Metrados Deductivo Virtual 2 - Patasagua Alto

40
PART. Nº DESCRIPCIÓN MEDIDAS PARCIAL LARGO ANCHO ALTO 01.00.00 ESTRUCTURAS 01.02.00 OBRAS PRELIMINARES 01.02.01 TRAZOS NIVELES Y REPLANTEO SANTA TERESA PASAJE AMERICA TRAMO 2 1 Área = 131.52 131.52 PASAJE GOLF CUADRA 1 1 Área = 121.86 121.86 01.03.00 MOVIMIENTO DE TIERRAS 01.03.01 CORTE DE TERRENO - SEMIROCOSO SANTA TERESA PASAJE AMERICA NIVEL 17.82 1 18.65 5.50 0.65 66.67 PASAJE GOLF NIVEL 20.85 A 1 0.53 5.50 2.90 NIVEL 22.47 1 0.50 5.50 2.74 01.03.03 RELLENO COMPACTADO CON MATERIAL PROPIO SANTA TERESA PASAJE AMERICA NIVEL 19.08 1 6.50 5.50 0.45 16.09 NIVEL 19.98 1 2.50 5.50 0.30 4.13 PASAJE GOLF NIVEL 20.85 1 0.02 5.50 0.11 NIVEL 22.47 1 0.14 5.50 0.79 NIVEL 25.17 1 0.73 5.50 3.99 Descuento de Material Préstamo (20%) -1 Vol = 5.02 -5.02 01.03.04 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO 20% del Material de Relleno 1 Vol = 5.02 5.02 01.03.06 EXCAVACIÓN DE ZANJAS SANTA TERESA EN JARDINERAS PASAJE AMERICA TRAMO 2 9 3.10 0.75 0.45 9.42 " 12 1.45 0.75 0.45 5.87 " 8 2.00 0.40 0.20 1.28 6 1.50 0.40 0.20 0.72 6 1.70 0.40 0.20 0.82 PASAJE GOLF CUADRA 1 8 1.55 0.75 0.45 4.19 " 16 0.65 0.75 0.45 3.51 " 8 1.50 0.30 0.20 0.72 EN GRADAS PASAJE AMERICA TRAMO 2 LLEGADAS 1 8.35 Área = 0.049 0.41 " 3 2.40 Área = 0.049 0.35 " 8 2.70 Área = 0.049 1.06 " 11 2.40 Área = 0.086 2.27 PASAJE GOLF CUADRA 1 LLEGADAS 5 2.70 Área = 0.049 0.66 VECES

description

deductivo

Transcript of Metrados Deductivo Virtual 2 - Patasagua Alto

ESTRUCTURASPLANILLA DE METRADOS

OBRA: MEJORAMIENTO DE ACCESO PEATONAL EN SANTA TERESA, 08 DE DICIEMBRE, SANTA RITA, PATASAGUA ALTO,DISTRITO DE TIABAYA - AREQUIPA - AREQUIPAENTIDAD: MUNICIPALIDAD DISTRITAL DE TIABAYACONTRATISTA: CONSORCIO PATASAGUA ALTOSUPERVISOR: ING. JUAN ROSALES HEREDIA C.I.P. 79089RESIDENTE: ING. ELMER MATIAS AGUILAR ALVA C.I.P. 51627

