Memorias Tanque Septico y Campo de Infiltracion

75
DEPARTAMENTO CALDAS MUNICIPIO PROYECTO CALCULO DE POBLACION Población Actual (PA) = 5Hab Taza de Crecimi ento (TC) = 1, 5 % Anual Periodo de Diseño (PD) = 15 Años PD PP = PA . TC + 1 100 Población Proyectada (PP)  = 6 Hab CALCUL O DE CAUDAL DE DISE OS Dotación = 135 lt/hab/dia Dotación por aguas negras = 135 X 0.9 = 121.5 lt/hab/dia Caudal de A.R. al año de diseño = 6 X 122 = 732 lt/di a = 0.7 m3/dia Conexiones erradas (10% QAR) = 0 X 0.1 = 0 m3/dia Caudal de infiltración = 0.7 X 0.1 = 0 m3/dia Caudal al año 2020 = 0.7 + 0 + 0 = 0.7 m3/dia FS = 1.3 Caudal de diseño al 2020 = FS X C = 1.3 X 0.7 = 0.9 m3/dia DISE O HIDRAULICO POZO SEPTICO VOLUMEN Tiempo de Retención (TR) = 2día V = Q2020 X TR V = 0.9 X 2= 1.9 M3 MEMORIAS DE CALCULO POZO SEPTICO Y CAMPO DE INFILTRACION  AGUADAS, BELALCAZAR, CHINC HINA, FILADELFIA, LA DORADA, LA MERCED , VICTORIA, MANZANARES, MARMATO , NEIRA, PACORA, PENSILVANIA, RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIA CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMEN TO DE CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA. La capacidad total del tanque séptico se determino con base en el caudal de afluente y el tiempo de retención, teniendo en cuenta que para una sedimentación efectiva, el tiempo de retención del tanque debe ser de uno a tres días, y la remoción o limpieza se d ebe hacer entre 2 y 5 años.

Transcript of Memorias Tanque Septico y Campo de Infiltracion

Page 1: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 1/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

CALCULO DE POBLACION

Población Actual (PA) = 5 HabTaza de Crecimiento (TC) = 1,5 % AnualPeriodo de Diseño (PD) = 15 Años

PD

PP = PA . TC + 1100

Población Proyectada (PP)  = 6 Hab

CALCULO DE CAUDAL DE DISE OS

Dotación = 135 lt/hab/diaDotación por aguas negras = 135 X 0.9 = 121.5 lt/hab/dia

Caudal de A.R. al año de diseño = 6 X 122 = 732 lt/dia = 0.7 m3/diaConexiones erradas (10% QAR) = 0 X 0.1 = 0 m3/dia

Caudal de infiltración = 0.7 X 0.1 = 0 m3/diaCaudal al año 2020 = 0.7 + 0 + 0 = 0.7 m3/dia

FS = 1.3

Caudal de diseño al 2020 = FS X C = 1.3 X 0.7 = 0.9 m3/dia

DISE O HIDRAULICO POZO SEPTICO

VOLUMEN

Tiempo de Retención (TR) = 2 díaV = Q2020 X TRV = 0.9 X 2 = 1.9 M3

MEMORIAS DE CALCULO POZO SEPTICO Y CAMPO DE INFILTRACION

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED, VICTORIA,MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO, RISARALDA, SAMANA, SANJOSE, SUPIA, VILLAMARIA

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE CALDAS, CONRESOLUCION DE CALAMIDAD PÚBLICA.

La capacidad total del tanque séptico se determino con base en el caudal de afluente y el tiempode retención, teniendo en cuenta que para una sedimentación efectiva, el tiempo de retención deltanque debe ser de uno a tres días, y la remoción o limpieza se debe hacer entre 2 y 5 años.

Page 2: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 2/75

Page 3: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 3/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

MEMORIAS DE CALCULO POZO SEPTICO Y CAMPO DE INFILTRACION

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED, VICTORIA,MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO, RISARALDA, SAMANA, SANJOSE, SUPIA, VILLAMARIA

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE CALDAS, CONRESOLUCION DE CALAMIDAD PÚBLICA.

CAMARAS 1 Y 2

Camara 1 = 2.Long Camara 2 = Long3

CAMARA 1 = 1.4 mCAMARA 2 = 0.7 m

DISE O CAMPO DE INFILTRACI N

AREA DE ABSORCI N

Tasa de infiltracion = 100 lt/m2/dia

Area Absorción = Q2020 . 1000Tasa Ifiltración

Area Absorción = 9.5 m2

DIMENCIONAMIENTO DE ZANJAS

Profundidad zanja = 1 mAncho del Fondo = 0.45 m

Longitud total de las zanjas = 4.7 m

LUIS ALBERTO CERVERA TERANIng. Civil

3

Las dimenciones de las zanjas se tomaron de acuerdo a la tabla E.3.4. del capitulo E.3.5 de la normaRAS 2000. Obtenido:

Tomando como área de infiltración de la zanja las paredes laterales, se obtiene la longitud total dezanjas necesarias para el campo de infiltración

Page 4: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 4/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

LARGO X

7 X TOTAL = M

X

X TOTAL = M

Nivelación del terreno a mano:

X

X TOTAL = M

Descapote a mano:

X

X TOTAL = M

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

42.00

ANCHO

7 6.00

7 6.00 42.00

42.00

LARGO ANCHO

7 6.00

LARGO

LARGO ANCHO

REA DE CONSTRUCCI N

ANCHO

6.00 42.00

Replanteo:

01 OBRAS PRELIMINARES

CANTIDADES DE OBRA

Page 5: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 5/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

CANTIDADES DE OBRA

Excavacion a mano M3

ENTREML

1 Y 3 x x = M

1 Y 2 x x = M

1 Y 3 x x = M3

A Y B x x = MB Y C x x = M

A Y B x x = M3

B Y C x x = M

A Y C x x = M

SUBTOTAL = M3

ANDEN= x x = M3

POZO S PTICO = x x = M

TRAMPA DE GRASA = x x = M3

CAJA REPARTICION = x x = M

TOTAL = M

Viga de Cimentación ml X 0.20 MTS

ML

ML

ML

ML

ML

ML

TOTAL = ML

0.25

0.60 0.40.60

6.00A 5.26

A

LONG.EJES

0.14

ANCHO VOL.

6.00 0.20 0.25

ALTO

0.30B 6.00 0.20 0.25 0.30

0.20 0.25 0.30

1 2.63 0.20 0.25 0.13

C 6.00

1 2.63 0.20 0.25 0.132 2.63 0.20 0.25 0.132 2.63 0.20 0.25 0.133 5.50 0.20 0.25 0.28

1.70

ANCHO LARGO ALTO VOL.

0.10 8.70 0.2 0.17

1.00 2.00 1.1 2.20

0.60 0.60 0.6 0.22

4.44

EJES LONG.

1 6.00

B 5.26C 5.26

02 CIMENTACI N

2 6.003

33.78

Page 6: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 6/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

CANTIDADES DE OBRA

Viga de Anden Fachada 0.10 x 0.2 MT

6 + 0.9 * 3 = ML

Viga de confinamiento superior 0.12 x 0.18 MT

ML

ML

ML

ML

ML

ML

TOTAL = ML

Viga cinta (Muros Baños) 0.12 x 0.1 MT

1.92 + 1.24 = ML

Columnas de confinamiento X 0.12

8.70

3.16

03 ESTRUCUTRAS

EJES LONG.

1 6.662 6.663 6.66A 5.64B 2.82C 5.64

34.08

0.18

EJE MLA -1 2.77A-2 2.77A-3 2.77B-1 2.42B-2 2.42B-3 2.42C-1 2.04

Page 7: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 7/75

Page 8: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 8/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

CANTIDADES DE OBRA

M

Meson de Cocina = Und

Placa de Concreto 2.500 PSI. (E = 7 cm )

(2.85*2.85) *2 + (2.85*5.80) + (0.90*6)

 = + +

M

Cercha

3 cerchas de 6.40 Ml según diseño ML

Bajantesh v

1 + 23 ML

Canalesh

6.60  ML

16.245 16.53 5.4

6.60 

1.0

05 PISOS

61.97

Total = 38.18

06 CUBIERTA

19.20

Page 9: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 9/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

CANTIDADES DE OBRA

Cubierta de zinc

X = M2

M

Punto Hidraulico Cantidad = 4.0 Und

Red Hidraulica Cantidad = 1.0 Gl

Lavadero Prefabricado Cantidad = 1.0 Und

Registro de paso Cantidad = 1.0 Und

Tanque de agua y accesorios Cantidad = 1.0 Und

Caja de circuitos Cantidad = 1.0 Und

Red Electrica interna Cantidad = 1.0 Gl

Punto Electrico y Accesorios Cantidad = 16.0 Punto

Punto Sanitario de 2" Cantidad = 4.0 Punto

48.642

07 INSTALACIONES HIDRAULICAS

08 INSTALACIONES ELECTRICAS

09 INSTALACIONES SANITARIAS

ANCHO LARGO

7.37 6.6 48.642

Page 10: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 10/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

CANTIDADES DE OBRA

Red Sanitaria de 4" Cantidad = 1.0 Gl

Punto Sanitario de 4" Cantidad = 1.0 Punto

Red Sanitaria Piso de 2" Cantidad = 1.0 Gl

CAJA DE INSPECCI N Y TAPA (60cm x 60cm x 30cm) Cantidad = 1.0 Und

TRAMPA DE GRASAS y tapa (60cm x 60cm x 50cm) Cantidad = 1.0 Und

SANITARIO LINEA ECONOMICA Cantidad = 1.0 Und

LAVAMANOS ACRILICO (especificaciones= ) y Cantidad = 1.0 Und

JUEGO DE INCRUSTACIONES (Toallero, jabonera, papelera) Cantidad = 1.0 Juego

Enchape de Muros M2 M2Enchape Mesón de la cocina M2 M2

PUERTA Y MARCO METALICOS (.93 x 2,0) incluye chapa Und 1.00PUERTA Y MARCO METALICOS (.65 x 2,0) incluye pasador Und 1.00PUERTA Y MARCO METALICOS (.93 X 2.0) incluye pasador Und 1.00VENTANA METALICA (1,06 X m x 0,96 m) Und 2.00

Pozo Séptico artesanal Und

10 ACABADOS

1.0

13 POZO S PTICO

11 CARPINTERIAS

6.002.00

Page 11: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 11/75

DEPARTAMENTO CALDAS

MUNICIPIO

PROYECTO

 AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LA MERCED,VICTORIA, MANZANARES, MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIACONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDAD PÚBLICA.

CANTIDADES DE OBRA

EDUARDO MONTOYA DUQUEIng. Civil

Page 12: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 12/75

FORMULARIO No. 01

FORMULARIO 1 - RESUMEN GENERAL DEL PROYECTO

p ca a recursos e:

Departamento CALDAS

1. IDENTIFICACION DE LA ENTIDAD OFERENTENombre o razón social Clase de oferente

Dirección GOBERNACION DE CALDAS

MARIO ARISTIZABAL MUÑOZ Cargo

C.C. o NIT No Teléfono

2. TIPO DE SOLUCION

Dispersa Nucleada No. de nucleos Area en m2 a construir por so lución

516

4. FINANCIACION DEL PROYECTO  Vr. Aporte del Departamento

Vr. Aporte de Otras Entidades $ Vr. Aporte de la Comunidad

Vr. Subsidio por familia Vr. Total del Subsidio

5. APORTES DE LOS POSTULANTES  Vr. Mano de Obra No Calificada

6. COSTOS  Vr. Costos Directos del Proyecto Vr. Costos Indirectos del Proyecto

Vr. Total del proyecto

(Este formulario es generado por elSoftware)

Municipio Localidad

GOBERNACION

Municipio, inspección o corregimiento

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDADPÚBLICA.

NIT. 890.801.052-1

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA,LA DORADA, LA MERCED, VICTORIA,MANZANARES, MARMATO, NEIRA, PACORA,

PENSILVANIA, RIOSUCIO, RISARALDA, SAMANA,SAN JOSE, SUPIA, VILLAMARIA

Valor m2 de construcción por solución

$ 335,996.17

Nombre del representante legal(Responsable del Proyecto)

GOBERNADOR

10,237,897  8842400 Fax, E-mail

Número de familias postulantes Duración del proyecto (Meses) 10

(ejecución a partir del primer desembolso)

A. MEJORAMIENTO DE VIVIENDA YSANEAMIENTO BASICO

B. CONSTRUCCION DE VIVIENDA EN SITIOPROPIO C. ADQUISICIÓN DE VIVIENDA NUEVA

Construcción en madera NO 42.00

258,000,000.00$

3. BREVE DESCRIPCIÓN DEL PROYECTOCON ESTE PROYECTO SE BUSCA MEJORAR LA CALIDAD DE VIDA DE LAS FAMILIAS POSTULANTES PARA QUE ASI OBTENGAN UNA SOLUCION DEVIVIENDA DIGNA Y SOLUCIONAR LAS NECESIDADES DE VIVIENDA GENERADAS POR LA FUERTE OLA INVERNAL, GENERANDO DESLIZAMIENTOS EINUNDACIONES QUE OCASIONARON LA DESTRUCCIÓN PARCIAL O TOTAL DE LAS VIVIENDAS.

El oferente se compromete a adquirir los insumos de construcción a traves del Banco de Materiales SI NO

6,677,470,204.00 

7,281,708,924.00$

8,640,712,981.00$

1,359,004,057.00$

Vr. Aporte del Municipio 673,242,777.00$ 1,032,000,000.00$

258,000,000.00$

12,940,833.73$ 6,677,470,204.00$

X

X

X

Page 13: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 13/75

DEPARTAMENTO MUNICIPIO FAMILIAS 516 LOCALIDAD

COSTOS DIRECTOS

TIPO APORTE NACIONAL COSTO TOTAL CD

DE COMUNIDAD OTROS SUBTOTAL OTROS SUBTOTAL % %SOLUCION COMPONETES LOCAL APORTES NACION

1 2 3 4 5=1+2+3+4 6 7 8=6+7 8=5+8

MATERIALES 601,185,740  601,185,740  5,387,165,056  5,387,165,056  5,988,350,796  6 9.304% 82. 2383%

MANO DE OBRA 258,000,000  154,800,000  258,000,000  670,800,000  622,558,128  622,558,128  1,293,358,128  1 4.968% 17. 7617%

SUBTOTAL (1) 859,185,740  154,800,000  258,000,000  -  1,271,985,740  6,009,723,184  -  6,009,723,184  7,281,708,924  84.272%

ESTUDIOS Y DISEÑOS 1% TOTAL PROYECTO 86,407,130  86,407,130  -  86,407,130  1.000%

DIRECCION DE OBRA 6% TOTAL PROYECTO 518,442,777  518,442,777  -  518,442,777  6.000%

NTERVENTORIA ADMINISTRATIVA Y FINANCIERA -  267,098,808  267,098,808  267,098,808  3.091%

NTERVENTORIA TECNICA -  400,648,212  400,648,212  400,648,212  4.637%

86,407,130  86,407,130  -  86,407,130  1.000%

SUBTOTAL (2) 172,814,260  518,442,777  -  -  691,257,037  667,747,020  -  667,747,020  1,359,004,057  15.728%

TOTAL ( 1+2 ) 1,032,000,000  673,242,777  258,000,000  -  1,963,242,777  6,677,470,204  -  6,677,470,204  8,640,712,981  100.0%

% 11.94% 7.79% 2.99% 0.00% 22.72% 77.28% 0.00% 77.28% 1 00 .00 % 1 00 .00 %

42 CANTIDAD TOTAL PROYECTO (M2) 21,672  335,996.17$

F2. RESUMEN DE COSTOS Y FUENTES DE FINANCIACION DEL PROYECTO

B

CANTIDAD INDIVIDUAL (M2)

Oferente Proyecto

MARIO ARISTIZABAL MUÑOZGobernador 

COSTOS INDIRECTOS

ASPECTOS AMBIENTALES 1% TOTAL DEL PROYECTO

CALDAS CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS

DEL DEPARTAMENTO DE CALDAS, CON RESOLUCION DCALAMIDAD PÚBLICA.

