MUNICIPALIDAD PROVINCIAL DE ALTO AMAZONASDIRECCION DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
YURIMAGUAS
OBRA: CONSTRUCCION DE DEFENSA RIBERÑA EMBARCADERO MUNICHIS.
HOJA DE METRADO
NºDESCRIPCION
Nº MEDIDASPARCIAL TOTAL UND
CODIGO VECES LARGO ANCHO ALTO01.00 OBRAS PROVISIONALES01.01 ALQUILER DE LOCAL PARA ALMACEN 2.50 2.50 mes01.02 CARTEL DE OBRA DE 3.60m X 5.40m 1.00 1.00 und
02.00 TRABAJOS PRELIMINARERS
02.01 LIMPIEZA DE TERRENO MANUAL 1.00 37.00 5.00 185.00 185.00 m2
02.02 TRAZO Y REPLANTEO 1.00 43.00 2.40 103.20
1.00 10.00 1.80 18.00 121.20 m2
02.03 DEMOLICION DE BASES 5.00 1.20 1.20 0.20 1.44 1.44 m3
03.00 MOVIMIENTO DE TIERRAS
03.01 EXCAVACIÓN
PARA COLUMNAS 1.00 1.20 1.20 3.20 4.61
1.00 1.20 1.20 1.80 2.59
1.00 1.20 1.20 1.60 2.30
1.00 1.20 1.20 1.40 2.02
1.00 1.20 1.20 2.60 3.74
PARA ZAPATAS 1.00 43.00 2.40 1.00 103.20
1.00 6.00 1.80 1.00 10.80 129.26 m3
03.02 RELLENO DE ESTRUCTURAS 1.00 2.60 0.90 0.90 2.11
1.00 3.50 0.90 0.90 2.84
1.00 2.00 0.90 0.90 1.62
1.00 1.00 0.90 0.90 0.81
1.00 1.40 0.90 0.90 1.13
1.00 53.00 1.70 0.50 45.05
1.00 37.00 2.50 2.50 231.25 284.81 m3
03.03 ELIMINACIÓN DE MATERIAL EXCEDENTE 1.25*(145.82-72.31) 61.51 m3
04.00 OBRAS DE CONCRETO SIMPLE
04.01 SOLADO PARA ZAPATAS e=4" 5.00 1.20 1.20 7.20
04.02 SOLADO PARA ZAPATAS EN MUROe=4" 1.00 43.00 2.40 103.20
1.00 6.00 1.80 10.80 121.20 m2
05.00 OBRAS DE CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS 5.00 1.20 1.20 0.60 4.32 4.32 m3
05.01.02 ACERO EN ZAPATAS Ø 1/2" 5.00 16.80 84.00
Coef. 0.99 83.16 kg
05.02 COLUMNAS
05.02.01 CONCRETO EN COLUMNAS F'C=210 KG/,CM2
5.00 1.20 1.20 0.20 1.44
1.00 2.60 0.30 0.30 0.23
1.00 3.50 0.30 0.30 0.32
1.00 2.60 0.30 0.30 0.23
1.00 1.00 0.30 0.30 0.09
1.00 1.40 0.30 0.30 0.13 2.44 m3
05.02.02 ENCOFRADO Y DESCONFRADO 5.00 4.80 0.20 4.80
5.00 0.90 0.90 4.05
1.00 2.60 1.20 3.12
1.00 3.50 1.20 4.20
1.00 2.60 1.20 3.12
1.00 1.00 1.20 1.20
1.00 1.40 1.00 1.40 21.89 m2
05.02.03 ACERO FY = 4200kg/cm2
Ø = 1/2" 6.00 3.60 21.60
6.00 4.50 27.00
6.00 3.60 21.60
6.00 2.00 12.00
6.00 2.40 14.40 96.60 ml
Coef. 0.99 95.63 kg
REVISADO POR:PLANO Nº
FECHA : Agosto 05
MUNICIPALIDAD PROVINCIAL DE ALTO AMAZONASDIRECCION DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
YURIMAGUAS
OBRA: CONSTRUCCION DE DEFENSA RIBERÑA EMBARCADERO MUNICHIS.
