growth target and 4.5% CAGR (97-07) in energy demand

    the situation is pretty Challenging

    India: Energy ScenarioIndia: Energy Scenario

  • 8/4/2019 RK SAPRU Presentation

    3/23

    3

    2361

    1863

    692

    518

    404322 311

    255 234 216

    USA China Russia Japan India Canada Germany France Sout h

    Korea

    UK

    _

    _

    _

    _

    __

    _

    __

    _

    _

    _

    _

    __

    _

    __

    India: Energy scenarioIndia: Energy scenario

    52% of primary energy consumed by 5 countries

    India: the 5th largest energy consumer

    CAGR (1996-2007): 4.5% (global CAGR: 2.1%)

    Source: BP Statistical Review 2008

    Primary Energy Consumption (MMToe)

    3.6% of total

  • 8/4/2019 RK SAPRU Presentation

    4/23

    4

    Indias Energy Mix

    Total 306 kgoe Total 1125 kgoe

    Source: Integrated Energy Policy, Govt. of India, Planning commission, New Delhi

    2004

    % Share of Commercial Primary Energy

    Resources

    Nuclear

    1.5%

    Hydro

    2.1%

    Coal

    51.3%

    Oil36.3%

    Natural Gas

    8.8%

    2032

    % Share of Commercial Primary Energy

    Resources

    Natural Gas

    11.9%

    Oil29.4%Coal

    50.6%

    Hydro

    2.1%Nuclear

    5.9%

  • 8/4/2019 RK SAPRU Presentation

    5/23

    5

    INDIA.

    Has the 4th largest coal

    reserves in the world (267.2

    Billion Tons)

    Ranks 3rd in coal production

    (557.6 Million TPA)

    Total Recoverable reserves are

    only about 20%

    NEED TO EXPLOIT THE UNRECOVERABLE RESERVES

  • 8/4/2019 RK SAPRU Presentation

    6/23

    6

    Underground Coal Gasification

    pilot production envisaged from 2010-11

    ONGC : In Pursuit of New Energy SourcesONGC : In Pursuit of New Energy Sources

  • 8/4/2019 RK SAPRU Presentation

    7/23

    7

    UCG Schematic

    (UCG Engineering Ltd 2006)

  • 8/4/2019 RK SAPRU Presentation

    8/23

    8

    CRIP

  • 8/4/2019 RK SAPRU Presentation

    9/23

    9

    Synergies between Oil & Gas and UCG

    Drilling

    Oil and GasOil and GasOil and Gas

    ExplorationExplorationExploration

    andandand

    ProductionProductionProduction

    UndergroundUndergroundUnderground

    coalcoalcoal

    GasificationGasificationGasification

    Intelligent wellcompletions

    Coiled-tubing techniquesOil & Natural gasProcessing

    In-situ combustion

    Pneumatic fracturingtechniques

    Compression &transportation ofNatural gas

    Exploration

  • 8/4/2019 RK SAPRU Presentation

    10/23

    10

    1st stage : Site Selection

    ONGC signed AOC - Skochinsky Institute of Mining(SIM), Russia

    MoUs signed with coal companies CIL, SCCL, NLC,GMDC, GIPCL

    Fifteen sites studied Five sites found suitable forUCG

    One site namely Vastan, in South Gujarat, prioritizedfor UCG pilot study

    This site is adjacent to the pit head Power Plant

  • 8/4/2019 RK SAPRU Presentation

    11/23

    11

    Details of VastanUCG Block

  • 8/4/2019 RK SAPRU Presentation

    12/23

    12

    2nd StageSite Characterization

    GIS data base Geomorphology, land use, drainage network

    Stratigraphic and lithological characterization Formation, sub-surface strata, coal seam and

    overburden

    Structural characterization Depth & thickness of coal seam, fault and fracturenetwork, mechanical properties , porosity &permeability of coal seam and overlying & underlyingstrata

    Hydrological characterization Aquifer system within geologic strata

    Water table map

    Hydro-dynamic characteristics of aquifers

  • 8/4/2019 RK SAPRU Presentation

    13/23

    13

    Exploration

    Drilling ofBoreholes

    GeophysicalLogging

    Hydro-geologicalstudies

    HRSS

    Geo-chemicalStudies Proximate Analysis

    Ultimate Analysis Maceral Analysis

    Petro-physical

    Studies Helium Porosity Air Permeability Relative Permeability

    Sample collection &

    Lab Studies

    Geo-mechanicalStudies Uni-axial tensile Strength Uni-axial Compressive Strength Tri-axial Compressive Strength Grain Density

    Young Modulus Poisson Ratio

    Quantum of data required for Exploration is more than that

    is required for conventional coal mining

  • 8/4/2019 RK SAPRU Presentation

    14/23

    14

    Use of Seismic as an Exploration tool vis-a- vis Borehole drilling

    F

    F

    F

    F

    V-07

    V-07

    Based on borewell data Based on HRSS data

  • 8/4/2019 RK SAPRU Presentation

    15/23

    15

    3rd stage : Engineering Design

    Engineering Design for pilot

    Parallel action - for Land Acquisition,Environmental Clearance and Mining Lease.