ING. EDUARDO MONTOYA DUQUEConsultor 

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA,LA DORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, PENSILVANIA,RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUPIA,

VILLAMARIA

FONDO NACIONAL DEREGALIAS

DEPARTAMENTO

COSTO CONSTRUCCION ($/M2)

MUNICIPIO

CONTRAPARTIDAS LOCALES

Page 14: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 14/75

FORMULARIO No. 03

DEPARTAMENTO

ROGRAMA VIVIENDA RURAL

ACTIVIDADES UNDCANTID

AD1 2 3

72,091,908.00 72,091,908.000.8%

39,951,300.00AVADERO PREFABRICADO Y

MAMPOSTERIAUND 516.00

72,091,908.00

19,975,650.00 19,975,650.00

RED HIDRAULICA PISO PVC

GL 516.0039,951,300.00 0.5%

41,362,560.0020,681,280.00 20,681,280.00

UNTO HIDRÁULICO PV C INC.CCESORIOS

UND 2 58 0.0 041,362,560.00 0.5%

256,838,656.00 256,838,656.00 256,838,656.00 770,515,968.008.9%

30,015,720.00 30,015,720.00 90,047,160.00UBIERTA EN TEJA DE ZINC INCCCESORIOS

M 2 2 50 98 .2 4770,515,968.00

30,015,720.00

ANALES EN PVC

ML 3612.0090,047,160.00 1.0%

1 4, 75 3, 47 2. 00 1 4, 75 3, 47 2. 00 1 4, 75 3, 47 2. 00 44,260,416.000.5%

54,650,592.00 54,650,592.00 218,602,368.00AJANTES EN PVC

ML 1548.0044,260,416.00

54,650,592.00 54,650,592.00

ERCHA (Indicar long. y díametrosel hierro)

ML 9907.20218,602,368.00 2.5%

201,605,672.00 604,817,016.007.0%

201,605,672.00 201,605,672.00

105,981,240.00 105,981,240.00LACA DE CONCRETO PISO (e= 7m) 2500 psi

M 2 1 97 00 .8 8604,817,016.00

MESON PARA COCINA VERETALLE INC LAVAPLATOS,

oncreto 2500 psi UND 516.00

105,981,240.00 1.2%

303,075,309.00 1,212,301,236.0014.0%

303,075,309.00 303,075,309.00 303,075,309.00

69,790,032.00 69,790,032.00MAMPOSTERÍA BLOQUE ARCILLA

= 12 cmM 2 3 19 86 .8 4

1,212,301,236.00

INTELES O VANOS

ML 4024.8069,790,032.00 0.8%

348,072,444.004.0%

174,036,222.00 174,036,222.00

30,165,360.00OLUMNAS DE CONFINAMIENTON CONCRETO (18cm x 12cm)500 psi M L 1 11 92 .0 4

348,072,444.00

15,082,680.00 15,082,680.00

IGA CINTA (12cm X 10cm) f´c=17,5MPa

ML 1630.5630,165,360.00 0.3%

543,385,152.006.3%

271,692,576.00 271,692,576.00

93,824,280.00IGA DE CONFINAMIENTOUPERIOR (18cm X 12cm) f´c=17,5

MPa. M L 1 75 85 .2 8543,385,152.00

1 8, 76 4, 85 6. 00 3 7, 52 9, 71 2. 00 3 7, 52 9, 71 2. 00

IGA ANDEN FACHADA ENONCRETO (20cm x 10 cm)

ML 4489.2093,824,280.00 1.1%

731,208,636.008.5%

146,241,727.20 292,483,454.40 292,483,454.40

54,297,648.00IGA DE CIMENTACION (25cm x0cm) f´c=17,5 Mpa

M L 1 74 30 .4 8731,208,636.00

1 0, 85 9, 52 9. 60 2 1, 71 9, 05 9. 20 2 1, 71 9, 05 9. 20

36,278,928.00XCAVACIÓN A MANO (INC. POZOEPTICO Y CAJAS)

M3 2291.0454,297,648.00 0.6%

36,278,928.00ESCAPOTE A MANO

M 2 2 16 72 .0 036,278,928.00 0.4%

36,278,928.00

27,501,768.00IVELACIÓN Y/O ADECUACIÓNERRENO A MANO

M 2 2 16 72 .0 036,278,928.00 0.4%

36,278,928.00

TOTALREPLANTEO

M 2 2 16 72 .0 0

27,501,768.00 0.3%

27,501,768.00

MES 5 MES 6 MES 7 MES 8 MES 9 MES 104 5 MES 1 MES 2 MES 3 MES 4

VALOR % TIEMPO DE EJECUCION: SEMANAS __40__ MESES__10___

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE CALDAS, CON RESOLUCION DECALAMIDAD PÚBLICA.

CALDAS

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIA

MUNICIPIO NOMBRE DEL PROYECTO

F3. CRONOGRAMA DE EJECUCI N DE OBRA E INVERSIONES Y FLUJO DE FONDOS MENSUAL

Page 15: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 15/75

FORMULARIO No. 03

DEPARTAMENTO

ROGRAMA VIVIENDA RURAL

ACTIVIDADES UNDCANTID

AD1 2 3 TOTALMES 5 MES 6 MES 7 MES 8 MES 9 MES 104 5 MES 1 MES 2 MES 3 MES 4

VALOR % TIEMPO DE EJECUCION: SEMANAS __40__ MESES__10___

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE CALDAS, CON RESOLUCION DECALAMIDAD PÚBLICA.

CALDAS

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIA

MUNICIPIO NOMBRE DEL PROYECTO

F3. CRONOGRAMA DE EJECUCI N DE OBRA E INVERSIONES Y FLUJO DE FONDOS MENSUAL

107,947,200.00 107,947,200.00 215,894,400.002.5%

54,876,600.00 54,876,600.00 109,753,200.00ENTANA METALICA (1,06 X m x,96 m)

UND 2 06 4.0 0215,894,400.00

UERTA Y MARCO METALICOS93 X 2.0) incluye pasador 

UND 516.00109,753,200.00 1.3%

49,355,400.00 49,355,400.00 98,710,800.001.1%

56,579,400.00 56,579,400.00 113,158,800.00UERTA Y MARCO METALICOS65 x 2,0) incluye pasador 

UND 516.0098,710,800.00

UERTA Y MARCO METALICOS93 x 2,0) incluye chapa

UND 516.00113,158,800.00 1.3%

38,555,520.00

NCHAPE MESON DE LA COCINACerámica)

M2 825.6038,555,520.00 0.4%

62,497,920.00 62,497,920.00 124,995,840.00

19,277,760.00 19,277,760.00

NCHAPE DE MUROS (Cerámica)

M2 3302.40124,995,840.00 1.4%

21,372,720.00 21,372,720.000.2%

33,725,760.00 33,725,760.00UEGO DE INCRUSTACIONESToallero, jabonera, papelera) JUEG

O 516.0021,372,720.00

AVAMANOS LINEA ECONOMICA

UND 516.0033,725,760.00 0.4%

93,080,208.00 93,080,208.00

1.1%

27,612,966.00 27,612,966.00 55,225,932.00ANITARIO LINEA ECONOMICA

UND 516.00

93,080,208.00

RAMPA DE GRASAS y tapa (60cm60cm x 50cm)

UND 516.0055,225,932.00 0.6%

52,339,944.000.6%

26,169,972.00 26,169,972.00

32,286,120.00AJA DE INSPECCIÓN Y TAPA

60cm x 60cm x 30cm)UND 516.00

52,339,944.00

16,143,060.00 16,143,060.00

RED SANITARIA PISO PVC 2"

GL 516.0032,286,120.00 0.4%

41,513,232.000.5%

20,756,616.00 20,756,616.00

87,940,848.00UNTO SANITARIO DE 4" PVC INCccesorios

PTO 516.0041,513,232.00

43,970,424.00 43,970,424.00

RED SANITARIA PISO PVC 4"

GL 516.0087,940,848.00 1.0%

63,575,328.000.7%

63,575,328.00

176,017,920.00 176,017,920.00 352,035,840.00UNTO SANITARIO DE 2" PVC INC.ccesorios

P TO 2 06 4.0 063,575,328.00

UNTO ELÉCTRICO INC.CCESORIOS

P TO 8 25 6.0 0352,035,840.00 4.1%

60,372,000.00 60,372,000.00 120,744,000.001.4%

8 ,9 44 ,8 60 .0 0 8 ,9 44 ,8 60 .0 0 17,889,720.00RED ELÉCTRICA INTERNA INC.

CCESORIOSGL 516.00

120,744,000.00

AJA DE CIRCUITOS INCLUYENTERRUPTOR

UND 516.0017,889,720.00 0.2%

97,815,540.00 97,815,540.001.1%

6,955,680.00 6,955,680.00ANQUE DE RESERVA DE AGUA YCCESORIOS PVC 250 LTS

UND 516.0097,815,540.00

REGISTRO DE PASO

UND 516.006,955,680.00 0.1%

Page 16: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 16/75

FORMULARIO No. 03

DEPARTAMENTO

ROGRAMA VIVIENDA RURAL

ACTIVIDADES UNDCANTID

AD1 2 3 TOTALMES 5 MES 6 MES 7 MES 8 MES 9 MES 104 5 MES 1 MES 2 MES 3 MES 4

VALOR % TIEMPO DE EJECUCION: SEMANAS __40__ MESES__10___

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL DEPARTAMENTO DE CALDAS, CON RESOLUCION DECALAMIDAD PÚBLICA.

CALDAS

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIA

MUNICIPIO NOMBRE DEL PROYECTO

F3. CRONOGRAMA DE EJECUCI N DE OBRA E INVERSIONES Y FLUJO DE FONDOS MENSUAL

OSTOS INDIRECTOS

135,900,405.70 135,900,405.70 

684,562,431.70643,724,557.70

Consultor Gobernador  ING. EDUARDO MONTOYA DUQUE

884,687,312.70 996,839,826.70

135,900,405.70 

Oferente Proyecto

944,433,877.70 1,064,579,919.70411,826,142.50 8,640,712,981.00

MARIO ARISTIZABAL MUÑOZ

661,668,853.30 1,273,336,414.30 1,075,053,644.70

1,359,004,057.00OSTO TOTAL DEL PROYECTO

 $ 8,640,712,981.00 100.0%

135,900,405.70 135,900,405.70 135,900,405.70 135,900,405.70 135,900,405.70  

8 ,6 40 ,7 13 .0 0 8 ,6 40 ,7 13 .0 08,640,713.00 8,640,713.00 8,640,713.00 8,640,713.00

135,900,405.70 135,900,405.70 

8 ,6 40 ,7 13 .0 0 8 ,6 40 ,7 13 .0 0 86,407,130.00TOTAL COSTOS INDIRECTOS

1,359,004,057.00 15.7%

8 ,6 40 ,7 13 .0 0 8 ,6 40 ,7 13 .0 0

4 0,0 64 ,8 21 .2 0 4 0,0 64 ,8 21 .2 0 4 0, 06 4,8 21 .2 0 4 0, 06 4,8 21 .2 0 400,648,212.00SPECTOS AMBIENTALES 1%OTAL DEL PROYECTO

GL 1.0086,407,130.00 1.0%

4 0, 06 4,8 21 .2 0 4 0, 06 4,8 21 .2 0 4 0,0 64 ,8 21 .2 0 4 0,0 64 ,8 21 .2 0 4 0, 06 4,8 21 .2 0 4 0, 06 4,8 21 .2 0

2 6,7 09 ,8 80 .8 0 2 6,7 09 ,8 80 .8 0 2 6, 70 9,8 80 .8 0 2 6, 70 9,8 80 .8 0 267,098,808.00NTERVENTORIA TECNICA

GL 1.00400,648,212.00 4.6%

2 6, 70 9,8 80 .8 0 2 6, 70 9,8 80 .8 0 2 6,7 09 ,8 80 .8 0 2 6,7 09 ,8 80 .8 0 2 6, 70 9,8 80 .8 0 2 6, 70 9,8 80 .8 0

5 1,8 44 ,2 77 .7 0 5 1,8 44 ,2 77 .7 0 5 1, 84 4,2 77 .7 0 5 1, 84 4,2 77 .7 0 518,442,777.00NTERVENTORIA ADMINISTRATIVA

FINANCIERAGL 1.00

267,098,808.00 3.1%

5 1, 84 4,2 77 .7 0 5 1, 84 4,2 77 .7 0 5 1,8 44 ,2 77 .7 0 5 1,8 44 ,2 77 .7 0 5 1, 84 4,2 77 .7 0 5 1, 84 4,2 77 .7 0

8,640,713.00 8,640,713.00 8,640,713.00 8,640,713.00 86,407,130.00IRECCION DE OBRA 6% TOTALROYECTO

GL 1.00518,442,777.00 6.0%

8,640,713.00 8,640,713.00 8,640,713.00 8,640,713.00 8,640,713.00 8,640,713.00

5 07 ,8 24 ,1 52 .0 0 8 08 ,5 33 ,4 72 .0 0 9 28 ,6 79 ,5 14 .0 0 5 48 ,6 62 ,0 26 .0 0   7,281,708,924.00

STUDIOS Y DISEÑOS 1% TOTALROYECTO

GL 1.0086,407,130.00 1.0%

2 75 ,9 25 ,7 36 .8 0 5 25 ,7 68 ,4 47 .6 0 1 ,1 37 ,4 36 ,0 08 .6 0 9 39 ,1 53 ,2 39 .0 0 7 48 ,7 86 ,9 07 .0 0 8 60 ,9 39 ,4 21 .0 0  

166,702,572.00 166,702,572.00 333,405,144.00TOTAL COSTOS DIRECTOS

7,281,708,924.00 84.3%

OZO SEPTICO incluye conexión

UND 516.00333,405,144.00 3.9%

Page 17: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 17/75

DEPARTAMENTO

CALDAS

Vr . U ni t. S ub tot al V r. U ni t. S ub to ta l V r. U ni t. Su bt ot al

01 OBRAS PRELIMINARES 23,730,840.00 18,204,480.00 58,124,304.00 100,059,624.00

1 REPLANTEO 21,672.00  M2 95.00 2,058,840.00 280.00 6,068,160.00 894.00 19,374,768.00 1,269.00 27,501,768.00

2 NIVELACIÓN Y/O ADECUACIÓN TERRENO A MANO 21,672.00  M2 500.00 10,836,000.00 280.00 6,068,160.00 894.00 19,374,768.00 1,674.00 36,278,928.00

3 DESCAPOTE A MANO 21,672.00  M2 500.00 10,836,000.00 280.00 6,068,160.00 894.00 19,374,768.00 1,674.00 36,278,928.0002 CIMENTACIÓN 679,327,416.00 45,028,224.00 154,974,924.00 879,330,564.00

4 EXCAVACIÓN A MANO (INC. POZO SEPTICO Y CAJAS) 2,291.04  M3 1,900.00 4,352,976.00 4,000.00 9,164,160.00 17,800.00 40,780,512.00 23,700.00 54,297,648.00