PART. NDESCRIPCINN VECESMEDIDASPARCIALTOTALUNIDADLARGO ANCHOALTO01.00.00ESTRUCTURAS01.02.00OBRAS PRELIMINARES01.02.01TRAZOS NIVELES Y REPLANTEO253.38M2SANTA TERESAPASAJE AMERICATRAMO 2 1rea = 131.52131.52156.6PASAJE GOLFCUADRA 11rea = 121.86121.866301.03.00MOVIMIENTO DE TIERRAS01.03.01CORTE DE TERRENO - SEMIROCOSO72.32M3SANTA TERESAPASAJE AMERICANIVEL 17.82118.655.500.6566.67PASAJE GOLFNIVEL 20.85 A 10.535.502.90NIVEL 22.4710.505.502.7401.03.03RELLENO COMPACTADO CON MATERIAL PROPIO20.08M3SANTA TERESAPASAJE AMERICANIVEL 19.0816.505.500.4516.09NIVEL 19.9812.505.500.304.13PASAJE GOLFNIVEL 20.8510.025.500.11NIVEL 22.4710.145.500.79NIVEL 25.1710.735.503.99Descuento de Material Prstamo (20%)-1Vol =5.02-5.0201.03.04RELLENO COMPACTADO CON MATERIAL DE PRSTAMO5.02M320% del Material de Relleno1Vol =5.025.0201.03.06EXCAVACIN DE ZANJAS 40.17M3SANTA TERESAEN JARDINERAS PASAJE AMERICATRAMO 2 93.100.750.459.4241.571.741.43.82"121.450.750.455.8761.553.221.46.99"82.000.400.201.2823.591.45.0361.500.400.200.7261.700.400.200.82PASAJE GOLFCUADRA 181.550.750.454.19"160.650.750.453.51"81.500.300.200.72EN GRADASPASAJE AMERICATRAMO 2 LLEGADAS18.35rea =0.0490.41"32.40rea =0.0490.35"82.70rea =0.0491.06"112.40rea =0.0862.27PASAJE GOLFCUADRA 1 LLEGADAS52.70rea =0.0490.66EN ZAPATASPASAJE GOLFZAPATA GRADAS21.201.201.002.88CUADRA 1 GRADAS NIVEL 20.85ZAPATA MURO GRADA15.501.750.535.10CUADRA 1 GRADAS NIVEL 24.4820.501.750.530.9201.03.07ACOPIO MATERIAL EXCEDENTE EN CARRETILLA (60 m)42.66M350 % VOMUMEN DEL MATERIAL EXEDENTE0.5Vol = 85.3342.6601.03.08PERFILADO DEL TERRENO212.26M3SANTA TERESAPASAJE AMERICAALAMEDA NIVEL 17.821rea =126.60126.60MENOS PISO-1rea =5.26-5.26MENOS PISO-1rea =7.02-7.02NIVEL 20.70 MIRADOR1rea =43.3743.37MENOS PISO-1rea =2.15-2.15PASAJE GOLFDESCANSO NIVEL 16.271rea =7.347.34DESCANSO NIVEL 16.531rea =7.347.34DESCANSO NIVEL 18.691rea =7.347.34DESCANSO NIVEL 20.851rea =7.347.34DESCANSO NIVEL 22.471rea =8.288.28DESCANSO NIVEL 23.911rea =8.868.86DESCANSO NIVEL 25.171rea =10.2410.2401.03.09NIVELACIN Y COMPACTACIN DEL TERRENO255.01M3AREA DE PERFILADO DEL TERRENO1rea =212.26212.26AREA DE GRADASSANTA TERESAPASAJE AMERICATRAMO 2 102.400.286.72"12.700.280.76PASAJE GOLFCUADRA 1482.400.2832.26"42.700.283.0201.03.10ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL. VOLQUETE 6M385.33M3VOMUMEN CORTE TERRENO CON MAQUINARIA1.15Vol = 72.3283.17VOLUMEN RELLENO-1Vol = 20.08-20.08EXCAVACION DE ZANJAS1.15Vol = 40.1746.20CIMIENTO-1Vol = 0.80-0.80ZAPATA-1Vol = 4.33-4.33SOLADO-1Vol = 1.36-1.36MUROS DE SOSTENIMIENTO-1Vol = 18.29-17.47SANTA TERESAPASAJE AMERICATRAMO 2 82.000.750.455.40"160.650.750.453.51"82.000.300.200.96PASAJE GOLFCUADRA 181.550.750.454.19"160.650.750.453.51"81.500.300.200.7201.04.00OBRAS DE CONCRETO SIMPLE01.04.