Metrados Estadio 25 de Nov r

46
CIVSA OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTE FORMULA : GENERAL UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA Item Descripción Und. Metrado 01 OBRAS PRELIMINARES 01.01 MOVILIZACION Y DESMOVILIZACION GLB 1.00 01.02 CONSTRUCCION DE ALMACENES Y OFICINAS EN OBRA m2 190.00 01.03 TRAZOS Y REPLANTEOS m2 5,045.40 01.04 LIMPIEZA AL INICIO DE LA OBRA m2 5,045.40 01.05 LIMPIEZA PERMANENTE EN OBRA mes 12.00 01.06 CARTEL DE OBRA 3.60X7.20 M m2 25.92 02 TRABAJOS DE RETIRO Y DEMOLICION 02.01 DEMOLICION DE CIMIENTOS CORRIDOS m3 149.17 02.02 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO ARMADO m3 36.98 02.03 DEMOLICION DE MURO DE LADRILLO m2 1,134.58 02.04 DEMOLICION DE LOSA ALIGERADA m2 173.72 02.05 DEMOLICION DE GRADERIAS DE CONCRETO m3 105.33 02.06 DEMOLICION DE PISO DE CONCRETO m2 314.98 02.07 DESMONTAJE DE DIVISIONES, PUERTAS Y VENTANAS METALICAS m2 42.39 02.08 DESMONTAJE DE PUERTAS DE MADERA m2 4.80 02.09 DESMONTAJES DE APARATOS SANITARIOS pza 5.00 02.10 ELIMINACION DE MATERIAL EXEDENTE m3 559.40 03 ESTRUCTURAS 03.01 MOVIMENTO DE TIERRAS - ESTRUCTURAS 03.01.01 EXCAVACION PARA CIMIENTOS TERRENO NORMAL m3 3,728.79 03.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1,382.74 03.01.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 7.50 03.01.04 NIVELACION DEL TERRENO m2 1,833.95 03.01.05 ELIMINACION DE MATERIAL EXEDENTE m3 1,068.79 03.02 CONCRETO SIMPLE 03.02.01 SOLADO PARA ZAPATAS DE e=10 cm MEZCLA 1:10 CEMENTO-HORMIGON m3 87.48 03.02.02 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 154.49 03.02.03 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 18.20 03.02.04 FALSO PISO DE 4" DE CONCRETO 1:10 m2 1,833.95 03.02.05 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 250.79 03.03 CONCRETO ARMADO TRIBUNA Y AREAS COMPLEMENTARIAS 03.03.01 ZAPATAS 03.03.01.01 CONCRETO F'C=210 KG/CM2. PARA ZAPATAS m3 400.46 03.03.01.02 ACERO GRADO 60 EN ZAPATAS kg 13,013.11 03.03.02 VIGAS DE CIMENTACION 03.03.02.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS DE CIMENTACION m3 356.08 03.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION m2 1,780.38 03.03.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION kg 27,270.54 03.03.03 MUROS DE SOSTENIMIENTO 03.03.03.01 CONCRETO F'C=210 KG/CM2. PARA MUROS DE SOSTENIMIENTO m3 70.80 03.03.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA UNA CARA MAS NORMAL UNA CARA EN m2 447.72 03.03.03.03 ACERO GRADO 60 EN MUROS DE SOSTENIMIENTO kg 4,790.05 03.03.04 SOBRECIMIENTOS 03.03.04.01 CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTOS m3 60.45 03.03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SOBRECIMIENTOS m2 902.10 03.03.04.03 ACERO GRADO 60 EN SOBRECIMIENTOS kg 2,138.36 03.03.05 COLUMNAS 03.03.05.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 251.79 RESUMEN DE LA PLANILLA DE METRADOS

Transcript of Metrados Estadio 25 de Nov r

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : GENERALUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Item Descripción Und. Metrado01 OBRAS PRELIMINARES01.01 MOVILIZACION Y DESMOVILIZACION GLB 1.0001.02 CONSTRUCCION DE ALMACENES Y OFICINAS EN OBRA m2 190.0001.03 TRAZOS Y REPLANTEOS m2 5,045.4001.04 LIMPIEZA AL INICIO DE LA OBRA m2 5,045.4001.05 LIMPIEZA PERMANENTE EN OBRA mes 12.0001.06 CARTEL DE OBRA 3.60X7.20 M m2 25.9202 TRABAJOS DE RETIRO Y DEMOLICION02.01 DEMOLICION DE CIMIENTOS CORRIDOS m3 149.1702.02 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO ARMADO m3 36.9802.03 DEMOLICION DE MURO DE LADRILLO m2 1,134.5802.04 DEMOLICION DE LOSA ALIGERADA m2 173.7202.05 DEMOLICION DE GRADERIAS DE CONCRETO m3 105.3302.06 DEMOLICION DE PISO DE CONCRETO m2 314.9802.07 DESMONTAJE DE DIVISIONES, PUERTAS Y VENTANAS METALICAS m2 42.3902.08 DESMONTAJE DE PUERTAS DE MADERA m2 4.8002.09 DESMONTAJES DE APARATOS SANITARIOS pza 5.0002.10 ELIMINACION DE MATERIAL EXEDENTE m3 559.4003 ESTRUCTURAS03.01 MOVIMENTO DE TIERRAS - ESTRUCTURAS03.01.01 EXCAVACION PARA CIMIENTOS TERRENO NORMAL m3 3,728.7903.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1,382.7403.01.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 7.5003.01.04 NIVELACION DEL TERRENO m2 1,833.9503.01.05 ELIMINACION DE MATERIAL EXEDENTE m3 1,068.7903.02 CONCRETO SIMPLE03.02.01 SOLADO PARA ZAPATAS DE e=10 cm MEZCLA 1:10 CEMENTO-HORMIGON m3 87.4803.02.02 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 154.4903.02.03 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 18.2003.02.04 FALSO PISO DE 4" DE CONCRETO 1:10 m2 1,833.9503.02.05 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 250.7903.03 CONCRETO ARMADO TRIBUNA Y AREAS COMPLEMENTARIAS03.03.01 ZAPATAS03.03.01.01 CONCRETO F'C=210 KG/CM2. PARA ZAPATAS m3 400.4603.03.01.02 ACERO GRADO 60 EN ZAPATAS kg 13,013.1103.03.02 VIGAS DE CIMENTACION03.03.02.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS DE CIMENTACION m3 356.0803.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION m2 1,780.3803.03.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION kg 27,270.5403.03.03 MUROS DE SOSTENIMIENTO03.03.03.01 CONCRETO F'C=210 KG/CM2. PARA MUROS DE SOSTENIMIENTO m3 70.8003.03.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA UNA CARA MAS NORMAL UNA CARA ENm2 447.7203.03.03.03 ACERO GRADO 60 EN MUROS DE SOSTENIMIENTO kg 4,790.0503.03.04 SOBRECIMIENTOS03.03.04.01 CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTOS m3 60.4503.03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SOBRECIMIENTOS m2 902.1003.03.04.03 ACERO GRADO 60 EN SOBRECIMIENTOS kg 2,138.3603.03.05 COLUMNAS03.03.05.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 251.79

RESUMEN DE LA PLANILLA DE METRADOS

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : GENERALUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

RESUMEN DE LA PLANILLA DE METRADOS

03.03.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNAS m2 1,301.4003.03.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 1,144.5903.03.05.04 ACERO GRADO 60 EN COLUMNAS kg 64,511.2503.03.06 TABIQUE Y PLACA03.03.06.01 CONCRETO F'C=210 KG/CM2. PARA TABIQUES Y PLACAS m3 127.7003.03.06.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN TABIQUES Y PLACAS m2 754.9103.03.06.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN TABIQUES Y PLACAS TIPO BRONCOm2 356.5103.03.06.04 ACERO GRADO 60 EN TABIQUES Y PLACAS kg 20,319.9903.03.07 VIGAS03.03.07.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS m3 626.4103.03.07.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS m2 3,495.2903.03.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 233.0203.03.07.04 ACERO GRADO 60 EN VIGAS kg 89,055.4503.03.08 LOSAS MACIZAS03.03.08.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS m3 140.7703.03.08.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSAS MACIZAS m2 353.2303.03.08.03 ACERO GRADO 60 EN LOSAS MACIZAS kg 6,666.8803.03.09 LOSAS ALIGERADAS03.03.09.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 121.4903.03.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 1,214.8503.03.09.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 9,701.2703.03.09.04 LADRILLO HUECO 15X30X30 PROV Y COLOCADO und 10,691.0003.03.10 ESCALERAS03.03.10.01 CONCRETO F'C=210 KG/CM2. PARA ESCALERAS m3 58.3703.03.10.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESCALERAS m2 242.3903.03.10.03 ACERO GRADO 60 EN ESCALERAS kg 4,877.8903.03.11 GRADERIAS03.03.11.01 CONCRETO F'C=210 KG/CM2. PARA GRADERIAS m3 3,819.4003.03.11.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN GRADERIAS m2 3,529.6503.03.11.03 ACERO GRADO 60 EN GRADERIAS kg 88,014.6103.04 CONCRETO ARMADO COBERTURA03.04.01 ZAPATAS03.04.01.01 CONCRETO F'C=210 KG/CM2. PARA ZAPATAS m3 389.0003.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS m2 454.4003.04.01.03 ACERO GRADO 60 EN ZAPATAS kg 7,152.1303.04.02 APOYOS03.04.02.01 CONCRETO F'C=210 KG/CM2. PARA APOYOS m3 397.8903.04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN APOYOS m2 109.2003.04.02.03 ACERO GRADO 60 EN APOYOS kg 5,434.9603.05 CONCRETO ARMADO CISTERNA - TANQUE ELEVADO03.05.01 LOSAS DE CIMENTACION03.05.01.01 CONCRETO F'C=210 KG/CM2. PARA LOSAS DE CIMENTACION m3 15.6803.05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DE CIMENTACION m2 28.8003.05.01.03 ACERO GRADO 60 EN LOSAS DE CIMENTACION kg 1,752.6803.05.02 MURO SOSTENIMIENTO03.05.02.01 CONCRETO F'C=210 KG/CM2. PARA MURO DE SOSTENIMIENTO m3 49.6603.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE SOSTENIMIENTO m2 221.4303.05.02.03 ACERO GRADO 60 ENMURO DE SOSTENIMIENTO kg 6,366.6703.05.03 COLUMNAS03.05.03.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 31.39

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : GENERALUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

RESUMEN DE LA PLANILLA DE METRADOS

03.05.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNAS m2 234.8203.05.03.03 ACERO GRADO 60 EN COLUMNAS kg 5,498.2003.05.04 VIGAS03.05.04.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS m3 11.9503.05.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS m2 95.2803.05.04.03 ACERO GRADO 60 EN VIGAS kg 1,436.7603.05.05 LOSAS MACIZAS03.05.05.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS m3 47.3903.05.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSAS MACIZAS m2 241.5803.05.05.03 ACERO GRADO 60 EN LOSAS MACIZAS kg 343.3904 ESTRUCTURA METALICA - COBERTURA04.01 ESTRUCTURA METALICA kg 330,197.6504.02 COBERTURA METALICA m2 2,879.2004.03 PINTURA04.03.01 PINTURA EPOXICA ANTICORROSIVA m2 12,999.9105 VARIOS05.01 JUNTA WATER STOP 6" m 67.0205.02 TAPA JUNTA DE ALUMINIO 6" m 171.8606 ARQUITECTURA06.01 ALBAÑILERIA06.01.01 MUROS SOGA DE LADRILLO KK 8x14x24 C/M 1:4 X 1.5CM. m2 1,473.5806.01.02 MUROS CANTO DE LADRILLO KK 8x14x24 CM 1:4 X 1.5 CM. m2 35.2106.02 TARRAJEO REVOQUES Y ENLUCIDOS06.02.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 953.5306.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 4,640.7106.02.03 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 1,043.5006.02.04 TARRAJEO DE COLUMNAS ACABADO CON CEMENTO-ARENA m2 52.4406.02.05 TARRAJEO DE VIGAS ACABADO CON CEMENTO-ARENA m2 39.7606.02.06 VESTIDURA DE DERRAMES ACABADO CON CEMENTO-ARENA m 1,385.9606.02.07 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 1,832.2406.03 PISOS Y PAVIMENTOS06.03.01 CONTRAPISO E=5 CM m2 1,645.3706.03.02 PISO DE CEMENTO PULIDO - BRUÑADO E=6 MM m2 699.5006.03.03 PISO DE LOSETA CERAMICA DE COLOR CLARO DE 30X30 CM. m2 864.7306.03.04 PISO DE LOSETA VINILICA A=2.5 MM. m2 1,359.9506.03.05 PISO DE PIEDRA LAJA DE MOQUEGUA m2 605.7506.03.06 VEREDA DE CEMENTO PULIDO m2 741.0606.03.07 PAVIMENTO DE CONCRETO06.03.07.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS m3 51.3306.03.07.02 ACERO GRADO 60 EN LOSAS MACIZAS kg 2,611.2006.04 ZOCALOS06.04.01 ZOCALO DE MAYOLICA DE COLOR CLARO DE 20X30 CM. m2 953.5306.05 REVESTIMIENTOS06.05.01 REVESTIMIENTO DE ESCALERAS PASO BRUÑADO Y CONTRAPASO, ACABADO CEMEN m2 485.9206.06 CONTRAZOCALOS06.06.01 CONTRAZOCALO CEMENTO m 480.2806.06.02 CONTRAZOCALO CERAMICO m 189.9206.06.03 CONTRAZOCALO DE MADERA DE CEDRO m 474.8506.07 CUBIERTAS06.07.01 COBERTURA CON LADRILLO PASTELERO m2 81.23

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : GENERALUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

RESUMEN DE LA PLANILLA DE METRADOS

06.08 SARDINELES06.08.01 CONCRETO SIMPLE06.08.01.01 CONCRETO F'C= 175 KG/CM2 PARA SARDINELES m3 13.2306.08.01.02 ENCOFRADO Y DEDESENCOFRADO CARAVISTA SARDINELES m2 24.6206.09 MALLA OLIMPICA PISTA ATLETICA06.09.01 CERCO METALICO C/TUB. RED. 4" ANG. 1.5" Y MALLA 4"x4" #12 m2 570.3106.10 CARPINTERIA DE MADERA06.10.01 REPOSTERO BAJO DE H=0.90 DE MELAMINE m 8.4506.10.02 PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MARCO CEDRO 2X3" m2 52.2506.10.03 PUERTAS DE MADERA TABLEROS REBAJADOS DE 4.5 MM. DE CEDRO m2 40.0306.10.04 SEPARADORES DE MELAMINE m2 67.9806.11 CARPINTERIA METALICA06.11.01 VENTANA METALICA m2 47.1806.11.02 PUERTA METAL LAC 1/16" C/MARCO 1.5"X1.5"X1/8" Y REFUERZOS m2 164.5806.11.03 PUERTA METAL LAC 1/16" CONTRAPLACADA C/MARCO 2"X2"X1/4" Y REFUERZOS m2 49.1406.11.04 DIVISION METALICA PARA BAÑOS m2 342.6406.11.05 PASAMANOS m 25.6006.11.06 BARANDA METALICA EN GRADERIA m 152.0006.11.07 BARANDA EN ESCALERAS m 93.6006.11.08 BARANDA METALICA EN BOLETERIAS m 25.8006.11.09 PUERTA DE REJA METALICA INGRESO AREA DE SERVICIO Y CORREDORES m2 30.3006.11.10 REJA METALICA m2 464.5206.11.11 CELOSIA METALICA m2 65.5606.12 CERRAJERIA06.12.01 CERRADURA PARA PUERTA PRINCIPAL TRES GOLPES pza 29.0006.12.02 CERRADURA PARA PUERTA PRINCIPAL DOS GOLPES pza 15.0006.12.03 CERRADURA PARA PUERTA PRINCIPAL TIPO PERILLA pza 26.0006.12.04 BISAGRA DE FIERRO 4" pza 484.0006.12.05 PICAPORTE DE FIJACION pza 84.0006.13 VIDRIOS, CRISTALES Y SIMILARES06.13.01 VIDRIOS SEMIDOBLES NACIONALES p2 6,870.1606.13.02 VIDRIO INCOLORO DE 8MM p2 409.2006.13.03 ESPEJOS INC. BASTIDOR p2 210.5406.14 PINTURA06.14.01 PINTURA VINILICA EN CIELO RASO 2 MANOS m2 1,832.2406.14.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 4,640.7106.14.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 1,135.7006.14.04 PINTURA LATEX EN DERRAMES INTERIORES Y EXTERIORES 2 MANOS m 1,385.9606.14.05 PINTURA EN CARPINTERIA METALICA CON ESMALTE m2 1,792.3506.14.06 PINTURA C/BARNIZ EN MADERA m2 184.5607 INSTALACIONES SANITARIAS07.01 APARATOS Y ACCESORIOS SANITARIOS07.01.01 INODORO TANQUE BAJO BLANCO pza 93.0007.01.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 85.0007.01.03 URINARIOS DE LOZA DE PICO BLANCO pza 32.0007.01.04 LAVADERO DE COCINA pza 3.0007.01.05 COLOCACION DE APARATOS CORRIENTES pza 213.0007.01.06 DUCHA CROMADA MAS LLAVE pza 8.0007.01.07 PAPELERA DE LOSA, COLOR BLANCO pza 9.0007.01.08 TOALLERA DE LOSA BLANCA pza 8.00

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : GENERALUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

RESUMEN DE LA PLANILLA DE METRADOS

07.01.09 COLOCACION DE ACCESORIOS CORRIENTES pza 17.0007.02 INSTALACIONES SANITARIAS07.02.01 SALIDA DE DESAGUE EN PVC SAL 4" pto 90.0007.02.02 SALIDA DE DESAGUE EN PVC SAL 2" pto 137.0007.02.03 SALIDA DE VENTILACION 2" pto 119.0007.02.04 TUBERIAS PVC SAL 6" m 20.4007.02.05 TUBERIAS PVC SAL 4" m 336.1007.02.06 TUBERIAS PVC SAL 3" m 23.7107.02.07 TUBERIAS PVC SAL 2" m 44.0007.02.08 TUBERIAS PVC SAL 3" VENTILACION m 132.9607.02.09 SUMIDEROS DE 2" pza 44.0007.02.10 REGISTROS ROSCADO DE BRONCE DE 4" pza 45.0007.02.11 SOMBRERO VENTILACION PVC DE 3" pza 22.0007.02.12 CAJA DE REGISTRO 30X60 und 2.0007.02.13 CAJA DE REGISTRO 45X90 und 15.0007.02.14 CAJA DE REGISTRO 90X90 und 1.0007.02.15 EXCAVACION DE ZANJA TERRENO NORMAL m 316.3907.02.16 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 52.6207.02.17 ELIMINACION DE MATERIAL EXEDENTE m3 6.5807.03 SISTEMA DE AGUA FRIA07.03.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 213.0007.03.02 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 35.4707.03.03 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP m 126.2307.03.04 RED DE DISTRIBUCION TUBERIA DE 11/4" PVC-SAP m 17.6707.03.05 RED DE DISTRIBUCION TUBERIA DE 11/2" PVC-SAP m 35.8507.03.06 RED DE DISTRIBUCION TUBERIA DE 2" PVC-SAP m 41.7207.03.07 RED DE DISTRIBUCION TUBERIA DE 21/2" PVC-SAP m 123.1907.03.08 RED DE DISTRIBUCION TUBERIA DE 3" PVC-SAP m 65.7807.03.09 RED DE DISTRIBUCION TUBERIA DE 4" PVC-SAP m 255.9007.03.10 VALVULAS DE COMPUERTA DE 1/2" pza 3.0007.03.11 VALVULAS DE COMPUERTA DE 3/4" pza 25.0007.03.12 VALVULAS DE COMPUERTA DE 1" pza 27.0007.03.13 VALVULAS DE COMPUERTA DE 1 1/2" pza 6.0007.03.14 VALVULAS DE COMPUERTA DE 2 1/2" pza 1.0007.03.15 VALVULAS CHECK DE BRONCE DE 2 1/2" pza 2.0007.03.16 VALVULAS DE COMPUERTA DE 4" pza 5.0007.03.17 BOMBA 2 HP C/ACCESORIOS pza 2.0007.03.18 BOMBA 1.5 HP C/ACCESORIOS pza 2.0007.03.19 GABINETE CONTRA INCENDIO 2 1/2" pza 4.0007.03.20 LLAVES SIAMESAS pza 3.0007.03.21 EXCAVACION DE ZANJA TERRENO NORMAL m 450.0007.03.22 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 72.0007.03.23 ELIMINACION DE MATERIAL EXEDENTE m3 9.3607.03.24 SISTEMA DE RIEGO POR ASPERSION OPERACION AUTOMATICA07.03.24.01 EXCAVACION DE ZANJA TERRENO NORMAL m 817.0007.03.24.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 394.1207.03.24.03 ELIMINACION DE MATERIAL EXEDENTE m3 57.3507.03.24.04 BOMBA 7.5 HP C/ACCESORIOS pza 2.0007.03.24.05 RED DE DISTRIBUCION TUBERIA DE 31/2" PVC-SAP m 108.0007.03.24.06 RED DE DISTRIBUCION TUBERIA DE 3" PVC-SAP m 204.00

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : GENERALUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

RESUMEN DE LA PLANILLA DE METRADOS

07.03.24.07 RED DE DISTRIBUCION TUBERIA DE 2" PVC-SAP m 190.0007.03.24.08 RED DE DISTRIBUCION TUBERIA DE 11/2" PVC-SAP m 190.0007.03.24.09 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP m 125.0007.03.24.10 ASPERSORES MODELO 125 1" CON BOQUILLAS und 40.0007.03.24.11 MANOMETRO DE GLICERINA 0-6 BAR und 1.0007.03.24.12 VALVULAS DE ACOPLE RAPIDO 1" pza 3.0007.03.24.13 VALVULAS ELECTRICAS 2" pza 5.0007.03.24.14 VALVULAS DE COMPUERTA DE 2" pza 8.0007.03.24.15 VALVULAS CHECK DE BRONCE DE 2" pza 4.0007.03.24.16 CONTROLADOR DE RIEGO DE 6 ESTACIONES pza 1.0007.03.24.17 CAJAS DE RECTANGULARES und 5.00

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

01 OBRAS PRELIMINARES01.01 MOVILIZACION Y DESMOVILIZACION GLB 1.00 1.0001.02 CONSTRUCCION DE ALMACENES Y OFICINAS EN OBRA m2 190.00 190.0001.03 TRAZOS Y REPLANTEOS m2 1.00 1.00 5,045.40 1.00 1.00 5,045.40 5,045.4001.04 LIMPIEZA AL INICIO DE LA OBRA m2 1.00 1.00 5,045.40 1.00 1.00 5,045.40 5,045.4001.05 LIMPIEZA PERMANENTE EN OBRA mes 1.00 1.0001.06 CARTEL DE OBRA 3.60X7.20 M m2 25.92 25.92

02 TRABAJOS DE RETIRO Y DEMOLICION02.01 DEMOLICION DE CIMIENTOS CORRIDOS

CERCO m3 1.00 1.00 175.94 0.50 1.20 105.56ZONA DE VESTUARIOS m3 1.00 1.00 72.67 0.50 1.20 43.60 149.17

02.02 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO ARMADOCOL EN CERCOS m3 59.00 1.00 0.25 0.30 5.00 22.13COL EN VESTUARIOS m3 17.00 1.00 0.25 0.15 3.00 1.91VIG EN CERCO m3 1.00 1.00 186.22 0.25 0.20 9.31

1.00 1.00 72.67 0.25 0.20 3.63 36.98

02.03 DEMOLICION DE MURO DE LADRILLOCERCO m2 1.00 1.00 186.22 1.00 5.00 931.10ZONA DE VESTUARIOS m2 1.00 1.00 72.67 1.00 2.80 203.48 1,134.58

02.04 DEMOLICION DE LOSA ALIGERADAVESTUARIOS m2 1.00 1.00 114.30 1.00 1.00 114.30RESERVORIO DE AGUA m2 1.00 1.00 1.52 3.60 1.00 5.47

m2 1.00 1.00 7.33 7.36 1.00 53.95 173.72

02.05 DEMOLICION DE GRADERIAS DE CONCRETO m3 1.00 1.00 105.12 6.68 0.15 105.33 105.3302.06 DEMOLICION DE PISO DE CONCRETO

VEREDAS DE ACCESO m2 1.00 1.00 200.68 1.00 1.00 200.68PISO DE BAÑOS m2 1.00 1.00 114.30 1.00 1.00 114.30 314.98

02.07 DESMONTAJE DE DIVISIONES, PUERTAS Y VENTANAS METALICASDIVISIONES METALICAS m2 16.00 1.00 0.60 1.00 1.80 17.28

m2 1.00 1.00 2.10 1.00 1.80 3.78PUERTAS TIPO REJA m2 1.00 1.00 5.50 1.00 3.50 19.25VENTANAS m2 4.00 1.00 1.30 1.00 0.40 2.08 42.39