5 VIGA DE CIMENTACION (25cm x 20cm) f´c=17,5 Mpa 17,430.48  ML 34,500.00 601,351,560.00 1,800.00 31,374,864.00 5,650.00 98,482,212.00 41,950.00 731,208,636.00

6 VIGA ANDEN FACHADA EN CONCRETO (20cm x 10 cm) 4,489.20  ML 16,400.00 73,622,880.00 1,000.00 4,489,200.00 3,500.00 15,712,200.00 20,900.00 93,824,280.00

03 ESTRUCTURA EN CONCRETO 825,059,748.00 33,543,096.00 132,810,144.00 991,412,988.00

7 VIGA DE CONFINAMIENTO SUPERIOR (18cm X 12cm) f c=17,5 MPa. 17,585.28  ML 25,900.00 455,458,752.00 1,000.00 17,585,280.00 4,000.00 70,341,120.00 30,900.00 543,385,152.00

8 VIGA CINTA (12cm X 10cm) f´c=17,5 MPa 1,630.56  ML 14,200.00 23,153,952.00 800.00 1,304,448.00 3,500.00 5,706,960.00 18,500.00 30,165,360.00

9 COLUMNAS DE CONFINAMIENTO EN CONCRETO (18cm x 12cm) 2500 psi 11,192.04  ML 26,100.00 292,112,244.00 1,000.00 11,192,040.00 4,000.00 44,768,160.00 31,100.00 348,072,444.00

10 DINTELES O VANOS 4,024.80  ML 13,500.00 54,334,800.00 860.00 3,461,328.00 2,980.00 11,993,904.00 17,340.00 69,790,032.00

04 MAMPOSTERIA 1,022,970,516.00 65,637,780.00 229,674,180.00 1,318,282,476.00

11 MAMPOSTERÍA BLOQUE ARCILLA E= 12 cm 31,986.84  M2 28,900.00 924,419,676.00 2,000.00 63,973,680.00 7,000.00 223,907,880.00 37,900.00 1,212,301,236.00

12 MESON PARA COCINA VER DETALLE INC LAVAPLATOS, concreto 2500 psi 516.00  UN 190,990.00 98,550,840.00 3,225.00 1,664,100.00 11,175.00 5,766,300.00 205,390.00 105,981,240.00

05 PISOS 531,923,760.00 15,760,704.00 57,132,552.00 604,817,016.00

13 PLACA DE CONCRETO PISO (e= 7 cm) 2500 psi 19,700.88  M2 27,000.00 531,923,760.00 800.00 15,760,704.00 2,900.00 57,132,552.00 30,700.00 604,817,016.00

06 CUBIERTA 976,634,232.00 32,849,076.00 113,942,604.00 1,123,425,912.00

14 CERCHA (Indicar long. y díametros del hierro) 9,907.20  ML 18,225.00 180,558,720.00 860.00 8,520,192.00 2,980.00 29,523,456.00 22,065.00 218,602,368.00

15 BAJANTES 1,548.00  ML 26,672.00 41,288,256.00 430.00 665,640.00 1,490.00 2,306,520.00 28,592.00 44,260,416.00

16 CANALES 3,612.00  ML 22,050.00 79,644,600.00 645.00 2,329,740.00 2,235.00 8,072,820.00 24,930.00 90,047,160.00

17 CUBIERTA EN TEJA DE ZINC INC ACCESORIOS 25,098.24  M2 26,900.00 675,142,656.00 850.00 21,333,504.00 2,950.00 74,039,808.00 30,700.00 770,515,968.00

07 INSTALACIONES HIDRAULICAS 233,357,388.00 5,214,180.00 19,605,420.00 258,176,988.00

18 PUNTO HIDRÁULICO PVC INC. ACCESORIOS 2,580.00  UN 12,192.00 31,455,360.00 860.00 2,218,800.00 2,980.00 7,688,400.00 16,032.00 41,362,560.00

19 RED HIDRAULICA PISO PVC 516.00  gl 63,025.00 32,520,900.00 3,225.00 1,664,100.00 11,175.00 5,766,300.00 77,425.00 39,951,300.00

20 LAVADERO PREFABRICADO Y MAMPOSTERIA 516.00  UN 133,953.00 69,119,748.00 1,290.00 665,640.00 4,470.00 2,306,520.00 139,713.00 72,091,908.00

21 REGISTRO DE PASO 516.00  UN 10,500.00 5,418,000.00 0.00 0.00 2,980.00 1,537,680.00 13,480.00 6,955,680.00

22 TANQUE DE RESERVA DE AGUA Y ACCESORIOS P VC 250 LTS 516.00  UN 183,805.00 94,843,380.00 1,290.00 665,640.00 4,470.00 2,306,520.00 189,565.00 97,815,540.00

08 INSTALACIONES ELECTRICAS 403,790,640.00 0.00 86,878,920.00 490,669,560.00

23 CAJA DE CIRCUITOS INCLUYE INTERRUPTOR 516.00  UN 30,200.00 15,583,200.00 0.00 0.00 4,470.00 2,306,520.00 34,670.00 17,889,720.00

24 RED ELÉCTRICA INTERNA INC. ACCESORIOS 516.00  Gl 189,300.00 97,678,800.00 0.00 0.00 44,700.00 23,065,200.00 234,000.00 120,744,000.00

25 PUNTO ELÉCTRICO INC. ACCESORIOS 8,256.00  PTO 35,190.00 290,528,640.00 0.00 0.00 7,450.00 61,507,200.00 42,640.00 352,035,840.00

09 INSTALACIONES SANITARIAS 405,739,572.00 8,431,440.00 66,889,080.00 481,060,092.00

26 PUNTO SANITARIO DE 2" PVC INC. accesorios 2,064.00  PTO 23,352.00 48,198,528.00 0.00 0.00 7,450.00 15,376,800.00 30,802.00 63,575,328.00

27 RED SANITARIA PISO PVC 4" 516.00  Gl 148,078.00 76,408,248.00 0.00 0.00 22,350.00 11,532,600.00 170,428.00 87,940,848.00

28 PUNTO SANITARIO DE 4" PVC INC accesorios 516.00  PTO 73,002.00 37,669,032.00 0.00 0.00 7,450.00 3,844,200.00 80,452.00 41,513,232.00

29 RED SANITARIA PISO PVC 2" 516.00  Gl 53,630.00 27,673,080.00 0.00 0.00 8,940.00 4,613,040.00 62,570.00 32,286,120.00

30 CAJA DE INSPECCIÓN Y TAPA (60cm x 60cm x 30cm) 516.00  UN 72,634.00 37,479,144.00 6,450.00 3,328,200.00 22,350.00 11,532,600.00 101,434.00 52,339,944.00

Und SUBTOTALESACTIVIDADESNo.Apu

 CANT.TOTAL

MUNICIPIOAGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA,

LA DORADA, LA MERCED, VICTORIA, MANZANARES,MARMATO, NEIRA, PACORA, PENSILVANIA,

RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUPIA,VILLAMARIA

LOCALIDAD

F5. - PRESUPUESTO GENERAL DE INVERSIÓN

MATERIALES (INCLUYETRANSPORTE, MAQUINARIA Y

MANO DE OBRA CALIFICADA(MAESTROS DE OBRA)

MANO DE OBRACOMUNITARIA (INCLUYE VALOR UNIT.

TOTAL

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DELDEPARTAMENTO DE CALDAS, CON RESOLUCION DE CALAMIDAD

PÚBLICA.

Page 18: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 18/75

DEPARTAMENTO

CALDAS

Vr . U ni t. S ub tot al V r. U ni t. S ub to ta l V r. U ni t. Su bt ot alUnd SUBTOTALESACTIVIDADES

No.Apu

 CANT.TOTAL

MUNICIPIOAGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA,

LA DORADA, LA MERCED, VICTORIA, MANZANARES,MARMATO, NEIRA, PACORA, PENSILVANIA,

RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUPIA,VILLAMARIA

LOCALIDAD

F5. - PRESUPUESTO GENERAL DE INVERSIÓN

MATERIALES (INCLUYETRANSPORTE, MAQUINARIA Y

MANO DE OBRA CALIFICADA(MAESTROS DE OBRA)

MANO DE OBRACOMUNITARIA (INCLUYE VALOR UNIT.

TOTAL

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DELDEPARTAMENTO DE CALDAS, CON RESOLUCION DE CALAMIDAD

PÚBLICA.

31 TRAMPA DE GRASAS y tapa (60cm x 60cm x 50cm) 516.00  UN 78,227.00 40,365,132.00 6,450.00 3,328,200.00 22,350.00 11,532,600.00 107,027.00 55,225,932.00

32 SANITARIO LINEA ECONOMICA 516.00  UN 170,788.00 88,126,608.00 2,150.00 1,109,400.00 7,450.00 3,844,200.00 180,388.00 93,080,208.00

33 LAVAMANOS LINEA ECONOMICA 516.00  UN 59,600.00 30,753,600.00 1,290.00 665,640.00 4,470.00 2,306,520.00 65,360.00 33,725,760.00

34 JUEGO DE INCRUSTACIONES (Toallero, jabonera, papelera) 516.00  Juego 36,950.00 19,066,200.00 0.00 0.00 4,470.00 2,306,520.00 41,420.00 21,372,720.00

10 ACABADOS 123,922,560.00 8,875,200.00 30,753,600.00 163,551,360.00

35 ENCHAPE DE MUROS (Cerámica) 3,302.40  M2 28,250.00 93,292,800.00 2,150.00 7,100,160.00 7,450.00 24,602,880.00 37,850.00 124,995,840.00

36 ENCHAPE MESON DE LA COCINA (Cerámica) 825.60  M2 37,100.00 30,629,760.00 2,150.00 1,775,040.00 7,450.00 6,150,720.00 46,700.00 38,555,520.00

11 CARPINTERIAS 487,981,200.00 11,094,000.00 38,442,000.00 537,517,200.00

37 PUERTA Y MARCO METALICOS (.93 x 2,0) incluye chapa 516.00  UN 200,100.00 103,251,600.00 4,300.00 2,218,800.00 14,900.00 7,688,400.00 219,300.00 113,158,800.00

38 PUERTA Y MARCO METALICOS (.65 x 2,0) incluye pasador 516.00  UN 172,100.00 88,803,600.00 4,300.00 2,218,800.00 14,900.00 7,688,400.00 191,300.00 98,710,800.00

39 PUERTA Y MARCO METALICOS (.93 X 2.0) incluye pasador 516.00  UN 193,500.00 99,846,000.00 4,300.00 2,218,800.00 14,900.00 7,688,400.00 212,700.00 109,753,200.00

40 VENTANA METALICA (1,06 X m x 0,96 m) 2,064.00  UN 95,000.00 196,080,000.00 2,150.00 4,437,600.00 7,450.00 15,376,800.00 104,600.00 215,894,400.00

13 POZO SÉPTICO 273,912,924.00 13,361,820.00 46,130,400.00 333,405,144.00

41 POZO SEPTICO incluye conexión 516.00  UN 530,839.00 273,912,924.00 25,895.00 13,361,820.00 89,400.00 46,130,400.00 646,134.00 333,405,144.00

TOTAL COSTOS DIRECTOS 5,988,350,796.00 258,000,000.00 1,035,358,128.00 7,281,708,924.00

COSTOS INDIRECTOSESTUDIOS Y DISE OS 1% TOTAL PROYECTO 86,407,130.00

DIRECCION DE OBRA 6% TOTAL PROYECTO 518,442,777.00INTE. ADMINISTRATIVA Y FINANCIERA 267,098,808.00INTE TECNICA 400,648,212.00 ASPECTOS AMBIENTALES 1% TOTAL DEL PROYECTO 86,407,130.00

TOTAL COSTOS INDIRECTOS 1,359,004,057.00T OT AL COSTOS DIRECTOS E INDIRECT OS DEL PROY ECT O 8 ,640 ,71 2,98 1.0 0$

ING. EDUARDO MONTOYA DUQUE MARIO ARISTIZABAL MUÑOZCONSULTOR Gobernador  

OFERENTE

Page 19: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 19/75

DEPARTAMENTO LOCALIDAD

CALDAS

CONSTRUCCION DE 516VIVIENDAS EN 18 MUNICIPIOS

DEL DEPARTAMENTO DECALDAS, CON RESOLUCION

DE CALAMIDAD PÚBLICA.

01 OBRAS PRELIMINARES 100,059,624.00

1 REPLANTEO 21,672.00  M2 1,269.00 27,501,768.00

2 NIVELACIÓN Y/O ADECUACIÓN TERRENO A MANO 21,672.00  M2 1,674.00 36,278,928.00

3 DESCAPOTE A MANO 21,672.00  M2 1,674.00 36,278,928.00

02 CIMENTACIÓN 879,330,564.00

4 EXCAVACIÓN A MANO (INC. POZO SEPTICO Y CAJAS) 2,291.04  M3 23,700.00 54,297,648.00

5 VIGA DE CIMENTACION (25cm x 20cm) f´c=17,5 Mpa 17,430.48  ML 41,950.00 731,208,636.00

6 VIGA ANDEN FACHADA EN CONCRETO (20cm x 10 cm) 4,489.20  ML 20,900.00 93,824,280.00

03 ESTRUCTURA EN CONCRETO 991,412,988.00

7 VIGA DE CONFINAMIENTO SUPERIOR (18cm X 12cm) f´c=17,5 MPa. 17,585.28  ML 30,900.00 543,385,152.00

8 VIGA CINTA (12cm X 10cm) f´c=17,5 MPa 1,630.56  ML 18,500.00 30,165,360.00

9 COLUMNAS DE CONFINAMIENTO EN CONCRETO (18cm x 12cm) 2500 ps i 11,192.04  ML 31,100.00 348,072,444.0010 DINTELES O VANOS 4,024.80  ML 17,340.00 69,790,032.00

04 MAMPOSTERIA 1,318,282,476.00

11 MAMPOSTERÍA BLOQUE ARCILLA E= 12 cm 31,986.84  M2 37,900.00 1,212,301,236.00

12 MESON PARA COCINA VER DETALLE INC LAVAPLATOS, concreto 2500 psi 516.00  UN 205,390.00 105,981,240.00

05 PISOS 604,817,016.00

13 PLACA DE CONCRETO PISO (e= 7 cm) 2500 psi 19,700.88  M2 30,700.00 604,817,016.00

06 CUBIERTA 1,123,425,912.00

14 CERCHA (Indicar long. y díametros del hierro) 9,907.20  ML 22,065.00 218,602,368.00

15 BAJANTES 1,548.00  ML 28,592.00 44,260,416.00

16 CANALES 3,612.00  ML 24,930.00 90,047,160.00

17 CUBIERTA EN TEJA DE ZINC INC ACCESORIOS 25,098.24  M2 30,700.00 770,515,968.00

07 INSTALACIONES HIDRAULICAS 258,176,988.00

18 PUNTO HIDRÁULICO PVC INC. ACCESORIOS 2,580.00  UN 16,032.00 41,362,560.00

19 RED HIDRAULICA PISO PVC 516.00  gl 77,425.00 39,951,300.0020 LAVADERO PREFABRICADO Y MAMPOSTERIA 516.00  UN 139,713.00 72,091,908.00

21 REGISTRO DE PASO 516.00  UN 13,480.00 6,955,680.00

22 TANQUE DE RESERVA DE AGUA Y ACCESORIOS PVC 250 LTS 516.00  UN 189,565.00 97,815,540.00

08 INSTALACIONES ELECTRICAS 490,669,560.00

23 CAJA DE CIRCUITOS INCLUYE INTERRUPTOR 516.00  UN 34,670.00 17,889,720.00

24 RED ELÉCTRICA INTERNA INC. ACCESORIOS 516.00  Gl 234,000.00 120,744,000.00

25 PUNTO ELÉCTRICO INC. ACCESORIOS 8,256.00  PTO 42,640.00 352,035,840.00

09 INSTALACIONES SANITARIAS 481,060,092.00

26 PUNTO SANITARIO DE 2" PVC INC. accesorios 2,064.00  PTO 30,802.00 63,575,328.00

27 RED SANITARIA PISO PVC 4" 516.00  Gl 170,428.00 87,940,848.00

28 PUNTO SANITARIO DE 4" PVC INC accesorios 516.00  PTO 80,452.00 41,513,232.00

29 RED SANITARIA PISO PVC 2" 516.00  Gl 62,570.00 32,286,120.00

30 CAJA DE INSPECCIÓN Y TAPA (60cm x 60cm x 30cm) 516.00  UN 101,434.00 52,339,944.00

31 TRAMPA DE GRASAS y tapa (60cm x 60cm x 50cm) 516.00  UN 107,027.00 55,225,932.0032 SANITARIO LINEA ECONOMICA 516.00  UN 180,388.00 93,080,208.00

33 LAVAMANOS LINEA ECONOMICA 516.00  UN 65,360.00 33,725,760.00

34 JUEGO DE INCRUSTACIONES (Toallero, jabonera, papelera) 516.00  Juego 41,420.00 21,372,720.00

10 ACABADOS 163,551,360.00

35 ENCHAPE DE MUROS (Cerámica) 3,302.40  M2 37,850.00 124,995,840.00

36 ENCHAPE MESON DE LA COCINA (Cerámica) 825.60  M2 46,700.00 38,555,520.00

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIA

F5. - PRESUPUESTO GENERAL DE INVERSIÓN

No.