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA0.80M3SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70 CORTE 21EN C320.500.500.800.40OKEN C-220.500.500.800.40OK01.04.02CONCRETO MUROS SOSTENIMIENTO FC=80KG/CM2 C:H 1:12+40%PG43.08M3JARDINERA SANTA TERESAPASAJE AMERICATRAMO 2 82.000.7500.455.40"82.000.2751.004.40"160.650.7500.453.51"160.650.2751.002.86"82.000.3000.200.96PASAJE GOLFTRAMO 181.600.7500.454.32"81.600.7501.009.60"160.650.7500.453.51"160.650.7501.007.80"81.500.3000.200.7201.04.03ENCOFRADO MUROS SOSTENIMIENTO R=15 m2/da99.20M2JARDINERA SANTA TERESAPASAJE AMERICATRAMO 2 8Per = 4.001.0032.00"16Per = 1.301.0020.80PASAJE GOLFCUADRA 18Per = 3.201.0025.60"16Per = 1.301.0020.8001.04.04CONCRETO GRADAS Y RAMPAS f'c=140 kg/cm2 + 30 %PM.12.88M3GRADASSANTA TERESAPASAJE AMERICATRAMO 2102.400.300.251.80"12.700.300.250.20LLEGADAS18.35rea = 0.050.41"32.40rea = 0.050.35"82.70rea = 0.051.06"112.40rea = 0.092.27PASAJE GOLFCUADRA 1272.400.300.254.86"42.700.300.250.81CUADRA 1 LLEGADAS52.40rea = 0.050.59"42.70rea = 0.050.5301.04.05ENCOFRADO GRADAS Y RAMPAS63.03M2SANTA TERESAPASAJE AMERICATRAMO 2102.400.184.32"12.700.180.49LLEGADAS28.350.254.18"62.400.253.60"162.700.2510.80"222.400.3015.84PASAJE GOLFCUADRA 1272.40.1811.66"42.70.181.94CUADRA 1 LLEGADAS82.40.254.80"82.70.255.4001.04.06SOLADOS CONCRETO f'c=100 kg/cm2 h=2"1.36M3SANTA TERESAPASAJE GOLFSOLADO ZAPATA GRADASCUADRA 1 GRADAS NIVEL 20.8521.21.20.10.29SOLADO ZAPATA MURO GRADACUADRA 1 GRADAS NIVEL 24.4815.51.750.10.96"10.61.750.10.1101.05.00OBRAS DE CONCRETO ARMADO01.05.01ZAPATAS01.05.03.01ENCOFRADO PARA ZAPATAS 9.15M2SANTA TERESAPASAJE GOLFZAPATA GRADASCUADRA 1 GRADAS NIVEL 20.8541.200.502.40OK"41.200.502.40OKZAPATA MURO GRADACUADRA 1 GRADAS NIVEL 22.4725.500.303.30"21.750.301.0501.05.01.02CONCRETO EN ZAPATAS f'c=210 kg/cm24.33M2SANTA TERESAPASAJE GOLFZAPATA GRADASCUADRA 1 GRADAS NIVEL 20.8521.201.200.501.44ZAPATA MURO GRADACUADRA 1 GRADAS NIVEL 22.4715.501.750.302.8901.05.01.03ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS 159.12KG01.05.02MUROS01.05.02.01ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS35.34M2SANTA TERESAPASAJE GOLFCUADRA 1 GRADAS NIVEL 22.4725.502.8531.35"20.702.853.9901.05.02.02CONCRETO EN MUROS FC= 210 kg/cm23.98M2SANTA TERESAPASAJE GOLF"15.500.232.853.53"10.700.232.850.4501.05.02.03ACERO ESTRUCTURAL TRABAJADO PARA MUROS310.41KG01.05.03SOBRECIMIENTOS01.05.03.01ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO90.90M2SANTA TERESAPASAJE AMERICATRAMO 26Per = 6.200.4516.74"16Per = 2.500.4518.00"8Per = 4.000.4514.40PASAJE GOLFCUADRA 18Per = 3.000.4510.80"16Per = 2.800.4520.16"8Per = 3.000.4510.8001.05.03.02CONCRETO