PTAR

12
HOJA DE ME  ESTRUCTURA, ARQUITECT CODIGO DESCRIPCION UND  PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 1.00 T ANQUE SEPTICO 1.10 OBRAS PRELIMINARES TRAZOS Y REPLANTEOS INICIALES Y FINALES (PTAR) M2  1.20 MOVIMIENTO DE TIERRAS EXCAV ACION - CORTES C/EQUIPOS EN TERRENO NORMAL M3 TANQUE SEPTICO SOREEXCAV T ANQUE SEPTICO LADO Y SOREEXCAV T ANQUE SEPTICO L ADO X CAMARA DE DOSA!E SOREEXCA V CAMARA DE DOSA!E REFINE Y NIVELACION EN TERRENO NORMAL M2 ELIMINACION DE DESMONTE M3 EXCAVACION RELLENO ELIMINACION 1.2"# ESPON! 1.30 CONCRETO SIMPLE CONCRETO FC 100 $G/CM2 PARA SOLADO Y/O SU-ASES M3 1.%0 CONCRETO ARMADO LOSAS DE FONDO CONCRETO P ARA LOSA DE FONDO FC 210 $G/CM2 M3 TANQUE SEPTICO CAMARA DOSA!E ENCOFRADO Y DESENCOFRADO P ARA LOSA DE FONDO M2

description

ptar

Transcript of PTAR

Page 1: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 1/12

Page 2: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 2/12

TANQUE SEPTICO X

TANQUE SEPTICO Y

CAMARA DOSA!E X

CAMARA DOSA!E Y

 ACERO ESTRUCTURAL PARA LOSA DE FONDO $G

MUROS REFORZADOS

CONCRETO PARA MUROS FC 210 $G/CM2 M3

TANQUE SEPTICO E!E X

TANQUE SEPTICO E!E Y

SEPARADOR DE CAMARAS

CAMARA MUROS X

CAMARA MUROS Y

ENCOFRADO Y DESENCOFRADO PARA MUROS M2

TANQUE SEPTICO INT X

TANQUE SEPTICO INT Y

TANQUE SEPTICO EXT X

TANQUE SEPTICO EXT Y

CAMARA DOSA!E INT X

CAMARA DOSA!E INT Y

CAMARA DOSA!E EXT X

CAMARA DOSA!E EXT Y

 ACERO ESTRUCTURAL PARA MUROS $G

LOSA MACIZA

CONCRETO FC 210 $G/CM2 PARA LOSA MACIZA M3

TANQUE SEPTICO

INGRESO

CAMARA DOSA!E

INGRESO

ENCOFRADO Y DESENCOFRADO PARA LOSA MACIZA M2

TANQUE SEPTICOINGRESO

CAMARA DOSA!E

INGRESO

 ACERO ESTRUCTURAL PARA LOSA MACIZA $G

Page 3: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 3/12

TAPAS DE FIERRO FUDIDO

TAPAS DE FIERRO FUNDIDO M2

REVOQUES Y ENLUCIDOS

TARRA!EO CON IMPERMEAILIZANTE DE MUROS Y FONDO M&1'3 E&2.00CM M2

SUM. E INSTAL. DE TUBERIAS Y ACCESORIOS PVC

TUERIA DE PVC SAL M

TEE PVC-SAP * UND

CODO PVC SAP UND

2.00 CAJA DE DISTRIBUCION

2.10 OBRAS PRELIMINARES

TRAZOS Y REPLANTEOS INICIALES Y FINALES M2

2.20 MOVIMIENTO DE TIERRAS

EXCAVACION - CORTES A/PULSO EN TERRENO NORMAL M3

REFINE Y NIVELACION EN TERRENO NORMAL M2

ELIMINACION DESMONTE CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R&" $M) M3

2.30 CONCRETO SIMPLE

CONCRETO FC 210 $G/CM2 PARA SOLADOS Y/O SU-ASES M3

2.%0 CONCRETO ARMADO

LOSA DE FONDO

CONCRETO FC 210 $G/CM2 PARA LOSAS DE FONDO-PISO M3

ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO M2

Page 4: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 4/12

 ACERO ESTRUCTURAL PARA LOSA DE FONDO $G

MUROS REFORZADOS

CONCRETO FC 210 $G/CM2 PARA MUROS REFORZADOS M3

ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2

 ACERO ESTRUCTURAL PARA MURO REFORZADO $G

TAPA DE CONCRETO

CONCRETO FC 210 $G/CM2 PARA TAPA DE CONCRETO M3

ENCOFRADO Y DESENCOFRADO PARA TAPA DE CONCRETO M2

TEC+O

LADOS

 ACERO ESTRUCTURAL PARA TAPA DE CONCRETO $G

REVOQUES Y ENLUCIDOS

M2

TARRA!EO CON IMPERMEAILIZANTE DE MUROS, M&1'3 E&2.00CM.M2

3.00 POZO PERCOLADOR

3.10 OBRAS PRELIMINARES

TRAZOS Y REPLANTEOS INICIALES Y FINALES (POZO PERCOLADOR)M2

3.20 MOVIMIENTO DE TIERRAS

EXCAVACION - CORTES C/EQUIPOS EN TERRENO NORMAL M3

TARRA!EO CON IMPERMEAILIZANTE DE LOSA DE FONDO-PISO, M&1'3E&2.00CM.

