PLANILLA DE METRADOS SANEAMIENTO ALT. N° 01
Item DescripcionMedidas
Parcial Total Und.Largo Ancho Altura
09.01 UNIDAD BASICA DE SANEAMIENTO ECOLOGICA O COMPOSTERA (52 UND) 52
09.01.01 ESTRUCTURAS
09.01.01.01 OBRAS PRELIMINARES
09.01.01.01.01 Limpieza y desbroce de terreno manual 546.00 m2
Area de Compostera 52.00 3.50 3.00 546.00
09.01.01.01.02 Trazo, nivelacion y replanteo 546.00 m2
Area de Compostera 52.00 3.50 3.00 546.00
09.01.01.02 MOVIMIENTO DE TIERRAS
09.01.01.02.01 Excavacion en material conglomerado (95%) 169.12 160.66 m3
Zapatas (UBS) 260.00 0.75 0.65 0.40 50.70
Eje B-B 52.00 1.15 0.30 0.40 7.18
Eje C-C 52.00 0.93 0.30 0.40 5.80
Eje A-A, D-D 104.00 0.70 0.40 0.40 11.65
Eje D-D (escalera) 52.00 0.65 0.25 0.40 3.38
Eje 2-2 52.00 2.50 0.40 0.40 20.80
Eje 3-3 52.00 1.85 0.40 0.40 15.39
Camara entre A-B (area x altura) 52.00 0.52 0.10 2.70
Camara entre B-C (area x altura) 52.00 0.98 0.10 5.10
Camara entre C-D (area x altura) 52.00 0.86 0.10 4.47
Caja de registro 52.00 0.85 0.60 0.80 21.22
Tuberia pvc sal d=2" 52.00 1.40 0.25 0.25 4.55
Tuberia pvc sal d=4" 52.00 1.00 0.25 0.50 6.50
Tuberia pvc sal d=4" 52.00 0.40 0.25 0.50 2.60
Cámara de distribución para Zanja de percolación 52.00 0.55 0.55 0.45 7.08
09.01.01.02.02 Excavacion en roca dura (5%) 169.12 8.46 m3
09.01.01.02.03 Refine y compactacion de fondos 443.82 443.82 m2
Zapatas (UBS) 208.00 0.75 0.65 101.40
Eje B-B, C-C 104.00 1.15 0.30 35.88
Eje A-A, D-D 104.00 0.70 0.40 29.12
Eje D-D (escalera) 52.00 0.65 0.25 8.45
Eje 2-2, 3-3 104.00 2.50 0.40 104.00
Camara entre A-B (area x altura) 52.00 0.52 27.04
Camara entre B-C (area x altura) 52.00 0.98 50.96
Camara entre C-D (area x altura) 52.00 0.86 44.72
Caja de registro 52.00 0.85 0.60 26.52
Cámara de distribución para Zanja de percolación 52.00 0.55 0.55 15.73
09.01.01.02.04 Refine y nivelacion de zanja 36.40 36.40 m
Tuberia pvc sal d=2" 52.00 1.40 0.25 18.20
Tuberia pvc sal d=4" 52.00 1.00 0.25 13.00
Tuberia pvc sal d=4" 52.00 0.40 0.25 5.20
09.01.01.02.05 Cama de apoyo para tuberia E=0.10 m 145.60 145.60 m
Tuberia pvc sal d=2" 52.00 1.40 72.80
Tuberia pvc sal d=4" 52.00 1.00 52.00
Tuberia pvc sal d=4" 52.00 0.40 20.80
09.01.01.02.06 Relleno con material propio seleccionado 10.01 10.01 m3
Tuberia pvc sal d=2" 52.00 1.40 0.25 0.15 2.73
Tuberia pvc sal d=4" 52.00 1.00 0.25 0.40 5.20
Tuberia pvc sal d=4" 52.00 0.40 0.25 0.40 2.08
09.01.01.03 CONCRETO SIMPLE
09.01.01.03.01 Concreto 1:8+25% PM Para cimientos 67.60 67.60 m3
Eje B-B, C-C 104.00 1.15 0.30 0.40 14.35
Eje A-A, D-D 104.00 0.70 0.40 0.40 11.65
Eje 2-2, 3-3 104.00 2.50 0.40 0.40 41.60
09.01.01.04 CONCRETO ARMADO
09.01.01.04.01 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 16993.03 16993.03 kg
09.01.01.04.02 Encofrado y desencofrado normal 2556.27 2556.27 m2
ESTRUCTURAS