EN SOBRECIMIENTOS f'c=210 kg/cm26.87M3JARDINERA SANTA TERESAPASAJE AMERICATRAMO 2 63.200.150.451.30"121.500.150.451.22"121.500.150.451.22PASAJE GOLFCUADRA 181.500.150.450.81"161.400.150.451.51"81.500.150.450.8201.05.03.03SOBRECIMIENTO REFORZADO ACERO227.81KG01.05.04COLUMNAS01.05.04.01ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS22.26M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70 EN C32Per = 0.7854.006.28OKEN C-22Per = 1.3833.238.93OKPASAJE GOLFCUADRA 1 GRADAS NIVEL 20.85EN C-32Per = 0.9403.757.0501.05.04.02CONCRETO EN COLUMNAS FC=210 kg/cm21.40M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70 EN C32rea = 0.0494.000.39OKEN C-22rea = 0.0753.230.48OKPASAJE GOLFCUADRA 1 GRADAS NIVEL 20.85EN C-32rea = 0.0703.750.5301.05.04.03ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS212.77KG01.05.05VIGAS01.05.05.01ENCOFRADO Y DESENCOFRADO PARA VIGAS9.23M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70VIGA CURVA V-10315.771.357.79OK"20.150.600.18OKPASAJE GOLFCUADRA 1 GRADAS NIVEL 20.85VIGA V-521.400.451.2601.05.05.02CONCRETO EN VIGAS FC=210 kg/cm20.77M3SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70VIGA CURVA V-10315.770.150.600.52PASAJE GOLFCUADRA 1 GRADAS NIVEL 20.85VIGA V-521.400.200.450.2501.05.05.03ACERO ESTRUCTURAL TRABAJADO PARA VIGAS163.41KG01.05.06ESCALERAS01.05.06.01ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS39.09M2SANTA TERESAPASAJE GOLFCUADRA 1 ESCALERA NIVEL 22.47C/PASOS141.500.183.78"72.400.183.02ESCALERA TRAMOS22.381.507.14"12.392.405.74DESCANSO1rea = 8.668.66"1rea = 4.554.55CANTOS TRAMOS62.400.304.32CANTOS DESCANSOS17.800.151.17"22.350.150.7101.05.06.02CONCRETO EN ESCALERAS FC=210 kg/cm24.88M3SANTA TERESAPASAJE GOLFCUADRA 1 ESCALERA NIVEL 20.85ESCALERA TRAMOS22.381.500.231.61"12.392.400.231.29DESCANSO1rea = 8.660.151.30"1rea = 4.550.150.6801.05.06.03ACERO ESTRUCTURAL TRABAJADO PARA ESCALERA530.63KG01.05.07GRADAS01.05.07.01ENCOFRADO GRADAS Y RAMPAS10.96M2SANTA TERESAPASAJE GOLFCUADRA 1 162.400.186.91"13.000.180.54LLEGADAS22.400.452.16"22.700.251.3501.05.07.02CONCRETO EN GRADAS f'c=140 kg/cm23.52M2SANTA TERESAPASAJE GOLFCUADRA 1 162.400.300.252.88"12.700.300.250.20LLEGADAS12.400.250.450.27"12.700.250.250.1701.05.07.03ACERO ESTRUCTURAL TRABAJADO PARA GRADAS35.25KG01.05.08BANCAS01.05.08.01ENCOFRADO Y DESENCOFRADO NORMAL EN BANCAS30.24M2SANTA TERESAPASAJE AMERICAAPOYOS720.500.4014.40"720.050.401.44BANCA241.500.103.60"240.500.101.20BASE240.500.202.40"241.500.207.2001.05.08.02CONCRETO FC=210 kg/cm2 PARA BANCAS3.42M2SANTA TERESAPASAJE AMERICAAPOYOS480.500.050.400.48"120.500.100.400.24BANCA121.500.500.100.90BASE121.500.500.201.8001.05.08.03ACERO ESTRUCTURAL TRABAJADO PARA BANCAS77.73KG