02.08 DESMONTAJE DE PUERTAS DE MADERABAÑOS m2 2.00 1.00 1.00 1.00 2.40 4.80 4.80

02.09 DESMONTAJES DE APARATOS SANITARIOS pza 5.00 1.00 1.00 1.00 1.00 5.00 5.00

02.10 ELIMINACION DE MATERIAL EXEDENTE m3 1.00 559.40

03 ESTRUCTURAS03.01 MOVIMENTO DE TIERRAS - ESTRUCTURAS03.01.01 EXCAVACION PARA CIMIENTOS TERRENO NORMAL

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOCC-1 m3 1.00 1.00 6.90 0.65 1.40 6.28CC-1 m3 1.00 1.00 18.10 0.65 1.40 16.47CC-2 CONTROL m3 1.00 1.00 5.50 0.80 1.40 6.16CC-2 m3 1.00 1.00 9.39 0.65 1.40 8.54CC-5 m3 1.00 1.00 5.68 0.80 1.40 6.36Z-6 M3 2.00 1.00 0.90 0.90 1.50 2.43

CISTERNAS AGUA POTABLE 1.00 1.00 22.70 9.45 1.00 214.52POZO CAPTADOR DE AGUA 1.00 1.00 4.55 1.00 0.95 4.32

SECCIONCIMIENTO DE MC-2 m3 1.00 1.00 23.25 7.42 1.00 172.52CIMIENTO DE MC-1 m3 1.00 1.00 53.31 4.45 1.00 237.23

EXCAVACION ZONA PATIO DE BOLETERIA

CC-2 m3 1.00 1.00 29.21 0.50 1.40 20.45CC-4 m3 1.00 1.00 12.71 0.50 1.40 8.90SARDINEL EN ZONA DE BOLETERIA m3 1.00 1.00 62.80 0.24 1.00 15.07Z-6 m3 1.00 1.00 0.90 0.90 1.50 1.22

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

SARDINEL EN ZONA DE CANCHACC-3 M3 1.00 1.00 122.39 0.45 0.90 49.57

TRIBUNASSHH EJE C-D CC-2 M3 2.00 1.00 1.55 0.50 1.40 2.17

CIMENTACION EJE C-ECC-2 M3 1.00 1.00 18.08 0.50 1.40 12.66CC-6 M3 1.00 1.00 3.74 0.40 0.70 1.05SSHH EJE I-J CC-2 M3 2.00 1.00 1.55 0.40 1.40 1.74CC-2 M3 2.00 1.00 6.52 0.50 1.40 9.13

CIMENTACION EJE L-M, N-O CC-2 M3 2.00 1.00 7.49 0.50 1.40 10.49ESCALERA A TAE KWON DO M3 2.00 1.00 1.23 0.50 1.40 1.72

SSHH DAMAS Y VARONESCC-2 M3 1.00 1.00 19.69 0.50 1.40 13.78

CC-2 EJE P-Q M3 1.00 1.00 8.91 0.50 1.40 6.24CC-6 EJE P-Q M3 1.00 1.00 3.74 0.40 0.70 1.05

CC-2 EJE Q-R M3 1.00 1.00 2.96 0.50 1.40 2.07CC-2 V-W M3 1.00 1.00 12.35 0.50 1.40 8.65CC-6 V-W M3 1.00 1.00 0.81 0.40 0.70 0.23CC-6 W-X M3 1.00 1.00 5.71 0.50 1.40 4.00CC-2 SSHH EJE W-X M3 1.00 1.00 2.76 0.50 1.40 1.93

ZAPATASZ-1 EJE A,Z m3 2.00 1.00 2.50 2.00 2.50 25.00

2.00 1.00 2.10 1.20 2.50 12.60Z-2 EJE 4 m3 18.00 1.00 2.30 1.80 2.50 186.30Z-4 AEJE 4 m3 3.00 1.00 3.00 3.00 2.50 67.50

3.00 1.00 3.48 1.20 2.50 31.32

Z-4 EJE 3 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 2.50 67.50Z-3 EJE 3 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 2.50 207.00

Z-2 EJE 2 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 2.50 207.00Z-4 EJE 2 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 2.50 67.50

PLACASEJE 2 m3 4.00 1.00 3.68 0.75 2.50 27.60

ESCALERAS DE ACCESO A TRIBUNAS m3 4.00 1.00 5.08 1.50 1.00 30.45

VIGAS DE CIMENTACIONEJE 4 m3 1.00 1.00 63.36 0.50 1.40 44.35EJE 3 m3 1.00 1.00 78.72 0.50 1.40 55.10EJE 2 m3 1.00 1.00 64.77 0.50 1.40 45.34

TANQUE ELEVADO m3 1.00 1.00 6.97 6.97 3.30 160.32

TORRE METALICACIMENTACION m3 2.00 1.00 9.00 9.00 6.00 972.00CAMARA DE ANCLAJE m3 2.00 1.00 7.50 7.50 6.00 675.00 3,728.79

03.01.02 RELLENO CON MATERIAL PROPIO SELECCIONADOZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOCC-1 m3 1.00 1.00 6.90 0.65 0.20 0.90CC-1 m3 1.00 1.00 18.10 0.65 0.20 2.35CC-2 CONTROL m3 1.00 1.00 5.50 0.80 0.40 1.76CC-2 m3 1.00 1.00 9.39 0.65 0.40 2.44CC-5 m3 1.00 1.00 5.68 0.80 0.40 1.82Z-6 M3 2.00 1.00 0.90 0.90 0.95 1.54

SECCIONCIMIENTO DE MC-2 m3 1.00 1.00 23.25 9.20 1.00 213.90CIMIENTO DE MC-1 m3 1.00 1.00 53.31 7.83 1.00 417.42

EXCAVACION ZONA PATIO DE BOLETERIA

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

CC-2 m3 1.00 1.00 29.21 0.50 0.40 5.84CC-4 m3 1.00 1.00 12.71 0.50 0.20 1.27

Z-6 m3 1.00 1.00 0.90 0.90 0.95 0.77

SARDINEL EN ZONA DE CANCHACC-3 M3 1.00 1.00 122.39 0.45 0.40 22.03

TRIBUNASSHH EJE C-D CC-2 M3 2.00 1.00 1.55 0.50 0.40 0.62

CIMENTACION EJE C-ECC-2 M3 1.00 1.00 18.08 0.50 0.40 3.62CC-6 M3 1.00 1.00 3.74 0.40 0.20 0.30SSHH EJE I-J CC-2 M3 2.00 1.00 1.55 0.50 0.40 0.62CC-2 M3 2.00 1.00 6.52 0.50 0.40 2.61

CIMENTACION EJE L-M, N-O CC-2 M3 2.00 1.00 7.49 0.50 0.40 3.00

SSHH DAMAS Y VARONESCC-2 M3 1.00 1.00 19.69 0.50 1.40 13.78

CC-2 EJE P-Q M3 1.00 1.00 8.91 0.50 1.40 6.24CC-6 EJE P-Q M3 1.00 1.00 3.74 0.40 0.70 1.05

CC-2 EJE Q-R M3 1.00 1.00 2.96 0.50 0.40 0.59CC-2 V-W M3 1.00 1.00 12.35 0.50 0.40 2.47CC-6 V-W M3 1.00 1.00 0.81 0.40 0.20 0.06CC-6 W-X M3 1.00 1.00 5.71 0.50 0.20 0.57CC-2 SSHH EJE W-X M3 1.00 1.00 2.76 0.50 0.40 0.55

ZAPATASZ-1 EJE A,Z m3 2.00 1.00 2.50 2.00 1.60 16.00

2.00 1.00 2.10 1.20 1.60 8.06Z-2 EJE 4 m3 18.00 1.00 2.30 1.80 1.60 119.23Z-4 AEJE 4 m3 3.00 1.00 3.00 3.00 1.60 43.20

3.00 1.00 3.48 1.20 1.60 20.04

Z-4 EJE 3 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 1.60 43.20Z-3 EJE 3 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 1.60 132.48

Z-2 EJE 2 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 1.60 132.48Z-4 EJE 2 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 1.60 43.20

PLACASEJE 2 m3 4.00 1.00 3.68 0.75 1.60 17.66

ESCALERAS DE ACCESO A TRIBUNAS m3 4.00 1.00 5.08 1.50 0.40 12.18

VIGAS DE CIMENTACIONEJE 4 m3 1.00 1.00 63.36 0.50 0.84 26.61EJE 3 m3 1.00 1.00 78.72 0.50 0.84 33.06EJE 2 m3 1.00 1.00 64.77 0.50 0.84 27.20 1,382.74

RELLENO EN GRADERIA PARTE BAJA SONA DE SERV M3 1.00 1.00 9.81 12.04 1.00 118.11RELLENO EN GRADERIA PARTE BAJA SONA DE BOLE M3 1.00 1.00 7.14 12.04 1.00 85.98 204.09

RELLENO DE TERRENO HASTA LA COTA DE 4.84AREA DE SERVCIO m3 1.00 1.00 564.00 1.00 0.40 225.60

m3 1.00 -1.00 5.50 5.50 0.40 -12.10m3 1.00 -1.00 6.00 6.00 0.40 -14.40m3 1.00 -1.00 7.00 7.00 0.40 -19.60m3 1.00 -1.00 1.00 30.79 0.40 -12.32

AREA DE TRIBUNAS m3 2.00 1.00 31.67 1.00 0.80 50.67m3 2.00 1.00 29.81 1.00 0.80 47.70m3 14.00 1.00 32.56 1.00 0.80 364.67m3 14.00 1.00 30.74 1.00 0.80 344.29m3 6.00 1.00 30.48 1.00 0.80 146.30

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

m3 6.00 1.00 28.52 1.00 0.80 136.90AREA DE BOLETERIA m3 1.00 1.00 698.00 1.00 0.40 279.20

m3 1.00 -1.00 1.00 32.51 0.40 -13.00 1,523.91

03.01.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMORELLENO CON MAT PERMEABLE EN POZA DE CAPTA m3 1.00 1.00 9.38 1.00 0.80 7.50 7.50

03.01.04 NIVELACION DEL TERRENOTRIBUNA m2 1.00 1.00 122.35 14.07 1.00 1,721.46SUB ESTACION m2 1.00 1.00 5.94 4.90 1.00 29.11CASETA m2 1.00 1.00 1.27 2.20 1.00 2.79BOLETERIA m2 1.00 1.00 4.50 3.20 1.00 14.40PATIO DE CORREDORES E=0.15 m m2 1.00 1.00 816.60 1.00 1.00 816.60 2,584.36

03.01.05 ELIMINACION DE MATERIAL EXEDENTE m3 1.00 1.30 822.15 1.00 1,068.79 1,068.79

03.02 CONCRETO SIMPLE03.02.01 SOLADO PARA ZAPATAS DE e=10 cm MEZCLA 1:10 CEMENTO-HORMIGON

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOZ-6 M3 2.00 1.00 0.90 0.90 1.00 1.62

SECCIONCIMIENTO DE MC-2 m3 1.00 1.00 23.25 2.40 0.10 5.58CIMIENTO DE MC-1 m3 1.00 1.00 53.31 2.00 0.10 10.66

EXCAVACION ZONA PATIO DE BOLETERIAZ-6 m3 1.00 1.00 0.90 0.90 1.00 0.81

TRIBUNAZAPATASZ-1 EJE A,Z m3 2.00 1.00 2.50 2.00 0.10 1.00

2.00 1.00 2.10 1.20 0.10 0.50Z-2 EJE 4 m3 18.00 1.00 2.30 1.80 0.10 7.45Z-4 AEJE 4 m3 3.00 1.00 3.00 3.00 0.10 2.70

3.00 1.00 3.48 1.20 0.10 1.25

Z-4 EJE 3 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 0.10 2.70Z-3 EJE 3 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 0.10 8.28

Z-2 EJE 2 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 0.10 8.28Z-4 EJE 2 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 0.10 2.70

PLACASEJE 2 m3 4.00 1.00 3.68 0.75 0.10 1.10

ESCALERAS DE ACCESO A TRIBUNAS m3 4.00 1.00 5.08 1.50 0.10 3.05

VIGAS DE CIMENTACIONEJE 4 m3 1.00 1.00 63.36 0.50 0.10 3.17EJE 3 m3 1.00 1.00 78.72 0.50 0.10 3.94EJE 2 m3 1.00 1.00 64.77 0.50 0.10 3.24

TANQUIE ELEVADO m3 1.00 1.00 6.00 6.00 0.10 3.60TORRE METALICA m3 2.00 1.00 7.00 7.00 0.10 9.80CAMARA DE ANCLAJE m3 2.00 1.00 5.5 5.50 0.10 6.05 87.48

03.02.02 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOSZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOCC-1 m3 1.00 1.00 6.90 0.65 1.40 6.28CC-1 m3 1.00 1.00 18.10 0.65 1.40 16.47CC-2 CONTROL m3 1.00 1.00 5.50 0.80 1.40 6.16CC-2 m3 1.00 1.00 9.39 0.65 1.40 8.54CC-5 m3 1.00 1.00 5.68 0.80 1.40 6.36

EXCAVACION ZONA PATIO DE BOLETERIACC-2 m3 1.00 1.00 29.21 0.50 1.40 20.45CC-4 m3 1.00 1.00 12.71 0.50 1.40 8.90

SARDINEL ENTRE LA TRIBUNA Y LA CANCHA

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

CC-3 M3 1.00 1.00 122.34 0.45 0.50 27.53

TRIBUNASSHH EJE C-D CC-2 M3 2.00 1.00 1.55 0.50 1.00 1.55

CIMENTACION EJE C-ECC-2 M3 1.00 1.00 18.08 0.50 1.00 9.04CC-6 M3 1.00 1.00 3.74 0.40 0.50 0.75SSHH EJE I-J CC-2 M3 2.00 1.00 1.55 0.50 1.00 1.55CC-2 M3 2.00 1.00 6.52 0.50 1.00 6.52

CIMENTACION EJE L-M, N-O CC-2 M3 2.00 1.00 7.49 0.50 1.00 7.49ESCALERA A TAE KWON DO M3 2.00 1.00 1.23 0.50 1.00 1.23

SSHH DAMAS Y VARONESCC-2 M3 1.00 1.00 19.69 0.50 1.00 9.85

CC-2 EJE P-Q M3 1.00 1.00 8.91 0.50 1.00 4.46CC-6 EJE P-Q M3 1.00 1.00 3.74 0.40 0.50 0.75

CC-2 EJE Q-R M3 1.00 1.00 2.96 0.50 1.00 1.48CC-2 V-W M3 1.00 1.00 12.35 0.50 1.00 6.18CC-6 V-W M3 1.00 1.00 0.81 0.40 0.50 0.16CC-6 W-X M3 1.00 1.00 5.71 0.50 0.50 1.43CC-2 SSHH EJE W-X M3 1.00 1.00 2.76 0.50 1.00 1.38 154.49

03.02.03 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOSZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOVERTICALCC-1 m3 1.00 1.00 5.87 0.15 0.65 0.57CC-5 2.00 1.00 5.57 0.15 0.60 1.00CC-2 m3 1.00 1.00 1.66 0.15 0.60 0.15CC-2 m3 1.00 1.00 2.10 0.15 0.60 0.19CC-2 m3 1.00 1.00 2.10 0.15 0.60 0.19HORIZONTALCC-1 m3 1.00 1.00 4.40 0.15 0.65 0.43CC-1 m3 1.00 1.00 4.41 0.15 0.65 0.43CC-1 m3 2.00 1.00 3.45 0.15 0.65 0.67CC-1 m3 1.00 1.00 1.05 0.15 0.65 0.10CC-2 m3 1.00 1.00 0.45 0.15 0.60 0.04CC-2 m3 1.00 1.00 6.00 0.15 0.60 0.54

EXCAVACION ZONA PATIO DE BOLETERIAVERTICALCC-2 m3 1.00 1.00 6.45 0.15 0.60 0.58CC-2 m3 1.00 1.00 5.59 0.15 0.60 0.50CC-2 m3 1.00 1.00 1.70 0.15 0.60 0.15HORIZONTALCC-2 m3 1.00 1.00 0.90 0.15 0.60 0.08CC-2 m3 5.00 1.00 1.85 0.15 0.60 0.83CERCO PROVISIONALCC-4 m3 1.00 1.00 7.94 0.15 0.40 0.48

m3 1.00 1.00 9.02 0.15 0.40 0.54m3 1.00 1.00 6.16 0.15 0.40 0.37m3 1.00 1.00 17.84 0.15 0.40 1.07

TRIBUNAEJE C-DCC-2 m3 1.00 1.00 2.70 0.15 0.60 0.24CC-2 m3 1.00 1.00 4.91 0.15 0.60 0.44

EJE D-ECC-6 m3 4.00 1.00 3.40 0.10 0.40 0.54CC-2 m3 1.00 1.00 6.56 0.10 0.60 0.39CC-2 m3 1.00 1.00 2.96 0.10 0.60 0.18CC-2 m3 1.00 1.00 2.35 0.10 0.60 0.14

EJE I-J CC-2 m3 2.00 1.00 1.60 0.15 0.60 0.29EJE J-K CC-2 m3 1.00 1.00 6.53 0.15 0.60 0.59EJE L-M ESCALERA CC-2 m3 1.00 1.00 7.98 0.15 0.60 0.72EJE L-M CC-2 m3 1.00 1.00 9.36 0.15 0.60 0.84

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

EJE M-N ESCALERA CC-2 m3 1.00 1.00 7.98 0.15 0.60 0.72m3 1.00 1.00 11.15 0.15 0.60 1.00

EJE P-Q ESCALERA CC-2 m3 1.00 1.00 9.62 0.15 0.60 0.87CC-6 m3 4.00 1.00 1.24 0.10 0.40 0.20

EJE Q-R CC-2 m3 1.00 1.00 2.30 0.15 0.60 0.21

EJE V-W CC-2 m3 1.00 1.00 12.63 0.15 0.60 1.14CC-6 m3 1.00 1.00 1.00 0.10 0.40 0.04

EJE W-X CC-2 m3 1.00 1.00 2.59 0.15 0.60 0.23m3 1.00 1.00 5.51 0.15 0.60 0.50 18.20

03.02.04 FALSO PISO DE 4" DE CONCRETO 1:10TRIBUNA m2 1.00 1.00 122.35 14.32 1.00 1,752.05SUB ESTACION + GRUPO ELEC m2 1.00 1.00 9.80 6.10 1.00 59.78CASETA m2 1.00 1.00 1.27 2.20 1.00 2.79BOLETERIA m2 1.00 1.00 6.04 3.20 1.00 19.33 1,833.95

03.02.05 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOVERTICALCC-1 m3 1.00 1.00 5.87 1.00 1.30 7.63CC-5 2.00 1.00 5.57 1.00 1.20 13.37CC-2 m3 1.00 1.00 1.66 1.00 1.20 1.99CC-2 m3 1.00 1.00 2.10 1.00 1.20 2.52CC-2 m3 1.00 1.00 2.10 1.00 1.20 2.52HORIZONTALCC-1 m3 1.00 1.00 4.40 1.00 1.30 5.72CC-1 m3 1.00 1.00 4.41 1.00 1.30 5.73CC-1 m3 2.00 1.00 3.45 1.00 1.30 8.97CC-1 m3 1.00 1.00 1.05 1.00 1.30 1.37CC-2 m3 1.00 1.00 0.45 1.00 1.20 0.54CC-2 m3 1.00 1.00 6.00 1.00 1.20 7.20

EXCAVACION ZONA PATIO DE BOLETERIAVERTICALCC-2 m3 1.00 1.00 6.45 1.00 1.20 7.74CC-2 m3 1.00 1.00 5.59 1.00 1.20 6.71CC-2 m3 1.00 1.00 1.70 1.00 1.20 2.04HORIZONTAL .CC-2 m3 1.00 1.00 0.90 1.00 1.20 1.08CC-2 m3 5.00 1.00 1.85 1.00 1.20 11.10CERCO PROVISIONALCC-4 m3 1.00 1.00 7.94 1.00 0.80 6.35

m3 1.00 1.00 9.02 1.00 0.80 7.22m3 1.00 1.00 6.16 1.00 0.50 3.08m3 1.00 1.00 17.84 1.00 0.80 14.27

TRIBUNAEJE C-DCC-2 m3 1.00 1.00 2.70 1.00 1.20 3.24CC-2 m3 1.00 1.00 4.91 1.00 1.20 5.89

EJE D-ECC-6 m3 4.00 1.00 3.40 1.00 0.80 10.88CC-2 m3 1.00 1.00 6.56 1.00 1.20 7.87CC-2 m3 1.00 1.00 2.96 1.00 1.20 3.55CC-2 m3 1.00 1.00 2.35 1.00 1.20 2.82

EJE I-J CC-2 m3 2.00 1.00 1.60 1.00 1.20 3.84EJE J-K CC-2 m3 1.00 1.00 6.53 1.00 1.20 7.84EJE L-M ESCALERA CC-2 m3 1.00 1.00 7.98 1.00 1.20 9.58EJE L-M CC-2 m3 1.00 1.00 9.36 1.00 1.20 11.23EJE M-N ESCALERA CC-2 m3 1.00 1.00 7.98 1.00 1.20 9.58

m3 1.00 1.00 11.15 1.00 1.20 13.38EJE P-Q ESCALERA CC-2 m3 1.00 1.00 9.62 1.00 1.20 11.54CC-6 m3 4.00 1.00 1.24 1.00 0.80 3.97

EJE Q-R CC-2 m3 1.00 1.00 2.30 1.00 1.20 2.76

EJE V-W CC-2 m3 1.00 1.00 12.63 1.00 1.20 15.16

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

CC-6 m3 1.00 1.00 1.00 1.00 0.80 0.80

EJE W-X CC-2 m3 1.00 1.00 2.59 1.00 1.20 3.11m3 1.00 1.00 5.51 1.00 1.20 6.61 250.79

03.03 CONCRETO ARMADO TRIBUNA03.03.01 ZAPATAS03.03.01.01 CONCRETO F'C=210 KG/CM2. PARA ZAPATAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOZ-6 m3 2.00 1.00 0.90 0.90 0.45 0.73

SECCIONCIMIENTO DE MC-2 m3 1.00 1.00 23.25 2.40 0.55 30.69CIMIENTO DE MC-1 m3 1.00 1.00 53.31 2.00 0.55 58.64EXCAVACION ZONA PATIO DE BOLETERIAZ-6 m3 1.00 1.00 0.90 0.90 0.45 0.36

TRIBUNAZAPATASZ-1 EJE A,Z m3 2.00 1.00 2.50 2.00 0.70 7.00

2.00 1.00 2.10 1.20 0.70 3.53Z-2 EJE 4 m3 18.00 1.00 2.30 1.80 0.70 52.16Z-4 AEJE 4 m3 3.00 1.00 3.00 3.00 0.70 18.90

3.00 1.00 3.48 1.20 0.70 8.77

Z-4 EJE 3 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 0.70 18.90Z-3 EJE 3 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 0.70 57.96

Z-2 EJE 2 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R,U,V,W,X,Y,Z, m3 20.00 1.00 2.30 1.80 0.70 57.96Z-4 EJE 2 CON GyH, MyN , SyT m3 3.00 1.00 3.00 3.00 0.70 18.90

PLACASEJE 2 m3 4.00 1.00 5.02 0.75 0.50 7.53

ESCALERAS DE ACCESO A TRIBUNAS m3 4.00 1.00 5.08 1.50 0.50 15.23

TANQUE ELEVADO m3 1.00 1.00 6.00 6.00 1.20 43.20 400.46

03.03.01.02 ACERO GRADO 60 EN ZAPATAS kg VER PLANILLA DE ACERO03.03.02 VIGAS DE CIMENTACION03.03.02.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS DE CIMENT m3 1.00

VIGAS DE CIMENTACIONEJE 4 VC-2 m3 2.00 1.00 61.20 0.40 0.70 34.27EJE 3 VC-2 m3 2.00 1.00 61.20 0.40 0.70 34.27EJE 2 VC-2 m3 2.00 1.00 61.20 0.40 0.70 34.27

ENTRE EJES 4-3 VC-1 m3 26.00 1.00 15.22 0.40 0.80 126.63ENTRE EJES 3-2 VC-1 m3 26.00 1.00 15.22 0.40 0.80 126.63 356.08

03.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACIONEJE 4 VC-2 m2 2.00 1.00 61.20 1.40 1.00 171.36EJE 3 VC-2 m2 2.00 1.00 61.20 1.40 1.00 171.36EJE 2 VC-2 m2 2.00 1.00 61.20 1.40 1.00 171.36

ENTRE EJES 4-3 VC-1 m2 26.00 1.00 15.22 1.60 1.00 633.15ENTRE EJES 3-2 VC-1 m2 26.00 1.00 15.22 1.60 1.00 633.15 1,780.38

03.03.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION VER PLANILLA DE ACERO

03.05.06.04 CONCRETO MURO DE CONTENCIONMURO MC-2 m3 1.00 1.00 23.25 0.25 4.04 23.48MURO MC-1 m3 1.00 1.00 53.31 0.25 3.55 47.31 70.80