Columnas (eje 2-2) 52.00 1.00 3.45 179.40
Columnas (eje 3-3) 52.00 0.50 3.15 81.90
52.00 0.50 4.15 107.90
52.00 0.50 4.15 107.90
Muro de camara exterior 52.00 8.40 1.15 502.32
Muro de camara interior (A-B) 52.00 4.20 1.00 218.40
Muro de camara interior (B-C) 52.00 4.80 1.00 249.60
Muro de camara interior (C-D) 52.00 4.80 1.00 249.60
Area Techo de camara interior (A-B) 52.00 0.98 50.96
Area Techo de camara interior (B-C) 52.00 1.40 72.80
Area Techo de camara interior (C-D) 52.00 1.40 72.80
Escaleras (Muro de apoyo) 52.00 1.90 1.65 163.02
Escaleras (losa de ingreso) 52.00 2.23 0.90 104.36
Escaleras (Pasos y contrapasos) 260.00 0.90 0.18 42.12
Escaleras (Área lateral) 52.00 0.43 22.36
Dintel en ventanas 52.00 1.20 0.35 21.84
Dintel en puerta 52.00 0.90 0.35 16.38
Losa para tanque elevado 52.00 1.45 1.20 90.48
52.00 5.30 0.15 41.34
PROYECTO: "AMPLIACIÓN Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACIÓN DEL SISTEMA DE SANEAMIENTO BÁSICO DE LA LOCALIDAD SANTA ANA DE PUCUNAN, DISTRITO DE SANTA ANA DE TUSI, PROVINCIA DE DANIEL ALCIDES CARRIÓN, DEPARTAMENTO DE PASCO"
FECHA: Enero 2014
N° de veces
CAJA DE REGISTRO
Muro 52.00 1.70 0.80 70.72
Tapa 52.00 0.55 0.30 8.58
104.00 0.55 0.08 4.58
104.00 0.30 0.08 2.50
Diente interior 52.00 0.52 0.30 8.11
CAJA DE DE DISTRIBUCION PARA ZANJA PERCOLADORA
Muro 52.00 1.80 0.50 46.80
Tapa 52.00 0.50 0.50 13.00
52.00 2.00 0.03 2.60
Diente interior 52.00 0.75 0.10 3.90
09.01.01.04.03 CONCRETO f'c=210 kg/cm2 264.02 264.02 m3
ESTRUCTURAS
Zapatas 208.00 0.75 0.65 0.40 40.56
Columnas (eje 2-2) 104.00 0.25 0.15 3.45 13.46
Columnas (eje 3-3) 52.00 0.25 0.15 3.15 6.14
104.00 0.25 0.15 4.15 16.19
Losa armada 52.00 3.30 1.70 0.15 43.76
Dintel en ventanas 52.00 1.20 0.15 0.10 0.94
Dintel en puerta 52.00 0.90 0.15 0.10 0.70
Escaleras (Muro de apoyo) 52.00 0.90 0.10 1.65 7.72
Escaleras (Cimentacion) 52.00 0.90 0.17 0.40 3.18
Escaleras (losa de ingreso) 52.00 2.25 0.90 0.10 10.53
Escaleras (Pasos y contrapasos) 130.00 0.90 0.25 0.18 5.27
Tapa para hoyo de inodoro 52.00 Area 0.14 0.05 0.36
Losa para tanque elevado 52.00 1.45 1.20 0.15 13.57
CAMARAS INTERIORES
Muro de camara (A-A, D-D) 104.00 1.20 0.15 1.00 18.72
Muro de camara (B-B) 52.00 1.40 0.15 1.00 10.92
Muro de camara (C-C) 52.00 1.50 0.15 1.00 11.70
52.00 0.05 0.05 1.00 0.13
Muro de camara (2-2) 52.00 3.00 0.15 1.00 23.40
Muro de camara (3-3) 52.00 0.85 0.15 1.00 6.63
52.00 2.25 0.15 0.05 0.88
52.00 2.25 0.10 0.05 0.59
Esquinas biseladas 416.00 0.10 0.10 1.00 4.16
Tapas de camaras 104.00 0.85 0.80 0.05 3.54
CAJA DE REGISTRO
Losa 52.00 0.85 0.60 0.15 3.98
Muro 52.00 2.30 0.15 0.65 11.66
Tapa 52.00 0.55 0.30 0.10 0.86
Diente interior 52.00 0.16 0.10 0.30 0.250
CAJA DE REGISTRO
Losa 52.00 0.55 0.55 0.05 0.79
Muro 52.00 2.00 0.05 0.45 2.34
Tapa 52.00 0.45 0.45 0.03 0.26
Diente interior 52.00 Area 0.16 0.10 0.848