Apu ACTIVIDADES CANT. TOTAL Und

VALOR TOTAL

UNIT. SUBTOTALES

Page 20: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 20/75

DEPARTAMENTO LOCALIDAD

CALDAS

CONSTRUCCION DE 516VIVIENDAS EN 18 MUNICIPIOS

DEL DEPARTAMENTO DECALDAS, CON RESOLUCION

DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, PENSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN JOSE, SUPIA, VILLAMARIA

F5. - PRESUPUESTO GENERAL DE INVERSIÓN

No.Apu

ACTIVIDADES CANT. TOTAL UndVALOR TOTAL

UNIT.SUBTOTALES

11 CARPINTERIAS 537,517,200.00

37 PUERTA Y MARCO METALICOS (.93 x 2,0) incluye chapa 516.00  UN 219,300.00 113,158,800.00

38 PUERTA Y MARCO METALICOS (.65 x 2,0) incluye pasador 516.00  UN 191,300.00 98,710,800.00

39 PUERTA Y MARCO METALICOS (.93 X 2.0) incluye pasador 516.00  UN 212,700.00 109,753,200.00

40 VENTANA METALICA (1,06 X m x 0,96 m) 2,064.00  UN 104,600.00 215,894,400.00

13 POZO SÉPTICO 333,405,144.00

41 POZO SEPTICO incluye conexión 516.00  UN 646,134.00 333,405,144.00

TOTAL COSTOS DIRECTOS 7,281,708,924.00

COSTOS INDIRECTOSESTUDIOS Y DISE OS 1% TOTAL PROYECTO 86,407,130.00DIRECCION DE OBRA 6% TOTAL PROYECTO 518,442,777.00INTE. ADMINISTRATIVA Y FINANCIERA 267,098,808.00INTE TECNICA 400,648,212.00 ASPECTOS AMBIENTALES 1% TOTAL DEL PROYECTO 86,407,130.00

1,359,004,057.008,640,712,981.00$

ING. EDUARDO MONTOYA DUQUE MARIO ARISTIZABAL MU OZCONSULTOR Gobernador  

OFERENTE

Page 21: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 21/75

PROGRAMA VIVIENDA RURAL FORMULARIO No. 06

ASPECTOS AMBIENTALES Y COMUNITARIOS DEL PROYECTO

 

TOTAL

Trabajador (a) social 5 meses

86,407,130.00

Trabajador (a) social 5 meses 1,329,340.46 6,646,702.311,329,340.46 6,646,702.31

Trabajador (a) social 5 meses 1,329,340.46 6,646,702.31

5 meses 1,329,340.46 6,646,702.31Trabajador (a) social

6,646,702.31

Trabajador (a) social 5 meses

5 mesesTrabajador (a) social

6,646,702.31

6,646,702.31

Trabajador (a) social 5 meses

1,329,340.46

5 meses 1,329,340.46Trabajador (a) social

Taller: desarrollo comunitario

Videoforo: vivienda con higiene ysaludCapacitacion: salud opcional,seguridad manejode materiales deconstruccion

Taller: uso adecuado de agua y

pozos sépticos

Orientacion y practica sobre elmanejo y uso adecuado de baños ylavamanos

1,329,340.46Orientación sobre reforestacion yformacion de huerta casera

Taller: desarrollo del proyecto ysentido de pertenenciaTaller: ¿como gerenciarse a simismo?

5 meses 1,329,340.46 6,646,702.31

Taller: manejo integral residuos sol6,646,702.316,646,702.31

1,329,340.46

5 meses 1,329,340.465 meses

Trabajador (a) socialTrabajador (a) social

Trabajador (a) social

1,329,340.46Trabajador (a) social

de su vivienda, con el proyecto operará cocmo un factor protector que favorece la calidad de vida de las personas

del suelo, utilizandose para ampliar espacios utiles en la vivienda.

AGUADAS, BELALCAZAR,CHINCHINA, FILADELFIA, LA

DORADA, LA MERCED, VICTORIA,

La participación de la comunidad en el desarrollo del proyecto exige compromisos, responsabilidades y sentidode petenencia con sus viviendas por lo tanto la gestion se orientará en liderazgo y participación en cuanto a lasacciones que se comprometen para mejorar las condiciones físicas ambientales de la vivienda y su entorno,

Las familias ubicadas en el sector rural presentan riesgos para su salud, asociados a las precarias condicones

vivienda dispersas en baja escala, las cuales se mitigan con las siguientes medidas: movilizacion de equipo ytransporte de materiales: impacto a miticar: ruido, aumento de materiales particulados, gases, deterioro de vias:

DEPARTAMENTO

CALDAS

EXPLIQUE EL PROCEDIMIENTO Y LAS ACTIVIDADES A DESARROLLAR DE ACUERDO CON LA PROBLEMÁTICA AMBIENTAL QUE GENEREN LASOBRAS DEL PROYECTO Y DE IGUAL FORMA DESCRIBA LAS ACTIVIDADES PARA DESARROLLAR COMO TRABAJO COMUNITARIO.

AMBIENTALES:Los impactos producidos durante la ejecución del proyecto se relacionan con la actividad constructora sobre

NOMBRE DEL PROYECTO

CONSTRUCCION DE 516 VIVIENDAS EN 18 MUNICIPIOS DEL

DEPARTAMENTO DE CALDAS, CON RESOLUCION DECALAMIDAD PÚBLICA.

MUNICIPIO

mediadas; suministro con maquinariaadecuada y sincronizada, cumpliendomedidas de transito, con señaliza-ción previa, los transportadores cubrirán los materialesy se prepararán los sitios de almecenamiento. Manejode escombros y material pos movimiento de tierra: los volumenes movidos para la construcción de los mejora-

mientos de vivienda son pequeños, por lo cual no generan cambios considerables en el aspecto de la cobertura

COSTOSUNITARIO TOTAL

6,646,702.316,646,702.31

INTENSIDAD OCRONOGRAMA

Taller: vivienda con espacio vitalTaller: control de plagas

Taller: legislacion medio ambiente y

procesos de reforestacion 1,329,340.46Trabajador (a) social

en cuanto a su salud y convivencia familiar se refiere.

6,646,702.31

5 meses 1,329,340.46

RECURSO HUMANO QUEEJECUTARA LA ACTIVIDAD

5 meses

COMUNITARIAS:

 como tambien a nivel de convivencia familiar y desarrollo comunitarios

Taller: manipulacion de alimentos

ACTIVIDAD

Page 22: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 22/75

Página 22

Nº Cédula Municipio1 15,332,602 AGUADAS2 71,702,857 AGUADAS3 15,337,020 AGUADAS4 1,221,012 AGUADAS5 75,050,164 AGUADAS6 4,335,990 AGUADAS

7 43,456,967 AGUADAS8 4,333,113 AGUADAS9 75,047,628 AGUADAS

10 15,337,998 AGUADAS11 70,045,944 AGUADAS12 21,671,888 BELALCAZAR13 14,256,829 BELALCAZAR14 54,190,188 BELALCAZAR15 1,259,011 BELALCAZAR16 24,604,117 BELALCAZAR17 10,198,043 BELALCAZAR18 4,385,225 BELALCAZAR

19 6,272,334 BELALCAZAR20 4,642,057 BELALCAZAR21 75,158,388 BELALCAZAR22 33,940,087 BELALCAZAR23 1,359,570 BELALCAZAR24 25,246,158 BELALCAZAR25 15,910,308 BELALCAZAR26 75,158,062 BELALCAZAR27 4,384,937 BELALCAZAR28 1,257,789 BELALCAZAR29 19,163,922 BELALCAZAR30 75,158,988 BELALCAZAR31 3,361,496 BELALCAZAR32 10,193,209 BELALCAZAR33 2,684,910 BELALCAZAR34 4,453,195 BELALCAZAR35 10,191,766 BELALCAZAR36 6,524,678 BELALCAZAR37 4,384,802 BELALCAZAR38 4,383,622 BELALCAZAR39 159,505,503 CHINCHINA

F8 PRESELECCION DE POSTULANTES AL SUBSIDIO DE VIVIENDA DE INTERES SOCIAL RURAL

ACTA DE PRESELECCIÓN

De acuerdo con la invitación para la selección de postulantes al Subsidio de Vivienda de Interes Social

Rural cuyo cierre se efectuó el día 27 de Agosto , los hogares que fueron preseleccionados para participaren la Convocatoria Nacional son:

Nombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucionBALLADALES RESTREPO LUIS ALBERTO 1 BMUÑOZ OSPINA JORGE IVAN 1 BBEDOYA VALENCIA JORGE 1 BCARDONA ARIAS ERARDO 1 BGALVIS ARENAS MANUEL ANTONIO 1 BHERNÁNDEZ HERNÁNDEZ LUIS CARLOS 1 B

HERNÁNDEZ HERNÁNDEZ DORA LIBIA 1 BJARAMILLO JARAMILLO NELSON 1 BLOTERO LOPEZ JOSÉ OSCAR 1 BCARDONA CARDONA ALVARO ANTONIO 1 BVALENCIA GONZALEZ ANGEL HERNÁN 1 B

 ARIAS ALVAREZ MARIA DEL ROCIO 1 B AVILES LOPEZ GREGORIO 1 BBARRETO MARIA EDILTRUDIS 1 BBEDOYA TREJOS DOMINGO DE JESUS 1 BCASTAÑO OSORIO LUCY 1 BCORREA BEDOYA JOSE IVAN 1 BCRUZ MARIN JOSE BERNARDO 1 B

ESPINAL ESPINAL ALVARO DE JESUS 1 BVIDAL LULIGO JOSE DOLORES 1 BGARCIA ATEHORTUA JOSE MAURICIO 1 BGARZON MARTINEZ LUZ DAYFENNI 1 BGONZALEZ RUIZ RAFAEL MARIA 1 BGRAJALES YEPES LUCELLY 1 BGUEVARA PEREZ ESDARDO IVAN 1 BJARAMILLO BEDOYA COSME DAMIAN 1 BMONCADA PENAGOS MANUEL SALVADOR 1 BMUÑOZ AGUDELO CESAR JULIO 1 BMONTOYA SALAZAR RODRIGO 1 BMOTATO MORALES HECTOR JAIME 1 BOCAMPO LLANOS RAUL ANTONIO 1 BOSPINA LOPEZ MARCO AURELIO 1 BPATI O HINCAPIE JAVIER DE JESUS 1 BRAMIREZ MARULANDA IVAN DE JESUS 1 BRODAS LUIS ARNOLDO 1 BTORO CARO PEDRO PABLO 1 BVALENCIA SARAZA JORGE ALBERTO 1 BVALENCIA VILLADA PEDRO NEL 1 B

 ACEVEDO LUIS ALCIBAR 1 B

Page 23: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 23/75

Página 23

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion40 70,135,534 CHINCHINA41 24,307,276 CHINCHINA42 24,620,258 CHINCHINA43 1,280,799 CHINCHINA44 1,284,600 FILADELFIA

45 24,951,826 FILADELFIA46 75,031,070 FILADELFIA47 4,419,243 FILADELFIA48 15,898,220 FILADELFIA49 16,051,942 FILADELFIA50 75,055,854 FILADELFIA51 24,710,509 LA DORADA52 579,214 LA DORADA53 3,131,499 LA DORADA54 10,168,269 LA DORADA55 10,166,248 LA DORADA56 10,164,857 LA DORADA

57 20,831,121 LA DORADA58 10,181,030 LA DORADA59 10,177,207 LA DORADA60 1,293,465 LA DORADA61 10,164,656 LA DORADA62 10,176,239 LA DORADA63 10,168,879 LA DORADA64 10,164,859 LA DORADA65 1,297,013 LA DORADA66 30,343,484 LA DORADA67 10,169,206 LA DORADA68 10,164,126 LA DORADA69 1,293,248 LA DORADA70 5,859,796 LA DORADA71 2,261,697 LA DORADA72 10,156,312 LA DORADA73 10,178,417 LA DORADA74 3,046,385 LA DORADA75 4,437,741 LA DORADA76 8,414,110 LA DORADA77 10,179,478 LA DORADA78 1,298,198 LA DORADA79 1,293,019 LA DORADA80 10,160,094 LA DORADA81 30,388,262 LA DORADA

82 10,172,232 LA DORADA83 10,167,217 LA DORADA84 10,187,964 LA DORADA85 10,172,913 LA DORADA86 24,652,023 LA DORADA87 354,283 LA DORADA88 10,157,215 LA DORADA89 93,401,087 LA DORADA90 4,438,354 LA DORADA

 ARISMENDY SOTO MANUEL RAMIRO 1 BLOAIZA DE PARDO MARIA ESPERANZA 1 BMONTOYA GALVIS MARIA OMAIRA 1 BSALAZAR JOSÉ OCTAVIO 1 B

 AGUDELO CARMONA HORACIO 1 B

 ALARCÓN DE CASTAÑO MARGARITA 1 B ARIAS GIRALDO OCTAVIO 1 BGIL SALAZAR RAMIRODE JESÚS 1 BMONTILLA SALAZAR JORGE URIEL 1 BMARULANDA NARANJO JAIME 1 BRODRIGUEZ MARÍN JOSÉ ELÍ 1 B

 AYALA BLANCA FLOR 1 B ALZATE MANUEL DE JESÚS 1 BBARON MARTÍNEZ ALVARO 1 BBARRIOS RODRIGUEZ LEONEL 1 BBELTRÁN SALDAÑA CAMPO ELÍAS 1 BBELTRÁN SALDAÑA LUIS 1 B