03.05.06.04 ENCOFRADO Y DESENCOFRADO MURO DE CONTENCIONMURO MC-2 m3 1.00 1.00 23.25 1.00 8.08 187.86MURO MC-1 m3 1.00 1.00 36.60 1.00 7.10 259.86 447.72

03.05.06.03 ACERO GRADO 60 EN MUROS DE CONTENCION VER PLANILLA DE ACERO

03.03.03 SOBRECIMIENTOS03.03.03.01 CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTOS

TRIBUNA

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

EJE A (CºAº) m3 2.00 1.00 6.21 0.15 1.14 2.12

EJE A-B (CºAº) m3 1.00 1.00 2.45 0.15 1.14 0.42EJE B-C (CºAº) m3 1.00 1.00 4.99 0.15 1.14 0.85

m3 1.00 1.00 4.99 0.15 1.14 0.85EJE C-D (CºAº) m3 1.00 1.00 5.93 0.15 1.14 1.01EJE C-D (CºAº) FACHADA m3 1.00 1.00 1.90 0.15 1.14 0.32

m3 1.00 1.00 0.85 0.15 1.14 0.15m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE D-E (CºAº) m3 1.00 1.00 6.23 0.15 1.14 1.07m3 1.00 1.00 5.02 0.15 1.14 0.86m3 1.00 1.00 4.51 0.15 1.14 0.77m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE F-G (CºAº) m3 2.00 1.00 6.26 0.15 1.14 2.14EJE F-G (CºAº) m3 1.00 1.00 2.48 0.15 1.14 0.42

EJE H-I (CºAº) m3 1.00 1.00 2.49 0.15 1.14 0.43m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE I-J (CºAº) m3 1.00 1.00 2.22 0.15 1.14 0.38m3 1.00 1.00 5.23 0.15 1.14 0.89m3 1.00 1.00 3.05 0.15 1.14 0.52m3 1.00 1.00 5.02 0.15 1.14 0.86

EJEJ-K (CºAº) m3 1.00 1.00 11.28 0.15 1.14 1.935.02 0.15 1.14 0.00

EJE L-M (CºAº) m3 1.00 1.00 10.25 0.15 1.14 1.75m3 1.00 1.00 1.31 0.15 1.14 0.22m3 1.00 1.00 5.02 0.15 1.14 0.86m3 1.00 1.00 6.26 0.15 1.14 1.07

EJE N-O (CºAº) m3 1.00 1.00 22.10 0.15 1.14 3.78

EJE P-Q (CºAº) m3 1.00 1.00 8.31 0.15 1.14 1.42m3 1.00 1.00 10.52 0.15 1.14 1.80m3 1.00 1.00 5.02 0.15 1.14 0.86m3 1.00 1.00 5.02 0.15 1.14 0.86m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE Q-R (CºAº) m3 1.00 1.00 3.05 0.15 1.14 0.521.00 1.00 5.02 0.15 1.14 0.86

EJE R-S (CºAº) m3 1.00 1.00 2.49 0.15 1.14 0.43m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE T-U (CºAº) m3 1.00 1.00 2.50 0.15 1.14 0.43m3 2.00 1.00 6.26 0.15 1.14 2.14

EJE V-W (CºAº) m3 1.00 1.00 10.57 0.15 1.14 1.81m3 1.00 1.00 5.02 0.15 1.14 0.86m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE W-X (CºAº) m3 1.00 1.00 8.29 0.15 1.14 1.42m3 1.00 1.00 1.40 0.15 1.14 0.24m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE X-Y (CºAº) m3 1.00 1.00 5.02 0.15 1.14 0.86m3 1.00 1.00 5.02 0.15 1.14 0.86

EJE Y-Z (CºAº) m3 1.00 1.00 2.49 0.15 1.14 0.43m3 2.00 1.00 6.26 0.15 1.14 2.14

CC-3 EN CERCO CON MALLA m3 1.00 1.00 122.24 0.15 0.70 12.84 60.45

03.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOSEJE A (CºAº) m3 2.00 1.00 6.21 1.00 2.28 28.32

EJE A-B (CºAº) m3 1.00 1.00 2.45 1.00 2.28 5.59EJE B-C (CºAº) m3 1.00 1.00 4.99 1.00 2.28 11.38

m3 1.00 1.00 4.99 1.00 2.28 11.38EJE C-D (CºAº) m3 1.00 1.00 5.93 1.00 2.28 13.52EJE C-D (CºAº) FACHADA m3 1.00 1.00 1.90 1.00 2.28 4.33

m3 1.00 1.00 0.85 1.00 2.28 1.94m3 1.00 1.00 5.02 1.00 2.28 11.45

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

EJE D-E (CºAº) m3 1.00 1.00 6.23 1.00 2.28 14.20m3 1.00 1.00 5.02 1.00 2.28 11.45m3 1.00 1.00 4.51 1.00 2.28 10.28m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE F-G (CºAº) m3 2.00 1.00 6.26 1.00 2.28 28.55EJE F-G (CºAº) m3 1.00 1.00 2.48 1.00 2.28 5.65

EJE H-I (CºAº) m3 1.00 1.00 2.49 1.00 2.28 5.68m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE I-J (CºAº) m3 1.00 1.00 2.22 1.00 2.28 5.06m3 1.00 1.00 5.23 1.00 2.28 11.92m3 1.00 1.00 3.05 1.00 2.28 6.95m3 1.00 1.00 5.02 1.00 2.28 11.45

EJEJ-K (CºAº) m3 1.00 1.00 11.28 1.00 2.28 25.725.02 1.00 2.28 0.00

EJE L-M (CºAº) m3 1.00 1.00 10.25 1.00 2.28 23.37m3 1.00 1.00 1.31 1.00 2.28 2.99m3 1.00 1.00 5.02 1.00 2.28 11.45m3 1.00 1.00 6.26 1.00 2.28 14.27

EJE N-O (CºAº) m3 1.00 1.00 22.10 1.00 2.28 50.39

EJE P-Q (CºAº) m3 1.00 1.00 8.31 1.00 2.28 18.95m3 1.00 1.00 10.52 1.00 2.28 23.99m3 1.00 1.00 5.02 1.00 2.28 11.45m3 1.00 1.00 5.02 1.00 2.28 11.45m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE Q-R (CºAº) m3 1.00 1.00 3.05 1.00 2.28 6.955.02 1.00 2.28 0.00

EJE R-S (CºAº) m3 1.00 1.00 2.49 1.00 2.28 5.68m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE T-U (CºAº) m3 1.00 1.00 2.50 1.00 2.28 5.70m3 2.00 1.00 6.26 1.00 2.28 28.55

EJE V-W (CºAº) m3 1.00 1.00 10.57 1.00 2.28 24.10m3 1.00 1.00 5.02 1.00 2.28 11.45m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE W-X (CºAº) m3 1.00 1.00 8.29 1.00 2.28 18.90m3 1.00 1.00 1.40 1.00 2.28 3.19m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE X-Y (CºAº) m3 1.00 1.00 5.02 1.00 2.28 11.45m3 1.00 1.00 5.02 1.00 2.28 11.45

EJE Y-Z (CºAº) m3 1.00 1.00 2.49 1.00 2.28 5.68m3 2.00 1.00 6.26 1.00 2.28 28.55

CC-3 m2 1.00 1.00 122.24 1.00 2.28 278.71 902.10

03.03.03.03 ACERO GRADO 60 EN SOBRECIMIENTOS VER PLANILLA DE ACERO03.03.04 COLUMNAS03.03.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOC-6 SUB ESTACION + GRUP ELECT m3 5.00 1.00 0.30 0.25 5.50 2.06C-8 m3 7.00 1.00 0.30 0.25 3.90 2.05C-A m3 4.00 1.00 0.25 0.15 3.25 0.49C-7 m3 2.00 1.00 0.30 0.30 5.50 0.99

EXCAVACION ZONA DE BOLETERIAC-7 m3 2.00 1.00 0.30 0.30 5.50 0.99C-A m3 15.00 1.00 0.25 0.15 3.20 1.80C-9 m3 19.00 1.00 0.25 0.15 3.40 2.42

C-A CERCO DE MALLA ENTRE TRIBUNA Y CANCHA m3 36.00 1.00 0.25 0.15 3.00 4.05

TENSORES SEGUNDO PISOT-1 EJE 4 M3 32.00 1.00 0.25 0.15 3.10 3.72T-1 EJE 4-3 M3 84.00 1.00 0.25 0.15 3.50 11.03T-1 EJE 3 M3 32.00 1.00 0.25 0.15 3.10 3.72

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

TENSORES TERCER PISOT-1 EJE 4 12.00 1.00 0.25 0.15 3.63 1.63T-1 EJE 4-3 61.00 1.00 0.25 0.15 4.03 9.22T-2 EJE 4-3 24.00 1.00 0.15 0.15 4.03 2.18T-3 28.00 1.00 0.25 0.15 1.20 1.26

TRIBUNAEJE 4 C-2 m3 18.00 1.00 0.90 0.40 10.67 69.14EJE 4 C-4 m3 28.00 1.00 0.25 0.15 3.14 3.30EJE 4 C-8 8.00 1.00 0.30 0.15 3.84 1.38

EJE 4-3 C-4 m3 57.00 1.00 0.25 0.15 3.14 6.71

EJE 3 C-2 m3 8.00 1.00 0.90 0.40 8.14 23.44EJE 3 C-1 m3 18.00 1.00 0.90 0.40 8.14 52.75

EJE 3 C-4 m3 19.00 1.00 0.25 0.15 3.14 2.24EJE 3-2 C-4 m3 61.00 1.00 0.25 0.15 3.14 7.18EJE 3-2 C-5 m3 27.00 1.00 0.25 0.15 3.14 3.18

EJE 2 C-2 m3 18.00 1.00 0.90 0.40 5.38 34.86 251.79

03.03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNASTRIBUNAEJE 4 C-2 m2 18.00 1.00 2.60 1.00 10.67 499.36

EJE 3 C-2 m2 8.00 1.00 2.60 1.00 8.14 169.31EJE 3 C-1 m2 18.00 1.00 2.60 1.00 8.14 380.95

EJE 2 C-2 m2 18.00 1.00 2.60 1.00 5.38 251.78 1,301.40

03.03.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOC-6 SUB ESTACION + GRUP ELECT m2 5.00 1.00 0.85 1.00 5.50 23.38C-8 m2 7.00 1.00 0.85 1.00 3.90 23.21C-A m2 4.00 1.00 0.50 1.00 3.25 6.50C-7 m2 2.00 1.00 1.20 1.00 5.50 13.20

EXCAVACION ZONA DE BOLETERIAC-7 m2 2.00 1.00 1.20 1.00 5.50 13.20C-A m2 15.00 1.00 0.50 1.00 3.20 24.00C-9 m2 19.00 1.00 0.50 1.00 3.40 32.30

C-A CERCO DE MALLA ENTRE TRIBUNA Y CANCHA m2 36.00 1.00 0.80 1.00 3.00 86.40

TENSORES SEGUNDO PISOT-1 EJE 4 m2 32.00 1.00 0.65 1.00 3.10 64.48T-1 EJE 4-3 m2 84.00 1.00 0.65 1.00 3.50 191.10T-1 EJE 3 m2 32.00 1.00 0.65 1.00 3.10 64.48

TENSORES TERCER PISOT-1 EJE 4 m2 12.00 1.00 0.50 1.00 3.63 21.78T-1 EJE 4-3 m2 61.00 1.00 0.50 1.00 4.03 122.92T-2 EJE 4-3 m2 24.00 1.00 0.30 1.00 4.03 29.02T-3 m2 28.00 1.00 0.50 1.00 1.20 16.80

TRIBUNAEJE 4 C-4 m2 28.00 1.00 0.65 1.00 3.14 57.15EJE 4 C-8 m2 8.00 1.00 0.65 1.00 3.84 19.97

EJE 4-3 C-4 m2 57.00 1.00 0.65 1.00 3.14 116.34

EJE 3 C-4 m2 19.00 1.00 0.65 1.00 3.14 38.78EJE 3-2 C-4 m2 61.00 1.00 0.65 1.00 3.14 124.50EJE 3-2 C-5 m2 27.00 1.00 0.65 1.00 3.14 55.11 1,144.59

03.03.04.04 ACERO GRADO 60 EN COLUMNAS VER PLANILLA DE ACERO03.03.05 TABIQUE Y PLACA03.03.05.01 CONCRETO F'C=210 KG/CM2. PARA TABIQUES Y PLACAS

TRIBUNA

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

EJE 4 P-1 m3 8.00 1.00 0.40 0.90 10.67 30.738.00 1.00 2.54 0.25 10.67 54.20

EJE 4 P-2 m3 8.00 1.00 0.40 0.90 5.38 15.49EJE 4 P-3 m3 4.00 1.00 5.07 0.25 5.38 27.28

MURO DE CONCRETO E=0.15M EN 2DO PISO m3 4.00 1.00 5.07 3.10 0.15 9.43 127.70

03.03.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN TABIQUES Y PLACASEJE 4 P-1 m3 8.00 1.00 1.70 1.00 10.67 145.11

8.00 1.00 2.54 1.00 10.67 216.81

EJE 4 P-2 m3 8.00 1.00 2.60 1.00 5.38 111.90EJE 4 P-3 m3 4.00 1.00 10.14 1.00 5.38 218.21MURO DE CONCRETO E=0.15M EN 2DO PISO m3 4.00 1.00 5.07 3.10 1.00 62.87 754.91

03.03.06.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN TABIQUES Y PLACAS TIPO BRONCOEJE 4 P-1 m3 8.00 1.00 0.90 1.00 10.67 76.82

8.00 1.00 2.54 1.00 10.67 216.81MURO DE CONCRETO E=0.15M EN 2DO PISO m3 4.00 1.00 5.07 3.10 1.00 62.87 356.51

03.03.06.03 ACERO GRADO 60 EN TABIQUES Y PLACAS VER PLANILLA DE ACERO

03.03.06 VIGAS03.03.06.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUB ESTACION + GRUPO ELET+ CERCO PERIMETRICO + CASETA DE CONTROLVS-1 m3 2.00 1.00 6.42 0.25 0.20 0.64VS-1 m3 1.00 1.00 14.95 0.25 0.20 0.75VS-1 m3 2.00 1.00 6.42 0.25 0.20 0.64VS-1 m3 2.00 1.00 8.78 0.25 0.20 0.88VS-1 m3 1.00 1.00 6.57 0.25 0.20 0.33

VA-1 m3 1.00 1.00 6.42 0.25 0.20 0.32VA-3 m3 1.00 1.00 5.05 0.25 0.20 0.25VA-2 m3 1.00 1.00 25.71 0.25 0.40 2.57

ZONA DE BOLETERIAVS-1 m3 1.00 1.00 26.29 0.25 0.15 0.99VA-1 m3 1.00 1.00 9.00 0.25 0.20 0.45CERCO PROVISIONAL VS-1 m3 1.00 1.00 45.88 0.25 0.20 2.29

TRIBUNAPORTICOVP-101 m3 8.00 1.00 14.72 0.40 0.60 28.26

VP-201 m3 8.00 1.00 7.81 0.40 0.60 15.00

VP-301 m3 8.00 1.00 16.91 0.40 1.00 54.11

VP-100 m3 18.00 1.00 14.72 0.40 0.60 63.59

VP-200 m3 18.00 1.00 7.81 0.40 0.60 33.74

VP-300 m3 18.00 1.00 16.91 0.40 1.00 121.75

TRANVERSALESV-101 m3 2.00 1.00 61.02 0.40 0.60 29.29V-101 2.00 1.00 33.25 0.40 0.60 15.96

V-201 m3 2.00 1.00 61.02 0.40 0.60 29.29V-301 m3 2.00 1.00 61.02 0.40 0.60 29.29

V-102 m3 2.00 1.00 61.02 0.40 0.60 29.29V-202 m3 2.00 1.00 61.02 0.40 0.60 29.29

V-101A m3 2.00 1.00 27.77 0.40 0.60 13.33

VB-01 m3 2.00 1.00 122.34 0.30 0.65 47.71VB-02 m3 1.00 1.00 122.34 0.30 1.10 40.37PARAPETO SOBRE TRIBUNA ALTA m3 1.00 1.00 122.34 0.25 0.50 15.29

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

PRIMER PISOVA-4 m3 2.00 1.00 55.65 0.25 0.25 6.96

m3 1.00 1.00 11.85 0.25 0.25 0.74VA-6 m3 2.00 1.00 5.90 0.25 0.25 0.74

SEGUNDO PISOVA-4 m3 1.00 1.00 11.85 0.25 0.25 0.74VA-4 m3 2.00 1.00 61.12 0.25 0.25 7.64

TERCER PISO m3 2.00 1.00 4.20 0.15 0.20 0.25VA-5 m3 2.00 1.00 33.38 0.15 0.20 2.00

m3 8.00 1.00 3.10 0.15 0.20 0.74m3 6.00 1.00 3.10 0.15 0.20 0.56m3 1.00 1.00 11.85 0.15 0.20 0.36 626.41

03.03.06.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS

TRIBUNAPORTICOVP-101 m3 8.00 1.00 14.72 1.40 1.00 164.86

VP-201 m3 8.00 1.00 7.81 1.40 1.00 87.47

VP-301 m3 8.00 1.00 16.91 2.00 1.00 270.56

VP-100 m3 18.00 1.00 14.72 1.40 1.00 370.94

VP-200 m3 18.00 1.00 7.81 1.40 1.00 196.81

VP-300 m3 18.00 1.00 16.91 2.00 1.00 608.76

TRANVERSALESV-101 m3 2.00 1.00 61.02 1.40 1.00 170.86V-101 2.00 1.00 33.25 1.40 1.00 93.10

V-201 m3 2.00 1.00 61.02 1.40 1.00 170.86V-301 m3 2.00 1.00 61.02 1.40 1.00 170.86

V-102 m3 2.00 1.00 61.02 1.40 1.00 170.86V-202 m3 2.00 1.00 61.02 1.40 1.00 170.86

V-101A m3 2.00 1.00 27.77 1.40 1.00 77.76VB-01 m3 2.00 1.00 122.34 1.40 1.00 342.55VB-02 m3 1.00 1.00 122.34 2.50 1.00 305.85PARAPETO SOBRE TRIBUNA ALTA m3 1.00 1.00 122.34 1.00 1.00 122.34 3,495.29

03.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUB ESTACION + GRUPO ELET+ CERCO PERIMETRICO + CASETA DE CONTROLVS-1 m3 2.00 1.00 6.42 0.40 1.00 5.14VS-1 m3 1.00 1.00 14.95 0.40 1.00 5.98VS-1 m3 2.00 1.00 6.42 0.40 1.00 5.14VS-1 m3 2.00 1.00 8.78 0.40 1.00 7.02VS-1 m3 1.00 1.00 6.57 0.40 1.00 2.63

VA-1 m3 1.00 1.00 6.42 0.40 1.00 2.57VA-3 m3 1.00 1.00 5.05 0.40 1.00 2.02VA-2 m3 1.00 1.00 25.71 0.40 1.00 10.28

ZONA DE BOLETERIAVS-1 m3 1.00 1.00 26.29 0.40 1.00 10.52VA-1 m3 1.00 1.00 9.00 0.40 1.00 3.60CERCO PROVISIONAL VS-1 m3 1.00 1.00 45.88 0.40 1.00 18.35

PRIMER PISOVA-4 m3 2.00 1.00 55.65 0.40 1.00 44.52

m3 1.00 1.00 11.85 0.40 1.00 4.74VA-6 m3 2.00 1.00 5.90 0.40 1.00 4.72

SEGUNDO PISO

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

VA-4 m3 1.00 1.00 11.85 0.40 1.00 4.74VA-4 m3 2.00 1.00 61.12 0.40 1.00 48.90

TERCER PISO m3 2.00 1.00 4.20 0.40 1.00 3.36VA-5 m3 2.00 1.00 33.38 0.40 1.00 26.70

m3 8.00 1.00 3.10 0.40 1.00 9.92m3 6.00 1.00 3.10 0.40 1.00 7.44m3 1.00 1.00 11.85 0.40 1.00 4.74 233.02

03.03.06.04 ACERO GRADO 60 EN VIGAS VER PLANILLA DDE ACERO

03.03.07 LOSAS MACIZAS03.03.07.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS

TRIBUNASPRIMER PISO m3 7.00 1.00 7.21 5.07 0.20 51.18

m3 4.00 1.00 5.07 3.49 0.20 14.16TERCER PISOLOSA MACIZA DE E=0.08 m3 6.00 1.00 1.45 1.35 0.08 0.94LOSA MACIZA DE E=0.08 m3 2.00 1.00 2.41 1.00 0.08 0.39LOSA MACIZA APOYA MOTOR DE EMERGENCIA m3 1.00 1.00 3.50 1.50 0.30 1.58

m3 1.00 1.00 8.80 0.30 0.70 1.85LOSA EN PATIO DE SERVICIOS E=0.15 m m3 1.00 1.00 471.25 1.00 0.15 70.69 140.77

03.03.08.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSAS MACIZASTRIBUNASPRIMER PISO 7.00 1.00 7.21 5.07 1.00 255.88

4.00 1.00 5.07 3.49 1.00 70.78

TERCER PISOLOSA MACIZA DE E=0.08 6.00 1.00 1.45 1.35 1.00 11.75LOSA MACIZA DE E=0.08 2.00 1.00 2.41 1.00 1.00 4.82

LOSA MACIZA APOYA MOTOR DE EMERGENCIA M3 1.00 1.00 10.00 1.00 1.00 10.00 353.23

03.03.08.03 ACERO GRADO 60 EN LOSAS MACIZAS VER PLANILLA DE ACERO

03.03.09 LOSAS ALIGERADAS03.03.09.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUBESTACION m3 1.00 1.00 5.90 9.00 0.10 5.31CASETA m3 1.00 1.00 2.00 1.10 0.10 0.22

ZONA DE BOLETERIAm3 3.00 1.00 1.25 2.75 0.10 1.03m3 1.00 1.00 1.65 2.75 0.10 0.45

TRIBUNASPRIIMER NIVEL

m3 18.00 1.00 5.07 3.49 0.10 31.85m3 9.00 1.00 5.07 6.86 0.10 31.30m3 2.00 1.00 5.07 4.51 0.10 4.57m3 1.00 1.00 5.07 0.62 0.10 0.31

SEGUNDO NIVEL m3 20.00 1.00 5.07 4.39 0.10 44.512.00 1.00 5.07 1.89 0.10 1.92 121.49

03.03.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUBESTACION m3 1.00 1.00 5.90 9.00 1.00 53.10CASETA m3 1.00 1.00 2.00 1.10 1.00 2.20

ZONA DE BOLETERIAm3 3.00 1.00 1.25 2.75 1.00 10.31m3 1.00 1.00 1.65 2.75 1.00 4.54

TRIBUNASPRIIMER NIVEL

m3 18.00 1.00 5.07 3.49 1.00 318.50m3 9.00 1.00 5.07 6.86 1.00 313.02m3 2.00 1.00 5.07 4.51 1.00 45.73

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

m3 1.00 1.00 5.07 0.62 1.00 3.14

SEGUNDO NIVEL m3 20.00 1.00 5.07 4.39 1.00 445.152.00 1.00 5.07 1.89 1.00 19.16 1,214.85

03.03.09.03 ACERO GRADO 60 EN LOSAS ALIGERADAS VER PLANILLA DE ACERO

03.03.09.04 LADRILLO HUECO 15X30X30 PROV Y COLOCADOZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUBESTACION und 1.00 8.80 5.90 9.00 1.00 467.28CASETA und 1.00 8.80 2.00 1.10 1.00 19.36

ZONA DE BOLETERIAund 3.00 8.80 1.25 2.75 1.00 90.75und 1.00 8.80 1.65 2.75 1.00 39.93

TRIBUNASPRIIMER NIVEL

und 18.00 8.80 5.07 3.49 1.00 2,802.78und 9.00 8.80 5.07 6.86 1.00 2,754.59und 2.00 8.80 5.07 4.51 1.00 402.44und 1.00 8.80 5.07 0.62 1.00 27.66

SEGUNDO NIVEL und 20.00 8.80 5.07 4.39 1.00 3,917.28und 2.00 8.80 5.07 1.89 1.00 168.65 10,690.72

03.03.10 ESCALERAS03.03.10.01 CONCRETO F'C=210 KG/CM2. PARA ESCALERAS

GRADERIA PRINCIPAL m3 4.00 1.00 1.81 5.07 1.00 36.71

GRADERIA A OFICINAS m3 2.00 1.00 0.87 1.23 1.00 2.13m3 6.00 1.00 1.25 1.23 1.00 9.19

ESCALERA HACIA TRIBUNA m3 4.00 1.00 0.51 5.07 1.00 10.34 58.37

03.03.10.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESCALERASESCALERA PRINCIPAL m2 4.00 1.00 5.36 5.07 1.00 108.70

m2 8.00 1.00 1.81 1.00 1.00 14.48

ESCALERA A OFICINAS m2 2.00 1.00 2.65 1.23 1.00 6.49m2 6.00 1.00 4.54 1.23 1.00 33.37m2 4.00 1.00 0.87 1.00 1.00 3.48m2 12.00 1.00 1.25 1.00 1.00 15.00