09.01.02 ARQUITECTURA
09.01.02.01 MURO Y TABIQUES DE ALBAÑILERIA
09.01.02.01.01 Muro de adobe de 40 cm de ancho 574.08 574.08 m2
Muro frontal 52.00 3.00 2.40 374.40
Puerta 52.00 -1.00 0.75 2.10 -81.90
Dintel 52.00 -1.00 0.75 0.10 -3.90
Muro lateral derecho 52.00 1.20 2.25 140.40
Ventana 52.00 -1.00 1.20 0.45 -28.08
Dintel 52.00 -1.00 1.20 0.10 -6.24
Muro lateral izquierdo 52.00 1.20 2.25 140.40
Muro posterior 52.00 3.00 2.10 327.60
09.01.02.02 PISOS
09.01.02.02.01 Contrapiso de 25 mm, Pulido 316.68 316.68 m2
Interior 52.00 3.00 1.40 218.40
Graderias Paso y contrapaso 52.00 2.10 0.90 98.28
09.01.02.03 REVOQUES Y ENLUCIDOS
09.01.02.03.01 SOLAQUEADO EXTERIOR EN MUROS MEZC. C:A 1:4 + C:C 1:1 656.50 656.50 m2
Muro (eje 2-2) 52.00 3.30 1.15 197.34
Muro (eje 3-3) 52.00 3.30 1.15 197.34
Muro (eje A-A) 52.00 1.70 1.15 101.66
Muro (eje D-D) 52.00 1.70 1.15 101.66
Muro Escalera 52.00 0.90 1.25 58.50
09.01.02.03.02 TARRAJEO EXTERIOR, e=2.0 cm, 1:4 1096.68 1096.68 m2
Muro frontal 52.00 3.50 2.40 436.80
Puerta 52.00 -1.00 0.75 2.10 -81.90
Dintel 52.00 -1.00 0.75 0.10 -3.90
Muro lateral derecho 52.00 1.70 2.25 198.90
Ventana 52.00 -1.00 1.20 0.45 -28.08
Dintel 52.00 -1.00 1.20 0.10 -6.24
Muro lateral izquierdo 52.00 1.70 2.25 198.90
Muro posterior 52.00 3.50 2.10 382.20
09.01.02.03.03 Tarrajeo interior, e=2.0 cm, 1:4 796.77 796.77 m2
Muro frontal 52.00 2.85 2.40 355.68
Puerta 52.00 -1.00 0.75 2.10 -81.90
Dintel 52.00 -1.00 0.75 0.10 -3.90
Muro lateral derecho 52.00 1.05 2.25 122.85
Ventana 52.00 -1.00 1.05 0.45 -24.57
Dintel 52.00 -1.00 1.05 0.10 -5.46
Muro lateral izquierdo 52.00 1.05 2.25 122.85
Muro posterior 52.00 2.85 2.10 311.22
09.01.02.04 PINTURA
09.01.02.04.01 Pintura en exteriores 2 manos 1096.68 1096.68 m2
Muro frontal 52.00 3.50 2.40 436.80
Puerta 52.00 -1.00 0.75 2.10 -81.90
Dintel 52.00 -1.00 0.75 0.10 -3.90
Muro lateral derecho 52.00 1.70 2.25 198.90
Ventana 52.00 -1.00 1.20 0.45 -28.08
Dintel 52.00 -1.00 1.20 0.10 -6.24
Muro lateral izquierdo 52.00 1.70 2.25 198.90
Muro posterior 52.00 3.50 2.10 382.20
09.01.02.04.02 Pintura en interiores 2 manos 796.77 796.77 m2
Muro frontal 52.00 2.85 2.40 355.68
Puerta 52.00 -1.00 0.75 2.10 -81.90
Dintel 52.00 -1.00 0.75 0.10 -3.90
Muro lateral derecho 52.00 1.05 2.25 122.85
Ventana 52.00 -1.00 1.05 0.45 -24.57
Dintel 52.00 -1.00 1.05 0.10 -5.46
Muro lateral izquierdo 52.00 1.05 2.25 122.85
Muro posterior 52.00 2.85 2.10 311.22
09.01.02.05 COBERTURAS
09.01.02.05.01 Correas de madera tornillo 52.00 52.00 52.00 und
09.01.02.05.02 Cobertura con plancha de calamina 52.00 3.70 2.30 442.52 442.52 m2
09.01.02.06 CARPINTERIA DE MADERA
09.01.02.06.01 Puerta contraplacada 52.00 52.00 52.00 u
09.01.02.06.02 Ventana de madera tornillo 52.00 1.20 0.45 28.08 28.08 m2
09.01.02.07 APARATOS Y ACCESORIOS