BERNAL AVILA YISELA NATHLIE 1 BBOCANEGRA SANABRIA EMILIANO 1 BBOTERO JAIRO 1 BBOTERO CORTES NILDO 1 BBUSTOS PEDRO PABLO 1 BCADENA RAMÍREZ WILLIAM 1 BCARDOZO ALVARADO DIDIER 1 BCARDOZO ALVARADO ELVER 1 BCARDOZO GONZÁLEZ ABUNDIO 1 BCASTAÑO MIRIAM 1 BCASTA O ORLANDO 1 BCONDE JULIO CESAR 1 BCRUZ ANASTASIO 1 BCUBILLOS AVILA EUSEBIO 1 BCUBILLOS AVILA GERMÁN 1 BCUBILLOS AVILA PEDRO 1 BDIAZ ALIRIO 1 BDIAZ EPIFANIO 1 BGAITÁN RESTREPO MOISÉS 1 BGARC A HIGUITA HERN N 1 BGODOY DIAZ JOSÉ LUIS 1 BGONZÁLEZ ANGEL EDUARDO 1 BGONZÁLEZ GABRIEL 1 BGONZÁLEZ JAIRO 1 BGONZÁLEZ OLIVAR LUZ DARY 1 B

GONZÁLEZ RIVERA PABLO EMILIO 1 BGONZÁLEZ ROMERO EDGAR 1 BGUZMAN LUIS EDUARDO 1 BHERNÁNDEZ CÁRDENAS BENJAMÍN 1 BHERNÁNDEZ PERDOMO YEIMY LUCERO 1 BHERNÁNDEZ RAMÍREZ VICTOR JULIO 1 BJAIME LUIS ALBERTO 1 BJIMENEZ MARTÍNEZ JOSÉ ALFREDO 1 BMEJÍA RODRÍGUEZ JOSÉ ANTONIO 1 B

Page 24: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 24/75

Página 24

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion91 5,163,491 LA DORADA92 30,390,073 LA DORADA93 10,188,226 LA DORADA94 1,054,539,169 LA DORADA95 10,167,238 LA DORADA

96 24,711,404 LA DORADA97 10,160,063 LA DORADA98 10,179,061 LA DORADA99 24,711,451 LA DORADA

100 3,050,647 LA DORADA101 10,173,086 LA DORADA102 10,172,402 LA DORADA103 2,834,450 LA DORADA104 2,835,435 LA DORADA105 10,183,974 LA DORADA106 7,247,200 LA DORADA107 10,165,275 LA DORADA

108 10,171,036 LA DORADA109 10,179,813 LA DORADA110 10,175,769 LA DORADA111 30,387,484 LA DORADA112 14,315,154 LA DORADA113 10,180,587 LA DORADA114 30,390,292 LA DORADA115 10,163,433 LA DORADA116 10,158,242 LA DORADA117 10,164,405 LA DORADA118 1,297,797 LA DORADA119 75,068,107 LA DORADA120 25,091,013 LA MERCED121 1,391,015 LA MERCED122 25,107,273 LA MERCED123 25,109,570 LA MERCED124 4,560,242 LA MERCED125 25,109,992 LA MERCED126 24,434,978 LA MERCED127 30,279,681 LA MERCED128 4,558,063 LA MERCED129 4,560,320 LA MERCED130 75,060,076 LA MERCED131 25,108,757 LA MERCED132 25,107,894 LA MERCED

133 4,561,643 LA MERCED134 4,562,092 LA MERCED135 4,560,497 LA MERCED136 4,561,947 LA MERCED137 4,561,604 LA MERCED138 15,961,157 LA MERCED139 77,006,015 MANZANARES140 4,441,821 MANZANARES141 5,926,068 MANZANARES

MENDOZA MONTAÑO MILCIADES DE JESÚS 1 BMONTERO ANA JOAQUINA 1 BNIETO MEDINA TIBERIO 1 BNIÑO SALAZAR ORMANDO 1 BNUÑEZ MANCILLA VICENTE 1 B

SALDAÑA CRUZ BLANCA LUZ 1 BORTEGA JOSÉ MANUEL 1 BORTEGA LOZANO JOSÉ LUIS 1 BPADILLA CARDOSO INES 1 BPAEZ REINALDO 1 BPATIÑO RUEDA AFRANIO 1 BPERDOMO ORTÍZ MAXIMILIANO 1 BPÉREZ GERMÁN 1 BPÉREZ JOSÉ ANTONIO 1 BPÉREZ OSORIO HENRY 1 BPÉREZ TORRES CARLOS GUSTAVO 1 BPÉREZ ZAPATA PABLO DOMINGO 1 B

PERDOMO JORGE ENRIQUE 1 BPERDOMO ORT Z JOS 1 BPERDOMO ORTÍZ OCTAVIO 1 BQUINTERO DELGADO ALEYDA 1 BRIOS LLANO JESÚS MARÍA 1 BROMERO ARMANDO 1 BROMERO OSTOS MARTHA ELENA 1 BVELASQUEZ EMILIO ANTONIO 1 BSANDOVAL PARRA ANASTACIO 1 BSEVENO HERNÁNDEZ ISMAEL 1 BTRIVI O VELASQUEZ HERNANDO 1 BVASQUEZ CARDONA ARLEY 1 BBEDOYA DE SOTO LILY 1 BCARDEÑO ABELARDE LUIS HUMBERTO 1 BCASTAÑEDA DE ARANGO ROSA MARIA 1 BCASTAÑEDA HERRERA GLORIA PATRICIA 1 BCASTAÑO MARÍN LUIS EDUARDO 1 BGARCÍA GONZÁLEZ MARY ISABEL 1 BGONZÁLEZ BEDOYA MARIA ORLINDA 1 BGONZ LEZ BEDOYA MARIA OMAIRA 1 BGONZÁLEZ GONZÁLEZ MARCO TULIO 1 BHERNÁNDEZ LONDOÑO AURENTINO 1 BHERNÁNDEZ TAMAYO ALCIDES 1 BHERRERA AGUDELO CELMIRA 1 BHERRERA DE BUSTAMANTE ROSALBA 1 B

HERNÁNDEZ GARCÍA HERNANDO 1 BHOYOS ARROYAVE JOSÉ ALCIDES 1 BLÓPEZ LÓPEZ HERNANDO 1 BOCAMPO MARÍN LUIS EVANGELISTA 1 BRAMÍREZ RAMÍREZ JOSÉ ALBEAR 1 BVIDAL GONZÁLEZ VICTOR DANIEL 1 B

 AGUIRRE SALAZAR JOSE ALFONSO 1 B ALVAREZ GIRALDO ALDEMAR 1 B ARENAS AGUIRRE GILDARDO 1 B

Page 25: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 25/75

Página 25

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion142 1,311,592 MANZANARES143 4,441,108 MANZANARES144 15,988,304 MANZANARES145 15,988,896 MANZANARES146 10,218,587 MANZANARES

147 24,730,429 MANZANARES148 9,846,402 MANZANARES149 24,724,886 MANZANARES150 15,985,065 MANZANARES151 24,726,703 MANZANARES152 4,442,807 MANZANARES153 15,990,671 MANZANARES154 7,491,817 MANZANARES155 24,728,450 MANZANARES156 15,991,101 MANZANARES157 15,988,520 MANZANARES158 15,988,140 MANZANARES

159 24,731,871 MANZANARES160 24,729,340 MANZANARES161 15,985,803 MANZANARES162 4,443,179 MANZANARES163 15,989,151 MANZANARES164 15,989,555 MANZANARES165 2,303,210 MANZANARES166 15,986,213 MANZANARES167 24,728,808 MANZANARES168 1,303,307 MANZANARES169 24,780,097 MANZANARES170 24,727,316 MANZANARES171 24,725,907 MANZANARES172 16,110,250 MANZANARES173 24,732,258 MANZANARES174 15,991,249 MANZANARES175 10,266,169 MANZANARES176 24,728,132 MANZANARES177 15,989,970 MANZANARES178 15,987,359 MANZANARES179 1,057,783,030 MANZANARES180 86,005,592 MANZANARES181 24,724,914 MANZANARES182 16,546,188 MANZANARES183 4,442,189 MANZANARES

184 15,987,239 MANZANARES185 10,221,208 MANZANARES186 24,730,876 MANZANARES187 30,332,242 MANZANARES188 16,045,095 MANZANARES189 33,730,067 MARMATO190 4,403,768 MARMATO191 25,213,976 MARMATO192 10,031,568 MARMATO

 ARENAS VILLA EDUARDO 1 BBUITRAGO MIRLE 1 BBUITRAGO GOMEZ RUBELIO 1 BBUITRAGO ZAPATA MIGUEL ANGEL 1 BCARDONA MUNERA ROGOBERTO 1 B

CARVAJAL VALENCIA AYDE 1 BCASTAÑEDA VALENCIA WILLIAM ALONSO 1 BCASTAÑO GOMEZ AMANDA 1 BCASTAÑO MARIN ALIRIO 1 BCASTAÑO QUINTERO GLORIA NELLY 1 BCEBALLOS CASTAÑO FERNANDO 1 BCEBALLOS GALEANO FERNANDO 1 BCUELLAR BARRAGAN JORGE ELIECER 1 BFLOREZ GIRALDO MARIA HERMINIA 1 BFLOREZ RAMIREZ JOSE LIBARDO 1 BGALLEGO CARLOS ORLANDO 1 BGARCES GARCES JOSE NESMER 1 B

GARCIA PARRA YASMID LILIANA 1 BGIRALDO VALENCIA DORA LILIA 1 BHENAO ZAPATA VICTOR FELIX 1 BHERNANDEZ GALLEGO MIGUEL ANTONIO 1 BHERRERA OSORIO RICARDO ANTONIO 1 BJARAMILLO CAMPUZANO JOSE OLMEDO 1 BJARAMILLO CARMONA JOSE MARIA 1 BJIMENEZ RAMIREZ EMILIO 1 BLLANO LLANO DIOSELINA 1 BLOPEZ GONZALEZ LEONARDO 1 BMARULANDA MARULANDA MARIA LUZDARIS 1 BMEJIA LOPEZ GLORIA NANCY 1 BMUÑOZ ARIAS YOLANDA 1 BMUÑOZ BEDOYA JAIME DE JESUS 1 BMUÑOZ LOPEZ MARIA FABIOLA 1 BPARRA RIOS HECTOR ARIEL 1 BQUICENO HENAO JOSE KENNEDY 1 BRAMIREZ CARVAJAL GLORIA BELSY 1 BRAMIREZ QUINTERO LIBARDO 1 BRIVERA MARTINEZ MANUEL SALVADOR 1 BRIVERA PARRA AMANDA MILENA 1 BROJAS GARCIA WILLIAM 1 BSANCHEZ DE ARREDONDO MARIA ASCENETH 1 BTORRES VELASQUEZ ARCESIO 1 BVALENCIA GARCIA SAUL 1 B

VALENCIA GIRALDO MARIO 1 BVALENCIA MORALES PEDRO LUIS 1 BVALENCIA RUIZ GLORIA MERCEDES 1 BVILLA LOPEZ LUZ ELIDA 1 BVILLA PINEDA JOSE ALBEIRO 1 B

 AGUDELO DE DÍAZ LUZ ELENA 1 B AGUDELO ZAPATA DUVERNEY DE JESUS 1 B ANDICA BUENO MARIA ROMELIA 1 B ARBOLEDA OSPINA JAVIER DE JESÚS 1 B

Page 26: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 26/75

Página 26

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion193 21,619,778 MARMATO194 15,932,746 MARMATO195 15,925,973 MARMATO196 15,932,212 MARMATO197 1,304,311 MARMATO

198 24,742,349 MARMATO199 24,742,314 MARMATO200 4,446,340 MARMATO201 4,445,580 MARMATO202 4,446,240 MARMATO203 15,912,934 MARMATO204 33,730,082 MARMATO205 1,415,359 MARMATO206 18,601,641 MARMATO207 4,446,232 MARMATO208 21,618,037 MARMATO209 43,883,527 MARMATO

210 15,931,231 MARMATO211 24,837,630 MARMATO212 33,990,571 MARMATO213 4,548,187 MARMATO214 24,742,881 MARMATO215 24,742,481 MARMATO216 32,276,306 MARMATO217 3,408,919 MARMATO218 15,933,305 MARMATO219 4,666,721 MARMATO220 25,213,247 MARMATO221 4,446,308 MARMATO222 16,080,011 MARMATO223 24,742,333 MARMATO224 3,433,608 MARMATO225 24,741,082 MARMATO226 15,927,545 MARMATO227 4,446,395 MARMATO228 9,810,151 MARMATO229 43,883,912 MARMATO230 4,445,809 MARMATO231 15,926,646 MARMATO232 24,742,154 MARMATO233 15,929,215 MARMATO234 42,093,816 MARMATO

235 4,446,366 MARMATO236 3,433,885 MARMATO237 18,494,552 MARMATO238 10,521,224 MARMATO239 4,446,684 MARMATO240 15,928,282 MARMATO241 10,245,179 NEIRA242 75,031,979 NEIRA243 24,826,120 NEIRA

 ARIAS CANO TERESA DE JESÚS 1 BBAÑOL ACEVEDO EDILBERTO 1 BBAÑOL TABARES EDILBERTO DE JESÚS 1 BBETANCUR GARCÍA ARNOLDO DE JESÚS 1 BCAMPUZANO PÉREZ ROSO 1 B

CASTAÑEDA LUZ ELENA 1 BCASTAÑEDA OSPINA MARIA NELLY 1 BCASTRO SÁNCHEZ HUMBERTO ANTONIO 1 BCOLINA TABARES VICTOR RAÚL 1 BDÍAZ AGUDELO BERTULFO ANTONIO 1 BGAÑAN GAÑAN FELIX EMILIO 1 BGARCÍA DE BETANCUR MARIA MARGOT 1 BGARCÍA GAVIRIA JOSÉ DE JESÚS 1 BGARCÍA LÓPEZ FIDEL DARÍO 1 BGIL CASTRO MAURICIO ANTONIO 1 BGIRALDO DE OSPINA BLANCA NUBIA 1 BGRANADA GÓMEZ CLAUDIA PATRICIA 1 B

GUTIÉRREZ JORGE ALEXANDER 1 BHERN NDEZ DE GARC A FLOR MAR A 1 BLEMUS VALENCIA ALBA LUCÍA 1 BLENGUA GAÑAN RAMÓN ELÍAS 1 BLENGUA MARTÍNEZ MARIBELLY 1 BLENGUA MOTATO FABIOLA 1 BLÓPEZ LÓPEZ MARTA LUCÍA 1 BMACHADO MARÍN JESÚS ANTONIO 1 BMEJÍA VILLADA JHONATAN DE JESÚS 1 BMONTENEGRO JESÚS ARBEY 1 BVALENCIA DE MONTOYA MIRIAN 1 BMONTOYA POSSO AICARDO DE JESÚS 1 BMONTOYA RAMÍREZ LEONARDO DE JESÚS 1 BMORENO PINEDA MARIA ELENA 1 BNOREÑA PULGARÍN JOSÉ DE JESÚS 1 BORTÍZ DE ESCOBAR ROSMIRA 1 BRAMÍREZ RAMÍREZ CRISTOBAL DE JESÚS 1 BRESTREPO OSCAR ELIÉCER 1 BORTÍZ ATEHORTUA GUSTAVO ALBERTO 1 BROMAN BETANCURT DIOSELINA 1 BSÁNCHEZ FIGUEROA SAULO ANTONIO 1 BSÁNCHEZ MEJÍA GERARDO ANTONIO 1 BTABARES MARIA NELLY 1 BTANGARIFE BONILLA FERNANDO ANTONIO 1 BTAPASCO CARMEN EMILIA 1 B