ESCALERA HACIA TRIBUNA m2 4.00 1.00 1.98 5.07 1.00 40.15m2 8.00 1.00 0.51 5.07 1.00 20.69 242.36

03.03.10.03 ACERO GRADO 60 EN ESCALERAS VER PLANILLA DE ACERO

03.03.11 GRADERIAS03.03.11.01 CONCRETO F'C=210 KG/CM2. PARA GRADERIAS

GRADERIA m3 1.00 1.00 102.40 29.20 1.00 2,990.08m3 1.00 1.00 122.34 0.93 1.00 113.78m3 1.00 1.00 122.34 0.70 1.00 85.64m3 4.00 1.00 5.03 26.60 1.00 535.19

GRADAS DE ACCESO A GRADERIA m3 160.00 1.00 1.20 0.40 0.23 17.28

GRADERIA EN ZONA DE RELLENO m3 1.00 1.00 122.34 0.15 2.47 45.33GRADERIA PARA COMPLETAR m3 1.00 1.00 16.96 0.15 8.06 20.50GRADERIAS EN SALA DE BOXEO m2 1.00 1.00 78.96 0.98 0.15 11.61 3,819.40

03.03.11.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN GRADERIASm2 1.00 1.00 102.40 29.35 1.00 3,005.44m2 1.00 1.00 122.34 0.70 1.00 85.64m2 1.00 1.00 122.34 0.15 1.00 18.35m2 4.00 1.00 5.03 4.25 1.00 85.41

GRADAS DE ACCESO A GRADERIA m2 160.00 1.00 1.20 0.63 1.00 120.96

GRADERIA EN ZONA DE RELLENO m2 1.00 1.00 122.34 1.00 1.17 143.14GRADERIA PARA COMPLETAR m2 1.00 1.00 16.96 1.00 2.40 40.70GRADERIAS EN SALA DE BOXEO m2 1.00 1.00 78.96 0.38 1.00 30.00 3,529.65

03.03.11.03 ACERO GRADO 60 EN GRADERIAS VER PLANILLA DE ACERO

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

03.04 CONCRETO ARMADO COBERTURA03.04.01 ZAPATAS03.04.01.01 CONCRETO F'C=210 KG/CM2. PARA ZAPATAS

TORRE m3 2.00 1.00 7.00 7.00 1.50 147.00CAMARA DE ANCLAJE m3 2.00 1.00 5.50 5.50 4.00 242.00 389.00

03.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATA m2 1.00TORRE m3 2.00 1.00 24.40 1.00 3.00 146.40CAMARA DE ANCLAJE m3 2.00 1.00 12.00 1.00 2.00 48.00TORRE m3 2.00 1.00 28.00 1.00 1.50 84.00CAMARA DE ANCLAJE m3 2.00 1.00 22.00 1.00 4.00 176.00 454.40

03.04.01.02 ACERO GRADO 60 EN ZAPATAS VER PLANILLA DE ACERO03.04.02 APOYOS03.04.02.01 CONCRETO F'C=210 KG/CM2. PARA APOYOS

TORRE m3 2.00 1.00 6.10 6.10 4.50 334.89CAMARA DE ANCLAJE m3 2.00 1.00 3.00 3.00 3.50 63.00 397.89

03.04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN APOYOSTORRE m3 2.00 1.00 24.40 1.00 1.50 73.20CAMARA DE ANCLAJE m3 2.00 1.00 12.00 1.00 1.50 36.00 109.20

03.04.02.03 ACERO GRADO 60 EN APOYOS kg 1.0003.05 CONCRETO ARMADO CISTERNA - TANQUE ELEVADO

03.05.02 LOSAS DE CIMENTACION03.05.02.01 CONCRETO F'C=210 KG/CM2. PARA LOSAS DE CIMENTACION

CISTERNA CIMENTACION m3 1.00 1.00 8.50 0.70 0.40 2.38m3 1.00 1.00 10.50 0.70 0.40 2.94m3 1.00 1.00 8.50 1.15 0.40 3.91m3 1.00 1.00 1.30 0.70 0.40 0.36m3 1.00 1.00 3.15 0.70 0.40 0.88m3 1.00 1.00 2.10 0.70 0.40 0.59m3 1.00 1.00 2.10 1.15 0.40 0.97m3 1.00 1.00 3.15 1.15 0.40 1.45m3 2.00 1.00 1.55 0.70 0.40 0.87m3 1.00 1.00 3.10 0.70 0.40 0.87m3 1.00 1.00 2.30 0.50 0.40 0.46 15.68

03.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DE CIMENTACIONZAPATA TANQUE m2 1.00 1.00 36.00 1.00 0.80 28.80 28.80

03.05.02.03 ACERO GRADO 60 EN LOSAS DE CIMENTACION VER PLANILLA DE ACERO

03.05.03 MURO SOSTENIMIENTO03.05.03.01 CONCRETO F'C=210 KG/CM2. PARA MURO

MURO TIPO COLLAR EN BASE DE TANQUE m3 1.00 1.00 14.92 0.25 2.00 7.46

CISTERNA AGUA m3 1.00 1.00 35.60 0.25 2.50 22.25m3 1.00 1.00 7.55 0.25 2.50 4.72m3 1.00 1.00 8.25 0.25 2.50 5.16

CISTERNA DE CAPTACION DE AGUA m3 1.00 1.00 8.75 0.25 3.80 8.31ALERO DE CAPTACION DE AGUAS m3 1.00 1.00 4.40 0.20 2.00 1.76 49.66

03.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROMURO TIPO COLLAR EN BASE DE TANQUE m2 1.00 1.00 14.92 1.00 4.00 59.68

CISTERNA AGUA m3 1.00 1.00 35.60 1.00 2.50 89.00m3 1.00 1.00 7.55 1.00 2.50 18.88m3 1.00 1.00 8.25 1.00 2.50 20.63

CISTERNA DE CAPTACION DE AGUA m3 1.00 1.00 8.75 1.00 3.80 33.25 221.43

03.05.03.03 ACERO GRADO 60 ENMURO DE SOSTENIMIENTO VER PLANILLA DE ACERO03.05.04 COLUMNAS03.05.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS

COLUMNAS DEL TANQUE m3 4.00 1.00 19.62 0.40 1.00 31.39 31.3903.05.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNAS

COLUMNAS DEL TANQUE m2 4.00 1.00 41.06 1.00 1.00 164.24M2 4.00 1.00 1.00 0.40 44.11 70.58 234.82

03.05.04.03 ACERO GRADO 60 EN COLUMNAS VER PLANILLA DE ACERO03.05.05 VIGAS03.05.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS

S10CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURASUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

PLANILLA DE METRADOS

MediadasDescripción %Cant de elemen

Concreto y otrosItem Unidad Total

VIGA DE AMARRE DEL TANQUE m3 24.00 1.00 1.45 0.40 0.40 5.57VIGA DE AMARRE DEL TANQUE VA-2 m3 1.00 1.00 9.19 0.20 0.35 0.64VIGA DE AMARRE DEL TANQUE VA-3 m3 1.00 1.00 18.70 0.25 0.25 1.17VIGA PAREDE NE TANQUE M3 1.00 1.00 10.15 0.15 3.00 4.57 11.95

03.05.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGASVIGA DE AMARRE DEL TANQUE VA-1 m2 24.00 1.00 1.45 0.40 0.40 5.57VIGA DE AMARRE DEL TANQUE VA-2 m2 1.00 1.00 9.19 1.10 1.00 10.11VIGA DE AMARRE DEL TANQUE VA-3 m2 1.00 1.00 18.70 1.00 1.00 18.70VIGA PARED EN TANQUE H=3 m2 1.00 1.00 10.15 1.00 6.00 60.90 95.28

03.05.05.03 ACERO GRADO 60 EN VIGAS VER PLANILLA DE ACERO03.05.06 LOSAS MACIZAS03.05.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS

TANQUE ELEVADO BASE m3 1.00 1.00 6.70 1.00 0.15 1.00TANQUE ELEVADO PAREDES m3 1.00 1.00 12.63 0.15 2.49 4.72TANQUE ELEVADO TECHO TIPO CASCARA m3 2.00 1.00 34.62 1.00 0.07 4.85TANQUE ELEVADO CORONAS m3 8.00 1.00 1.95 0.15 1.00 2.34

LOSA MACIZA CISTERNA PISO m3 1.00 1.00 8.50 3.25 0.20 5.53m3 1.00 1.00 10.50 4.55 0.20 9.56m3 1.00 1.00 4.50 2.40 0.20 2.16

LOSA MACIZA CISTERNA TECHO m3 1.00 1.00 8.50 3.25 0.20 5.53m3 1.00 1.00 10.50 4.55 0.20 9.56m3 1.00 1.00 4.50 2.40 0.20 2.16 47.39

03.05.06.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSAS MACIZASTANQUE ELEVADO BASE m2 1.00 1.00 6.70 1.00 1.00 6.70TANQUE ELEVADO PAREDES m2 1.00 1.00 12.63 1.00 3.82 48.24TANQUE ELEVADO TECHO TIPO CASCARA m2 2.00 1.00 34.62 1.00 1.00 69.24TANQUE ELEVADO CORONAS m2 8.00 1.00 1.95 2.00 1.00 31.20

LOSA MACIZA CISTERNA TECHO m3 1.00 1.00 8.50 3.25 1.00 27.63m3 1.00 1.00 10.50 4.55 1.00 47.78m3 1.00 1.00 4.50 2.40 1.00 10.80 241.58

03.05.06.03 ACERO GRADO 60 EN LOSAS MACIZAS VER PLANILLA DE ACERO

TAPA JUNTAS EN GRADERIAS

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 603.03 CONCRETO ARMADO TRIBUNA03.03.01 ZAPATAS03.03.01.02 ACERO GRADO 60 EN ZAPATAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOZ-6 2.00 0.90 0.90 4.00 0.80 6.40 1/2" 3.00 6.53

2.00 4.00 0.80 6.40 1/2" 3.00 6.53 MUROS DE CONTENCIONCIMIENTO DE MURO MC-2 1.00 23.25 1.50 116.25 1.50 174.38 1/2" 3.00 177.86

1.00 7.50 23.25 174.38 1/2" 3.00 177.86 CIMIENTO DE MURO MC-1 1.00 53.31 2.00 266.55 2.00 533.10 1/2" 3.00 543.76

1.00 10.00 53.31 533.10 1/2" 3.00 543.76

EXCAVACION ZONA PATIO DE BOLETERIAZ-6 1.00 0.90 0.90 4.00 0.80 3.20 1/2" 3.00 3.26

1.00 4.00 0.80 3.20 1/2" 3.00 3.26 TRIBUNAZAPATASZ-1 EJE A,Z 2.00 2.50 2.00 13.00 2.00 52.00 3/4" 5.00 119.60

2.00 10.00 2.50 50.00 3/4" 5.00 115.00 2.00 10.00 2.00 40.00 1/2" 3.00 40.80 2.00 8.00 2.50 40.00 1/2" 3.00 40.80 2.00 2.10 1.20 10.50 1.20 25.20 3/4" 5.00 57.96 2.00 6.00 2.10 25.20 3/4" 5.00 57.96

Z-2 EJE 4 CON B,C,D,E,F, I,J,K,L,O,Q,R,U,W 18.00 2.30 1.80 11.50 1.80 372.60 3/4" 5.00 856.98 18.00 9.00 2.30 372.60 3/4" 5.00 856.98 18.00 9.20 1.80 298.08 1/2" 3.00 304.04 18.00 7.20 2.30 298.08 1/2" 3.00 304.04

Z-4 EJE 4 CON GyH, MyN , SyT 3.00 3.00 3.00 15.00 3.00 135.00 3/4" 5.00 310.50 3.00 15.00 3.00 135.00 3/4" 5.00 310.50 3.00 12.00 3.00 108.00 1/2" 3.00 110.16 3.00 12.00 3.00 108.00 1/2" 3.00 110.16 3.00 3.48 1.20 17.40 1.20 62.64 3/4" 5.00 144.07 3.00 6.00 3.48 62.64 3/4" 5.00 144.07

Z-4 EJE 3 CON GyH, MyN , SyT 3.00 3.00 3.00 15.00 3.00 135.00 3/4" 5.00 310.50 3.00 15.00 3.00 135.00 3/4" 5.00 310.50 3.00 12.00 3.00 108.00 1/2" 3.00 110.16 3.00 12.00 3.00 108.00 1/2" 3.00 110.16

Z-3 EJE 3 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R 20.00 2.30 1.80 13.14 1.80 473.14 3/4" 5.00 1,088.23 20.00 10.29 2.30 473.14 3/4" 5.00 1,088.23 20.00 9.20 1.80 331.20 1/2" 3.00 337.82 20.00 7.20 2.30 331.20 1/2" 3.00 337.82

Z-2 EJE 2 CON A,B,C,D,E,F,I,J,K,L,O,P,Q,R 20.00 2.30 1.80 11.50 1.80 414.00 3/4" 5.00 952.20 20.00 9.00 2.30 414.00 3/4" 5.00 952.20 20.00 9.20 1.80 331.20 1/2" 3.00 337.82 20.00 7.20 2.30 331.20 1/2" 3.00 337.82 20.00

Z-4 EJE 2 CON GyH, MyN , SyT 3.00 3.00 3.00 15.00 3.00 135.00 3/4" 5.00 310.50 3.00 15.00 3.00 135.00 3/4" 5.00 310.50 3.00 12.00 3.00 108.00 1/2" 3.00 110.16 3.00 12.00 3.00 108.00 1/2" 3.00 110.16

PLACASEJE 2 4.00 5.02 0.75 25.10 0.75 75.30 5/8" 4.00 120.48

4.00 3.75 5.02 75.30 5/8" 4.00 120.48

ESCALERAS DE ACCESO A TRIBUNAS4.00 5.08 1.50 25.40 1.50 152.40 1/2" 3.00 155.45 4.00 7.50 5.08 152.40 1/2" 3.00 155.45

TANQUE ELEVADO 1.00 6.00 6.000.00 0.00 4,475.67 240.96 8,296.48 0.00

13,013.1103.03.02 VIGAS DE CIMENTACION03.03.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION

VC-1 26.00 0.40 0.80 4.00 17.03 1,771.61 1" 6.00 7,157.2926.00 8.00 3.16 657.28 1" 6.00 2,655.4126.00 4.00 5.30 551.20 1" 6.00 2,226.8526.00 2.00 17.03 885.80 1/2" 3.00 903.52 26.00 98.00 2.35 5,987.80 3/8" 2.00 3,592.68

EJE 4 VC-2 2.00 0.40 0.70 4.00 65.33 522.62 3/4" 5.00 1,202.04 2.00 16.00 7.80 249.60 1" 6.00 1,008.382.00 8.00 7.80 124.80 3/4" 5.00 287.04 2.00 36.00 3.80 273.60 5/8" 4.00 437.76 2.00 473.00 2.15 2,033.90 3/8" 2.00 1,220.34

EJE 3 VC-2 2.00 0.40 0.70 4.00 64.53 516.21 3/4" 5.00 1,187.28 2.00 16.00 2.35 75.20 5/8" 4.00 120.32 2.00 36.00 3.80 273.60 5/8" 4.00 437.76 2.00 473.00 2.15 2,033.90 3/8" 2.00 1,220.34

EJE 2 VC-2 2.00 0.40 0.70 4.00 41.29 330.35 3/4" 5.00 759.80 2.00 8.00 2.35 37.60 5/8" 4.00 60.16 2.00 12.00 3.80 91.20 5/8" 4.00 145.92 2.00 258.00 2.15 1,109.40 3/8" 2.00 665.64

EJE 2 VC-2A 2.00 0.40 0.70 4.00 35.47 283.73 1" 6.00 1,146.282.00 8.00 2.35 37.60 3/4" 5.00 86.48 2.00 16.00 3.80 121.60 5/8" 4.00 194.56 2.00 215.00 2.15 924.50 3/8" 2.00 554.70

Diam

PLANILLA DE METRADOS

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

0.00 7,253.70 903.52 1,396.48 3,522.63 14,194.2127,270.54

ACERO GRADO 60 EN MUROS DE CONTENCIONMURO MC-2 1.00 0.25 2.52 36.00 23.25 837.00 3/8" 2.00 502.20

1.00 93.00 4.93 458.49 3/8" 2.00 275.09 1.00 93.00 4.93 458.49 1/2" 3.00 467.66 1.00 93.00 2.47 229.25 1/2" 3.00 233.83

MURO MC-1 1.00 0.25 3.55 32.00 53.31 1,705.92 3/8" 2.00 1,023.55 1.00 266.55 4.27 1,138.17 1/2" 3.00 1,160.93 1.00 266.55 2.14 569.08 1/2" 3.00 580.47 1.00 213.24 4.27 910.53 3/8" 2.00 546.32

0.00 2,347.17 2,442.89 0.00 0.00 0.004,790.05

03.03.04 SOBRECIMIENTOS03.03.04.03 ACERO GRADO 60 EN SOBRECIMIENTOS

CC-3 1.00 4.00 122.24 488.96 3/8" 2.00 293.38 1.00 488.96 1.35 660.10 3/8" 2.00 396.06

SOBRECIMIENTO ARMADO 1.00 258.00 1.14 1,032.00 1.20 1,238.40 3/8" 2.00 743.04 1.00 4.56 258.00 1,176.48 3/8" 2.00 705.89

0.00 2,138.36 0.00 0.00 0.00 0.002,138.36

03.03.05 COLUMNAS03.03.05.03 ACERO GRADO 60 EN COLUMNAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOC-6 SUB ESTACION + GRUP ELECT 5.00 0.30 0.25 6.00 5.50 6.65 199.50 1/2" 3.00 203.49

5.00 31.43 1.05 165.00 3/8" 2.00 99.00 C-8 7.00 0.30 0.25 6.00 3.90 6.65 279.30 1/2" 3.00 284.89

7.00 22.29 1.05 163.80 1/4" 1.00 42.59 C-A 4.00 0.25 0.15 6.00 3.25 4.90 117.60 3/8" 2.00 70.56

4.00 18.57 0.75 55.71 1/4" 1.00 14.49 C-7 2.00 0.30 0.30 6.00 5.50 6.65 79.80 5/8" 4.00 127.68

2.00 31.43 1.15 72.29 3/8" 2.00 43.37

EXCAVACION ZONA DE BOLETERIAC-7 2.00 0.30 0.30 6.00 5.50 6.65 79.80 5/8" 4.00 127.68

2.00 31.43 1.15 72.29 3/8" 2.00 43.37 C-A 15.00 0.25 0.15 6.00 3.20 4.90 441.00 3/8" 2.00 264.60

15.00 18.29 0.75 205.71 1/4" 1.00 53.49 C-9 19.00 0.25 0.15 4.00 3.40 4.80 364.80 3/8" 2.00 218.88

19.00 27.43 0.75 390.86 1/4" 1.00 101.62 C-A CERCO DE MALLA ENTRE TRIBUNA Y 36.00 0.25 0.15 6.00 3.00 4.40 950.40 3/8" 2.00 570.24

36.00 17.14 0.75 462.86 1/4" 1.00 120.34

TENSORES SEGUNDO PISOT-1 EJE 4 32.00 0.25 0.15 4.00 3.10 3.90 499.20 1/2" 3.00 509.18

32.00 17.22 0.75 413.33 1/4" 1.00 107.47 T-1 EJE 4-3 84.00 0.25 0.15 4.00 3.50 4.30 1,444.80 1/2" 3.00 1,473.70

84.00 19.44 0.75 1,225.00 1/4" 1.00 318.50 T-1 EJE 3 32.00 0.25 0.15 4.00 3.10 3.90 499.20 1/2" 3.00 509.18

32.00 17.22 0.75 413.33 1/4" 1.00 107.47 TENSORES TERCER PISOT-1 EJE 4 12.00 0.25 0.15 4.00 3.63 4.43 212.64 1/2" 3.00 216.89

12.00 20.74 0.75 186.69 1/4" 1.00 48.54 T-1 EJE 4-3 61.00 0.25 0.15 4.00 4.03 4.83 1,178.52 1/2" 3.00 1,202.09

61.00 23.03 0.75 1,053.56 1/4" 1.00 273.92 T-2 EJE 4-3 24.00 0.15 0.15 4.00 4.03 4.83 463.68 1/2" 3.00 472.95

24.00 23.03 0.55 303.98 1/4" 1.00 79.03 T-3 28.00 0.25 0.15 4.00 1.20 2.00 224.00 3/8" 2.00 134.40

28.00 6.86 0.75 144.00 1/4" 1.00 37.44 TRIBUNAEJE 4 C-2 18.00 0.90 0.40 8.00 10.67 15.66 2,255.04 1" 6.00 9,110.36

18.00 8.00 15.66 2,255.04 3/4" 5.00 5,186.59 18.00 123.00 1.95 4,317.30 3/8" 2.00 2,590.38 18.00 123.00 1.95 4,317.30 3/8" 2.00 2,590.38

EJE 4 C-4 28.00 0.25 0.15 6.00 3.14 3.74 628.32 1/2" 3.00 640.89 28.00 21.37 0.75 448.80 3/8" 2.00 269.28

EJE 4 C-8 8.00 0.30 0.15 6.00 3.84 4.44 213.12 1/2" 3.00 217.38 8.00 25.37 0.85 172.53 1/4" 1.00 44.86

EJE 4-3 C-4 57.00 0.25 0.15 6.00 3.14 3.74 1,279.08 1/2" 3.00 1,304.66 57.00 21.37 0.75 913.63 3/8" 2.00 548.18

EJE 3 C-2 8.00 0.90 0.40 8.00 9.62 11.52 737.28 1" 6.00 2,978.618.00 8.00 11.52 737.28 3/4" 5.00 1,695.74 8.00 89.00 1.95 1,388.40 3/8" 2.00 833.04 8.00 89.00 1.95 1,388.40 3/8" 2.00 833.04

EJE 3 C-1 18.00 0.90 0.40 12.00 9.62 11.52 2,488.32 1" 6.00 10,052.8118.00 4.00 11.52 829.44 3/4" 5.00 1,907.71 18.00 89.00 1.95 3,123.90 3/8" 2.00 1,874.34 18.00 89.00 1.95 3,123.90 3/8" 2.00 1,874.34

EJE 3 C-4 19.00 0.25 0.15 6.00 3.14 3.74 426.36 1/2" 3.00 434.89 19.00 21.37 0.75 304.54 3/8" 2.00 182.73

EJE 3-2 C-4 61.00 0.25 0.15 6.00 3.14 3.74 1,368.84 1/2" 3.00 1,396.22 61.00 21.37 0.75 977.74 3/8" 2.00 586.65

EJE 3-2 C-5 27.00 0.25 0.15 6.00 3.14 3.74 605.88 3/8" 2.00 363.53 27.00 21.37 0.75 432.77 1/4" 1.00 112.52

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

EJE 2 C-2 18.00 0.90 0.40 8.00 5.38 7.28 1,048.32 1" 6.00 4,235.2118.00 8.00 7.28 1,048.32 3/4" 5.00 2,411.14 18.00 56.00 1.95 1,965.60 3/8" 2.00 1,179.36 18.00 56.00 1.95 1,965.60 3/8" 2.00 1,179.36

1,462.27 16,349.02 8,866.41 255.36 11,201.18 26,377.0064,511.25

03.03.06 TABIQUE Y PLACA03.03.06.03 ACERO GRADO 60 EN TABIQUES Y PLACAS

TRIBUNAEJE 4 P-1 8.00 8.00 15.66 1,002.24 1" 6.00 4,049.05

8.00 8.00 15.66 1,002.24 3/4" 5.00 2,305.15 8.00 22.00 15.66 2,756.16 1/2" 3.00 2,811.28 8.00 4.00 15.66 501.12 5/8" 4.00 801.79 8.00 89.00 1.95 1,388.40 3/8" 2.00 833.04 8.00 89.00 1.95 1,388.40 3/8" 2.00 833.04 8.00 42.68 5.86 2,000.84 3/8" 2.00 1,200.50

EJE 2 P-1 4.00 16.00 5.38 7.28 465.92 1" 6.00 1,882.324.00 16.00 7.28 465.92 3/4" 5.00 1,071.62 4.00 178.00 1.95 1,388.40 3/8" 2.00 833.04 4.00 178.00 1.95 1,388.40 3/8" 2.00 833.04 4.00 50.00 8.78 1,756.00 1/2" 3.00 1,791.12 4.00 29.12 5.98 696.55 1/2" 3.00 710.48

TABIQUE DE CONCRETO E=0.15 MT-1 4.00 5.07 3.10 20.28 3.90 316.37 3/8" 2.00 189.82 4.00 12.40 5.87 291.15 3/8" 2.00 174.69

0.00 4,897.18 5,312.88 801.79 3,376.77 5,931.3720,319.99

03.03.07 VIGAS03.03.07.03 ACERO GRADO 60 EN VIGAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUB ESTACION + GRUPO ELET+ CERCO PERIMETRICO + CASETA DE CONTROLVS-1 2.00 0.25 0.20 4.00 6.42 6.82 54.56 1/2" 3.00 55.65

