Resumen Valorizacion Nº 04 Chilca Septiembre 2015
Transcript of Resumen Valorizacion Nº 04 Chilca Septiembre 2015
7/23/2019 Resumen Valorizacion Nº 04 Chilca Septiembre 2015
http://slidepdf.com/reader/full/resumen-valorizacion-no-04-chilca-septiembre-2015 1/1
S/. 736,890.67 154,874.19 3,525.62 158,399.81 578,490.86 21.50%
S/. 572,831.53 179,611.70 200,141.43 379,753.13 193,078.40 66.29%
S/. 4,500.00 4,500.00 - 4,500.00 - 100.00%
S/. 12,546.31 - - - 12,546.31 0.00%
S/. 63,124.41 - - - 63,124.41 0.00%
S/. 1,908,225.68 162,490.54 510,504.67 672,995.21 1,235,230.47 35.27%
S/. 72,292.29 57,953.74 - 57,953.74 14,338.55 80.17%
S/. 120,942.85 120,932.69 - 120,932.69 10.16 99.99%
S/. 283,662.33 8,528.48 - 8,528.48 275,133.85 3.01%
S/. 3,775,016.07 688,891.34 714,171.72 1,403,063.06 2,371,953.01
S/. 377,501.61 68,889.13 71,417.17 140,306.31 237,195.30
PRESUPUESTO TOTAL S/. 4,152,517.68 757,780.47 785,588.89 1,543,369.37 2,609,148.31
% AVANCE FÍSICO EJECUTADO 18.25% 18.92% 37.17% 62.83%
RESUMEN DE VALORIZACIÓN DE AVANCE DE OBRA
CORRESPONDIENTE AL MES DE AGOSTO DEL 01/08/2015 AL 31/08/2015
MEJORAMIENTO INTEGRAL Y TRATAMIENTO PAISAJISTICO DE LA AV. REAL TRAMO: JR. PEDRO PERALTA – JR. TUPAC AMARU, DISTRITO DE
CHILCA – HUANCAYO – JUNIN (I ETAPA).Fecha de Valorización:
03
HASTA EL 31/08/2015Nombre del Proyecto:
VALORIZACIÓN Nº
Costo del Proyecto (S/.) : S/. 4,152,517.68 Ubicación del Proyecto:
JUNIN
ING. HECTOR P. CHAVEZ LEON
Región:
Provincia:
Plazo de Ejecucion
Residente de Obra:
CHILCA
AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO A EJECUTAR
AZAPAMPA
210 DIAS CALENDARIOS
HUANCAYO
GASTOS GENERALES 10.00 %
GOBIERNO REGIONAL JUNINOrganismo Ejecutor : Distrito:
AMPLIACION DE RED DE DESAGUE
AMPLIACION DE RED DE AGUA POTABLE
TRATAMIENTO PAISAJISTICO
COSTO DIRECTO TOTAL
CANALIZACIONES DEL RIO
PONTON L=10 M
Supervisor de Obra:
IMPACTO AMBIENTAL
DRENAJE PLUVIAL
PAVIMENTO RIGIDO
ALINEAMIENTO DE PREDIOS