TAPASCO GUERRERO JOSÉ GILDARDO 1 BVASQUEZ AGUDELO DARÍO DE JESÚS 1 BVILLOTA NARVAEZ LUIS ALFREDO 1 BZAPATA OSORIO GILDARDO ANTONIO 1 BZAPATA VASQUEZ NELSON DE JESÚS 1 BZAPATA ZAPATA JOSÉ DABEL 1 BCANO OCAMPO JOSE SAMUEL 1 BGARCIA GARCIA BERNARDO 1 BGIRALDO AGUDELO MARIA DE LAS NIEVES 1 B

Page 27: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 27/75

Page 28: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 28/75

Página 28

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion295 30,414,362 RIOSUCIO296 25,052,391 RIOSUCIO297 1,381,273 RIOSUCIO298 15,920,385 RIOSUCIO299 1,376,293 RIOSUCIO

300 15,921,023 RIOSUCIO301 10,004,114 RIOSUCIO302 4,548,030 RIOSUCIO303 4,383,087 RIOSUCIO304 15,917,692 RIOSUCIO305 15,919,947 RIOSUCIO306 15,917,866 RIOSUCIO307 33,994,294 RIOSUCIO308 9,920,454 RIOSUCIO309 4,546,660 RIOSUCIO310 4,541,811 RIOSUCIO311 15,923,799 RIOSUCIO

312 15,924,399 RIOSUCIO313 30,414,824 RIOSUCIO314 1,375,517 RIOSUCIO315 15,919,427 RIOSUCIO316 25,053,671 RIOSUCIO317 15,335,587 RIOSUCIO318 4,547,006 RIOSUCIO319 1,348,591 RIOSUCIO320 25,072,825 RIOSUCIO321 15,919,263 RIOSUCIO322 4,548,494 RIOSUCIO323 7,529,701 RIOSUCIO324 15,911,517 RIOSUCIO325 4,548,217 RIOSUCIO326 4,545,590 RIOSUCIO327 15,911,639 RIOSUCIO328 15,915,977 RIOSUCIO329 15,916,982 RIOSUCIO330 4,543,791 RIOSUCIO331 4,550,121 RISARALDA332 24,413,241 RISARALDA333 24,855,469 RISARALDA334 25,243,998 RISARALDA335 4,550,068 RISARALDA336 25,078,583 RISARALDA

337 9,922,524 RISARALDA338 1,383,331 RISARALDA339 1,382,515 RISARALDA340 3,624,822 RISARALDA341 29,320,248 RISARALDA342 9,923,852 RISARALDA343 10,201,225 RISARALDA344 1,225,535 RISARALDA345 16,614,050 RISARALDA

CAÑAS ARIAS MARIA YACKELIN 1 BCAÑA CASTAÑEDA EDILMA DE JESÚS 1 BGAÑAN JOSÉ NOEL 1 BGAÑAN ANDICA JOSÉ HERNAIN 1 BGAÑAN ANDICA MARCELIANO 1 B

GAÑAN DÁVILA QUERUBIN 1 BGAÑAN GAÑAN JOSÉ ARLEY 1 BGAÑAN GAÑAN JOSÉ HERIBERTO 1 BGAÑAN GAÑAN LUIS EDUARDO 1 BGAÑAN IZQUIERDO RAMÓN ELÍAS 1 BGAÑAN LARGO SAÚL 1 BGAÑAN MELCHOR JOSÉ LEONARDO 1 BGAÑAN ROJAS BLANCA NUVIA 1 BGUAPACHA GUAPACHA JOSÉ ULISES 1 BGUTIÉRREZ MORALES ARCÁNGEL DE JESÚS 1 BLADINO GASPAR ELISEO 1 BLENGUA LENGUA LUIS CARLOS 1 B

MARÍN TABORDA ROSI FREDY 1 BMORALES BUENO DIONNY SHIRLEY 1 BMORALES PESCADOR ENRIQUE 1 BMORALES REYES OVIDIO ANTONIO 1 BNIETO DE PESCADOR CENELIA 1 BPATIÑO HOYOS OSCAR DE JESÚS 1 BRAMOS GUAPACHA JUAN DE LOS SANTOS 1 BROJAS AGUIRRE RICARDO ANTONIO 1 BROJAS DE GAÑAN CARMEN TULIA 1 BROJAS GAÑAN BALTAZAR ANTONIO 1 BSALAZAR D VILA LUIS ORLANDO 1 BSALAZAR RODAS JOSUÉ DE JESÚS 1 BSALAZAR TAPASCO REY MARÍA 1 BSALAZAR ZAMORA LUIS ARCESIO 1 BSUÁREZ CALVO GERARDO 1 BTABORDA PABLO EMILIO 1 BTAPASCO ARICAPA LUIS ANIBAL 1 BTAPASCO TAPASCO JOSÉ LEONEL 1 BVINASCO JOSÉ ALVARO 1 B

 AGUDELO JIMENEZ LUIS GONZALO 1 B ALVAREZ RODAS BLANCA AURORA 1 B ARANGO VALENCIA LETICIA 1 B ARGOTE SEPULVEDA MARTA OLIVA 1 BBEDOYA CALLE JOSÉ LIBARDO 1 BBEDOYA DE VALENCIA MARIA ENOE 1 B

BEDOYA OSPINA JESÚS ALBEIRO 1 BBLANDON RENDON JULIO CESAR 1 BBLANDON BEDOYA HORACIO DE JESÚS 1 BBOTERO HENAO CARLOS MANUEL 1 BCARDONA DE SÁNCHEZ ELVA LIBIA 1 BCASTAÑEDA GALVIS DUVAN DE JESÚS 1 BCATAÑEDA PULGARÍN CARLOS ARTURO 1 BCASTRILLÓN RIOS JOSÉ GUSTAVO 1 BCASTRO MARÍN RAMÓN DARÍO 1 B

Page 29: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 29/75

Página 29

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion346 25,076,985 RISARALDA347 25,080,513 RISARALDA348 30,285,650 RISARALDA349 25,077,312 RISARALDA350 4,550,075 RISARALDA

351 4,342,585 RISARALDA352 4,550,884 RISARALDA353 4,327,055 RISARALDA354 25,077,328 RISARALDA355 4,550,819 RISARALDA356 4,551,920 RISARALDA357 1,257,996 RISARALDA358 1,420,326 RISARALDA359 9,920,930 RISARALDA360 1,059,784,338 RISARALDA361 1,382,170 RISARALDA362 25,077,371 RISARALDA

363 75,063,927 RISARALDA364 18,560,338 RISARALDA365 9,921,613 RISARALDA366 1,382,781 RISARALDA367 9,921,257 RISARALDA368 10,072,220 RISARALDA369 9,921,266 RISARALDA370 3,452,649 RISARALDA371 4,551,497 RISARALDA372 6,352,166 RISARALDA373 10,201,579 RISARALDA374 25,079,609 RISARALDA375 10,201,575 RISARALDA376 4,341,860 RISARALDA377 1,383,456 RISARALDA378 75,039,857 RISARALDA379 24,396,857 RISARALDA380 25,078,326 RISARALDA381 24,623,578 RISARALDA382 9,922,680 RISARALDA383 25,078,765 RISARALDA384 4,480,849 RISARALDA385 1,233,063 RISARALDA386 2,371,664 SAMANA387 5,992,568 SAMANA

388 4,567,325 SAMANA389 25,126,250 SAMANA390 16,114,192 SAMANA391 16,111,886 SAMANA392 4,565,601 SAMANA393 24,866,562 SAMANA394 4,566,730 SAMANA395 16,113,686 SAMANA396 4,566,843 SAMANA

CUERVO DE ZAPATA ANA BERTA 1 BGALEANO ORTÍZ MARIA DILIA 1 BGALLO DE SÁNCHEZ MARTHA 1 BGAVIRIA DE CARDONA MARIA ROSMIRA 1 BGIL BETANCUR JESÚS ALCIDES 1 B

GIRALDO RESTREPO DARÍO DE JESÚS 1 BGONZÁLEZ CASTAÑEDA FLOVER ANTONIO 1 BGONZÁLEZ RAMÍREZ RIGOBERTO 1 BGUTIÉRREZ DE VILLAMIL ANGELA MARÍA 1 BHENAO CELIS LUIS ARIEL 1 BISAZA MURILLO ELIBARDO ANTONIO 1 BLADINO EFREN DE JESÚS 1 BLARGO JOSÉ MESIAS 1 BLEDESMA MEJÍA JOSÉ ALBEIRO 1 BLÓPEZ ALZATE ANDRÉS FELIPE 1 BLÓPEZ BALLESTEROS MANUEL ANTONIO 1 BMEZA DE ECHEVERRI MARIA ARACELLY 1 B

MONTOYA GARCÍA JOSÉ NELSON 1 BORT Z ZULUAGA ANCIZAR DE JES S 1 BOSPINA NORBAI 1 BOSPINA RIVERA LUIS GERARDO 1 BPARRA VASQUEZ HÉCTOR DARÍO 1 BPATIÑO PÉREZ DONELIO 1 BPULGARÍN AGUILAR LUIS ENRIQUE 1 BPULGARÍN HERRERA ROBERTO ANTONIO 1 BQUICENO VALENCIA HERNÁN DE JESÚS 1 BQUINTERO LUIS ALFONSO 1 BRAM REZ LARGO GUILLERMO 1 BRENDÓN PULGARÍN MARIA TERESA 1 BRIOS BEDOYA FRANCISCO JAVIER 1 BRIOS GRAJALES ANTONIO MARÍA 1 BRODAS GAMBOA ANTONIO 1 BSÁNCHEZ BEDOYA LUIS ALFREDO 1 BVALENCIA BLANDON CLAUDIA PATRICIA 1 BVALENCIA DE ROJAS BLANCA MYRIAM 1 BVALENCIA MEDINA MARINA 1 BVANEGAS RINC N EULOGIO JAVIER 1 BVILLADA MONTOYA SOL MARIA 1 BZAPATA ECHEVERRI MANUEL OMAR 1 BZAPATA ECHEVERRI ANCIZAR 1 B

 ACOSTA ANANIAS 1 B ACOSTA MENDOZA JOSÉ MILLER 1 B

BEDOYA BUITRAGO JOSUÉ ALIRIO 1 BBEDOYA DE RODRIGUEZ ANA MARIA 1 BBLANDON DIAZ JOSE ALEXANDER 1 BCALDERÓN CASTAÑO JOSÉ JAIR 1 BCARDONA QUINTERO HÉCTOR JOSÉ 1 BCORTÉS HURTADO DORA 1 BGARCIA BEDOYA JOSE GUILLERMO 1 BGARCÍA GARCÍA HERNANDO 1 BGIRALDO FLOREZ JOSÉ VIDAL 1 B

Page 30: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 30/75

Página 30

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion397 16,114,360 SAMANA398 4,488,299 SAMANA399 4,566,540 SAMANA400 25,125,110 SAMANA401 16,110,755 SAMANA

402 16,110,447 SAMANA403 16,112,879 SAMANA404 16,111,955 SAMANA405 16,111,489 SAMANA406 16,114,848 SAMANA407 16,111,060 SAMANA408 16,113,361 SAMANA409 4,508,000 SAMANA410 4,566,561 SAMANA411 16,112,002 SAMANA412 4,567,126 SAMANA413 25,131,127 SAMANA

414 25,125,612 SAMANA415 4,565,657 SAMANA416 1,395,728 SAMANA417 4,567,913 SAMANA418 3,537,757 SAMANA419 16,111,768 SAMANA420 9,922,292 SAN JOSE421 4,430,216 SAN JOSE422 9,991,367 SAN JOSE423 25,242,807 SAN JOSE424 1,376,542 SAN JOSE425 9,921,781 SAN JOSE426 7,516,886 SUPIA427 15,926,046 SUPIA428 30,412,674 SUPIA429 25,053,128 SUPIA430 10,993,028 SUPIA431 33,991,898 SUPIA432 25,210,759 SUPIA433 24,742,288 SUPIA434 25,211,564 SUPIA435 25,213,544 SUPIA436 25,214,941 SUPIA437 33,991,370 SUPIA438 1,087,486,364 SUPIA

439 15,926,954 SUPIA440 4,592,563 SUPIA441 25,213,668 SUPIA442 15,925,920 SUPIA443 33,994,664 SUPIA444 15,931,683 SUPIA445 33,991,661 SUPIA446 4,389,521 SUPIA447 71,991,610 SUPIA

GIRALDO GARCIA RIGOBERTO 1 BGIRALDO JIMÉNEZ GERARDO 1 BGRAJALES CARDONA JOSÉ ANTONIO 1 BGUERRERO DE LONDOÑO DORA 1 BHERNANDEZ ARANGO JOSE GILDARDO 1 B

HERNANDEZ QUINTERO ABELARDO 1 BHERNANDEZ MUÑOZ GILIBER 1 BHERNANDEZ VALENCIA CARLOS JULIO 1 BLOPEZ GIRALDO CARLOS ALBERTO 1 BLOPEZ HENAO ALCIBER 1 BMATEUS GONZALEZ JUAN CARLOS 1 BMOLANO PARRA ELIBERTO 1 BMONTES MONTOYA RUBIEL DE JESUS 1 BOCAMPO BEDOYA JOSÉ UBALDO 1 BOSORIO QUICENO CARLOS ENRIQUE 1 BOSORIO RAMÍREZ JAIME DE JESÚS 1 BMUÑOZ DE VALBUENA MARIA DEL CARMEN 1 B

QUICENO RESTREPO MARIA INÉS 1 BQUINTERO HERNANDEZ JOSE RUBELIO 1 BRESTREPO OSPINA GERARDO ANTONIO 1 BROJAS PARRA HECTOR JOSE 1 BTABAREZ PÉREZ JOSÉ 1 BVELASQUEZ SEPULVEDA ARTURO ANGEL 1 BESCOBAR MEJIA JOSE FERNANDO 1 BHERNANDEZ HERNANDEZ LUIS ANGEL 1 BHOYOS SANCHEZ ALBEIRO DE JESUS 1 BMARIN UPEGUI ROSA AMELIA 1 BPESCADOR DURAN ANGEL GABRIEL 1 BRESTREPO ZULUAGA LIBADIER 1 B

 ABELLO LÓPEZ LEOCADIO DE JESÚS 1 B ALARCÓN SÁNCHEZ JOSÉ IVÁN 1 B ALCALDE GARCÍA XIMENA ELISA 1 B ANDICA GÓMEZ ANA DOLORES 1 B ANDICA MORALES JOSÉ MIGUEL 1 B ARRUBLA BERTA OFELIA 1 B AYALA AURA MARÍA 1 BCORT S VELASQUEZ NORALBA 1 BFERNÁNDEZ CORRALES CRUZ EDILMA 1 BGAÑAN GAÑAN MARIA OLIVA 1 BGAÑAN LUZ MARIA 1 BGONZALEZ ARNICA LUZ ARGENY 1 BGIL TABORDA JAVIER ALFONSO 1 B

HERNÁNDEZ UCHIMA URIEL 1 BLEÓN GÓMEZ LUIS CARLOS 1 BMORALES BAÑOL MARÍA ROCIO 1 BMORENO GERSAIN ANTONIO 1 BMORENO MARIA CRUZ 1 BRIOS QUINTERO RAMÓN ELEAZAR 1 BMORENO MORENO CARIDAD 1 BOSPINA RESTREPO MANUEL JOSÉ 1 BOSSA HENAO GUSTAVO DE JESÚS 1 B