2.00 38.97 0.85 66.25 1/4" 1.00 17.23 VS-1 1.00 0.25 0.20 4.00 14.95 15.35 61.40 1/2" 3.00 62.63

1.00 87.71 0.85 74.56 1/4" 1.00 19.38 VS-1 2.00 0.25 0.20 4.00 6.42 6.82 54.56 1/2" 3.00 55.65

2.00 38.97 0.85 66.25 1/4" 1.00 17.23 VS-1 2.00 0.25 0.20 4.00 8.78 9.18 73.44 1/2" 3.00 74.91

2.00 52.46 0.85 89.18 1/4" 1.00 23.19 VS-1 1.00 0.25 0.20 4.00 6.57 6.97 27.88 1/2" 3.00 28.44

1.00 39.83 0.85 33.85 1/4" 1.00 8.80 VA-1 1.00 0.25 0.20 4.00 6.42 6.82 27.28 1/2" 3.00 27.83

1.00 38.97 0.85 33.13 1/4" 1.00 8.61 VA-3 1.00 0.25 0.20 4.00 5.05 5.45 21.80 1/2" 3.00 22.24

1.00 31.14 0.85 26.47 1/4" 1.00 6.88 VA-2 1.00 0.25 0.40 4.00 25.71 26.11 104.44 1/2" 3.00 106.53

1.00 149.20 1.25 186.50 1/4" 1.00 48.49 ZONA DE BOLETERIAVS-1 1.00 0.25 0.15 4.00 26.29 26.69 106.76 1/2" 3.00 108.90

1.00 152.51 0.75 114.39 1/4" 1.00 29.74 VA-1 1.00 0.25 0.20 4.00 9.00 9.40 37.60 1/2" 3.00 38.35

1.00 53.71 0.85 45.66 1/4" 1.00 11.87 CERCO PROVISIONAL VS-1 1.00 0.25 0.20 4.00 45.88 46.28 185.12 1/2" 3.00 188.82

1.00 264.46 0.85 224.79 1/4" 1.00 58.45 TRIBUNAPORTICO EN LOS EXTREMOS VP-101 8.00 0.40 0.60 4.00 16.30 521.60 1" 6.00 2,107.26

8.00 2.00 3.55 56.80 3/4" 5.00 130.64 8.00 2.00 4.00 64.00 3/4" 5.00 147.20 8.00 3.00 5.30 127.20 3/4" 5.00 292.56 8.00 2.00 4.92 78.72 3/4" 5.00 181.06 8.00 2.00 5.46 87.36 3/4" 5.00 200.93 8.00 2.00 15.70 251.20 1/2" 3.00 256.22

EST 8.00 86.00 1.93 1,327.84 3/8" 2.00 796.70

VP-201 8.00 0.40 0.60 4.00 6.26 8.12 259.84 1" 6.00 1,049.758.00 3.00 3.55 85.20 3/4" 5.00 195.96 8.00 3.00 3.55 85.20 3/4" 5.00 195.96 8.00 2.00 5.46 87.36 3/4" 5.00 200.93 8.00 2.00 8.12 129.92 1/2" 3.00 132.52

EST 8.00 45.00 1.93 694.80 3/8" 2.00 416.88

VP-301 8.00 0.40 0.60 2.00 25.49 407.89 1" 6.00 1,647.898.00 2.00 22.99 367.79 1" 6.00 1,485.868.00 3.00 3.10 74.40 3/4" 5.00 171.12 8.00 3.00 5.80 139.20 3/4" 5.00 320.16 8.00 4.00 7.90 252.80 1" 6.00 1,021.318.00 4.00 4.72 151.04 1" 6.00 610.208.00 2.00 5.28 84.48 3/4" 5.00 194.30 8.00 2.00 4.37 69.92 3/4" 5.00 160.82 8.00 2.00 23.94 383.02 1/2" 3.00 390.68

EST 8.00 127.00 2.15 2,184.40 3/8" 2.00 1,310.64 EST 8.00 36.00 2.55 734.40 3/8" 2.00 440.64 EST 8.00 17.00 2.05 278.80 3/8" 2.00 167.28

VP-100 18.00 0.40 0.60 4.00 16.30 1,173.60 1" 6.00 4,741.34

18.00 4.00 3.55 255.60 1" 6.00 1,032.6218.00 4.00 4.00 288.00 3/4" 5.00 662.40 18.00 4.00 5.30 381.60 1" 6.00 1,541.6618.00 2.00 4.92 177.12 3/4" 5.00 407.38 18.00 2.00 5.46 196.56 3/4" 5.00 452.09 18.00 2.00 15.70 565.20 1/2" 3.00 576.50

EST 18.00 86.00 1.93 2,987.64 3/8" 2.00 1,792.58

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

VP-200 18.00 0.40 0.60 4.00 6.26 8.12 584.64 1" 6.00 2,361.95

18.00 4.00 3.55 255.60 1" 6.00 1,032.6218.00 4.00 3.55 255.60 3/4" 5.00 587.88 18.00 2.00 5.46 196.56 3/4" 5.00 452.09 18.00 2.00 8.12 292.32 1/2" 3.00 298.17

EST 18.00 45.00 1.93 1,563.30 3/8" 2.00 937.98

VP-300 18.00 0.40 0.60 2.00 25.49 917.76 1" 6.00 3,707.7518.00 2.00 22.99 827.52 1" 6.00 3,343.1818.00 4.00 3.10 223.20 1" 6.00 901.7318.00 4.00 5.80 417.60 1" 6.00 1,687.1018.00 6.00 7.90 853.20 1" 6.00 3,446.9318.00 4.00 4.72 339.84 1" 6.00 1,372.9518.00 2.00 5.28 190.08 3/4" 5.00 437.18 18.00 2.00 4.37 157.32 3/4" 5.00 361.84 18.00 2.00 23.94 861.79 1/2" 3.00 879.03

EST 18.00 127.00 2.15 4,914.90 3/8" 2.00 2,948.94 EST 18.00 36.00 2.55 1,652.40 3/8" 2.00 991.44 EST 18.00 17.00 2.05 627.30 3/8" 2.00 376.38

TRANVERSALES V-101 EJE 4 2.00 0.40 0.60 4.00 61.02 62.91 503.28 3/4" 5.00 1,157.54

2.00 16.00 7.91 253.12 1" 6.00 1,022.602.00 8.00 7.91 126.56 3/4" 5.00 291.09 2.00 36.00 3.80 273.60 5/8" 4.00 437.76 2.00 2.00 62.91 251.64 1/2" 3.00 256.67 2.00 403.00 1.93 1,555.58 3/8" 2.00 933.35

V-201 EJE 4 2.00 0.40 0.60 4.00 61.02 62.91 503.28 3/4" 5.00 1,157.54

2.00 16.00 7.91 253.12 1" 6.00 1,022.602.00 8.00 7.91 126.56 3/4" 5.00 291.09 2.00 36.00 3.80 273.60 5/8" 4.00 437.76 2.00 2.00 62.91 251.64 1/2" 3.00 256.67 2.00 403.00 1.93 1,555.58 3/8" 2.00 933.35

V-301 EJE 4 2.00 0.40 0.60 4.00 61.02 62.91 503.28 3/4" 5.00 1,157.54

2.00 16.00 7.91 253.12 1" 6.00 1,022.602.00 8.00 7.91 126.56 3/4" 5.00 291.09 2.00 36.00 3.80 273.60 5/8" 4.00 437.76 2.00 2.00 62.91 251.64 1/2" 3.00 256.67 2.00 403.00 1.93 1,555.58 3/8" 2.00 933.35

V-102 EJE 3 2.00 0.40 0.60 6.00 61.02 62.91 754.92 3/4" 5.00 1,736.32

2.00 36.00 3.80 273.60 3/4" 5.00 629.28 2.00 16.00 2.40 76.80 3/4" 5.00 176.64 2.00 451.00 1.93 1,740.86 3/8" 2.00 1,044.52

V-202 EJE 3 2.00 0.40 0.60 6.00 61.02 62.91 754.92 3/4" 5.00 1,736.32

2.00 36.00 3.80 273.60 3/4" 5.00 629.28 2.00 16.00 2.40 76.80 3/4" 5.00 176.64 2.00 451.00 1.93 1,740.86 3/8" 2.00 1,044.52

V-101 EJE 2 2.00 0.40 0.60 4.00 61.02 34.40 275.20 3/4" 5.00 632.96

2.00 20.00 3.80 152.00 5/8" 4.00 243.20 2.00 2.00 33.25 133.00 1/2" 3.00 135.66 2.00 222.00 1.93 856.92 3/8" 2.00 514.15

V-101A EJE 2 2.00 0.40 0.60 4.00 61.02 29.63 237.06 1" 6.00 957.71

2.00 8.00 2.60 41.60 3/4" 5.00 95.68 2.00 16.00 3.80 121.60 3/4" 5.00 279.68 2.00 2.00 27.78 111.12 1/2" 3.00 113.34 2.00 205.00 1.93 791.30 3/8" 2.00 474.78

VB-02 1.00 0.30 1.18 8.00 122.04 123.20 985.60 5/8" 4.00 1,576.96 1.00 2.00 123.20 246.40 1/2" 3.00 251.33 1.00 717.65 2.95 2,117.06 3/8" 2.00 1,270.24

VB-01 2.00 0.30 0.94 8.00 122.04 123.20 1,971.20 5/8" 4.00 3,153.92 2.00 2.00 123.20 492.80 1/2" 3.00 502.66 2.00 717.65 2.43 3,487.76 3/8" 2.00 2,092.66

PARAPETO 1.00 6.00 122.00 732.00 1/2" 3.00 746.64 1.00 488.00 3.94 1,922.72 3/8" 2.00 1,153.63

PRIMER PISOVA-4 2.00 0.25 0.25 7.00 55.65 58.12 813.73 1/2" 3.00 830.00

2.00 332.13 0.95 631.05 1/4" 1.00 164.07 1.00 0.25 0.25 7.00 11.85 12.38 86.64 1/2" 3.00 88.37 1.00 67.71 0.95 64.33 1/4" 1.00 16.73

VA-6 2.00 0.25 0.25 4.00 5.90 6.30 50.40 1/2" 3.00 51.41 36.00 0.95 0.00 1/4" 1.00 0.00

SEGUNDO PISOVA-4 1.00 0.25 0.25 7.00 11.85 12.38 86.64 1/2" 3.00 88.37

1.00 70.72 0.95 67.19 1/4" 1.00 17.47 VA-4 2.00 0.25 0.25 7.00 61.12 63.84 893.71 1/2" 3.00 911.58

2.00 364.78 0.95 693.08 1/4" 1.00 180.20 TERCER PISOVA-5 2.00 0.15 0.20 4.00 4.20 4.60 36.80 3/8" 2.00 22.08

2.00 26.29 0.65 34.17 1/4" 1.00 8.88 2.00 0.15 0.20 4.00 33.38 33.78 270.24 3/8" 2.00 162.14 2.00 193.03 0.65 250.94 1/4" 1.00 65.24 8.00 0.15 0.20 4.00 3.10 3.50 112.00 3/8" 2.00 67.20 8.00 20.00 0.65 104.00 1/4" 1.00 27.04

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

6.00 0.15 0.20 4.00 3.10 3.50 84.00 3/8" 2.00 50.40 6.00 20.00 0.65 78.00 1/4" 1.00 20.28 1.00 0.15 0.20 4.00 11.85 12.25 49.00 3/8" 2.00 29.40 1.00 70.00 0.65 45.50 1/4" 1.00 11.83

761.61 20,905.23 7,792.43 6,287.36 16,191.17 37,117.6589,055.45

03.03.08 LOSAS MACIZAS03.03.08.03 ACERO GRADO 60 EN LOSAS MACIZAS

TRIBUNASPRIMER PISOPRIMER PISOACERO INFERIOR 7.00 7.21 5.07 28.84 5.07 1,023.53 3/8" 2.00 614.12

7.00 20.28 7.21 1,023.53 3/8" 2.00 614.12 ACERO SUPERIOR 7.00 36.05 2.10 529.94 1/2" 3.00 540.53

7.00 36.05 2.50 630.88 1/2" 3.00 643.49 7.00 20.28 3.10 440.08 1/2" 3.00 448.88 7.00 20.28 3.10 440.08 1/2" 3.00 448.88

4.00 5.07 3.49 20.28 3.49 283.11 3/8" 2.00 169.87 4.00 13.96 5.07 283.11 3/8" 2.00 169.87 4.00 20.28 3.49 283.11 3/8" 2.00 169.87 4.00 13.96 5.07 283.11 3/8" 2.00 169.87

TERCER PISOLOSA MACIZA DE E=0.08 6.00 1.45 1.35 9.00 1.61 86.94 3/8" 2.00 52.16

6.00 9.00 1.70 91.80 3/8" 2.00 55.08 LOSA MACIZA DE E=0.08 2.00 2.41 1.00 9.00 1.61 28.98 3/8" 2.00 17.39

2.00 9.00 1.61 28.98 3/8" 2.00 17.39 LOSA EN PATIO DE SERVICIOS 1.00 473.21 8.00 3,785.68 3/8" 2.00 2,271.41 LOSA DE APOYO DE MOTOR GENERADO 2.00 17.50 1.50 52.50 1/2" 3.00 53.55

2.00 7.50 3.50 52.50 1/2" 3.00 53.55 4.00 14.00 1.31 73.36 1/2" 3.00 74.83 4.00 6.00 1.31 31.44 1/2" 3.00 32.07 2.00 7.00 3.50 49.00 1/2" 3.00 49.98

0.00 4,321.13 2,345.76 0.00 0.00 0.006,666.88

03.03.09 LOSAS ALIGERADAS03.03.09.03 ACERO GRADO 60 EN LOSAS ALIGERADAS

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOSUBESTACIOND 1.00 5.90 9.60 4.00 10.50 42.00 3/8" 2.00 25.20

1.00 4.00 2.65 10.60 3/8" 2.00 6.36 1.00 4.00 2.75 11.00 3/8" 2.00 6.60 1.00 8.00 1.40 11.20 3/8" 2.00 6.72 1.00 4.00 3.50 14.00 1/2" 3.00 14.28 1.00 4.00 2.20 8.80 3/8" 2.00 5.28

E 1.00 9.00 4.96 44.64 3/8" 2.00 26.78 1.00 9.00 2.65 23.85 3/8" 2.00 14.31 1.00 9.00 4.95 44.55 1/2" 3.00 45.44 1.00 9.00 1.40 12.60 3/8" 2.00 7.56 1.00 9.00 7.20 64.80 1/2" 3.00 66.10

TEMPERATURA 1.00 42.00 5.90 247.80 1/4" 1.00 64.43

CASETAC 1.00 2.00 1.10 5.00 1.50 7.50 3/8" 2.00 4.50

1.00 5.00 1.75 8.75 3/8" 2.00 5.25 1.00 4.40 2.00 8.80 1/4" 1.00 2.29

ZONA DE BOLETERIA1.00 1.25 2.75 7.00 6.23 43.61 3/8" 2.00 26.17 1.00 7.00 6.23 43.61 3/8" 2.00 26.17

TRIBUNASPRIIMER NIVELTIPO AACERO LARGO 2.00 7.00 16.72 234.08 1/2" 3.00 238.76 AC (+) 2.00 14.00 3.50 98.00 1/2" 3.00 99.96 AC (+) 2.00 7.00 3.50 49.00 3/8" 2.00 29.40 BASTON 2.00 14.00 1.70 47.60 3/8" 2.00 28.56 BALANCIN 2.00 14.00 3.80 106.40 1/2" 3.00 108.53 BALANCIN 2.00 14.00 2.80 78.40 1/2" 3.00 79.97 TEMP 2.00 70.78 1.00 141.55 1/4" 1.00 36.80

TIPO BACERO LARGO 4.00 25.00 11.24 1,124.00 1/2" 3.00 1,146.48 AC (+) 4.00 50.00 3.50 700.00 1/2" 3.00 714.00 BASTON 4.00 50.00 1.70 340.00 3/8" 2.00 204.00 BALANCIN 4.00 25.00 3.80 380.00 1/2" 3.00 387.60 BALANCIN 4.00 25.00 2.80 280.00 1/2" 3.00 285.60 TEMP 4.00 524.37 1.00 2,097.48 1/4" 1.00 545.34

TIPO BACERO LARGO 1.00 28.00 11.24 314.72 1/2" 3.00 321.01 AC (+) 1.00 56.00 3.50 196.00 1/2" 3.00 199.92 BASTON 1.00 56.00 1.70 95.20 3/8" 2.00 57.12 BALANCIN 1.00 28.00 3.80 106.40 1/2" 3.00 108.53 BALANCIN 1.00 28.00 2.80 78.40 1/2" 3.00 79.97 TEMP 1.00 603.16 1.00 603.16 1/4" 1.00 156.82

TIPO CACERO LARGO 1.00 17.00 5.80 98.60 1/2" 3.00 100.57 AC (+) 1.00 17.00 3.50 59.50 1/2" 3.00 60.69 BASTON 1.00 34.00 1.70 57.80 3/8" 2.00 34.68 TEMP 1.00 184.08 1.00 184.08 1/4" 1.00 47.86

SEGUNDO NIVEL

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

TTPO DACERO LARGO 2.00 11.00 33.12 728.64 1/2" 3.00 743.21 AC (+) 2.00 22.00 3.50 154.00 1/2" 3.00 157.08 AC (+) 2.00 44.00 3.50 308.00 3/8" 2.00 184.80 BASTON 2.00 22.00 1.70 74.80 3/8" 2.00 44.88 BALANCIN 2.00 55.00 3.80 418.00 1/2" 3.00 426.36 BALANCIN 2.00 55.00 2.80 308.00 1/2" 3.00 314.16 TEMP 2.00 1,038.60 1.00 2,077.20 1/4" 1.00 540.07

TIPO EACERO LARGO 2.00 7.00 22.20 310.80 1/2" 3.00 317.02 AC (+) 2.00 14.00 3.50 98.00 1/2" 3.00 99.96 AC (+) 2.00 14.00 3.50 98.00 3/8" 2.00 58.80 BASTON 2.00 14.00 1.70 47.60 3/8" 2.00 28.56 BALANCIN 2.00 21.00 3.80 159.60 1/2" 3.00 162.79 BALANCIN 2.00 21.00 2.80 117.60 1/2" 3.00 119.95 TEMP 2.00 449.60 1.00 899.20 1/4" 1.00 233.79

TIPO FACERO LARGO 2.00 5.00 27.65 276.50 1/2" 3.00 282.03 AC (+) 2.00 10.00 3.50 70.00 1/2" 3.00 71.40 AC (+) 2.00 15.00 3.50 105.00 3/8" 2.00 63.00 BASTON 2.00 10.00 1.70 34.00 3/8" 2.00 20.40 BALANCIN 2.00 20.00 3.80 152.00 1/2" 3.00 155.04 BALANCIN 2.00 20.00 2.80 112.00 1/2" 3.00 114.24 TEMP 2.00 265.60 1.00 531.20 1/4" 1.00 138.11

1,765.52 915.10 7,020.65 0.00 0.00 0.009,701.27

03.03.10 ESCALERAS03.03.10.03 ACERO GRADO 60 EN ESCALERAS

4.00 25.35 8.25 836.55 5/8" 4.00 1,338.48 4.00 20.28 7.96 645.72 1/2" 3.00 658.63 4.00 20.28 2.67 216.59 3/8" 2.00 129.95 4.00 20.28 3.44 279.05 1/2" 3.00 284.63 4.00 62.00 5.07 1,257.36 3/8" 2.00 754.42

ESCALERA HACIA TRIBUNA 4.00 20.00 0.75 60.00 1/2" 3.00 61.20 4.00 20.00 2.75 220.00 1/2" 3.00 224.40 4.00 20.00 2.75 220.00 1/2" 3.00 224.40 4.00 20.00 0.80 64.00 1/2" 3.00 65.28 4.00 15.00 5.00 300.00 3/8" 2.00 180.00

ESCALERA A OFICINASPRIMER TRAMO A=1.27 2.00 8.47 5.71 96.69 1/2" 3.00 98.62

2.00 5.08 5.51 55.98 3/8" 2.00 33.59 2.00 5.08 1.66 16.87 3/8" 2.00 10.12 2.00 5.08 2.05 20.83 3/8" 2.00 12.50 2.00 40.00 1.27 101.60 3/8" 2.00 60.96

SEGUNDO TRAMO A=1.27 6.00 8.47 6.57 333.76 1/2" 3.00 340.43 6.00 5.08 6.53 199.03 3/8" 2.00 119.42 6.00 5.08 2.02 61.57 3/8" 2.00 36.94 6.00 6.35 1.11 42.29 3/8" 2.00 25.37 6.00 5.08 1.95 59.44 3/8" 2.00 35.66 6.00 40.00 1.27 304.80 3/8" 2.00 182.88

0.00 1,581.81 1,957.60 1,338.48 0.00 0.004,877.89

03.03.11 GRADERIAS03.03.11.03 ACERO GRADO 60 EN GRADERIAS

PARAPETO PARTE BAJA 2.00 3.00 61.02 366.12 1/2" 3.00 373.44 2.00 244.08 0.82 400.29 1/2" 3.00 408.30

BASE 2.00 10.00 61.02 1,220.40 1/2" 3.00 1,244.81 2.00 244.08 1.40 683.42 1/2" 3.00 697.09 2.00 244.10 1.40 683.48 1/2" 3.00 697.15

1 CONTRAPASOESTRIBO 2.00 363.00 1.62 1,176.12 1/4" 1.00 305.79

2.00 4.00 61.02 488.16 3/8" 2.00 292.90 TRAMO COMPLETOTIPO C 38.00 244.10 1.12 10,388.90 3/8" 2.00 6,233.34 TIPO C 38.00 244.10 1.12 10,388.90 3/8" 2.00 6,233.34 LONG 38.00 6.00 61.02 13,912.56 1/2" 3.00 14,190.81 LONG 38.00 6.00 61.02 13,912.56 3/8" 2.00 8,347.54 LONG 38.00 3.00 61.02 6,956.28 3/8" 2.00 4,173.77 ESTRIBO 38.00 363.00 1.45 20,001.30 1/4" 1.00 5,200.34

TRAMO CORTADOTIPO C 4.00 410.20 1.12 1,837.70 3/8" 2.00 1,102.62 TIPO C 4.00 410.20 1.12 1,837.70 3/8" 2.00 1,102.62 LONG 4.00 6.00 102.55 2,461.20 1/2" 3.00 2,510.42 LONG 4.00 6.00 102.55 2,461.20 3/8" 2.00 1,476.72 LONG 4.00 3.00 102.55 1,230.60 3/8" 2.00 738.36 ESTRIBO 4.00 610.00 1.45 3,538.00 1/4" 1.00 919.88

BARANDE PROTECCION EN GRADERIA 4.00 3.00 11.27 135.24 1/2" 3.00 137.94 4.00 45.08 0.90 162.29 1/2" 3.00 165.53

GRADERIA EN ZONA DE RELLENO 1.00 407.80 122.34 49,890.25 3/8" 2.00 29,934.15 1.00 20.00 2.37 47.40 3/8" 2.00 28.44

GRADERIA PARA COMPLETAR 1.00 56.53 16.96 958.81 3/8" 2.00 575.28 1.00 7.00 2.40 16.80 3/8" 2.00 10.08

GRADERIA EN SALA DE BOXEO 1.00 11.00 26.31 289.41 3/8" 2.00 173.65 1.00 87.70 2.63 230.65 3/8" 2.00 138.39

CORREDOR EN GRADERIA DE 1.20 ACERO LONGITUDINAL 1.00 4.00 122.34 489.36 3/8" 2.00 293.62 INCREMENTO DE ESTRIBO 1.00 611.70 0.84 513.83 3/8" 2.00 308.30

6,426.01 61,163.09 20,425.50 0.00 0.00 0.00

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

88,014.6103.04 CONCRETO ARMADO COBERTURA03.04.01 ZAPATAS03.04.01.02 ACERO GRADO 60 EN ZAPATAS

ZAPATA TORRE 2.00 27.20 6.80 369.92 5/8" 4.00 591.87 2.00 27.20 6.80 369.92 5/8" 4.00 591.87 2.00 27.20 6.80 369.92 5/8" 4.00 591.87 2.00 27.20 6.80 369.92 5/8" 4.00 591.87

sup 2.00 3.00 28.00 168.00 5/8" 4.00 268.80 2.00 112.00 0.90 201.60 5/8" 4.00 322.56

parte de 6*6 2.00 24.00 6.00 288.00 5/8" 4.00 460.80 2.00 24.00 6.00 288.00 5/8" 4.00 460.80 2.00 17.00 24.00 816.00 5/8" 4.00 1,305.60 2.00 96.00 6.40 1,228.80 5/8" 4.00 1,966.08

