![Page 1: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/1.jpg)
Automatizacion CHUNGAR
FEBRERO 2011
CHUNGAR PROCESS INFORMATION SYSTEM
Ing. Cesar Chung Ching – Area Mantenimiento
![Page 2: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/2.jpg)
Avances a la Fecha:
� Monitoreo de condiciones (Horometros, Temperatura, corrientes, voltajes, potencias etc.)
� Sub estación Animon (95%)� Motores bombas nivel 310 /antigua – Mina (100%)� Motores bombas nivel 310 /Nueva – Mina (100%)� Motores Compresoras sullair – mina (100%)� Motores bombas deepcone – Planta (100%)� Motores fajas molienda – Planta (100%)� Motores fajas Chancado – Planta (95%)� Motores planta flotación – Planta (90%)� Motores Molinos - Planta (75% - Falta RED)� Motor Chancadora 40HP (100%)� Motores espesadores – Planta (90% - Falta Espesador 1)� Motores Filtro Larox CC45-CC30 (100%)� Motores bombas Poza C - PLanta (100%)� Celdas SE eléctrica Montenegro (50%)� Celdas SE eléctrica Esperanza (90%)
![Page 3: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/3.jpg)
Avances a la Fecha
� Sistema de información y Control de Procesos - PLanta
� Deepcone – Planta (100 %)
� Chancado – Planta (98%)
� Monitoreo y control consumo de cal (80%)
� Molienda – Planta (100%)
� Balance masa Molienda (100%)
� Control de reactivos (50% )
� Flotación – Planta (90%)
� Espesamiento – Planta (90%)
� Filtración – Planta (85%)
� Holding Tank Zinc – Planta (100%)
� Holding Tank Plomo – Plomo (100%)
![Page 4: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/4.jpg)
En proceso
� Implementación de Reportes automáticos de procesos, monitoreo condiciones, horometros etc.
� Monitoreo de condiciones molinos – planta (Falta RED, falta cablear hasta la SE eléctrica)
� Control pozas A y C
� Monitoreo y control operación compresoras Sullair – Mina (Se tiene generado la solped 1100231284 para adquirir gateway)
� Monitoreo y control espesador 1 - Planta
![Page 5: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/5.jpg)
� Automatización y monitoreo sistema ventilación – Mina
� Automatización y monitoreo de condiciones Sistema Bombeo mina (Pozas 465, 365, etc.)
� Optimización sistema de lubricación molinos – Planta
� Optimización sistema de telemetría - planta
� Sistema Tracking – mina
� Posicionamiento y monitoreo de parámetros operacionales (horas de operación, rpm, consumos, paradas de equips etc.)
� Monitoreo y control de grupos generadores
� Monitoreo y control de niveles de celdas de flotación -Planta
� Monitoreo y control de reactivos – Planta (Red Profibus)
� Control de pH - flotacion
Proyecciones 2011
![Page 6: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/6.jpg)
� Automatización proceso Laboratorio. LIMS - SAP
� Conectividad SAP
� Adquisición Software del PI System
Proyecciones 2011
![Page 7: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/7.jpg)
Requerimiento a corto plazo:
� Compra de los software (debido a que se tiene licenciamiento temporal)
� Laptop para el área de instrumentación como herramienta de trabajo
� Considerar la construcción del taller de instrumentación en planta y el taller de comunicaciones debidamente equipada
� Terminar de cablear la red desde el cuarto de control hasta la SE eléctrica de los molinos
![Page 8: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/8.jpg)
Conclusion
� El sistema de información Chungar PI System cuenta en la actualidad con mas de 100 pantallas, 2000 tags, 10 clientes concurrentes, server
� Implementar el monitoreo de condiciones a quipos críticos (Vibración, temperatura etc.) de manera de mejorar el mantenimiento preventivo y optimizar el mantenimiento predictivo
![Page 9: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/9.jpg)
Arquitectura del sistema
![Page 10: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/10.jpg)
Pantallas PI SystemScada Chungar.dst
![Page 11: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/11.jpg)
Flow sheet - Planta Concentradora
![Page 12: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/12.jpg)
Operación - Chancado
![Page 13: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/13.jpg)
Operación - Molienda
![Page 14: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/14.jpg)
Balance de masa / agua - Molienda
![Page 15: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/15.jpg)
Operación – Molinos de barras
![Page 16: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/16.jpg)
Registro historico/carga total guardia - Molienda
![Page 17: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/17.jpg)
Operación – Molinos de bolas
![Page 18: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/18.jpg)
Registro Histórico – operación molinos
![Page 19: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/19.jpg)
Operación – Flotación
![Page 20: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/20.jpg)
Monitoreo consumo reactivos
![Page 21: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/21.jpg)
Operación – Espesadores
![Page 22: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/22.jpg)
Operación – Holding Tank Zinc
![Page 23: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/23.jpg)
Operación – Holding Tank Plomo
![Page 24: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/24.jpg)
Operación – Filtro Larox 1
![Page 25: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/25.jpg)
Operación – Filtro Larox 2
![Page 26: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/26.jpg)
Operación – deepcone
![Page 27: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/27.jpg)
Operación – disposición relave
![Page 28: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/28.jpg)
Reportes automaticosReportes automaticos
![Page 29: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/29.jpg)
Sistema de bombeo agua de mina
![Page 30: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/30.jpg)
Motores Nueva poza Nivel 310
![Page 31: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/31.jpg)
Monitoreo condiciones - Motores
![Page 32: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/32.jpg)
Motores Poza C
![Page 33: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/33.jpg)
Monitoreo condiciones - Motores
Tendencias históricas
Voltajes, corrientes, energía etc.
![Page 34: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/34.jpg)
Camara de Bombeo antigua Nivel 310
![Page 35: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/35.jpg)
Monitoreo condiciones / Registro Historico
![Page 36: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/36.jpg)
Motores Sala de Compresoras -Mina
![Page 37: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/37.jpg)
Monitoreo condiciones - Motores
![Page 38: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/38.jpg)
SE Animon – monitoreo variables electricas
![Page 39: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/39.jpg)
Circuito planta concentradora
![Page 40: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/40.jpg)
Circuitos – registros historicos
![Page 41: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/41.jpg)
Variables históricos
![Page 42: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/42.jpg)
SE Montenegro – Monitoreo Celdas
![Page 43: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/43.jpg)
SE Esperanza – Monitoreo Celdas
![Page 44: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/44.jpg)
Registro historico
![Page 45: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/45.jpg)
Variables en tiempo real – registro Historicos
![Page 46: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/46.jpg)
Monitoreo de Vibracion – Molinos de Barras
![Page 47: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/47.jpg)
Análisis de Información:
Valores de vibración (velocidad – mm/s) antes del cambio del sistema de transmisión contra eje y catalina
![Page 48: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/48.jpg)
Análisis de Información:
Valores de vibración (velocidad – mm/s) después del cambio del sistema de transmisión contra eje y catalina
![Page 49: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/49.jpg)
Análisis de Información:
Valores de vibración (aceleración – g’s) antes del cambio del sistema de transmisión contra eje y catalina
![Page 50: Reporte Avance Automatizacion Chungar FEB 2011 JT[1]](https://reader037.fdocuments.mx/reader037/viewer/2022100217/5571fb78497959916994f5fd/html5/thumbnails/50.jpg)
Analisis de Informacion:
Valores de vibración (aceleración – g’s) después del cambio del sistema de transmisión contra eje y catalina