Page 31: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 31/75

Página 31

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion448 71,592,614 SUPIA449 25,211,026 SUPIA450 15,926,861 SUPIA451 15,925,505 SUPIA452 4,545,798 SUPIA

453 15,928,659 SUPIA454 4,593,440 SUPIA455 25,214,119 SUPIA456 2,775,583 SUPIA457 4,560,784 SUPIA458 15,926,818 SUPIA459 15,912,138 SUPIA460 38,992,425 SUPIA461 1,415,366 SUPIA462 4,593,545 SUPIA463 30,387,416 VICTORIA464 4,595,458 VICTORIA

465 451,635 VICTORIA466 30,351,741 VICTORIA467 16,161,153 VICTORIA468 10,184,361 VICTORIA469 10,178,641 VICTORIA470 18,411,572 VICTORIA471 30,351,298 VICTORIA472 25,220,478 VICTORIA473 25,219,834 VICTORIA474 25,237,080 VILLAMARIA475 14,449,726 VILLAMARIA476 10,229,020 VILLAMARIA477 15,955,777 VILLAMARIA478 18,591,631 VILLAMARIA479 16,212,602 VILLAMARIA480 78,143,658 VILLAMARIA481 6,511,736 VILLAMARIA482 1,281,355 VILLAMARIA483 6,012,852 VILLAMARIA484 15,908,228 VILLAMARIA485 30,354,280 VILLAMARIA486 4,435,859 VILLAMARIA487 5,944,621 VILLAMARIA488 10,212,131 VILLAMARIA489 15,905,807 VILLAMARIA

490 10,222,543 VILLAMARIA491 15,895,806 VILLAMARIA492 4,442,059 VILLAMARIA493 10,228,274 VILLAMARIA494 15,896,890 VILLAMARIA495 30,358,384 VILLAMARIA496 15,902,940 VILLAMARIA497 24,618,958 VILLAMARIA498 4,327,060 VILLAMARIA

PÉREZ PEÑA SERGIO 1 BRANGEL DE HIGINIO MARIA ROSELIA 1 BRAMÍREZ LARGO ADIEL ANTONIO 1 BRENDON GIRALDO GERMÁN DE JESÚS 1 BRIOS PELAEZ JORGE IVÁN 1 B

RIVERA ORTÍZ ELIÉCER DE JESÚS 1 BRODRIGUEZ IZQUIERDO FABIAN ANTONIO 1 BROMÁN ABELLO MERY DEL CARMEN 1 BSALDARRIAGA SÁNCHEZ LUIS ANIBAL 1 BTAMAYO GALVIS JOSÉ JAIRO 1 BTAPASCO DÍAZ MARINO ANTONIO 1 BVALENCIA LARGO JESÚS ANTONIO 1 BVALENCIA MORENO MARIA SOLANGEL 1 BVASQUEZ OBANDO RODRIGO 1 BURIBE MONTOYA ORLANDO DE JESUS 1 B

 ABREO ALZATE MARY LUZ 1 B ALVAREZ RUIZ GEIMAR 1 B

 ARIAS GUERRERO PEDRO 1 BBURITICA CASTILLO LILIA 1 BCASTAÑEDA ROJAS FERNANDO ALBEIRO 1 BMORENO GUTIERREZ NELSON 1 BMURILLO ROJAS ARNOLDO ANTONIO 1 BQUINCHUA MORALES ALVARO ANTONIO 1 BRIVERA ALBA LUCIA 1 BSANTAMARIA ELDA MARIA 1 BTORRES BERNAL MARIA PASTORA 1 B

 ALZATE SÁNCHEZ MÉLIDA 1 B ARIAS P REZ RUBEN 1 BCAICEDO HERNÁNDEZ JOSÉ HUMBERTO 1 BCARDONA GUTIÉRREZ BERNARDO 1 BCARDONA VALENCIA JOSÉ ALDEMAR 1 BCATAÑO VILLEGAS LUIS GABRIEL 1 BCORREA QUINTERO LUIS EDUARDO 1 BDIAZ POSADA JAVIER ANTONIO 1 BGIRALDO TORRES OVIDIO 1 BGOMEZ BAUTISTA SERAFÍN 1 BGONZ LEZ ARBOLEDA JOS ALFONSO 1 BGONZÁLEZ ARBOLEDA MARIA DEL SOCORRO 1 BGRAJALES SOTO JESÚS EDILIO 1 BGUTIÉRREZ PULIDO LUIS GONZAGA 1 BHERNÁNDEZ MUNOZ JOSÉ HERNANDO 1 BHURTADO YEPES MARIO 1 B

MARÍN MARÍN IGNACIO 1 BMESA CAÑAS RUMENUS DE JESÚS 1 BMUÑOZ GUTIÉRREZ JORGE TULO 1 BOROZCO PINEDA CONRADO 1 BOROZCO PINEDA JOSE JAIRO 1 BOSORIO OSORIO MARIA YANETH 1 BOSORIO QUINTERO JOSÉ JAVIER 1 BPINEDA DE RENDÓN MARIA MARLENY 1 BRAMÍREZ OSPINA LUIS ALBERTO 1 B

Page 32: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 32/75

Página 32

Nº Cédula MunicipioNombres y apellidos Jefe de HogarNivel

SisbenTipo de

solucion499 15,908,061 VILLAMARIA500 17,623,814 VILLAMARIA501 25,235,389 VILLAMARIA502 15,896,578 VILLAMARIA503 15,955,956 VILLAMARIA

504 15,909,913 VILLAMARIA505 15,900,621 VILLAMARIA506 25,233,679 VILLAMARIA507 15,905,047 VILLAMARIA508 15,896,003 VILLAMARIA509 30,353,026 VILLAMARIA510 9,971,053 VILLAMARIA511 16,341,933 VILLAMARIA512 75,145,560 VILLAMARIA513 15,907,928 VILLAMARIA514 15,901,114 VILLAMARIA515 2,330,143 VILLAMARIA

516 10,024,147 VILLAMARIA

RAMÍREZ SALGADO LUIS NORBERTO 1 BRESTREPO MESA CARLOS OVIDIO 1 BRODAS MARIA NORLLYS 1 BRODRIGUEZ CARDONA FABIO 1 BRODRIGUEZ HERNÁNDEZ JOSÉ HERNEY 1 B

RODRIGUEZ HERNÁNDEZ MARIO 1 BMUÑOZ OTÁLVARO JUAN JOSÉ 1 BSÁNCHEZ CALAMBAS MARIA CENELIA 1 BSÁNCHEZ TORRES JOAQUÍN EMILIO 1 BSUAREZ ARISTIZABAL WILLIAM 1 BTABARES GIRALDO MARIA EDILMA 1 BTABARES MONTES LUIS FERNANDO 1 BTASCON POTES CESAR AUGUSTO 1 BTORRES JARAMILLO EVER ANTONIO 1 BSALAZAR JUAN 1 BSALAZAR LUIS GONZAGA 1 BVARON CASTILLO LUIS CARLOS 1 B

Para constancia se firma en el Departamento de Caldas a los 28 días del mes deAgosto del año 2009

Entidad oferente Coordinador (a) del Sisbén

VARON TORRES LUIS JOANNI 1 B

La anterior preseleccion se realizó de acuerdo con la metodologia de preselección consiste en priorizarlas familias con menor nivel del sisben, cuando se prsento igual puntaje, se realizó en acto público unsorteo que determinó las familias seleccionadas para participar en el proyecto.

Page 33: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 33/75

FORMULARIO No. 09

DEPARTAMENTO NOMBRE DEL PROYECTO

CALDAS

INSUMO UNIDAD VALOR UNIT CANTIDAD VALOR TOTAL VR FLETE

 AYUDANTE JORNAL 12,900.00  1.00  258,000,000.00 OFICIAL JORNAL 44,700.00  1.00  1,035,358,128.00  Accesorios punto hidráulico gl 2,100.00  5,676.00  11,919,600.00  595,980.00  Accesorios PVC gl 3,045.00  2,064.00  6,284,880.00  314,244.00  Accesorios tanque 250 lts Und 21,000.00  516.00  10,836,000.00  541,800.00  Acople Und 4,000.00  2,580.00  10,320,000.00  516,000.00  Accesorios pozo septico gl 94,500.00  516.00  48,762,000.00  2,438,100.00  Adaptador PVC 1" Und 3,150.00  16,512.00  52,012,800.00  2,600,640.00  Adaptador PVC 1/2" Und 3,000.00  2,580.00  7,740,000.00  387,000.00  Adaptador terminal 1" Und 3,465.00  10,320.00  35,758,800.00  1,787,940.00  Alambre encauchetado No.14 ml 2,730.00  21,672.00  59,164,560.00  2,958,228.00  Alambre negro N°18 2x12 Kgr 3,600.00  11,173.41  40,224,284.64  2,011,214.23  Amarres y atraque und 3,200.00  5,160.00  16,512,000.00  825,600.00  Arena de río m3 42,000.00  9.91  416,102.40  20,805.12  Arena lavada m3 73,500.00  205.37  15,094,493.77  754,724.69 Bajante para aguas de cubierta

ml 18,000.00  1,548.00  27,864,000.00  1,393,200.00 Bloque arcll. #4 9x23x33 Und 1,050.00  20,691.60  21,726,180.00  1,086,309.00 Bloque arcll. #5 12x20x30 Und 1,386.00  559,769.70  775,840,804.20  38,792,040.21  Alambre encauchetado No. 12 Und 2,730.00  21,672.00  59,164,560.00  2,958,228.00 Caja octagonal Und 1,500.00  8,256.00  12,384,000.00  619,200.00 Caja para tacos 2 circuitos Und 20,800.00  516.00  10,732,800.00  536,640.00 Caja rectangular  Und 1,470.00  8,256.00  12,136,320.00  606,816.00 Canal 3" ml 18,550.00  3,612.00  67,002,600.00  3,350,130.00 Cemento blanco Kgr 588.00  516.00  303,408.00  15,170.40 Cemento gris Kgr 532.00  30,863.11  16,419,172.57  820,958.63 Cerradura Und 23,100.00  516.00  11,919,600.00  595,980.00 Codo PVC 1/2" 90° Und 945.00  5,160.00  4,876,200.00  243,810.00 Codo PVC 3" 90° Und 22,050.00  516.00  11,377,800.00  568,890.00 Codo PVC 4" 90° Und 36,750.00  1,032.00  37,926,000.00  1,896,300.00 Codo sanitario PVC 2" 90° Und 4,200.00  4,128.00  17,337,600.00  866,880.00 Concreto 2500 psi m3 343,120.00  3,645.74  1,250,927,964.00  62,546,398.20 

Correa metálica ml 17,500.00  9,907.20  173,376,000.00  8,668,800.00 Enchape con baldosa común m2 19,500.00  4,953.60  96,595,200.00  4,829,760.00 Ganchos y accesorios und 600.00  50,196.48  30,117,888.00  1,505,894.40 Hierro 1/4" (N° 2) Kgr 3,600.00  44,066.19  158,638,296.96  7,931,914.85 Hierro 3/8" (N° 3) Kgr 3,600.00  134,799.43  485,277,937.92  24,263,896.90 Herramienta menor  gl 1.00  171,515,280.26  171,515,280.26  8,575,764.01 Interruptor  Und 6,300.00  8,256.00  52,012,800.00  2,600,640.00 Interruptor automatico 20 A Und 8,400.00  516.00  4,334,400.00  216,720.00 Juego incrustaciones Und 36,750.00  516.00  18,963,000.00  948,150.00 Ladrillo tolete 7x12x25 Und 420.00  268,319.04  112,693,997.12  5,634,699.86 Lavadero prefabricado Und 89,000.00  516.00  45,924,000.00  2,296,200.00 Lavamanos porcelana Und 54,600.00  516.00  28,173,600.00  1,408,680.00 Lavaplatos Und 84,000.00  516.00  43,344,000.00  2,167,200.00 Limpiador PVC ltr 36,750.00  206.33  7,582,620.00  379,131.00 Llave terminal Und 15,750.00  1,032.00  16,254,000.00  812,700.00 Marco lámina 0,83x2.o mts calibre 20 Und 34,600.00  516.00  17,853,600.00  892,680.00 

Marco lámina 0,90x1,90 mts calibre 20 Und 36,000.00  1,032.00  37,152,000.00  1,857,600.00 Mortero 1:4 m3 286,864.00  486.97  139,693,842.00  6,984,692.10 Puerta met. O,65x2.0 mtscal.20 Und 120,000.00  516.00  61,920,000.00  3,096,000.00 Puerta met. O,93x2mts cal.20 Und 140,000.00  1,032.00  144,480,000.00  7,224,000.00 Pasador UNIDAD 16,500.00  1,032.00  17,028,000.00  851,400.00 Puntilla 2" Lbr 3,500.00  18,647.72  65,267,034.00  3,263,351.70 Registro directo 1/2" Und 10,500.00  516.00  5,418,000.00  270,900.00 Rejilla Und 4,725.00  1,032.00  4,876,200.00  243,810.00 Repiza, vareta, vigueta ml 3,150.00  653.60  2,058,840.00  102,942.00 Sanitario Und 165,200.00  516.00  85,243,200.00  4,262,160.00 

MUNICIPIO

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DE CALAMIDADPÚBLICA.

AGUADAS, BELALCAZAR, CHINCHINA,FILADELFIA, LA DORADA, LA MERCED,

VICTORIA, MANZANARES, MARMATO, NEIRA,PACORA PENSILVANIA RIOSUCIO

Page 34: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 34/75

INSUMO UNIDAD VALOR UNIT CANTIDAD VALOR TOTAL VR FLETE

Sifón PVC 180 2" Und 5,250.00  2,064.00  10,836,000.00  541,800.00 Soldadura PVC ltr 73,500.00  206.40  15,170,400.00  758,520.00 Tabla formaleta ml 3,800.00  37,992.57  144,371,774.16  7,218,588.71 Tanque plástico 250 lts Und 134,000.00  516.00  69,144,000.00  3,457,200.00 Teja ondulada de zinc # 8 und 22,000.00  27,608.06  607,377,408.00  30,368,870.40 Tuber P. PVC 1/2" ml 3,100.00  10,320.00  31,992,000.00  1,599,600.00 Tuberia Sanitaria PVC 2" ml 4,200.00  7,224.00  30,340,800.00  1,517,040.00 

Tuberia Sanitaria PVC 3" ml 20,100.00  1,032.00  20,743,200.00  1,037,160.00 Tuberia Sanitaria PVC 4" ml 10,500.00  4,128.00  43,344,000.00  2,167,200.00 Tubo Pvc conduit 1/2" ml 6,510.00  5,160.00  33,591,600.00  1,679,580.00 Tubo de gres 3" ml 4,200.00  3,096.00  13,003,200.00  650,160.00 Tubo PVC conduit 1" ml 4,200.00  16,512.00  69,350,400.00  3,467,520.00 Union Pvc 4" UNIDAD 13,650.00  1,548.00  21,130,200.00  1,056,510.00 

Ventana metálica 1,13 x .95 mts m2 94,500.00  2,064.00  195,048,000.00  9,752,400.00 Yee de 4" x 2" en pvc m2 8,003.00  516.00  4,129,548.00  206,477.40 

TOTAL MATERIALES 5,988,350,796.00$ 299,417,539.80 MANO DE OBRAMANO DE OBRA NO CALIFICADA 258,000,000.00 MANO DE OBRA CALIFICADA 1,035,358,128.00 

TOTAL MANO DE OBRA 1,293,358,128.00$

TOTAL MANO DE OBRA Y MATERIALES 7,281,708,924.00$

5,988,350,796.00 

ING. EDUARDO MONTOYA DUQUE MARIO ARISTIZABAL MUÑOZCONSULTOR   Alcalde Municipal

Oferente Proyecto

Page 35: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 35/75

APU No. 1

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: LOCALIZACION Y REPLANTEO LOTE UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

 Madera (estantillos) Und 0.03 3,150.00 95.00

 

SUBTOTAL $95.002. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.0  50.00 280.00

 

SUBTOTAL $280.003. OTRA MANO DE OBRA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 50.00 894.00

 

SUBTOTAL $894.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

 

SUBTOTAL $0.00

TOTAL COSTOS DIRECTOS A MANO $1,269.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 36: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 36/75

APU No. 2

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: NIVELACI N Y/O ADECUACI N DE TERRENO A MANO UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

SUBTOTAL $0.00

2. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL Ayudante 12,900.00  50.00 280.00

 

SUBTOTAL $280.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 50.00 894.00 

SUBTOTAL $894.004. OTROS

DESCRIPCION UNIDAD CANT. VALOR UNIT. VALOR TOTAL

HERRAMIENTA MENOR GL 1.00 500.00 500.00 

SUBTOTAL $500.00

TOTAL $1,674.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 37: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 37/75

APU No. 3

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: DESCAPOTE A MANO UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

 

SUBTOTAL $0.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

  Ayudante 12,900.00 50.00 280.00 

SUBTOTAL $280.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 50.00 894.00

 

SUBTOTAL $894.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta Menor Gl 1.00 500.00 500.00

 

SUBTOTAL $500.00

TOTAL COSTOS DIRECTOS $1,674.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 38: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 38/75

APU No.