09.01.02.07.01 Inodoro prefabricado 52.00 52.00 52.00 u
09.01.02.07.02 Urinarios prefabricado 52.00 52.00 52.00 u
09.01.02.07.03 Lavatorio de pared blanco 1 llave 52.00 52.00 52.00 pza
09.01.02.07.04 Ducha cromada 1 llave incluye accesorios 52.00 52.00 52.00 u
09.01.02.07.05 Tanque elevado de plastico y accesorios 52.00 52.00 52.00 pza
09.01.02.07.06 Lavadero multiusos 52.00 52.00 52.00 u
09.01.03 INSTALACIONES SANITARIAS
09.01.03.01 SISTEMA DE AGUA FRIA
09.01.03.01.01 Salida de agua con tuberia de PVC-SAP 1/2" 156.00 156.00 156.00 pto
09.01.03.01.02 Red de distribucion tuberia de 1/2" PVC-SAP 52.00 4.00 208.00 208.00 m
09.01.03.01.03 Caja de paso 12"x12" prefabricado 52.00 52.00 52.00 u
09.01.03.01.04 Suminstro e instalcion de valvulas y accesorios 52.00 52.00 52.00 u
09.01.03.02 SISTEMA DE DESAGUE
09.01.03.02.01 Salida de desague en PVC 208.00 208.00 208.00 pto
09.01.03.02.02 Red colectora PVC SAL de 2" 52.00 14.00 728.00 728.00 m
09.01.03.02.03 Yee PVC SAL de 2" 156.00 156.00 156.00 u
09.01.03.02.04 Sumidero de bronce 2" provision y colocacion 52.00 52.00 52.00 u
09.01.03.03 SISTEMA DE VENTILACION
09.01.03.01 Sombrero ventilacion PVC de 2" 104.00 104.00 104.00 pza
09.01.03.02 Suministro e instalcion de tuberia PVC SAL 2" 52.00 3.00 156.00 156.00 m
09.01.04 HUMEDALES
09.01.04.01 OBRAS PRELIMINARES
09.01.04.01.01 Limpieza y desbroce de terreno manual 52.00 2.00 0.80 83.20 83.20 m2
09.01.04.01.02 Trazo, nivelacion y replanteo 52.00 2.00 0.80 83.20 83.20 m2
09.01.04.02 MOVIMIENTO DE TIERRAS
09.01.04.02.01 Excavacion en material conglomerado 70.72 67.18 m3
Humedales_95% 52.00 2.00 0.80 0.85 70.72
09.01.04.02.02 Excavacion en roca dura 70.72 3.54 m3
Humedales_05% 52.00 2.00 0.80 0.85 70.72
09.01.04.02.03 Refine y compactacion de fondos 52.00 2.00 0.80 83.20 83.20 m2
09.01.04.02.04 Relleno con grava gruesa de 1/2" a 2" 52.00 2.00 0.80 0.85 70.72 70.72 m3
09.01.04.03 VARIOS
09.01.04.03.01 Instalacion de vegetacion 52.00 52.00 52.00 GLB
09.01.05 ZANJA DE PERCOLACIÓN
09.01.05.01 OBRAS PRELIMINARES
09.01.05.01.01 Limpieza y desbroce de terreno manual 52.00 240.24 240.24 m2
52.00 2.95 0.70 107.38
52.00 2.95 0.70 107.38
52.00 1.40 0.35 25.48
09.01.05.01.02 Trazo, nivelacion y replanteo 52.00 240.24 240.24 m2
52.00 2.95 0.70 107.38
52.00 2.95 0.70 107.38
52.00 1.40 0.35 25.48
09.01.04.02 MOVIMIENTO DE TIERRAS
09.01.04.02.01 Excavacion en material conglomerado (95%) 144.14 136.94 m3
52.00 2.95 0.70 0.60 64.43
52.00 2.95 0.70 0.60 64.43
52.00 1.40 0.35 0.60 15.29
09.01.04.02.02 Excavacion en roca dura (5%) 144.14 7.21 m3
52.00 2.95 0.70 0.60 64.43
52.00 2.95 0.70 0.60 64.43
52.00 1.40 0.35 0.60 15.29
09.01.04.02.03 Refine y compactacion de fondos 52.00 240.24 240.24 m2
52.00 2.95 0.70 107.38
52.00 2.95 0.70 107.38
52.00 1.40 0.35 25.48
09.01.04.02.04 Relleno con grava gruesa de 1/2" a 2" 104.00 2.95 0.70 0.30 64.43 64.43 m3