ACEROPLANILLA DE METRADOS DE ACERO

OBRA: MEJORAMIENTO DE ACCESO PEATONAL EN SANTA TERESA, 08 DE DICIEMBRE, SANTA RITA, PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA - AREQUIPAENTIDAD: MUNICIPALIDAD DISTRITAL DE TIABAYACONTRATISTA: CONSORCIO PATASAGUA ALTOSUPERVISOR: ING. JUAN ROSALES HEREDIA C.I.P. 79089RESIDENTE: ING. ELMER MATIAS AGUILAR ALVA C.I.P. 51627PART. NDESCRIPCINN DE ELEMENTOS IGUALESN DE PIEZAS POR ELEMENTOLONGITUD POR PIEZA (m)LONGITUD (m) POR PESO (Kg)1/4''3/8''1/2''5/8''3/4''1''0.250.560.991.552.243.9701.00.00ESTRUCTURAS01.05.00OBRAS DE CONCRETO ARMADO01.05.01ZAPATAS01.05.01.03ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS 159.12SANTA TERESAPASAJE GOLFTRAMO 1 GRADAS NIVEL 20.85COLUMNAS GRADASACERO LONGITUDINAL 1/2"1/2261.1513.8013.66ACERO TRANSVERSAL 1/2"1/2261.1513.8013.66MURO ZAPATAACERO LONGITUDINAL 3/8"3/81115.4559.9533.57ACERO TRANSVERSAL 3/8"3/81361.761.2034.27ACERO LONGITUDINAL 1/2"1/2165.4532.7032.37ACERO TRANSVERSAL 1/2"1/21221.4531.9031.5801.05.02MUROS01.05.02.03ACERO ESTRUCTURAL TRABAJADO PARA MUROS310.41SANTA TERESAPASAJE GOLFTRAMO 1 GRADAS NIVEL 22.47 PANTALLAACERO LONGITUDINAL 3/8" @.203/8267.387.6049.06ACERO LONGITUDINAL 3/8"@.253/8287.3116.8065.41ACERO VERTICAL 1/2"@0.251/21291.543.5043.07ACERO VERTICAL 3/8"@.203/81364.2151.2084.67ACERO VERTICAL 3/8"@.253/81294.2121.8068.2101.05.03SOBRECIMIENTOS01.05.03.03SOBRECIMIENTO REFORZADO ACERO227.81EN JARDINERASSANTA TERESAPASAJE AMERICATRAMO 2ACERO LONGITUDINAL 3/8"3/8824.572.0040.32"3/882232.0017.92ACERO TRANSVERSAL 3/8"3/88130.7578.0043.68"3/8860.7536.0020.16PASAJE GOLFACERO LONGITUDINAL 3/8"3/8824.368.8038.53"3/8821.524.0013.44ACERO TRANSVERSAL 3/8"3/88120.7572.0040.32"3/8840.7524.0013.4401.05.04COLUMNAS01.05.04.03ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS212.77SANTA TERESAPASAJE AMERICAEN C3ACERO 1/21/2265.8570.2069.50ESTRIBO 1/4"1/42290.78545.5311.38ESTRIBO 1/4" ADIC. CIMIENTO1/4240.7856.281.57EN C2ACERO 1/21/2245.0540.4040.00ESTRIBO 1/4"1/42241.3866.2416.56ESTRIBO 1/4" ADIC. CIMIENTO1/4241.3811.042.76PASAJE GOLFEN C3ACERO 1/21/2264.7557.0056.43ESTRIBO 1/4"1/42290.9454.5213.63ESTRIBO 1/4" ADIC. CIMIENTO1/4220.943.760.9401.05.05VIGAS01.05.05.03ACERO ESTRUCTURAL TRABAJADO PARA VIGAS163.41SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70VIGA CURVA V-103ACERO 1/2"1/2147.530.0029.70ACERO 3/8"3/8127.515.008.40ESTRIBO 1/4"1/42141.542.0010.50"1/41221.533.008.25PASAJE GOLFCUADRA 1 GRADAS NIVEL 20.85VIGA V-5ACERO 3/4"3/4252.7527.5061.60ACERO 5/8"5/8222.7511.0017.05ACERO 1/2"1/2222.7511.0010.89ESTRIBO 3/8"3/82160.9530.4017.0201.05.06ESCALERAS01.05.06.03ACERO ESTRUCTURAL TRABAJADO PARA ESCALERA530.63SANTA TERESAPASAJE GOLFCUADRA 1 ESCALERA NIVEL 20.87ESCALERAS TRAMO 1EMPALMES 3/83/8261.9523.4013.10"3/8261.720.4011.42ACERO 1/21/22105.12102.40101.38ACERO TRANSV 3/83/8261.4517.409.74"3/82111.4531.9017.86DESCANSOACERO 1/21/22122.5561.2060.59ACERO TRANSV 3/83/8265.3564.2035.95ESCALERAS TRAMO 2ACERO 1/21/21164.876.8076.03ACERO TRANSV 3/83/8162.3514.107.90"3/81112.3525.8514.48DESCANSOACERO 1/21/22103.978.0077.22"1/22121.945.6045.14ACERO TRANSV 3/83/8262.428.8016.13"3/8255.5555.5031.08REFUERZIO3/81210.816.809.41"3/8115.75.703.1901.05.07GRADAS01.05.07.03ACERO ESTRUCTURAL TRABAJADO PARA GRADAS35.25SANTA TERESACUADRA 1 ACERO LONGIT 6mm1/41126.7581.0020.25ACERO TRANSV 6mm1/41252.460.0015.0001.05.08BANCAS01.05.08.03ACERO ESTRUCTURAL TRABAJADO PARA BANCAS77.73SANTA TERESAPASAJE AMERICAACERO 1/41/486148.0012.00ACERO 3/83/883124.0013.44SABE3/8831.536.0020.16"3/8880.4528.8016.13ACERO 1/41/482464.0016.00

ARQUITECURAPLANILLA DE METRADOS

OBRA: MEJORAMIENTO DE ACCESO PEATONAL EN SANTA TERESA, 08 DE DICIEMBRE, SANTA RITA, PATASAGUA ALTO,DISTRITO DE TIABAYA - AREQUIPA - AREQUIPAENTIDAD: MUNICIPALIDAD DISTRITAL DE TIABAYACONTRATISTA: CONSORCIO PATASAGUA ALTOSUPERVISOR: ING. JUAN ROSALES HEREDIA C.I.P. 79089RESIDENTE: ING. ELMER MATIAS AGUILAR ALVA C.I.P. 51627