    Drilling - expected to commence shortly

  • 8/4/2019 RK SAPRU Presentation

    16/23

    16

    UCG Pilot Flow Diagram

    DetailedExploration

    Siteselection

    Pilot LayoutDesign

    EngineeringDesign

    MiningLease

    LandAcquisition

    Drilling of wells

    Commissioning ofSurface Facilities

    Linkage of Wells,Flame Treatment

    Trial Run ofUCG Pilot

    EnvironmentalClearance

    Fabrication,

    Erection ofSurface Facilities

  • 8/4/2019 RK SAPRU Presentation

    17/23

    17

    COMPRESSED

    AIR + STEAM

    UNDERGROUND

    COAL GASIFIER

    SYN GAS

    GAS PIPELINE GAS PIPELINE

    COOLING

    TOWER

    HEAT

    EXCHANGER

    COMBUSTION

    CHAMBER

    CONDENSATE

    PLANT

    CONDENSATE

    STORAGE

    FLUE GASES

    SCHEMATIC OF UCG PILOT

    Schematics of UCG engineering

    design

  • 8/4/2019 RK SAPRU Presentation

    18/23

    18

    UCG operations currently in progress

    MajubaMajubaMajubaJan 2007;Jan 2007;Jan 2007;

    6 MW Electricity6 MW Electricity6 MW Electricity

    ProductionProductionProduction June 2007;June 2007;June 2007;

    Planned 2100 MW by 2011Planned 2100 MW by 2011Planned 2100 MW by 2011

    ChinchillaChinchillaChinchillaAug2007;Aug2007;Aug2007;

    CTL 5CTL 5CTL 5---10 BBL/day Demo10 BBL/day Demo10 BBL/day Demo

    facility; to upgrade tofacility; to upgrade tofacility; to upgrade to

    20000 bbl/d20000 bbl/d20000 bbl/d

    AngrenAngrenAngren50 Years of Commercial50 Years of Commercial50 Years of Commercial

    UCG Operations;UCG Operations;UCG Operations;

    Electricity generationElectricity generationElectricity generation

    for 47 Yearsfor 47 Yearsfor 47 Years

    BloodwoodBloodwoodBloodwood

    creekcreekcreek---SuratSuratSurat

    BasinBasinBasin --- Nov 2008Nov 2008Nov 2008Oxygen InjectedOxygen InjectedOxygen Injected Power,Power,Power,

    Gas to Chemicals ,Gas to Chemicals ,Gas to Chemicals ,

    TransportTransportTransport fuelfuelfuel

    Inner MongoliaInner MongoliaInner Mongolia

    --- ChinaChinaChinaPilot Oct 2007Pilot Oct 2007Pilot Oct 2007 CommercialCommercialCommercial

    ---2010 Methanol & Methane2010 Methanol & Methane2010 Methanol & Methane

  • 8/4/2019 RK SAPRU Presentation

    19/23

    19

    Limited choice of operators

    Technology limited to few operators

    Grey areas

    Drilling of high angle and horizontal wells with

    intersecting vertical wells Linkage of injection and production wells

    Flame treatment of gasification passages

    Processing of hot Syngas End usage of low calorific value Syngas

  • 8/4/2019 RK SAPRU Presentation

    20/23

    20

    Legislation & mining lease

    UCG Gazette Notification issued by

    Govt. after 2 years of persuasion Another 2 years for framing

    guidelines

    Mining lease

  • 8/4/2019 RK SAPRU Presentation

    21/23

    21

    Economics

    Figures not readily available in literature

    Only indirect references are made by current

    players in the market

    Management finding it difficult to make

    investment decisions

  • 8/4/2019 RK SAPRU Presentation

    22/23

    22

    Summing up

    Quantum of data required for Exploration is moreRequire additional time for data generation

    Seismic can be used as an Exploration tool to

    optimize Borehole drilling

    Technology limited to few operators

    Capex & Opex figures not readily available in

    literature

    ONGC-GIPCL shortly testing first ever UCG pilot in

    India

  • 8/4/2019 RK SAPRU Presentation