09.01.04.02.05 Relleno con terreno natural 104.00 2.95 0.70 0.30 64.43 64.43 m3
09.01.05.03 SISTEMADE DESAGUE
09.01.05.03.01 Accesorios para zanjas de infiltracion 52.00 52.00 52.00 und
METRADO DE ACERO DE REFUERZO Fy=4200 Kg/cm2
SERVICIO DE SANEAMIENTO: ALTERNATIVA N° 01
Item Descripcion Φ
Longitudes x Φ
1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
Factor Kg/m 0.25 0.56 1 1.55 2.24 3.9809.01.01.04.01 UNIDAD BASICA DE SANEAMIENTO ECOLOGICA O COMPOSTERA(52 UND) 52
COLUMNAS --.-- --.-- --.-- --.-- --.-- --.-- Acero Longitudinal 1/2" 104.00 4.50 4.00 --.-- --.-- 1872 --.-- --.-- --.-- Acero Longitudinal 1/2" 104.00 5.10 4.00 --.-- --.-- 2121.6 --.-- --.-- --.-- Acero Longitudinal 1/2" 52.00 4.20 4.00 --.-- --.-- 873.6 --.-- --.-- --.-- Acero Estribos 3/8" 156.00 0.70 22.00 --.-- 2402.4 --.-- --.-- --.-- --.-- Acero Estribos 3/8" 104.00 0.70 20.00 --.-- 1456 --.-- --.-- --.-- --.--
LOSA Acero Lon. Losa 3/8" 52.00 3.30 11.00 --.-- 1887.6 --.-- --.-- --.-- --.-- Acero Transv. Losa 3/8" 52.00 1.70 19.00 --.-- 1679.6 --.-- --.-- --.-- --.--
LOSA EN TANQUE ELEVADO Acero Lon. Losa 5/8" 52.00 1.45 6.00 --.-- --.-- --.-- 452.4 --.-- --.-- Acero Transv. Losa 5/8" 52.00 1.20 8.00 --.-- --.-- --.-- 499.2 --.-- --.--
ESCALERA Acero Transv. Muro de apoyo 3/8" 52.00 0.90 9.00 --.-- 421.2 --.-- --.-- --.-- --.-- Acero Lon. Muro de apoyo 3/8" 52.00 1.65 6.00 --.-- 514.8 --.-- --.-- --.-- --.-- Acero Transv. Escalera 3/8" 52.00 0.90 10.00 --.-- 468 --.-- --.-- --.-- --.-- Acero Lon. Escalera 1/2" 52.00 5.10 6.00 --.-- --.-- 1591.2 --.-- --.-- --.--
VIGAS --.-- --.-- --.-- --.-- --.-- Acero Lon. Dintel puerta 3/8" 52.00 1.10 4.00 --.-- 228.8 --.-- --.-- --.-- --.-- Acero Estribos dintel puerta 1/4" 52.00 0.20 5.00 52.00 --.-- --.-- --.-- --.-- --.-- Acero Lon. Dintel ventana 3/8" 52.00 1.80 4.00 --.-- 374.4 --.-- --.-- --.-- --.-- Acero Estribos dintel Ventana 1/4" 52.00 0.20 7.00 72.80 --.-- --.-- --.-- --.-- --.-- Acero Lon. Viga larga de Techo 1/2" 104.00 3.40 4.00 --.-- --.-- 1414.4 --.-- --.-- --.-- Acero estribos Viga larga de camara 3/8" 104.00 0.75 18.00 --.-- 1404 --.-- --.-- --.-- --.-- Acero Lon. Viga corta de Techo 1/2" 104.00 2.00 4.00 --.-- --.-- 832 --.-- --.-- --.-- Acero estribos Viga corta de camara 3/8" 104.00 0.75 8.00 --.-- 624 --.-- --.-- --.-- --.--
ARMADURA DE TAPA --.-- --.-- --.-- --.-- --.-- Acero Lon. Tapa 1/4" 104.00 0.85 8.00 707.20 --.-- --.-- --.-- --.-- --.-- Acero Transv. Tapa 1/4" 104.00 0.80 9.00 748.80 --.-- --.-- --.-- --.-- --.--
Kg 395.20 6418.05 8704.8 1474.98 0 0 16993.03
PROYECTO: "MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CASERÍO DE PARGUYUC, DISTRITO DE HUARMACA, PROVINCIA DE HUANCABAMBA - PIURA"LUGAR: NUEVA LIBERACION DE HUALLANCA
N° de elementos
iguales
Long. de piezas
N° de Piezas