PART. NDESCRIPCINN VECESMEDIDASPARCIALTOTALUNIDADLARGO ANCHOALTO02.00.00ARQUITECTURA02.01.00REVOQUES ENLUCIDOS Y MOLDURAS02.01.01TARRAJEO EN EXTERIORES 167.30M2SANTA TERESAPASAJE AMERICAJARDINERA UN MODULO66.260.8030.05JARDINERA TRES MODULOS1rea = 5.1255.13FACHADA 21.81.615.8021.80.351.2641.80.906.48INTERIOR43.750.456.7526.650.455.99PASAJE GOLFCUADRA 1JARDINERA UN MODULO4rea = 1.295.16JARDINERA DOS MODULOS8rea = 2.5320.24JARDINERA TRES MODULOS4rea = 5.9123.64FACHADA JARDINERA81.551.6119.96"81.550.354.34INTERIOR83.760.4513.54"85.270.4518.9702.01.02TARRAJEO EN COLUMNAS20.30M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.7021.383.6510.07"20.7853.054.79PASAJE GOLFCUADRA 1 GRADAS NIVEL 20.8520.942.895.4302.01.03TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNAS24.40MSANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.7083.0524.4002.01.04TARRAJEO DE VIGAS8.19M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.7015.771.357.79"20.151.350.4102.01.05TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGAS11.54M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.7025.7711.5402.01.06ENLUCIDO DE ELEMENTOS DE FACHADA45.35M2SANTA TERESAPASAJE AMERICATRAMO 2182.000.259.00"361.250.2511.25"82.000.254.00PASAJE GOLFCUADRA 184.350.258.70"86.200.2512.4002.01.07BRUAS83.32M2SANTA TERESAPASAJE AMERICATRAMO 2 PORTICO NIVEL 20.70141.3819.32BANCAS ALMEDA164.0064.0002.02.00CIELO RASO02.02.01VESTIDURA DE SUPERFICIE FONDO DE ESCALERA MORTERO 1:4 X 1.5 cm25.29M2SANTA TERESAPASAJE GOLFGRADA CUADRA 122.381.507.14"12.392.405.74DESCANSO1rea = 8.668.66"1rea = 3.753.7502.03.00PISOS Y PAVIMENTOS02.03.01PISOS DE CEMENTO SIN COLOR ACABADO BRUADO E=1.5cm C:AG, 1:2155.26M2SANTA TERESAPASAJE AMERICAALAMEDA NIVEL 17.821rea = 69.6069.60MENOS PISO-1rea = 5.26-5.26MENOS PISO-1rea = 7.02-7.02NIVEL 20.70 MIRADOR1rea = 43.3743.37MENOS PISO-1rea = 2.15-2.15PASAJE GOLFDESCANSO NIVEL 16.271rea = 7.347.34DESCANSO NIVEL 16.531rea = 7.347.34DESCANSO NIVEL 18.691rea = 7.347.34DESCANSO NIVEL 20.851rea = 7.347.34DESCANSO NIVEL 22.471rea = 8.288.28DESCANSO NIVEL 23.911rea = 8.868.86DESCANSO NIVEL 25.171rea = 10.2410.2402.03.02PISOS CON ESCORIA DE PIEDRA6.92M2SANTA TERESAPASAJE AMERICATRAMO 2 ALAMEDA NIVEL 17.821rea = 2.612.61"1rea = 4.314.3102.03.03PISO CEMENTO PULIDO COLOREADO NEGRO5.38M2SANTA TERESAPASAJE AMERICATRAMO 2 ALAMEDA NIVEL 17.82111.000.151.65"16.750.151.01"110.690.151.60"17.400.151.1102.04.00REVESTIMIENTO 02.04.01REVESTIMIENTO GRADAS Y ESCALERAS C/CEMENTO FROTACHADO137.70MSANTA TERESAPASAJE AMERICATRAMO 2102.4024.00"12.702.70PASAJE GOLFCUADRA 142.7010.80"272.4064.80ESCALERA141.5021.00ESCALERA62.4014.4002.04.03REVESTIMIENTO BANCAS C.MORTERO 1:4 X 2cm PULIDO MEZCLA 1:2 X 1cm18.40M2SANTA TERESAPASAJE AMERICAAPOYOS160.500.504.00"161.500.5012.00BANCA242.000.052.4002.04.04REVESTIMIENTO DE BANCAS CON CERAMICO3.84M2SANTA TERESAPASAJE AMERICABANCA240.400.403.8402.06.00PINTURA02.06.01PINTURA LATEX EN EXTERIORES 2 MANOS241.14MTARRAJEO EXTERIOR1rea = 167.30167.30TARRAJEO COLUMNAS1rea = 20.3020.30TARRAJEO VIGAS1rea = 8.198.19VESTIDURA DE ELEMENTOS DE FACHADA1rea = 45.3545.3502.07.00JUNTAS ASFALTICAS02.07.01JUNTAS ASFALTICAS72.80MSANTA TERESAPASAJE GOLFCUADRA 1145.2072.80