Page 5: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 5/12

REFINE Y NIVELACION EN TERRENO NORMAL M2

ELIMINACION DESMONTE CARG. Y VOLQ. 10 M3 TERRENO NORMAL (R&" $M)M3

3.30 OBRAS DE CONCRETO SIMPLE

CONCRETO FC 1%0 $G/CM2 PARA ANCLA!ES Y/O DADOS M3

3.%0 OBRAS DE CONCRETO ARMADO

MUROS REFORZADOS

CONCRETO FC 210 $G/CM2 EN MUROS M3

ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2

 ACERO ESTRUCTURAL PARA MUROS REFORZADOS $G

LOSA MACIZA

CONCRETO FC 210 $G/CM2 PARA LOSAS MACISAS M3

ENCOFRADO Y DESENCOFRADO P/ LOSAS MACIZAS M2

TEC+O

LADO

 ACERO ESTRUCTURAL PARA LOSAS MACIZAS $G

3."0 ALBAÑILERIA

MURO DE LADRILLO $.$. ARC. DE CAEZA MEZCLA 1'% 1." CM M2

3.0 SUMINISTRO E INSTALACION DE TUB. Y ACCES. DE PVC

TUERIA DE PVC SAL 3 M

CODO PVC-SAP 3*0 UND

Page 6: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 6/12

3.0 MATERIAL FILTRANTE

SUM. E INST. GRAVA SELECC. GRANO&" M3

MURO

ASE

Page 7: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 7/12

 RADOS

RA Y EQUIPAMIENTO

N CLCULO METRADO METRADOVECES L A + PARCIAL TOTAL

10.

1.00 3." 2.0" .

1.00 1.3" 2.0" 2.

  !."3

1.00 3." 2.0" 3.20 2".2

2.00 %." 0."0 3.20 1"."2

2.00 0."0 2.0" 3.20 ."

1.00 1.3" 2.0" 1.0 %.0

1.00 "." 0."0 1.0 %.

!."!

1.00 3." 2.0" .1.00 1.3" 2.0" 2.

!#.$

".3

0.00

0.1

0.#"

1.00 3." 2.0" 0.10 0.

1.0

1.00 3." 2.0" 0.1" 1.1

1.00 1.3" 2.0" 0.1" 0.%2

2.$%

Page 8: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 8/12

2.00 3." 0.1" 1.1

2.00 2.0" 0.1" 0.2

2.00 1.3" 0.1" 0.%1

1.00 2.0" 0.1" 0.31

111."3

1.00 1.0 0.00 111.3

!.%2

2.00 3." 0.1" 2.0 3.00

2.00 1." 0.1" 2.0 1.3

1.00 1." 0.1" 1.20 0.32

2.00 1.3" 0.1" 1.0 0.

1.00 1." 0.1" 1.0 0.%"

##.#$

2.00 3.%0 2.0 1.

%.00 1." 2.0 1.20

2.00 3." 2.0 20.02

1.00 2.0" 2.0 ".33

2.00 1.20 1."" 3.2

2.00 1." 1."" ".%3

2.00 1.3" 1."" %.1

1.00 2.0" 1."" 3.1

".2 0.00 2%3.!%

0."$

1.00 3." 2.0" 0.10 0.

-2.00 1.00 1.00 0.10 -0.20

1.00 1.3" 2.0" 0.20 0.""

-1.00 1.00 1.00 0.20 -0.20

!.0!

1.00 3.%0 1." "."-2.00 1.00 1.00 -2.00

1.00 1.20 1." 2.10

-1.00 1.00 1.00 -1.00

!.""

0.% 0.00 ".

Page 9: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 9/12

".00

1.00 3.00 3.00 .00

  10.

1.00 ".20 2.0" 10.

1!.00

1.00 1".00 1".00

3.00

3.00 3.00

!.00

".00 ".00

0.$"

1.00 0.0 0.0 0.%

0.$%

1.00 0.0 0.0 0. 0.%

0.$"

1.00 0.0 0.0 0.%

0.!"

1.00 0."

0.0!

1.00 0.0 0.0 0.10 0.0"

0.0#

1.00 0.0 0.0 0.1" 0.0

0.$2

Page 10: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 10/12

1.00 2.0 0.1" 0.%2

!.1!

1.00 0.0 0.00 ".1"

0.10

1.00 1.%0 0.10 0.2 0.10

$.03

2.00 2.0 0.2 %.03

#.0

1.00 0.10 0.00 .0

0.0!

1.00 0.0 0.0 0.10 0.0"

0.$"

1.00 0.0 0.0 0.%

1.00 0.0 0.10 0.0

3.$3

1.00 0.0" 0.00 3.%3

0.$2

1.00 0.%2

1.$$

1.00 2.00 0.2 1.%%

13.20

1.00 %.10 13.20

".31

1.00 %.10 ".2" .31

Page 11: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 11/12

3.$

1.00 2.10 3.%

%.$

1.00 %.10 ".2" .31

0.2"

1.00 0.0 0.0 0.%0 0.2

0.2%

1.00 0.2 0.2

3.11

1.00 3.11 3.11

1".#"

1.00 0.2 0.00 1.

1.2%

1.00 1.2 1.2

10.11

1.00 ."" .""

1.00 1." 1."

%".%1

1.00 1.2 0.00 .1

$1.""1.00 %1. %1.

10.0

1.00 10.0 10.0

2.00

Page 12: PTAR

7/17/2019 PTAR

http://slidepdf.com/reader/full/ptar563db8da550346aa9a979125 12/12

1.00 2.00 2.00

1%.%#

1.00 12.02 12.02

1.00 .% .%