0.00 0.00 0.00 7,152.13 0.00 0.007,152.13

03.04.02 APOYOS03.04.02.03 ACERO GRADO 60 EN APOYOS

2.00 22.00 5.50 242.00 5/8" 4.00 387.20 2.00 22.00 5.50 242.00 5/8" 4.00 387.20 2.00 22.00 5.50 242.00 5/8" 4.00 387.20 2.00 22.00 5.50 242.00 5/8" 4.00 387.20 2.00 9.00 22.00 396.00 5/8" 4.00 633.60 2.00 88.00 2.60 457.60 5/8" 4.00 732.16 2.00 14.00 3.50 98.00 5/8" 4.00 156.80 2.00 14.00 3.50 98.00 5/8" 4.00 156.80 2.00 11.00 14.00 308.00 5/8" 4.00 492.80 2.00 56.00 4.50 504.00 5/8" 4.00 806.40 2.00 25.00 8.82 441.00 1/2" 3.00 449.82 2.00 34.00 6.60 448.80 1/2" 3.00 457.78

0.00 0.00 907.60 4,527.36 0.00 0.005,434.96

03.05 CONCRETO ARMADO CISTERNA - TANQUE ELEVADO03.05.01 ZAPATAS03.05.01.02 ACERO GRADO 60 EN ZAPATAS03.05.02 LOSAS DE CIMENTACION03.05.02.03 ACERO GRADO 60 EN LOSAS DE CIMENTACION

CISTERNAPISO 1.00 85.53 10.00 855.30 3/8" 2.00 513.18

1.00 30.20 10.00 302.00 3/8" 2.00 181.20

TANQUE ELEVADOZAPATA 1.00 30.00 6.00 180.00 5/8" 4.00 288.00

1.00 30.00 6.00 180.00 5/8" 4.00 288.00 1.00 24.00 6.00 144.00 1/2" 3.00 146.88 1.00 24.00 6.00 144.00 1/2" 3.00 146.88

TAPA DE RELLENO 2.00 19.64 8.00 314.24 3/8" 2.00 188.54 0.00 882.92 293.76 576.00 0.00 0.00

1,752.68

03.05.03 MURO SOSTENIMIENTO03.05.03.03 ACERO GRADO 60 ENMURO DE SOSTENIMIENTO

CISTERNAMURO ALTO 2.00 42.50 5.10 433.50 1/2" 3.00 442.17

2.00 22.00 8.50 374.00 1/2" 3.00 381.48

MURO NORMAL 2.00 15.00 38.90 1,167.00 1/2" 3.00 1,190.34 2.00 194.50 3.60 1,400.40 1/2" 3.00 1,428.41

2.00 22.00 13.00 572.00 1/2" 3.00 583.44 2.00 65.00 4.82 626.60 1/2" 3.00 639.13

2.00 85.53 9.00 1,539.54 3/8" 2.00 923.72 MURO DE CAPATACIONHORIZONTAL 2.00 16.00 2.00 64.00 1/2" 3.00 65.28 VERTICAL 2.00 16.00 2.40 76.80 1/2" 3.00 78.34 TANQUE ELEVADO MURO COLLAR BASE 1.00 16.00 14.95 239.20 1/2" 3.00 243.98

2.00 59.80 3.20 382.72 1/2" 3.00 390.37 0.00 923.72 5,442.94 0.00 0.00 0.00

6,366.6703.05.04 COLUMNAS03.05.04.03 ACERO GRADO 60 EN COLUMNAS

4.00 3.00 4.80 57.60 5/8" 4.00 92.16 4.00 3.00 4.15 49.80 5/8" 4.00 79.68 4.00 3.00 7.22 86.64 5/8" 4.00 138.62 4.00 7.00 22.83 639.24 3/4" 5.00 1,470.254.00 6.00 21.95 526.80 5/8" 4.00 842.88 4.00 6.00 22.60 542.40 3/4" 5.00 1,247.52

EST 4.00 20.00 5.30 424.00 1/4" 1.00 110.24 EST 4.00 19.00 2.65 201.40 1/4" 1.00 52.36 EST 4.00 24.00 2.15 206.40 3/8" 2.00 123.84 EST 4.00 147.00 3.80 2,234.40 3/8" 2.00 1,340.64

162.60 1,464.48 0.00 1,153.34 2,717.77 0.005,498.20

03.05.05 VIGAS03.05.05.03 ACERO GRADO 60 EN VIGAS

VA-1 6.00 8.00 7.80 374.40 3/4" 5.00 861.12EST 6.00 64.00 1.60 614.40 3/8" 2.00 368.64

VA-2 1.00 6.00 7.50 45.00 5/8" 4.00 72.00 EST 1.00 42.86 1.10 3/8" 2.00 0.00

VA-3 1.00 6.00 17.75 106.50 1/2" 3.00 108.63

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE REFUERZO DE ACERO FY=4200 KG/CM2UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

0.26 0.6 1.02 1.6 2.3 4.04Codigo Cant de Nº de Long Long 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Elemen Piezas P/Pz Total 1 2 3 4 5 6Diam

PLANILLA DE METRADOS

EST 1.00 101.43 1.00 101.43 1/4" 1.00 26.37 26.37 368.64 108.63 72.00 861.12 0.00

1,436.7603.05.06 LOSAS MACIZAS03.05.06.03 ACERO GRADO 60 EN LOSAS MACIZAS

PISO 1.00 5.41 8.00 43.28 3/8" 2.00 25.97 1.00 31.45 8.00 251.59 3/8" 2.00 150.95

CASCARA 1.00 34.68 8.00 277.44 3/8" 2.00 166.46 0.00 343.39 0.00 0.00 0.00 0.00

343.39

TIJERAL 1

DIAMETRO NOMINAL (pulg)

DIAMETRO EXTERIOR

(mm)SCHEDULE ESPESOR

(mm)

PESO NOMINAL

(kg/m)2 60.3 80 2.5 3.633 88.9 80 3 6.444 114.3 80 4.5 11.02

VIGA PRINCIPAL

CODIFICACIONDIAMETRO NOMINAL

(pulg)

DIAMETRO EXTERIOR

(mm)SCHEDULE ESPESOR

(mm)

PESO NOMINAL

(kg/m)a 8 219.1 80 12.7 64.64b 10 273.1 80 15.09 95.97c 6 168.1 80 10.9 42.56d 4 114.3 40 6.02 16.07

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURA METALICAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

BRIDA SUPERIOR a 2.00 2.00 38.43 64.64 9936.46BRIDA SUPERIOR b 2.00 1.00 77.64 95.97 14902.22

BRIDA INFERIOR a 2.00 2.00 38.60 64.64 9980.42BRIDA INFERIOR b 2.00 1.00 77.64 95.97 14902.22MONTANTE c 2.00 2.00 0.60 42.56 102.14

c 2.00 2.00 1.13 42.56 192.37c 2.00 2.00 1.71 42.56 291.11c 2.00 2.00 2.03 42.56 345.59c 2.00 2.00 2.35 42.56 400.06d 4.00 10.00 2.50 16.07 1607.00c 2.00 30.00 2.50 42.56 6384.00

DIAGONALES c 2.00 2.00 2.59 42.56 440.92c 2.00 2.00 3.25 42.56 553.28c 2.00 2.00 3.25 42.56 553.28c 2.00 2.00 3.63 42.56 617.97c 2.00 2.00 3.63 42.56 617.97c 2.00 23.00 3.73 42.56 7302.44 69129.4656

PLANTA SUPERIORMONTANTE d 2.00 30.00 1.20 16.07 1157.04DIAGONAL d 2.00 1.00 2.73 16.07 87.74

d 2.00 4.00 3.01 16.07 386.97d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.92 16.07 93.85d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.88 16.07 92.56d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.88 16.07 92.56d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.88 16.07 92.56d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63

PLANILLA DE METRADOS ( 05.01 )

LONGITUD (M)NRO DE PIEZASCANTIDADDESCRIPCION

PESO NOMINAL

(kg/m)

PESO PARCIAL

(kg)

PESO TOTAL

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURA METALICAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

PLANILLA DE METRADOS ( 05.01 )

LONGITUD (M)NRO DE PIEZASCANTIDADDESCRIPCION

PESO NOMINAL

(kg/m)

PESO PARCIAL

(kg)

PESO TOTAL

d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.81 16.07 90.31d 2.00 1.00 2.80 16.07 89.99d 2.00 1.00 2.85 16.07 91.60d 2.00 1.00 2.83 16.07 90.96 3734.0252

PLANTA INFERIORMONTANTE d 2.00 30.00 1.20 16.07 1157.04DIAGONAL d 2.00 1.00 2.73 16.07 87.74

d 2.00 4.00 3.01 16.07 386.97d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.92 16.07 93.85d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.88 16.07 92.56d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.88 16.07 92.56d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.88 16.07 92.56d 2.00 1.00 2.87 16.07 92.24d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.82 16.07 90.63d 2.00 1.00 2.83 16.07 90.96d 2.00 1.00 2.81 16.07 90.31d 2.00 1.00 2.80 16.07 89.99d 2.00 1.00 2.85 16.07 91.60d 2.00 1.00 2.83 16.07 90.96 3734.0252

METRADO TIJERAL BRIDA SUPERIOR TUBO 4" e=4.5 mm 52.00 8.00 1.55 11.02 7105.70

TUBO 4" e=4.5 mm 52.00 1.00 1.20 11.02 687.65TUBO 3" e=3.0 mm 52.00 2.00 1.55 6.44 1038.13TUBO 3" e=3.0 mm 52.00 3.00 1.70 6.44 1707.89TUBO 3" e=3.0 mm 52.00 1.00 1.59 6.44 532.46 11071.82

BRIDA INFERIOR TUBO 4" e=4.5 mm 52.00 8.00 1.54 11.02 7059.85TUBO 4" e=4.5 mm 52.00 1.00 1.20 11.02 687.65TUBO 3" e=3.0 mm 52.00 2.00 1.54 6.44 1031.43TUBO 3" e=3.0 mm 52.00 3.00 1.70 6.44 1707.89TUBO 3" e=3.0 mm 52.00 1.00 1.60 6.44 535.81 11022.63

MONTANTE TUBO 2" e=2.5 mm 52.00 1.00 0.30 3.63 56.63TUBO 2" e=2.5 mm 52.00 1.00 0.39 3.63 73.62TUBO 2" e=2.5 mm 52.00 1.00 0.48 3.63 90.60TUBO 2" e=2.5 mm 52.00 1.00 0.57 3.63 107.59TUBO 2" e=2.5 mm 52.00 1.00 0.66 3.63 124.58TUBO 2" e=2.5 mm 52.00 1.00 0.75 3.63 141.57TUBO 2" e=2.5 mm 52.00 1.00 0.84 3.63 158.56TUBO 2" e=2.5 mm 52.00 1.00 0.93 3.63 175.55TUBO 2" e=2.5 mm 52.00 1.00 1.02 3.63 192.54TUBO 2" e=2.5 mm 52.00 1.00 1.11 3.63 209.52TUBO 2" e=2.5 mm 52.00 1.00 1.20 3.63 226.51

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURA METALICAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

PLANILLA DE METRADOS ( 05.01 )

LONGITUD (M)NRO DE PIEZASCANTIDADDESCRIPCION

PESO NOMINAL

(kg/m)

PESO PARCIAL

(kg)

PESO TOTAL

TUBO 2" e=2.5 mm 52.00 1.00 1.20 3.63 226.51TUBO 2" e=2.5 mm 52.00 1.00 0.97 3.63 183.10TUBO 2" e=2.5 mm 52.00 1.00 0.75 3.63 141.57TUBO 2" e=2.5 mm 52.00 1.00 0.52 3.63 98.16TUBO 2" e=2.5 mm 52.00 1.00 0.30 3.63 56.63 2263.23

DIAGONALES TUBO 3" e=3.0 mm 52.00 1.00 1.58 6.44 529.11TUBO 3" e=3.0 mm 52.00 1.00 1.61 6.44 539.16TUBO 2" e=2.5 mm 52.00 1.00 1.63 3.63 307.68TUBO 2" e=2.5 mm 52.00 1.00 1.66 3.63 313.34TUBO 2" e=2.5 mm 52.00 1.00 1.70 3.63 320.89TUBO 2" e=2.5 mm 52.00 1.00 1.74 3.63 328.44TUBO 2" e=2.5 mm 52.00 1.00 1.78 3.63 335.99TUBO 2" e=2.5 mm 52.00 1.00 1.83 3.63 345.43TUBO 2" e=2.5 mm 52.00 1.00 1.88 3.63 354.87TUBO 2" e=2.5 mm 52.00 1.00 1.93 3.63 364.31TUBO 4" e=4.5 mm 52.00 1.00 1.70 11.02 974.17TUBO 4" e=4.5 mm 52.00 1.00 1.70 11.02 974.17TUBO 2" e=2.5 mm 52.00 1.00 2.01 3.63 379.41TUBO 2" e=2.5 mm 52.00 1.00 1.89 3.63 356.76TUBO 2" e=2.5 mm 52.00 1.00 1.81 3.63 341.66TUBO 2" e=2.5 mm 52.00 1.00 1.64 3.63 309.57 7074.94

PLANTA SUPERIOR TUBO 2" e=2.5 mm 52.00 16.00 0.35 3.63 1057.06PLANTA INFERIOR TUBO 2" e=2.5 mm 52.00 16.00 0.35 3.63 1057.06 2114.11

CORREASCORREA 1 2.00 7.00 5.58 18.05 1410.28CORREA 1 2.00 7.00 16.59 18.05 4192.92CORREA 1 2.00 7.00 27.10 18.05 6849.19CORREA 1 2.00 7.00 5.38 18.05 1359.73CORREA 1 2.00 7.00 5.45 18.05 1377.42 15189.54

TEMPLADORES TEMP - 1/2" 14.00 10.00 6.02 1.00 840.12

14.00 4.00 6.13 1.00 342.19 1182.31

TORRE METALICA

COLUMNAS 2.00 4.00 43.13 233.90 80704.93VIGAS DE AMARRE 2.00 36.00 3.50 233.90 58942.85 139647.78

CABLES Ø2"

2.00 2.00 224.16 15.93 14286.59 14286.59

PENDOLASPENDOLA 1 4.00 2.00 19.30 3.98 614.07PENDOLA 2 4.00 2.00 17.76 3.98 565.07PENDOLA 3 4.00 2.00 16.29 3.98 518.30PENDOLA 4 4.00 2.00 14.94 3.98 475.35PENDOLA 5 4.00 2.00 13.65 3.98 434.31PENDOLA 6 4.00 2.00 12.45 3.98 396.12PENDOLA 7 4.00 2.00 11.33 3.98 360.49PENDOLA 8 4.00 2.00 10.30 3.98 327.72PENDOLA 9 4.00 2.00 9.34 3.98 297.17PENDOLA 10 4.00 2.00 8.45 3.98 268.86PENDOLA 11 4.00 2.00 7.65 3.98 243.40PENDOLA 12 4.00 2.00 6.91 3.98 219.86PENDOLA 13 4.00 2.00 6.24 3.98 198.54

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : METRADO DE ETRUCTURA METALICAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

PLANILLA DE METRADOS ( 05.01 )

LONGITUD (M)NRO DE PIEZASCANTIDADDESCRIPCION

PESO NOMINAL

(kg/m)

PESO PARCIAL

(kg)

PESO TOTAL

PENDOLA 14 4.00 2.00 5.50 3.98 174.99PENDOLA 15 4.00 2.00 4.98 3.98 158.45PENDOLA 16 4.00 2.00 4.50 3.98 143.18PENDOLA 17 4.00 2.00 4.10 3.98 130.45PENDOLA 18 4.00 2.00 3.78 3.98 120.27PENDOLA 19 4.00 2.00 3.50 3.98 111.36PENDOLA 20 4.00 2.00 3.27 3.98 104.04PENDOLA 21 4.00 2.00 3.12 3.98 99.27PENDOLA 22 4.00 2.00 3.00 3.98 95.45PENDOLA 23 4.00 2.00 2.98 3.98 94.82 6151.55

ESCALERA METAICAPESO NOMINALØ6E3.0MM 10.99Ø2E3.0MM 3.1396RECTANGULO 0.1,0.20X3MMM 14.1282ANGULO 11/2"X11/2"E=3/16" 2.3547

TUBO DE ACERO Ø 8" e=1/4" 2.00 1.00 20.68 30.61 1266.08TUBO DE ACERO Ø 3" 3/16" 2.00 87.00 0.95 8.63 1427.18PERFIL 11/2" e=3/16 2.00 108.00 3.48 2.68 2014.50PASO S 2.00 108.00 0.41 24.92 2203.69BARANDA TUBO 2" e=1/16" 2.00 14.00 1.50 1.57 65.93 6977.38

ESCALERA DE ESCAPETUBO DE 6" E=3.0 mm 2.00 4.00 3.21 10.99 282.22

2.00 4.00 1.46 10.99 128.362.00 8.00 1.00 10.99 175.842.00 4.00 0.90 10.99 79.13

TUBO DE 3" E=3.0 mm 2.00 1.00 10.26 6.44 132.152.00 1.00 1.80 6.44 23.182.00 3.00 0.95 6.44 36.71

TUBO DE 2" E=3.0 mm 2.00 2.00 8.45 3.14 106.122.00 2.00 1.80 3.14 22.61

TUBO RECTANGULAR 0.1X0.20 E=3.00 MM 2.00 2.00 8.23 14.13 465.102.00 4.00 1.80 14.13 203.45

ANGULO 11/2"X11/2"E=3/16" 2.00 38.00 0.47 2.35 84.112.00 40.00 180.00 2.35 33907.68

AREAPLANCHA ESTRIADA 1/16" 2.00 19.00 0.85 24.92 801.15

2.00 1.00 1.80 24.92 89.712.00 0.90 1.80 24.92 80.74 36618.26

330197.65PANEL ELECTRONICO (APROX) 1.00 8.00 20.00 6.44 1030.40

1.00 114.29 1.15 3.14 412.691.00 16.00 2.50 3.14 125.601.00 6.25 16.00 3.14 314.001.00 18.00 5.00 3.14 282.60 2598.34

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h06 ARQUITECTURA06.01 ALBAÑILERIA06.01.01 MUROS SOGA DE LADRILLO KK 8x14x24 C/M 1:4 X 1.5CM.

ZONA DE PATIO DE ESTACIONAMIENTO DE SERVICIOVERTICALCC-1 m2 1.00 1.00 5.87 1.00 4.6 27.00

-1.00 3 -3.00CC-5 2.00 1.00 5.57 1.00 3.3 36.76CC-2 m2 1.00 1.00 1.66 1.00 3.3 5.48CC-2 m2 1.00 1.00 2.10 1.00 2.8 5.88

-1.00 0.7 -0.70CC-2 m2 1.00 1.00 2.10 1.00 2.8 5.88HORIZONTALCC-1 m2 1.00 1.00 4.40 1.00 4.6 20.24

-1.00 5 -5.00CC-1 m2 1.00 1.00 4.41 1.00 4.6 20.29CC-1 m2 2.00 1.00 3.45 1.00 4.6 31.74CC-1 m2 1.00 1.00 1.05 1.00 4.6 4.83

-1.00 0.7 -0.70CC-2 m2 1.00 1.00 0.45 1.00 2.8 1.26CC-2 m2 1.00 1.00 6.00 1.00 2.7 16.20

-1.00 5 -5.00EXCAVACION ZONA PATIO DE BOLETERIAVERTICALCC-2 m2 1.00 1.00 6.45 1.00 2.4 15.48CC-2 m2 1.00 1.00 5.59 1.00 2.4 13.42

0.8CC-2 m2 1.00 1.00 1.70 1.00 2.4 4.08HORIZONTALCC-2 m2 1.00 1.00 0.90 1.00 2.4 2.16CC-2 m2 5.00 1.00 1.85 1.00 2.4 22.20CERCO PROVISIONALCC-4 m2 1.00 1.00 7.94 1.00 2.8 22.23

m2 1.00 1.00 9.02 1.00 2.8 25.26m2 1.00 1.00 6.16 1.00 2.8 17.25m2 1.00 1.00 17.84 1.00 2.8 49.95

TRIBUNAPRIMER PISOEJE C-DCC-2 m2 1.00 1.00 2.70 1.00 3.1 8.37CC-2 m2 1.00 1.00 4.91 1.00 3.1 15.22EJE D-ECC-2 m2 1.00 1.00 6.56 1.00 3.1 20.34CC-2 m2 1.00 1.00 2.96 1.00 3.1 9.18CC-2 m2 1.00 1.00 2.35 1.00 3.1 7.29EJE I-J CC-2 m2 2.00 1.00 1.60 1.00 3.1 9.92EJE J-K CC-2 m2 1.00 1.00 6.53 1.00 3.1 20.24EJE L-M ESCALERA CC-2 m2 1.00 1.00 7.98 1.00 3.1 24.74EJE L-M CC-2 m2 1.00 1.00 9.36 1.00 3.1 29.02EJE M-N ESCALERA CC-2 m2 1.00 1.00 7.98 1.00 3.1 24.74

m2 1.00 1.00 11.15 1.00 3.1 34.57EJE P-Q ESCALERA CC-2 m2 1.00 1.00 9.62 1.00 3.1 29.82EJE Q-R CC-2 m2 1.00 1.00 2.30 1.00 3.1 7.13EJE V-W CC-2 m2 1.00 1.00 12.63 1.00 3.1 39.15EJE W-X CC-2 m2 1.00 1.00 2.59 1.00 3.1 8.03

m2 1.00 1.00 5.51 1.00 3.1 17.08SEGUNDO PISO

m2 1.00 1.00 6.21 1.00 3.1 19.25m2 8.00 1.00 4.57 1.00 2.5 91.40m2 4.00 1.00 3.48 1.00 2.5 34.80m2 4.00 1.00 3.96 1.00 1.4 22.18m2 2.00 1.00 4.88 1.00 3.1 30.26m2 2.00 1.00 5.51 1.00 3.1 34.16m2 13.00 1.00 5.64 1.00 3.1 227.29m2 1.00 1.00 3.58 1.00 3.1 11.10m2 1.00 1.00 4.06 1.00 3.1 12.59m2 2.00 1.00 5.38 1.00 3.1 33.36m2 1.00 1.00 3.31 1.00 3.1 10.26m2 2.00 1.00 3.34 1.00 1.62 10.82

TERCER PISOm2 8.00 1.00 2.07 1.00 2.4 39.74m2 4.00 1.00 3.10 1.00 1.56 19.34

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción Unidad

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción Unidadm2 4.00 1.00 8.66 1.00 2.12 73.44

m2 2.00 1.00 9.45 1.00 3.32 62.75m2 2.00 -1.00 0.60 0.60 1 -0.72m2 2.00 -1.00 2.20 1.20 1 -5.28m2 2.00 -1.00 2.20 1.20 1 -5.28

MURO FACHADA 3ER PISO m2 10.00 1.00 5.07 1.00 1.2 60.84m2 9.00 1.00 5.07 1.00 1.2 54.76m2 4.00 1.00 2.52 1.00 2.42 24.39

DESCUENTO DE VENTANAS m2 1.00 -1.00 1.75 1.00 0.60 -1.05m2 1.00 -1.00 1.70 1.00 0.60 -1.02m2 4.00 -1.00 2.73 1.00 0.60 -6.55m2 1.00 -1.00 2.73 1.00 0.60 -1.64m2 1.00 -1.00 2.78 1.00 0.60 -1.67m2 1.00 -1.00 2.43 1.00 0.60 -1.46m2 1.00 -1.00 0.90 1.00 0.60 -0.54m2 1.00 -1.00 0.43 1.00 0.60 -0.26m2 1.00 -1.00 2.73 1.00 0.60 -1.64m2 1.00 -1.00 0.78 1.00 0.60 -0.47m2 1.00 -1.00 1.60 1.00 0.60 -0.96m2 4.00 -1.00 2.73 1.00 0.60 -6.55m2 1.00 -1.00 1.75 1.00 0.60 -1.05m2 1.00 -1.00 1.70 1.00 0.60 -1.02 1473.58

06.01.02 MUROS CANTO DE LADRILLO KK 8x14x24 C/M 1:4 X 1.5CM.CC-6 m3 4.00 1.00 3.40 1.00 1.80 24.48CC-6 m3 4.00 1.00 1.24 1.00 1.80 8.93CC-6 m3 1.00 1.00 1.00 1.00 1.80 1.80 35.21

06,02 TARRAJEO REVOQUES Y ENLUCIDOS06.02.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA

PRIMER PISO BOX SH-6 m2 1.00 1.00 5.50 1.00 1.20 6.60BOX SH-7 m2 1.00 1.00 4.70 1.00 1.20 5.64VESTIDOR BOX m2 1.00 1.00 27.75 1.00 2.10 58.28SSHH-PUBLICO DAMAS 1 m2 1.00 1.00 13.55 1.00 2.10 28.46SSHH-PUBLICO VARONES 2 m2 1.00 1.00 13.70 1.00 2.10 28.77TENIS DE MESA SSHH-5 m2 1.00 1.00 5.30 1.00 1.20 6.36TENIS DE MESA VESTIDOR m2 1.00 1.00 28.50 1.00 2.10 59.85SNACK -1 m2 1.00 1.00 4.10 1.00 0.60 2.46SSHH - PUBLICO DAMAS 3 m2 1.00 1.00 18.75 1.00 2.10 39.38SSHH - PUBLICO VARONES 4 m2 1.00 1.00 18.80 1.00 2.10 39.48TAE KWON DO SH-1 m2 1.00 1.00 6.80 1.00 2.10 14.28SSHH - DISCAPACITADOS m2 1.00 1.00 8.65 1.00 2.10 18.17SNACK 2 m2 1.00 1.00 6.50 1.00 0.60 3.90BILLAR SSHH 1 m2 1.00 1.00 4.95 1.00 1.20 5.94BILLAR SSHH 2 m2 1.00 1.00 5.15 1.00 1.20 6.18SSHH-PUBLICO DAMAS 5 m2 1.00 1.00 13.55 1.00 2.10 28.46SSHH-PUBLICO VARONES 6 m2 1.00 1.00 13.70 1.00 2.10 28.77GIMNASIA SSHH - 1 m2 1.00 1.00 5.15 1.00 1.20 6.18GIMNASIA SSHH - 2 m2 1.00 1.00 5.10 1.00 1.20 6.12GIMNASIA VESTIDORES m2 1.00 1.00 26.50 1.00 2.10 55.65

SEGUNDO PISO SS.HH.7 Y SS.HH.9 m2 2.00 1.00 43.25 1.00 2.10 181.65DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00SS.HH.8 Y SS.HH. 10 m2 2.00 1.00 42.85 1.00 2.10 179.97DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00SNACK m2 2.00 1.00 7.45 1.00 0.60 8.94SS.HH. ARTES MARCIALES m2 1.00 1.00 7.20 1.00 0.60 4.32DESCUENTO DE PUERTA m2 1.00 -1.00 0.65 1.00 2.50 -1.63DUCHAS Y VESTIDORES(ARTESMARCIALES) m2 1.00 1.00 27.25 1.00 2.10 57.23DESCUENTO DE PUERTA m2 1.00 -1.00 1.00 1.00 2.50 -2.50

TERCER PISOSS.HH. TIPO 1 m2 2.00 1.00 5.90 1.00 2.10 24.78DESCUENTO DE PUERTA m2 2.00 -1.00 0.65 1.00 2.40 -3.12SS.HH. TIPO 2 m2 6.00 1.00 5.90 1.00 2.10 74.34DESCUENTO DE PUERTA m2 6.00 -1.00 0.65 1.00 2.40 -9.36 953.53

06.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENAPRIMER PISO

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción UnidadBOX SH-6 m2 1.00 1.00 4.14 1.00 1.90 7.87

m2 1.00 1.00 0.70 1.00 0.60 0.42BOX SH-7 m2 1.00 1.00 4.04 1.00 1.90 7.68

m2 1.00 1.00 0.70 1.00 0.60 0.42VESTIDOR BOX m2 1.00 1.00 12.80 1.00 1.00 12.80

m2 1.00 1.00 3.90 1.00 1.45 5.66m2 1.00 1.00 9.12 1.00 1.90 17.33m2 1.00 1.00 1.00 1.00 0.20 0.20

SALA DE BOX m2 1.00 1.00 42.88 1.00 2.70 115.78m2 1.00 1.00 7.62 1.00 3.24 24.69m2 1.00 1.00 7.95 1.00 2.12 16.85m2 1.00 1.00 1.00 1.00 0.20 0.20m2 1.00 1.00 29.41 1.00 2.34 68.82

SSHH-PUBLICO DAMAS 1 m2 1.00 1.00 8.19 1.00 1.00 8.19m2 1.00 1.00 3.04 1.00 1.92 5.84m2 1.00 1.00 1.10 1.00 0.45 0.50

SSHH-PUBLICO VARONES 2 m2 1.00 1.00 8.78 1.00 1.00 8.78m2 1.00 1.00 3.32 1.00 1.12 3.72m2 1.00 1.00 1.10 1.00 0.45 0.50

INGRESO 1 m2 1.00 1.00 19.45 1.00 2.70 52.52INGRESO 2 m2 1.00 1.00 18.20 1.00 2.40 43.68

m2 1.00 1.00 1.91 1.00 2.70 5.16TENIS DE MESA SSHH-5 m2 1.00 1.00 1.60 1.00 1.50 2.40

m2 1.00 1.00 1.40 1.00 1.00 1.40m2 1.00 1.00 0.70 1.00 0.60 0.42

TENIS DE MESA VESTIDOR m2 1.00 1.00 8.14 1.00 0.60 4.88m2 1.00 1.00 8.66 1.00 1.00 8.66m2 1.00 1.00 8.40 1.00 1.90 15.96m2 1.00 1.00 1.00 1.00 0.20 0.20

SALA TENIS DE MESA m2 1.00 1.00 29.97 1.00 2.10 62.94m3 1.00 1.00 23.34 1.00 2.70 63.02

SNACK -1 m2 1.00 1.00 6.18 1.00 2.50 15.45m2 1.00 1.00 2.56 1.00 1.50 3.84

INGRESO 3 m2 1.00 1.00 18.89 1.00 2.70 51.00INGRESO 4 m2 1.00 1.00 13.77 1.00 2.70 37.18

m2 1.00 1.00 7.80 1.00 2.10 16.38SSHH - PUBLICO DAMAS 3 m2 1.00 1.00 4.11 1.00 0.60 2.47

m2 1.00 1.00 6.00 1.00 0.95 5.70m2 1.00 1.00 0.90 1.00 0.55 0.50m2 1.00 1.00 2.68 1.00 0.35 0.94

SSHH - PUBLICO VARONES 4 m2 1.00 1.00 6.27 1.00 0.95 5.96m2 1.00 1.00 5.08 1.00 0.60 3.05m2 1.00 1.00 0.90 1.00 0.55 0.50m2 1.00 1.00 2.68 1.00 0.35 0.94

PASILLO DISCAPACITADOS m2 1.00 1.00 8.42 1.00 2.45 20.63m2 1.00 1.00 3.13 1.00 2.70 8.45m2 1.00 1.00 1.85 1.00 3.10 5.74

TAE KWON DO SH-1 m2 1.00 1.00 2.83 1.00 0.95 2.69m2 1.00 1.00 3.10 1.00 0.60 1.86m2 1.00 1.00 0.90 1.00 0.35 0.32m2 1.00 1.00 0.70 1.00 0.55 0.39

TOPICO m2 1.00 1.00 5.96 1.00 3.10 18.48m2 1.00 1.00 2.56 1.00 2.70 6.91m2 1.00 1.00 1.90 1.00 2.10 3.99m2 1.00 1.00 1.00 1.00 0.20 0.20

SALA DE TAE KWON DO m2 1.00 1.00 24.48 1.00 2.70 66.10m2 1.00 1.00 10.36 1.00 3.10 32.12m2 1.00 1.00 7.90 1.00 1.20 9.48m2 1.00 1.00 21.12 1.00 1.40 29.57m2 1.00 1.00 4.79 1.00 2.50 11.98m2 1.00 1.00 4.54 1.00 3.35 15.21m2 2.00 1.00 1.20 1.00 0.20 0.48m2 2.00 1.00 1.20 1.00 0.55 1.32

SSHH - DISCAPACITADOS m2 1.00 1.00 7.92 1.00 0.95 7.52m2 1.00 1.00 1.00 1.00 0.55 0.55

INGRESO 5 m2 1.00 1.00 12.99 1.00 2.70 35.07m2 1.00 1.00 5.13 1.00 2.10 10.77

INGRESO 6 m2 1.00 1.00 18.90 1.00 2.70 51.03SNACK 2 m2 1.00 1.00 2.54 1.00 2.70 6.86

m2 1.00 1.00 6.51 1.00 3.10 20.18m2 1.00 1.00 2.54 1.00 2.12 5.38

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción UnidadSERVICIOS m2 1.00 1.00 2.35 1.00 2.70 6.35

m2 1.00 1.00 6.51 1.00 3.10 20.18m2 1.00 1.00 2.34 1.00 2.12 4.96

SALA DE BILLAR m2 1.00 1.00 27.21 1.00 2.70 73.47m2 1.00 1.00 25.31 1.00 2.10 53.15

INGRESO 7 m2 1.00 1.00 11.14 1.00 2.70 30.08m2 1.00 1.00 14.64 1.00 2.10 30.74

INGRESO 8 m2 1.00 1.00 19.30 1.00 2.70 52.11BILLAR SSHH 1 m2 1.00 1.00 1.95 1.00 1.90 3.71

m2 1.00 1.00 1.79 1.00 1.50 2.69m2 1.00 1.00 1.35 1.00 0.90 1.22m2 1.00 1.00 0.70 1.00 0.60 0.42

BILLAR SSHH 2 m2 1.00 1.00 1.95 1.00 1.90 3.71m2 1.00 1.00 1.19 1.00 1.50 1.79m2 1.00 1.00 1.35 1.00 0.90 1.22m2 1.00 1.00 0.70 1.00 0.60 0.42

SSHH-PUBLICO DAMAS 5 m2 1.00 1.00 8.19 1.00 1.00 8.19m2 1.00 1.00 3.04 1.00 1.92 5.84m2 1.00 1.00 1.10 1.00 0.60 0.66

SSHH-PUBLICO VARONES 6 m2 1.00 1.00 8.78 1.00 1.00 8.78m2 1.00 1.00 3.32 1.00 1.12 3.72m2 1.00 1.00 1.10 1.00 0.60 0.66

SALA DE GIMNASIA m2 1.00 1.00 31.64 1.00 2.70 85.43m2 1.00 1.00 15.56 1.00 2.10 32.67m2 1.00 1.00 9.74 1.00 3.10 30.19

GIMNASIA SSHH - 1 m2 1.00 1.00 3.85 1.00 1.90 7.32m2 1.00 1.00 1.35 1.00 0.90 1.22m2 1.00 1.00 0.70 1.00 0.60 0.42

GIMNASIA SSHH - 2 m2 1.00 1.00 4.15 1.00 1.90 7.89m2 1.00 1.00 1.35 1.00 0.90 1.22m2 1.00 1.00 0.70 1.00 0.60 0.42

GIMNASIA VESTIDORES m2 1.00 1.00 12.80 1.00 1.00 12.80m2 1.00 1.00 3.90 1.00 1.45 5.66m2 1.00 1.00 9.12 1.00 1.90 17.33m2 1.00 1.00 1.00 1.00 0.60 0.60

SEGUNDO PISOSS.HH.7 Y SS.HH.9 m2 2.00 1.00 34.10 1.00 1.40 95.48DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00DESCUENTO DE VENTANAS m2 1.00 -1.00 8.42 1.00 0.60 -5.05SS.HH.8 Y SS.HH. 10 m2 2.00 1.00 33.70 1.00 1.40 94.36DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00DESCUENTO DE VENTANAS m2 1.00 -1.00 19.77 1.00 0.60 -11.86SNACK Y ÁREA DE MESAS m2 2.00 1.00 28.40 1.00 3.50 198.80DESCUENTOS m2 2.00 -1.00 1.00 1.00 2.50 -5.00

m2 2.00 -1.00 7.45 1.00 0.60 -8.94DEPÓSITO m2 2.00 1.00 10.00 1.00 3.50 70.00DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00SS.HH. ARTES MARCIALES m2 1.00 1.00 7.20 1.00 1.40 10.08DESCUENTO DE PUERTA m2 1.00 -1.00 0.65 1.00 0.40 -0.26DESCUENTO DE VENTANAS m2 1.00 -1.00 0.50 1.00 0.50 -0.25DUCHAS Y VESTIDORES(ARTESMARCIALES) m2 1.00 1.00 27.25 1.00 1.40 38.15DESCUENTO DE PUERTA m2 1.00 -1.00 1.00 1.00 0.40 -0.40DESCUENTO DE VENTANAS m2 1.00 -1.00 2.35 1.00 0.60 -1.41ARTES MARCIALES ADULTOS m2 1.00 1.00 64.85 1.00 3.50 226.98DESCUENTO DE PUERTAS m2 3.00 -1.00 1.00 1.00 2.50 -7.50DESCUENTO DE PUERTA m2 1.00 -1.00 0.70 1.00 2.50 -1.75DESCUENTO DE VENTANAS m2 1.00 -1.00 7.80 1.00 3.50 -27.30DESCUENTO DE VENTANAS m2 1.00 -1.00 15.80 1.00 0.60 -9.48OTROS FINES m2 2.00 1.00 25.95 1.00 3.50 181.65DESCUENTO DE PUERTA m2 2.00 -1.00 1.10 1.00 2.50 -5.50DESCUENTO DE VENTANAS m2 1.00 -1.00 5.98 1.00 0.60 -3.59TIENDA DE SOUVENIRS DEPORTIVOS m2 2.00 1.00 26.35 1.00 3.50 184.45DESCUENTO DE PUERTA m2 2.00 -1.00 1.10 1.00 2.50 -5.50DESCUENTO DE VENTANAS m2 1.00 -1.00 8.55 1.00 0.60 -5.13PASADIZO m2 1.00 1.00 265.85 1.00 3.10 824.14DESCUENTO DE PUERTAS DE ESCAPE m2 2.00 -1.00 1.20 1.00 2.14 -5.14DESCUENTO DE PUERTAS DE BAÑOS m2 4.00 -1.00 1.00 1.00 2.50 -10.00DESCUENTO DE PUERTAS DE 1,10 m2 4.00 -1.00 1.10 1.00 2.50 -11.00DESCUENTO DE GRADAS DE INGRESO m2 8.00 -1.00 5.08 1.00 3.10 -125.98DESCUENTO DE ÁREA DE MESAS m2 2.00 -1.00 10.16 1.00 3.10 -62.99DESCUENTO DE VENTANAS m2 1.00 -1.00 50.30 1.00 0.60 -30.18GRADAS DE INGRESO m2 4.00 1.00 21.30 1.00 3.50 298.20

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción UnidadMUROS DE GRADAS DE ACCESO A TRIBUNA m2 8.00 1.00 1.00 1.00 10.50 84.00

TERCER PISOSS.HH. TIPO 1 m2 2.00 1.00 5.90 1.00 2.40 28.32DESCUENTO DE PUERTA m2 2.00 -1.00 0.70 1.00 2.40 -3.36DESCUENTO DE VENTANAS m2 2.00 -1.00 0.75 1.00 0.60 -0.90SS.HH. TIPO 2 m2 6.00 1.00 5.90 1.00 2.40 84.96DESCUENTO DE PUERTA m2 6.00 -1.00 0.70 1.00 2.40 -10.08DESCUENTO DE VENTANAS m2 2.00 -1.00 0.60 1.00 0.60 -0.72OFICINA TIPO 1 m2 2.00 1.00 45.26 1.00 3.30 298.72DESCUENTO DE PUERTA m2 2.00 -1.00 0.90 1.00 2.40 -4.32DESCUENTO DE VENTANAS m2 6.00 -1.00 2.53 1.00 2.42 -36.74OFICINA TIPO 2 m2 6.00 1.00 27.55 1.00 3.30 545.49DESCUENTO DE PUERTA m2 6.00 -1.00 0.90 1.00 2.40 -12.96DESCUENTO DE VENTANAS m2 26.00 -1.00 1.20 1.00 1.20 -37.44PASILLO m2 1.00 1.00 211.85 1.00 2.10 444.89DESCUENTO DE PUERTAS m2 8.00 -1.00 0.90 1.00 2.40 -17.28DESCUENTO DE VENTANAS m2 26.00 -1.00 1.20 1.00 1.20 -37.44DESCUENTO DE ABERTURAS FACHADA m2 1.00 -1.00 60.92 1.00 2.45 -149.25 4640.71

06.02.03 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA PRIMER PISOAREA DE BOLETERIA

M2 1 1 18.63 3 3.1 173.26DESCUENTO DE VENTANAS M2 4 -1 0.5 0.4 1 -0.80FACHADA CALLE FLORESTA

m2 6 1 2.54 1 2.15 32.77m2 1 1 5.07 1 2.15 10.90m2 8 1 1.55 1 2.15 26.66m2 2 1 1.2 1 2.15 5.16

FACHADA LATERALESm2 2 1 6.26 1 2.7 33.804m2 2 1 36.26 1 2.7 195.804

FACHA POSTERIOR EJE 2 M2 12 1 5.07 1 2.12 128.984 1 5.07 1 2.52 51.11

SEGUNDO PISOSS.HH.7 Y SS.HH.9 m2 2.00 1.00 2.54 1.00 3.70 18.80DESCUENTO DE VENTANAS m2 2.00 -1.00 2.54 1.00 0.60 -3.05SS.HH.8 Y SS.HH. 10 m2 2.00 1.00 5.50 1.00 3.70 40.70DESCUENTO DE VENTANAS m2 4.00 -1.00 2.54 1.00 0.60 -6.10SNACK Y ÁREA DE MESAS m2 2.00 1.00 8.05 1.00 3.70 59.57DESCUENTOS VENTANAS m2 2.00 -1.00 7.60 1.00 0.60 -9.12OTOS FINES m2 2.00 1.00 2.74 1.00 3.70 20.28| m2 2.00 -1.00 2.74 1.00 0.60 -3.29TIENDA DE SOUVENIRS DEPORTIVOS m2 2.00 1.00 5.08 1.00 3.70 37.59DESCUENTO VENTANA m2 2.00 -1.00 5.08 1.00 0.60 -6.10ARTES MARCIALES Y GRADAS m2 2.00 1.00 8.01 1.00 3.70 59.27DESCUENTO VENTANA m2 2.00 -1.00 2.54 1.00 3.10 -15.75DESCUENTO VENTANA m2 2.00 -1.00 5.08 1.00 3.10 -31.50ELEVACIONLATERALSUR Y NORTE m2 2.00 1.00 1.00 1.00 33.16 66.32DESCUENTO VENTANA m2 2.00 -1.00 1.00 1.00 0.45 -0.90

TERCER PISO m2 2.00 1.00 13.50 1.00 4.72 127.44DESCUENTO DE VENTANAS m2 6.00 -1.00 2.53 1.00 2.42 -36.74PASILLO m2 2.00 1.00 1.00 1.00 15.23 30.46

m2 2.00 1.00 1.00 1.00 18.98 37.96 1043.50

06.02.04 TARRAJEO DE COLUMNAS ACABADO CON CEMENTO-ARENAAREA DE SERVICIOS

SUBESTACION m2 7.00 1.00 1.00 0.40 3.10 8.68SUBESTACION ESTERIOR m2 10.00 1.00 1.00 0.40 5.05 20.20AREA DE BOLETERIA CERCO PROVISIONAL m2 19.00 1.00 0.40 1.00 3.10 23.56 52.44

06.02.05 TARRAJEO DE VIGAS ACABADO CON CEMENTO-ARENASUBESTACION VA-2 m2 1.00 1.00 25.65 0.50 3.10 39.76 39.76

06.02.06 VESTIDURA DE DERRAMES ACABADO CON CEMENTO Y ARENAPRIMER PISO m 1.00 1.00 599.08 1.00 1.00 599.08SEGUNDO PISO m 1.00 1.00 373.50 1.00 1.00 373.50TERCER PISO m 1.00 1.00 327.88 1.00 1.00 327.88

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción UnidadBOLETERIAS m 1.00 1.00 30.20 1.00 1.00 30.20CASETA m 1.00 1.00 9.80 1.00 1.00 9.80SUB ESTACION - GRUPO ELECTROGENO m 1.00 1.00 45.50 1.00 1.00 45.50 1385.96

06.02.07 CIELORRAZOS CON MEZCLA DE CEMENTO ARENAPRIMER PISO M2 18.00 1.00 10.87 5.08 1.00 993.95PRIMER PISO M2 4.00 1.00 6.50 5.08 1.00 132.08

BOLETERIAS M2 1.00 1.00 6.00 3.20 1.00 19.20SUBESTACION ELECT M2 1.00 1.00 6.10 4.70 1.00 28.67GRUPO ELECTROG.. M2 1.00 1.00 6.10 4.65 1.00 28.37CASETA M2 1.00 1.00 6.10 4.65 1.00 28.37

SEGUNDO PISO M2 22.00 1.00 5.12 5.08 1.00 572.21TERCER PISO M2 15.00 1.00 1.40 1.40 1.00 29.40 1832.24

06,03 PISOS Y PAVIMENTOS06.03.01 CONTRAPISO E=5CM

LOSETA CERAMICA 2 PISO m2 1.00 1.00 394.76 1.00 1.00 394.76LOSETA VINILICA 2 PISO m2 1.00 1.00 276.70 1.00 1.00 276.70PULIDO BRUÑADO 2 PISO m2 1.00 1.00 422.82 1.00 1.00 422.82PULIDO 2 PISO m2 1.00 1.00 20.74 1.00 1.00 20.74LOSETA CERAMICA 3 PISO m2 1.00 1.00 16.14 1.00 1.00 16.14LOSETA VINILICA 3 PISO m2 1.00 1.00 327.82 1.00 1.00 327.82PULIDO BRUÑADO 3 PISO m2 1.00 1.00 186.39 1.00 1.00 186.39 1645.37

06.03.02 CEMENTO PULIDO DEPÓSITO DEBAJO DE ESCALERAS M2 4.00 1.00 5.08 4.67 1.00 94.89DEPÓSITOS DE TAE KWON DO M2 2.00 1.00 2.45 2.16 1.00 10.58EN SUB-ESTACIÓN M2 2.00 1.00 2.45 2.16 1.00 10.58EN GRUPO ELECTRÓGENO M2 2.00 1.00 2.45 2.16 1.00 10.58PULIDO BRUÑADO 2 PISO m2 1.00 1.00 422.82 1.00 1.00 422.82PULIDO 2 PISO m2 1.00 1.00 20.74 1.00 1.00 20.74PULIDO BRUÑADO 3 PISO m2 1.00 1.00 186.39 1.00 1.00 186.39 756.60

06.03.03 PISO DE LOSETA CERAMICA DE COLOR CLARO DE 30 x 30 CM SALA DE BILLAR M2 1.00 1.00 17.84 14.07 1.00 251.01SERVICIOS HIGIENICOS 1, 2 Y 5, 6 M2 2.00 1.00 6.46 4.34 1.00 56.07SERVICIO HIGIENICO 3 M2 1.00 1.00 4.71 3.87 1.00 18.23SERVICIO HIGIENICO 4 M2 1.00 1.00 4.37 4.69 1.00 20.50SERVICIO HIGIENICO MINUSVÁLIDOS M2 1.00 1.00 3.05 1.30 1.00 3.97SERVICIO HIGIENICO SALAS DEPORTIVAS M2 8.00 1.00 1.50 1.35 1.00 16.20SNACK Y TÓPICO M2 4.00 1.00 3.18 2.90 1.00 36.89VESTIDORES M2 3.00 1.00 6.51 2.61 1.00 50.97LOSETA CERAMICA 2 PISO m2 1.00 1.00 394.76 1.00 1.00 394.76LOSETA CERAMICA 3 PISO m2 1.00 1.00 16.14 1.00 1.00 16.14 864.73

06.03.04 PISO DE LOSETA VINILICA A=2,5 MMEN SALA DE BOX M2 1.00 1.00 14.90 7.89 1.00 117.56EN SALA DE TENIS DE MESA M2 1.00 1.00 16.72 14.17 1.00 236.92EN TAE KWAN DO M2 1.00 1.00 11.50 4.56 1.00 52.44EN SALA DE GIMNASIA M2 1.00 1.00 15.20 14.07 1.00 213.86EN SALA DE ARTES MARCIALES M2 1.00 1.00 19.44 5.93 1.00 115.28EN BOLETERÍAS M2 1.00 1.00 6.05 3.20 1.00 19.36LOSETA VINILICA 2 PISO m2 1.00 1.00 276.70 1.00 1.00 276.70LOSETA VINILICA 3 PISO m2 1.00 1.00 327.82 1.00 1.00 327.82 1359.95

06.03.05 PISO DE PIEDRA LAJA DE MOQUEGUAPLAZA ORIENTE M2 1.00 1.00 21.90 27.66 1.00 605.75 605.75

06.03.06 VEREDA DE CEMENTO PULIDOVEREDA EN FACHADA PRINCIPAL M2 1.00 1.00 210.12 1.80 1.00 378.22SARDINEL EN VEREDA M2 1.00 1.00 210.12 0.35 1.00 73.54BERMA EN FACHADA M2 1.00 1.00 210.12 0.40 1.00 84.05EN VEREDAS INTERIORES DE AREA DE SERVICIO M2 1.00 1.00 45.00 1.20 1.00 54.00VEREDA EN ZONA DE TANQUE ELEVADO M2 1.00 1.00 119.92 1.00 1.00 119.92VEREDA CERCA DE CIMIENTO DE TORRE M2 1.00 1.00 31.33 1.00 1.00 31.33 741.06