VARIOSPLANILLA DE METRADOS

OBRA: MEJORAMIENTO DE ACCESO PEATONAL EN SANTA TERESA, 08 DE DICIEMBRE, SANTA RITA, PATASAGUA ALTO,DISTRITO DE TIABAYA - AREQUIPA - AREQUIPAENTIDAD: MUNICIPALIDAD DISTRITAL DE TIABAYACONTRATISTA: CONSORCIO PATASAGUA ALTOSUPERVISOR: ING. JUAN ROSALES HEREDIA C.I.P. 79089RESIDENTE: ING. ELMER MATIAS AGUILAR ALVA C.I.P. 51627

PART. NDESCRIPCINN VECESMEDIDASPARCIALTOTALUNIDADLARGO ANCHOALTO03.00.00VARIOS03.01.00LIMPIEZA FINAL DE OBRA253.38M2SANTA TERESAPASAJE AMERICATRAMO 2 1rea = 131.52131.52PASAJE GOLFCUADRA 11rea = 121.86121.8603.03.00SEMBRADO DE MACIZOS DE FLORES22.00PZASANTA TERESAPASAJE AMERICATRAMO 21616.00PASAJE GOLFTRAMO 166.0003.04.00SEMBRADO DE ARBOLES18.00PZASANTA TERESAPASAJE AMERICATRAMO 288.00PASAJE GOLFTRAMO 11010.0003.05.00RELLENO CON MATERIAL DE PRESTAMO PARA JARDINERA22.80M3SANTA TERESAPASAJE AMERICATRAMO 2ARBUSTOS81.51.250.203.00ARBOLES81.51.250.609.00PASAJE GOLFTRAMO 1ARBUSTOS61.21.250.201.80ARBOLES101.21.250.609.00

PRESUPUESTOPRESUPUESTO DEDUCTIVO N 02

OBRA: MEJORAMIENTO DE ACCESO PEATONAL EN SANTA TERESA, 08 DE DICIEMBRE, SANTA RITA, PATASAGUA ALTO,DISTRITO DE TIABAYA - AREQUIPA - AREQUIPAENTIDAD: MUNICIPALIDAD DISTRITAL DE TIABAYACONTRATISTA: CONSORCIO PATASAGUA ALTOSUPERVISOR: ING. JUAN ROSALES HEREDIA C.I.P. 79089RESIDENTE: ING. ELMER MATIAS AGUILAR ALVA C.I.P. 51627

PART. NDESCRIPCINUNIDADMETRADOPRECIO S/.PARCIAL S/.