HOJA DE METRADO
NºDESCRIPCION
Nº MEDIDASPARCIAL TOTAL UND
CODIGO VECES LARGO ANCHO ALTO
Ø = 3/8" 19.00 1.35 25.65
21.00 1.35 28.35
19.00 1.35 25.65
12.00 1.35 16.20
13.00 1.35 17.55 113.40 ml
Coef. 0.56 63.50 kg
159.14
5.03 MURO DE CONTENCION
05.03.01 CONCRETO F'C=210 KG/,CM2
PANTALLA (MURO 1) 1.00 43.00 0.20 3.00 25.80
PANTALLA (MURO 2) 1.00 10.00 0.20 3.00 6.00
ZAPATA (MURO 1) 1.00 43.00 0.50 2.40 51.60
ZAPATA (MURO 2) 1.00 6.00 0.50 1.80 5.40
CONTRAFUERTE (MURO 1) 16.00 1.70 0.20 3.00 8.16
CONTRAFUERTE (MURO 2) 4.00 1.60 0.20 3.00 1.92 98.88 m3
05.03.02 ENCOFRADO Y DESENCOFRADO 2.00 43.00 3.00 258.00
2.00 10.00 3.00 60.00
32.00 1.70 3.00 81.60
8.00 1.60 3.00 19.20 418.80 m2
05.03.03 ACERO FY = 4200kg/cm2
Ø = 3/4"
ACERO PRINCIPAL CONTRAFUERTES 20.00 5.20 104.00 104.00
Coef. 2.24 232.96
Ø = 5/8"
ZAPATA (MURO 1) 176.00 2.70 475.20
176.00 2.70 475.20
ZAPATA (MURO 2) 26.00 1.90 49.40
26.00 1.90 49.40
ACERO PRINCIPAL CONTRAFUERTES 20.00 9.00 180.00 1,229.20
Coef. 1.55 1,905.26
Ø = 1/2"
REFUERZO HORIZONTAL EN PANTALLA 43.00 54.50 2,343.50
REFUERZO EN ZAPATA (MURO 1) 11.00 43.95 483.45
12.00 43.95 527.40
REFUERZO EN ZAPATA (MURO 2) 9.00 5.00 45.00
9.00 5.00 45.00
REFUERZO HOR. EN CONTRAF 01. ( 28 bar.) 16.00 0.90 403.20
REFUERZO VER. EN CONTRAF 01. ( 14 bar.) 16.00 1.65 369.60
REFUERZO HOR. EN CONTRAF 02. ( 28 bar.) 4.00 0.85 95.20
REFUERZO VER. EN CONTRAF 02. ( 12 bar.) 4.00 1.60 76.80 4,389.15
Coef. 0.99 4,345.26
Ø = 3/8"
REFUERZO VERTICAL EN PANTALLA 218.00 3.70 806.60
218.00 3.70 806.60 1,613.20
Coef. 0.56 903.39
7,386.87
PROYECTO OBSERVACIONES METRADOS
HECHO POR:
REVISADO POR:PLANO Nº
FECHA : Agosto 05
MUNICIPALIDAD PROVINCIAL DE ALTO AMAZONASDIRECCION DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
YURIMAGUAS
OBRA: REHABILITACION ALCANTARILLA FLORIDA 1era CUADRA
HOJA DE METRADO
Nº Nº MEDIDASPARCIAL TOTAL UNDCODIGO VECES LARGO ANCHO ALTO
PROYECTO OBSERVACIONES METRADOS
HECHO POR:
REVISADO POR:PLANO Nº
FECHA :
MUNICIPALIDAD PROVINCIAL DE ALTO AMAZONASDIRECCION DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
YURIMAGUAS
OBRA: REHABILITACION ALCANTARILLA FLORIDA 1era CUADRA
HOJA DE METRADO
Nº Nº MEDIDASPARCIAL TOTAL UNDCODIGO VECES LARGO ANCHO ALTO
PROYECTO OBSERVACIONES METRADOS
HECHO POR:
REVISADO POR:PLANO Nº
FECHA :
MUNICIPALIDAD PROVINCIAL DE ALTO AMAZONASDIRECCION DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
YURIMAGUAS
OBRA: REHABILITACION ALCANTARILLA FLORIDA 1era CUADRA
HOJA DE METRADO
Nº Nº MEDIDASPARCIAL TOTAL UNDCODIGO VECES LARGO ANCHO ALTO
PROYECTO OBSERVACIONES METRADOS
HECHO POR:
REVISADO POR:PLANO Nº
FECHA :
MUNICIPALIDAD PROVINCIAL DE ALTO AMAZONASDIRECCION DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
YURIMAGUAS
OBRA: REHABILITACION ALCANTARILLA FLORIDA 1era CUADRA
HOJA DE METRADO
NºDESCRIPCION
Nº MEDIDASPARCIAL TOTAL UNDCODIGO VECES LARGO ANCHO ALTO
PROYECTO OBSERVACIONES METRADOS
HECHO POR:
REVISADO POR:PLANO Nº
FECHA :