06.03.07 PAVIMENTO DE CONCRETO06.03.06 CONCRETO F`C=210 210 KG/CM2 PARA LOSAS MACIZAS

ÁREA DE SERVICIO M3 1.00 1.00 256.67 1.00 0.20 51.33 51.3306.03.06 ACERO GRADO 60 EN LOSAS MACIZAS

ÁREA DE SERVICIO KG 1.00 1.00 2611.20 1.00 1.00 2611.20 2611.20

06.04 ZOCALOS06.04.01 ZOCALO DE MAYOLICA DE COLOR CLARO DE 20X30 CM.

PRIMER PISO

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción UnidadBOX SH-6 m2 1.00 1.00 5.50 1.00 1.20 6.60BOX SH-7 m2 1.00 1.00 4.70 1.00 1.20 5.64VESTIDOR BOX m2 1.00 1.00 27.75 1.00 2.10 58.28SSHH-PUBLICO DAMAS 1 m2 1.00 1.00 13.55 1.00 2.10 28.46SSHH-PUBLICO VARONES 2 m2 1.00 1.00 13.70 1.00 2.10 28.77TENIS DE MESA SSHH-5 m2 1.00 1.00 5.30 1.00 1.20 6.36TENIS DE MESA VESTIDOR m2 1.00 1.00 28.50 1.00 2.10 59.85SNACK -1 m2 1.00 1.00 4.10 1.00 0.60 2.46SSHH - PUBLICO DAMAS 3 m2 1.00 1.00 18.75 1.00 2.10 39.38SSHH - PUBLICO VARONES 4 m2 1.00 1.00 18.80 1.00 2.10 39.48TAE KWON DO SH-1 m2 1.00 1.00 6.80 1.00 2.10 14.28SSHH - DISCAPACITADOS m2 1.00 1.00 8.65 1.00 2.10 18.17SNACK 2 m2 1.00 1.00 6.50 1.00 0.60 3.90BILLAR SSHH 1 m2 1.00 1.00 4.95 1.00 1.20 5.94BILLAR SSHH 2 m2 1.00 1.00 5.15 1.00 1.20 6.18SSHH-PUBLICO DAMAS 5 m2 1.00 1.00 13.55 1.00 2.10 28.46SSHH-PUBLICO VARONES 6 m2 1.00 1.00 13.70 1.00 2.10 28.77GIMNASIA SSHH - 1 m2 1.00 1.00 5.15 1.00 1.20 6.18GIMNASIA SSHH - 2 m2 1.00 1.00 5.10 1.00 1.20 6.12GIMNASIA VESTIDORES m2 1.00 1.00 26.50 1.00 2.10 55.65

SEGUNDO PISO SS.HH.7 Y SS.HH.9 m2 2.00 1.00 43.25 1.00 2.10 181.65DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00SS.HH.8 Y SS.HH. 10 m2 2.00 1.00 42.85 1.00 2.10 179.97DESCUENTO DE PUERTA m2 2.00 -1.00 1.00 1.00 2.50 -5.00SNACK m2 2.00 1.00 7.45 1.00 0.60 8.94SS.HH. ARTES MARCIALES m2 1.00 1.00 7.20 1.00 0.60 4.32DESCUENTO DE PUERTA m2 1.00 -1.00 0.65 1.00 2.50 -1.63DUCHAS Y VESTIDORES(ARTESMARCIALES) m2 1.00 1.00 27.25 1.00 2.10 57.23DESCUENTO DE PUERTA m2 1.00 -1.00 1.00 1.00 2.50 -2.50

TERCER PISOSS.HH. TIPO 1 m2 2.00 1.00 5.90 1.00 2.10 24.78DESCUENTO DE PUERTA m2 2.00 -1.00 0.65 1.00 2.40 -3.12SS.HH. TIPO 2 m2 6.00 1.00 5.90 1.00 2.10 74.34DESCUENTO DE PUERTA m2 6.00 -1.00 0.65 1.00 2.40 -9.36 953.53

06.05 REVESTIMIENTOS04.05.01 REVESTIMIENTO DE ESCALERAS PASO BRUÑADO Y CONTRAPASO, ACABADO CEMENTO-ARENA

ECALERA PRINCIPALPASO Y CONTRAPASO m 4.00 1.00 7.77 5.07 1.00 157.58FONDO DE ESCALERA m 4.00 1.00 5.28 5.07 1.00 107.08

ESCALERA HACI LA TRIBUNA m 4.00 1.00 2.46 5.07 1.00 49.89m 4.00 1.00 1.71 5.07 1.00 34.68m 8.00 1.00 0.49 1.00 1.00 3.92

ESCALER AHACIA LAS OFICINASPRIMER TRAMO m 2.00 1.00 3.73 1.28 1.00 9.51

m 2.00 1.00 5.39 1.28 1.00 13.74m 4.00 1.00 0.87 1.00 1.00 3.48

TRAMO 2,3 Y 4 m 6.00 1.00 7.10 1.28 1.00 54.32m 6.00 1.00 5.82 1.28 1.00 44.52m 6.00 1.00 1.20 1.00 1.00 7.20 485.92

06.06 CONTRAZOCALOS06.06.01 CONTRAZÓCALO CEMENTO

PRIMER PISOPATIO DE BOLETERIA m 2.00 1.00 1.00 48.48 1.00 96.96CORREDORES DE INGRESO m 2.00 1.00 1.00 28.72 1.00 57.44ESCALERAS DE ACCESO m 4.00 1.00 1.00 15.54 1.00 62.16ESCALERAS A OFICINAS m 8.00 1.00 1.00 5.21 1.00 41.68SUB ESTACION + GRUPO ELECTROGENO m 1.00 1.00 1.00 43.40 1.00 43.40

SEGUNDA PLANTAPASILLOS m 1.00 1.00 1.00 104.48 1.00 104.48

m 1.00 1.00 1.00 11.13 1.00 11.13m 1.00 1.00 1.00 63.03 1.00 63.03 480.28

06.06.02 CONTRAZÓCALO CERÁMICOPRIMER PISO mSNACK 1 m 1.00 1.00 1.00 10.71 1.00 10.71SNACK 2 m 1.00 1.00 1.00 8.14 1.00 8.14SALA DE BILLAR m 1.00 1.00 1.00 64.89 1.00 64.89SEGUNDO PISO mAREA DE MESAS m 2.00 1.00 1.00 28.87 1.00 57.74TIENDA SOUVENIRS m 2.00 1.00 1.00 24.22 1.00 48.44 189.92

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción Unidad

06.06.03 CONTRAZÓCALO MADERA DE CEDRO H=0,10PRIMER PISOSALA DE BOXEO m 1.00 1.00 1.00 47.7 1.00 47.70PING PONG m 1.00 1.00 1.00 67.19 1.00 67.19GIMNASIA m 68.17SEGUNDO PISOOTRO FINES m 1.00 1.00 1.00 25.22 1.00 25.22ARTES MARCIALES m 1.00 1.00 1.00 52.02 1.00 52.02TERCER PISOOFICINAS m 6 1.00 1.00 25.8 1.00 154.80BOLETERIA m 1.00 1.00 1.00 34.54 1.00 34.54CASETA DE CONTROL m 1.00 1.00 1.00 6.30 1.00 6.30

m 2 1.00 1.00 43.54 1.00 87.08 474.8506.07 CUBIERTAS06.07.01 COBERTURA CON LADRILLO PASTELERO

LADRILLO PASTELERO BOLETERIA M2 1.00 1.00 1.00 16.76 1.00 16.76LADRILLO PASTELERO SUB ESTACION - G. ELECTROGEN M2 1.00 1.00 1.00 64.47 1.00 64.47 81.23

06.08 SARDINELES06.08.01 CONCRETO SIMPLE06.08.01.01 CONCRETO F'C=175 KG/CM2 PARA SARDINELES

CORREDOR DE INGRESO m3 1.00 1.00 61.55 1.00 0.22 13.23 13.2306.08.01.02 ENCOFRADO Y DEDESENCOFRADO CARAVISTA SARDINELES m2

CORREDOR DE INGRESO m2 1.00 1.00 61.55 1.00 0.40 24.62 24.6206.09 MALLA OLIMPICA PISTA ATLETICA06.09.01 CERCO METALICO C/TUB. RED. 4" ANG. 1.5" Y MALLA 4"x4" #12 m2

MALLAS LATERALES DE PROTECCION TRIBUNA m2 2.00 1.00 1.00 25.43 1.00 50.86MALLA OLIMPICA m2 1.00 173.15 1.00 1.00 3.00 519.45 570.31

06.10 CARPINTERÍA DE MADERA06.10.01 REPOSTERO BAJO DE H=0.90 DE MELAMINE

SNACK M2 2.00 1.00 8.45 0.50 1.00 8.45 8.45

06.10.02 PUERTAS CONTRAPLACADA 35 MM CON TRIPLAY 4 MM + MARCO CEDRO DE 2X3"PUERTAS CONTRAPLACADAS BOLETERIAS Y SsHh M2 19.00 1.00 1.00 0.70 2.50 33.25PUERTAS CONTRAPLACADAS SNACK Y TOPICO M2 3.00 1.00 1.00 1.00 2.50 7.50PUERTAS CONTRAPLACADAS DEPOSITO TKD M2 2.00 1.00 1.00 0.70 2.50 3.50PUERTAS CONTRAPLACADAS DEPOSITO SALAS DEPORT. M2 4.00 1.00 1.00 1.00 2.00 8.00 52.25

06.10.03 PUERTAS DE MADERA TABLERO REBAJADO DE 4,5 MM DE CEDRO PUERTAS TABLERO REBAJADO CASETA M2 1.00 1.00 1.00 0.80 2.10 1.68PUERTASTABLERO REBAJADO BOLETERIA M2 1.00 1.00 1.00 0.90 2.50 2.25PUERTASTABLERO REBAJADO VESTIDORES M2 4.00 1.00 1.00 1.00 2.50 10.00TABLERO REB. LOCAL TIENDA Y ART. MARCIALES M2 6.00 1.00 1.00 1.10 2.50 16.50TABLERO REB. OFICINAS M2 4.00 1.00 1.00 1.00 2.40 9.60 40.03

06.10.04 SEPARADORES DE MELAMINESEPARADORES DE URINARIOS EN SS.HH.2,4, 6, 8 Y 10 M2 30.00 1.00 0.50 1.00 1.20 18.00SEPARADORES DE VESTIDORES M2 4.00 1.00 2.05 1.00 2.10 17.22PUERTAS DE DUCHAS Y VESTIDORES M2 24.00 1.00 0.65 1.00 2.10 32.76 67.98

06.11 CARPINTRÍA METÁLICA06.11.01 VENTANAS METÁLICAS

VENTANAS SEGUNDO PISO M2 24.00 1.00 1.00 1.00 1.15 27.60VENTANAS CUARTO DE LLAVES M2 2.00 1.00 1.85 1.00 1.40 5.18VENTANAS SUB - ESTACION Y G.ELECTROGENO M2 4.00 1.00 1.00 1.00 1.10 4.40

M2 2.00 1.00 2.50 1.00 2.00 10.00 47.18

06.11.02 PUERTA METAL LAC 1/16" CONTRAPLACADA C/MARCO 2"X2"X1/4" Y REFUERZOSPUERTAS PRINCIPALES EXTERIORES CORREDORES. M2 4.00 1.00 1.00 5.08 2.70 54.86PUERTAS PRINCP. EXTER. ACCESO TRIB ALTA M2 4.00 1.00 1.00 5.08 2.55 51.82PUERTAS PRINCP. EXTER. SALAS DEPORT. M2 4.00 1.00 1.00 2.00 2.70 21.60PUERTAS PRINCP. EXTER. ESCALERAS 2ºY3º PISO M2 2.00 1.00 1.00 1.20 2.50 6.00PUERTAS EXTER. EMERGENCIA Y SERVICIOS M2 2.00 1.00 1.00 5.05 3.00 30.30 164.58

06.11.03 PUERTA METAL LAC 1/16" C/MARCO 1.5"X1.5"X1/8" Y REFUERZOSPUERTAS DE PLANCHA CONTRAPLACADA sshh M2 11.00 1.00 1.00 1.00 2.50 27.50PUERTA SUB-ESTACION M2 1.00 1.00 1.00 2.80 3.30 9.24PUERTA GRUPO ELECTROGENO M2 1.00 1.00 1.00 4.00 3.10 12.40 49.14

06.11.04 DIVISIONES METÁLICAS PARA BAÑOS

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción UnidadSEPARADORES DE BAÑOS 1,2,5,6 M2 4.00 1.00 5.62 1.00 2.10 47.21SEPARADORES DE BAÑOS 3,4 M2 2.00 1.00 10.74 1.00 2.10 45.11SEPARADORES DE BAÑOS 7,8,9,10 M2 4.00 1.00 29.80 1.00 2.10 250.32 342.64

06.11.05 PASAMANOSGRADAS DE INGRESOTUBO DE 3" M 4.00 1.00 6.40 1.00 1.00 25.60 25.60MUROS DE INGRESO EN GRADERÍASTUBO DE 3" M 4.00 1.00 11.20 1.00 1.00 44.80

06.11.06 BARANDA METÁLICA EN GRADERÍABARANDA DE 3" m 1.00 1.00 117.02 1.00 1.00 117.02BARANDA DE 2" m 1.00 1.00 152.52 1.00 1.00 152.52LONGITUD DE LA BARANDA 152.00 152.00 152.00

06.11.07 BARANDA EN ESCALERASESCALERAS DE INGRESOTUBO DE 3" m 4.00 1.00 7.20 1.00 1.00 28.80TUBO DE 2" m 4.00 1.00 13.00 1.00 1.00 52.00TUBO DE 1" m 4.00 1.00 22.92 1.00 1.00 91.68ESCALERAS DE INGRESO A 2DO Y 3ER PISOTUBO DE 3" m 2.00 1.00 19.45 1.00 1.00 38.90TUBO DE 2" m 2.00 1.00 56.00 1.00 1.00 112.00ESCALERAS DE ESCAPETUBO DE 3" m 2.00 1.00 12.95 1.00 1.00 25.90 93.60TUBO DE 2" m 2.00 1.00 21.10 1.00 1.00 42.20

06.11.08 BARANDA METALICA EN BOLETERIASTUBO CUADRADO DE 3 X 3 m 1.00 1.00 25.80 1.00 1.00 25.80 25.80TUBO CUADRADO DE 3 X 2 m 1.00 1.00 19.50 1.00 1.00 19.50TUBO CUADRADO DE 2 X 1 1/2 X 1/8 m 1.00 1.00 82.00 1.00 1.00 82.00

06.11.09 PUERTA DE REJA METALICA INGRESO AREA DE SERVICIO Y CORREDORESPUERTAS DE INGRESO A SERVICIOS m2 2.00 1.00 5.05 1.00 3.00 30.30 30.30

06.11.10 REJA METALICAREJA METALICA 1 1 122.27 1 3.84 469.52TUBOS DE 10" m 26.00 1.00 4.34 1.00 1.00 112.84TUBO CUADRADO DE 2 x2 m 2.00 1.00 122.27 1.00 1.00 244.54TUBO CUADRADO DE 2,1/4 m 4.00 1.00 122.27 1.00 1.00 489.08TUBO CUADRADO DE 1x1 m 924.00 1.00 3.75 1.00 1.00 3465.00

06.11.11 CELOSÍA METÁLICA m2 2.00 1.00 1.00 32.78 1.00 65.56 65.56

06.12 CERRAJERIA06.12.01 CERRADURA PARA PUERTA PRINCIPAL TRES GOLPES UND 29.00 1.00 1.00 1.00 1.00 29.00 29.0006.12.02 CERRADURA PARA PUERTA PRINCIPAL DOS GOLPES UND 15.00 1.00 1.00 1.00 1.00 15.00 15.0006.12.03 CERRADURA PARA PUERTA PRINCIPAL TIPO PERILLA UND 26.00 1.00 1.00 1.00 1.00 26.00 26.00

06.12.04 BISAGRAS DE FIERRO 4"BISAGRAS DE FIERRO 4" UND 220.00 1.00 1.00 1.00 1.00 220.00BISAGRAS DE FIERRO 3" PUERTAS INODOROS UND 210.00 1.00 1.00 1.00 1.00 210.00BISAGRAS DE GOZNE UND 54.00 1.00 1.00 1.00 1.00 54.00 484.00

06.12.05 PICAPORTE DE FIJACIONPICAPORTE DE ACERO LISO SUP. E INF. UND 14.00 1.00 1.00 1.00 1.00 14.00PICAPORTE TIPO SAPITO UND 70.00 1.00 1.00 1.00 1.00 70.00 84.00

06.13 VIDRIOS, CRISTALES Y SIMILARES06.13.01 VIDRIOS SEMIDOBLES NACIONALES

PRIMERPISO p2 2.00 11.00 1.00 11.80 1.00 259.60p2 2.00 11.00 1.00 210.66 1.00 4634.5

SEGUNDO PISO p2 2.00 11.00 1.00 38.07 1.00 837.54p2 2.00 11.00 1.00 30.05 1.00 661.10

TERCER PISO p2 2.00 11.00 1.00 21.70 1.00 477.40 6870.16

06.13.02 VIDRIO INCOLORO E=8.0 MM m2 6.00 1.00 1.00 6.20 1.00 37.20 37.20

06.13.03 ESPEJO INCLUIDO BASTIDORESPEJO 3.95*0.60 m2 4.00 11.00 3.95 0.60 1.00 104.28ESPEJO 2.90*0.60 m2 4.00 11.00 2.90 0.60 1.00 76.56ESPEJO 0.50*0.60 m2 9.00 11.00 0.50 0.60 1.00 29.70 210.54

06.14 PINTURA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

Cant de elemen

PLANILLA DE METRADOS

Item Mediadas%Concreto y otros

TotalDescripción Unidad06.14.01 PINTURA VINILICA EN CIELO RASO 2 MANOS m2 1832.2406.14.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 4640.7106.14.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 1135.7006.14.04 PINTURA LATEX EN DERRAMES INTERIORES Y EXTERIORES 2 m 1385.9606.14.05 PINTURA EN CARPINTERIA METALICA CON ESMALTE m2 1694.97

06.14.06 PINTURA C/BARNIZ EN MADERA m2 184.56

CIVSA

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : ARQUITECTURAUBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

07 INSTALACIONES SANITARIAS07.01 APARATOS Y ACCESORIOS SANITARIOS07.01.01 INODORO TANQUE BAJO BLANCO pza 93.0007.01.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 85.0007.01.03 URINARIOS DE LOZA DE PICO BLANCO pza 32.0007.01.04 LAVADERO DE COCINA pza 3.0007.01.05 COLOCACION DE APARATOS CORRIENTES pza 213.0007.01.06 DUCHA CROIMADA 8.0007.01.07 PAPELERA DE LOSA, COLOR BLANCO pza 9.0007.01.08 TOALLERA DE LOSA BLANCA pza 8.0007.01.09 COLOCACION DE ACCESORIOS CORRIENTES pza 17.00

07.02 INSTALACIONES SANITARIAS07.02.01 SALIDA DE DESAGUE EN PVC SAL 4" pto 90.0007.02.02 SALIDA DE DESAGUE EN PVC SAL 2" pto 137.0007.02.03 SALIDA DE VENTILACION 3" pto 119.0007.02.04 TUBERIAS PVC SAL 6" m 20.4007.02.05 TUBERIAS PVC SAL 4" m 336.1007.02.06 TUBERIAS PVC SAL 3" m 23.7107.02.07 TUBERIAS PVC SAL 2" m 44.0007.02.08 TUBERIAS PVC SAL 3" VENTILACION m 132.9607.02.09 SUMIDEROS DE 2" pza 44.0007.02.10 REGISTROS ROSCADO DE BRONCE DE 4" pza 45.0007.02.11 SOMBRERO VENTILACION PVC DE 3" pza 22.0007.02.12 CAJA DE REGISTRO 30X60 und 2.0007.02.13 CAJA DE REGISTRO 45X90 und 15.0007.02.14 CAJA DE REGISTRO 90X90 und 1.00

07.02.14 EXCAVACION DE ZANJA TERRENO NORMAL m 316.3907.02.15 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 50.6207.02.16 ELIMINACION DE MATERIAL EXEDENTE m3 6.5807.03 SISTEMA DE AGUA FRIA07.03.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 213.0007.03.02 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 35.4707.03.03 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP m 126.2307.03.04 RED DE DISTRIBUCION TUBERIA DE 11/4" PVC-SAP m 17.6707.03.05 RED DE DISTRIBUCION TUBERIA DE 11/2" PVC-SAP m 35.8507.03.06 RED DE DISTRIBUCION TUBERIA DE 2" PVC-SAP m 41.7207.03.07 RED DE DISTRIBUCION TUBERIA DE 21/2" PVC-SAP m 123.1907.03.08 RED DE DISTRIBUCION TUBERIA DE 3" PVC-SAP m 65.7807.03.10 RED DE DISTRIBUCION TUBERIA DE 4" PVC-SAP m 255.9007.03.11 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 3.0007.03.12 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" pza 25.00

VALVULAS DE COMPUERTA DE BRONCE DE 1" 27.00 VALVULAS DE COMPUERTA DE BRONCE DE 11/2" 6.00

07.03.13 VALVULAS DE COMPUERTA DE BRONCE DE 21/2" pza 1.0007.03.14 VALVULAS DE COMPUERTA DE BRONCE DE 4" pza 2.0007.03.15 BOMBA 2 HP C/ACCESORIOS pza 2.0007.03.16 BOMBA 1.5 HP C/ACCESORIOS pza 2.0007.03.17 GABINETE CONTRA INCENDIO 2 1/2" pza 4.0007.03.18 EXCAVACION DE ZANJA TERRENO NORMAL m 450.0007.03.19 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 72.0007.03.20 ELIMINACION DE MATERIAL EXEDENTE m3 9.36

PLANILLA DE METRADOS

OBRA : CONSTRUCCION DE GRADERIAS ESTADIO 25 DE NOVIEMBRE II ETAPA - TRIBUNA ORIENTEFORMULA : INSTALACION SANITARIAS (DESAGUE)UBICACIÓN : PROVINCIA DE MARISCAL NIETO, DISTRITO DE MOQUEGUA - MOQUEGUA

l a h

07.02 INSTALACIONES SANITARIAS07.02.01 SALIDA DE DESAGUE EN PVC SAL 4"

PRIMER PISO pto 29.00 1.00 1.00 1.00 1 29.00SEGUNDO PISO pto 53.00 1.00 1.00 1.00 1 53.00TERCER PISO pto 8.00 1.00 1.00 1.00 1 8.00

90.0007.02.02 SALIDA DE DESAGUE EN PVC SAL 2"

PRIMER PISO pto 52.00 1.00 1.00 1.00 1 52.00SEGUNDO PISO pto 77.00 1.00 1.00 1.00 1 77.00TERCER PISO pto 8.00 1.00 1.00 1.00 1 8.00

137.0007.02.04 TUBERIAS PVC SAL 6"

PRIMER PISO m 1.00 1.00 20.40 1.00 1 20.40

07.02.05 TUBERIAS PVC SAL 4"PRIMER PISO m 1.00 1.00 199.40 1.00 1 199.40SEGUNDO PISO m 1.00 1.00 124.02 1.00 1 124.02TERCER PISO m 1.00 1.00 12.68 1.00 1 12.68

336.1007.02.06 TUBERIAS PVC SAL 3"

SEGUNDO PISO m 1.00 1.00 23.71 1.00 1 23.71

07.02.08 TUBERIAS PVC SAL 3" VENTILACIONPRIMER PISO m 1.00 1.00 33.51 1.00 1 33.51SEGUNDO PISO m 1.00 1.00 24.40 1.00 1 24.40TERCER PISO m 1.00 1.00 26.07 1.00 1 26.07

83.9807.02.09 SUMIDEROS DE 2"

PRIMER PISO pza 25.00 1.00 1.00 1.00 1 25.00SEGUNDO PISO pza 11.00 1.00 1.00 1.00 1 11.00TERCER PISO pza 8.00 1.00 1.00 1.00 1 8.00

44.0007.02.10 REGISTROS ROSCADO DE BRONCE DE 4"

PRIMER PISO pza 16.00 1.00 1.00 1.00 1 16.00SEGUNDO PISO pza 23.00 1.00 1.00 1.00 1 23.00TERCER PISO pza 6.00 1.00 1.00 1.00 1 6.00

45.0007.02.11 SOMBRERO VENTILACION PVC DE 3"

SEGUNDO PISO pza 8.00 1.00 1.00 1.00 1 8.00TERCER PISO pza 14.00 1.00 1.00 1.00 1 14.00

22.0007.02.12 CAJA DE REGISTRO 30X60

PRIMER PISO und 2.00 1.00 1.00 1.00 1 2.00

07.02.12 CAJA DE REGISTRO 45X90PRIMER PISO und 15.00 1.00 1.00 1.00 1 15.00

07.02.12 CAJA DE REGISTRO 90X90PRIMER PISO und 1.00 1.00 1.00 1.00 1 1.00

07.02.14 EXCAVACION DE ZANJA TERRENO NORMALPRIMER PISO m 1.00 1.00 316.39 1.00 1 316.39

07.02.15 RELLENO CON MATERIAL PROPIO SELECCIONADOPRIMER PISO m3 1.00 1.00 316.39 1.00 1 50.62

07.02.16 ELIMINACION DE MATERIAL EXCEDENTEPRIMER PISO m3 1.00 0.10 50.62 1.30 1 6.58

PLANILLA DE METRADOS

Item Descripción Unidad Cant de elemen %

Concreto y otrosTotalMediadas