01.00.00ESTRUCTURAS01.02.00OBRAS PRELIMINARES01.02.01TRAZOS NIVELES Y REPLANTEOM2253.382.19554.9001.03.00MOVIMIENTO DE TIERRAS01.03.01CORTE DE TERRENO - SEMIROCOSOM372.3177517.911295.2501.03.03RELLENO COMPACTADO CON MATERIAL PROPIOM320.081620.38409.2301.03.04RELLENO COMPACTADO CON MATERIAL DE PRSTAMOM35.020436.99185.6901.03.06EXCAVACIN DE ZANJAS M340.1707530.311217.5501.03.07ACOPIO MATERIAL EXCEDENTE EN CARRETILLA (60 m)M342.656087515.50661.2301.03.08PERFILADO DEL TERRENOM3212.2551.72365.0901.03.09NIVELACIN Y COMPACTACIN DEL TERRENOM3255.0111.12285.6101.03.10ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL. VOLQUETE 6M3M385.33217528.512432.7601.04.00OBRAS DE CONCRETO SIMPLE01.04.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAM30.8153.86123.0901.04.02CONCRETO MUROS SOSTENIMIENTO FC=80KG/CM2 C:H 1:12+40%PGM343.08163.957062.9701.04.03ENCOFRADO MUROS SOSTENIMIENTO R=15 m2/daM299.240.113978.9101.04.04CONCRETO GRADAS Y RAMPAS f'c=140 kg/cm2 + 30 %PM.M312.88045206.862664.3601.04.05ENCOFRADO GRADAS Y RAMPASM263.02936.352291.1401.04.06SOLADOS CONCRETO f'c=100 kg/cm2 h=2"M31.355510.1013.7401.05.00OBRAS DE CONCRETO ARMADO01.05.01ZAPATAS01.05.03.01ENCOFRADO PARA ZAPATAS M29.1536.78336.5401.05.01.02CONCRETO EN ZAPATAS f'c=210 kg/cm2M24.3275281.751219.9801.05.01.03ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG159.1224.02639.6601.05.02MUROS01.05.02.01ENCOFRADO Y DESENCOFRADO NORMAL EN MUROSM235.3432.451146.7801.05.02.02CONCRETO EN MUROS FC= 210 kg/cm2M23.97575283.991130.2801.05.02.03ACERO ESTRUCTURAL TRABAJADO PARA MUROSKG310.4094.021247.8501.05.03SOBRECIMIENTOS01.05.03.01ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOM290.933.933084.2401.05.03.02CONCRETO EN SOBRECIMIENTOS f'c=210 kg/cm2M36.868286.501968.2601.05.03.03SOBRECIMIENTO REFORZADO ACEROKG227.8084.02915.8001.05.04COLUMNAS01.05.04.01ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASM222.2641840.10892.6301.05.04.02CONCRETO EN COLUMNAS FC=210 kg/cm2M21.4015299.57419.4001.05.04.03ACERO ESTRUCTURAL TRABAJADO PARA COLUMNASKG212.76654.02855.3401.05.05VIGAS01.05.05.01ENCOFRADO Y DESENCOFRADO PARA VIGASM29.229560.24556.0201.05.05.02CONCRETO EN VIGAS FC=210 kg/cm2M30.7713292.32225.0901.05.05.03ACERO ESTRUCTURAL TRABAJADO PARA VIGASKG163.4144.02656.9101.05.06ESCALERAS01.05.06.01ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERASM239.08551.021994.3701.05.06.02CONCRETO EN ESCALERAS FC=210 kg/cm2M34.8786295.741443.2101.05.06.03ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAKG530.6284.022133.1301.05.07GRADAS01.05.07.01ENCOFRADO GRADAS Y RAMPASM210.96236.35398.4001.05.07.02CONCRETO EN GRADAS f'c=140 kg/cm2M23.52125280.49987.3201.05.07.03ACERO ESTRUCTURAL TRABAJADO PARA GRADASKG35.254.08143.8201.05.08BANCAS01.05.08.01ENCOFRADO Y DESENCOFRADO NORMAL EN BANCASM230.2433.931026.0401.05.08.02CONCRETO FC=210 kg/cm2 PARA BANCASM23.42292.32999.7301.05.08.03ACERO ESTRUCTURAL TRABAJADO PARA BANCASKG77.7284.02312.4702.00.00ARQUITECTURA02.01.00REVOQUES ENLUCIDOS Y MOLDURAS02.01.01TARRAJEO EN EXTERIORES M2167.29616.942834.0602.01.02TARRAJEO EN COLUMNASM220.295726.92546.4802.01.03TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNASM24.411.35276.9402.01.04TARRAJEO DE VIGASM28.194527.25223.1802.01.05TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGASM211.5412.25141.3702.01.06ENLUCIDO DE ELEMENTOS DE FACHADAM245.3516.11730.5902.01.07BRUASM283.323.42284.9502.02.00CIELO RASO02.02.01VESTIDURA DE SUPERFICIE FONDO DE ESCALERA MORTERO 1:4 X 1.5 cmM225.28623.47593.5602.03.00PISOS Y PAVIMENTOS02.03.01PISOS DE CEMENTO SIN COLOR ACABADO BRUADO E=1.5cm C:AG, 1:2M2155.25513.592109.9802.03.02PISOS CON ESCORIA DE PIEDRAM26.9224.06166.5002.03.03PISO CEMENTO PULIDO COLOREADO NEGROM25.37627.16146.1202.04.00REVESTIMIENTO 02.04.01REVESTIMIENTO GRADAS Y ESCALERAS C/CEMENTO FROTACHADOM137.723.563244.2102.04.03REVESTIMIENTO BANCAS C.MORTERO 1:4 X 2cm PULIDO MEZCLA 1:2 X 1cmM218.420.33374.0702.04.04REVESTIMIENTO DE BANCAS CON CERAMICOM23.8437.65144.5802.06.00PINTURA02.06.01PINTURA LATEX EN EXTERIORES 2 MANOSM241.13628.432032.8102.07.00JUNTAS ASFALTICAS02.07.01JUNTAS ASFALTICASM72.811.56841.5703.00.00VARIOS03.01.00LIMPIEZA FINAL DE OBRAM2253.380.2358.2803.03.00SEMBRADO DE MACIZOS DE FLORESPZA2213.82304.0403.04.00SEMBRADO DE ARBOLESPZA1822.75409.5003.05.00RELLENO CON MATERIAL DE PRESTAMO PARA JARDINERAM322.841.28941.18COSTO DIRECTO64,678.76GASTOS GENERALES (4.5%)2,910.54UTILIDAD (5.5%)3,557.33===============SUB TOTAL71,146.63FACTOR DE RELACIN (1.08)76,838.36IGV (18%)13,830.90===============TOTAL PRESUPUESTO90,669.26