4

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: EXCAVACI N A MANO (INC. POZO SEPTICO Y CAJ AS) UNIDAD: M3

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL0.00

 

SUBTOTAL $0.002. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL Ayudante 12,900.00 m3/H/D 0.31 4,000.00 

SUBTOTAL $4,000.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOFICIAL 44,700.00 44,700.00 0.40 17,800.00

 

SUBTOTAL $17,800.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

Herramienta Menor gl 1.00 1,900.00 1,900.00

 

SUBTOTAL $1,900.00

TOTAL COSTOS DIRECTOS A MANO $23,700.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 39: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 39/75

APU No. 5

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: VIGA DE CIME NTACION (25cm x 20cm) f c=17,5 Mpa UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

Concreto 2500 psi m3 0.05 343,120.00 18,600.00Hierro 3/8" Kg 2.44 3,600.00 8,784.00Hierro 1/4" kg 0.68 3,600.00 2,448.00

 Alambre negro Nº 18 Kg 0.19 3,600.00 684.00Tabla formaleta ml 0.62 3,800.00  2,356.00Puntilla 2" llbr 0.31 3,500.00  1,085.00

SUBTOTAL 25X20 $33,957.00

2. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL 

 Ayudante 12,900.00 7.17 1,800.00 

SUBTOTAL $1,800.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 7.91 5,650.00

 

SUBTOTAL $5,650.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 543.00 543.00

 

TOTA SUBTOTAL $543.00

TOTAL COSTOS DIRECTOS 25X20 $41,950.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LAMERCED, VICTORIA, MANZANARES , MARMATO, NEIRA, PACORA,

PENSILVANIA, RIOSUCIO, RISARALDA, SAMANA, SAN J OSE, SUP IA,VILLAMARIA

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 40: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 40/75

APU No. 6

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: VIGA ANDEN FACHADA E N CONCRETO (20cm x 10 cm) UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

Concreto 2500 psi m3 0.02 343,120.00 7,600.00Hierro 3/8" Kg 1.23 3,600.00 4,428.00Hierro 1/4" kg 0.44 3,600.00 1,584.00

 Alambre negro Nº 18 Kg 0.10 3,600.00 360.00Tabla formaleta ml 0.34 3,800.00  1,300.00Puntilla 2" llbr 0.17 3,500.00  595.00

SUBTOTAL $15,867.00

2. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL 

 Ayudante 12,900.00 12.90 1,000.00 

SUBTOTAL $1,000.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 12.77 3,500.00

 

SUBTOTAL $3,500.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 533.00 533.00

 

TO SUBTOTAL $533.00

TOTAL COSTOS DIRECTOS 25X20 $20,900.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA,LA MERCE D, VICTORIA, MANZANARES, MARMATO, NEIRA,

PACORA, PENSILVANIA, RIOSUCIO, RISARALDA, SAMANA, SAN J OSE , SUPIA, VILLAMARIA

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RES OLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 41: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 41/75

O AGRARIO DE COLOBIA

RAMA VIVIENDA RURAL

SIS DE PRECIOS UNITARIOS APU No. 7

DEPARTAMENTO CATEGORIA

CALDAS

ACTIVIDAD: VIGA DE CONFINAMIENTO SUPERIOR (18cm X 12cm) f´c=17,5 MPa. UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALConcreto 2500 psi + desperdicio m3 0.024 343,120.00 8,300.00Hierro 3/8" kgr 2.5 3,600.00 8,856.00Hierro 1/4" kgr 1.04 3,600.00 3,744.00Tabla formaleta ml 0.67 3,800.00 2,546.00Puntilla 2" lbr 0.34 3,500.00 1,190.00

 Alambre Negro NO. 18 kg. 0.21 3,600.00 756.00

 

SUBTOTAL 0.18 x 0.12 25,392.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

  Ayudante 12,900.00 ml/H/D 0.08 1,000.00 

SUBTOTAL 0.18 x 0.20 1,000.00 3. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 0.09 4,000.00

 

SUBTOTAL 0.18 x 0.20 $4,000.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor 508.00 508.00 

TOT SUBTOTAL $508.00

TOTAL COSTOS DIRECTOS 0.18 X 0.20 $30,900.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LAMERCE D, VICTORIA, MANZANARES , MARMATO, NEIRA, PACORA,

PENS ILVANIA, RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUP IA,VILLAMARIA

Page 42: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 42/75

APU No. 8

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: VIGA CINTA (12cm X 10cm) f´c=17,5 MPa UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALConcreto 2500 psi + desperdicio m3 0.013 343,120.00 4,500.00Hierro 3/8" kgr 1.23 3,600.00 4,428.00Hierro 1/4" kgr 0.19 3,600.00 684.00Tabla formaleta ml 0.67 3,800.00 2,546.00Puntilla 2" lbr 0.34 3,500.00 1,190.00

 Alambre Negro No 18 kgr 0.09 3,600.00 324.00

 

SUBTOTAL 13,672.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

  Ayudante 12,900.00 ml/H/D 0.06 800.00

SUBTOTAL 800.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 12.77 3,500.00

 

SUBTOTAL 3,500.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 528.00 528.00

 

SUBTOTAL 528.00

TOTAL COSTOS DIRECTOS 18,500.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LAMERCE D, VICTORIA, MANZANARES , MARMATO, NEIRA, PACORA,

PENS ILVANIA, RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUP IA,VILLAMARIA

Page 43: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 43/75

APU No. 9

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: COLUMNAS DE CONFINAMIENTO EN CONCRETO (18cm x 12cm) 2500 psi UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

Varilla 3/8" Kg 2.46 3,600.00 8,856.00 Alambre negro Nº 18 Kg 0.25 3,600.00 900.00Tabla formaleta ml 0.67 3,800.00 2,546.00puntilla 2" Lb 0.34 3,500.00 1,190.00Concreto 2500 PSI + 10% cavernidad m3 0.024 343,120.00 8,300.00Hierro 1/4 kg 1.04 3,600.00 3,744.00

SUBTOTAL 0.18 x 0.12 $25,536.00

2. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00 12.90 1,000.00

SUBTOTAL 0.18 x 0.12 $1,000.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 44,700.00 44,700.00 11.18 4,000.00

SUBTOTAL 0.18 x 0.12 $4,000.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 564.00 564.00

 

TOTAL C SUBTOTAL $564.00

TOTAL COSTOS DIRECTOS 0.18 X 0.20 $31,100.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LA DORADA, LAMERCE D, VICTORIA, MANZANARES , MARMATO, NEIRA, PACORA,

PENS ILVANIA, RIOSUCIO, RISARALDA, SAMANA, SAN JOS E, SUPIA,VILLAMARIA

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 44: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 44/75

APU No.

10

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: DINTEL O VANOS EN CONCRETO 0.12 X 0.10 UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Concreto 2500 PS.I m3 0.013 343,120.00 4,500.00Hierro 3/8" Kg 1.2300 3,600.00 4,428.00

 Alambre negro Nº 18 Kg 0.0900 3,600.00 324.00Tabla fromaleta ml 0.6700 3,800.00 2,546.00Puntilla 2" Lb. 0.3400 3,500.00 1,190.00

 

SUBTOTAL $12,988.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

  Ayudante 12,900.00 15.00 860.00 

SUBTOTAL $860.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 15.00 2,980.00

 

SUBTOTAL $2,980.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 512.00 512.00

 

SUBTOTAL $512.00

TOTAL COSTOS DIRECTOS $17,340.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 45: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 45/75

APU No. 11

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALBloque ARCILLA No.5 E=12 cms Und 17.50 1,386.00 24,255.00Mortero de pega m3 0.01 286,864.00 4,050.00

 

SUBTOTAL No.5 E=12 $28,305.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL 

 Ayudante 12,900.00 6.45 2,000.00

SUBTOTAL No.5 E=12 $2,000.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 44,700.00 44,700.00 6.39 7,000.00 

SUBTOTAL No.5 E=12 $7,000.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 595.00 595.00

 

SUBTOTAL $595.00

$37,900.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

TOTAL COSTOS DIRECTOS No.5 E=12 cms

MAMPOSTER IA BLOQUE ARCILLA E=12 cms

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 46: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 46/75

APU No. 12

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: MESON DE COC INA EN CONCRETO(1,92*,60*,07) Mts. UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Concreto 2500 PSI m3 0.090 343,120.00 30,881.00

 Acero de Refuerzo 3/8 kg 5.49 3,600.00 19,764.00Tabla Formaleta ml 3.00 3,800.00 11,400.00Puntilla 2" Lb. 1.50 3,500.00 5,250.00

 Alambre negro Kg 0.30 3,600.00 1,080.00Llave terminal Un 1.00 15,750.00 15,750.00Lavaplatos Un 1.00 84,000.00 84,000.00Bloque ARCILLA No.4 E=10 cms Un 17.00 1,050.00 17,850.00Mortero de pega m3 0.01 286,864.00 4,015.00

SUBTOTAL $189,990.002. MANO DE OBRA COMUNITARIA  

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL  Ayudante 12,900.00 4.00 3,225.00

SUBTOTAL $3,225.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 4.00 11,175.00

 

SUBTOTAL $11,175.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

Herramienta menor gl 1,000.00 1,000.00 

SUBTOTAL $1,000.00

TOTAL COSTOS DIRECTOS $205,390.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 47: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 47/75

APU No. 13

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: PISO EN CONCRETO AFINADO e=7 cms UNIDAD: M2

Fy'=17.5 Mpa

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

Concreto de 2500 psi, E=7 cms M3 0.077 343,120.00 26,500.00

 

SUBTOTAL E=7 cms $26,500.00

2. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL Ayudante 12,900.00 15.00 800.00

SUBTOTAL E=7 cms $800.00

3. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 15.00 2,900.00

SUBTOTAL E=7 cms $2,900.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 500.00 500.00

 

SUBTOTAL $500.00

TOTAL COSTOS DIRECTOS, E=7 cms $30,700.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 48: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 48/75

APU No. 14

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: ENTRAMADO DE CERCHA METALICA PARA C UBIERTA UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

ML 1.00 17,500.00 17,500.00kg 0.30 532.00 160.00M3 0.001 42,000.00 42.00

 

SUBTOTAL $17,702.002. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL Ayudante 12,900.00 15.00 860.00

 

SUBTOTAL $860.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 15.00 2,980.00

 

SUBTOTAL $2,980.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor 523.00 523.00

 

SUBTOTAL $523.00

TOTAL COSTOS DIRECTOS $22,065.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

 

Correa metálica 12x18, 2D 3/8 + 1D 1/2 yflejes de 3/8

Cemento para el atraque Arena para atraque

 

Page 49: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 49/75

APU No. 15

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: BAJANTES UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALBajante Aguas Lluvias ML 1.00 18,000.00 18,000.00 Acoples y accesorios Und. 1.00 4,000.00 4,000.00 Amarres y atraque Und. 1.00 3,200.00 3,200.00

 

SUBTOTAL $25,200.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

  Ayudante 12,900.00 30.00 430.00 

SUBTOTAL $430.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 0.00 44,700.00 30.00 1,490.00

 

SUBTOTAL $1,490.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 1,472.00 1,472.00

 

SUBTOTAL $1,472.00

TOTAL COSTOS DIRECTOS $28,592.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 50: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 50/75

APU No. 16

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: CANALES UNIDAD: ML

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALCanal 3" ML 1.00 18,550.00 18,550.00 Amarres y atraque UNIDAD 1.00 3,200.00 3,200.00

 

SUBTOTAL $21,750.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

  Ayudante 12,900.00 20.00 645.00 

SUBTOTAL $645.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 20.00 2,235.00

 

SUBTOTAL $2,235.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 300.00 300.00

 

SUBTOTAL $300.00

TOTAL COSTOS DIRECTOS $24,930.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 51: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 51/75

APU No.

17

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: CUBIERTA TE J A ONDULADA ZINC UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Teja Ondulada ZINC Und 1.10 22,000.00 24,200.00Ganchos y Accesorios glb 2.00 600.00 1,200.00

 

SUBTOTAL TEJA $25,400.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00 15.18 850.00

 

SUBTOTAL TEJA $850.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 15.15 2,950.00

 

SUBTOTAL TEJA $2,950.004. OTROS

DESCRIPCION UNIDAD cant VALOR UNIT. VALOR TOTALHerramienta menor gl 1 500.00 500.00

 Andamios gl 1 1,000.00 1,000.00 

SUBTOTAL TEJA $1,500.00

TOTAL COSTOS DIRECTOS TEJA $30,700.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 52: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 52/75

APU No. 18

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: PUNTO HIDRAULICO Ø 1/2" en Muro UNIDAD: Un

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALCodo PVC 90° 1/2" un 2.00 945.00 1,890.00Tubería PVC " 1/2 ml 2.00 3,100.00 6,200.00

 Adaptador PVC 1/2" un 1.0 3,000.00 3,000.00Soldadura PVC lt 0.01 73,500.00 735.00Limpiador lt 0.01 36,750.00 367.00

 

SUBTOTAL $12,192.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12900 15.00 860.00

 

SUBTOTAL $860.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 15.00 2,980.00

 

SUBTOTAL $2,980.004. OTROS

DESCRIPCION UNIDAD cant VALOR UNIT. VALOR TOTAL 

SUBTOTAL $0.00

TOTAL COSTOS DIRECTOS $16,032.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 53: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 53/75

APU No. 19

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: GL

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALTubería PVC " 1/2 ml 10.00 3,100.00 31,000.00

 ACCESORIOS PVC Und 10.00 2,100.00 21,000.00Soldadura PVC lt 0.10 73,500.00 7,350.00Limpiador lt 0.10 36,750.00 3,675.00

 

SUBTOTAL 1/2" $63,025.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  1 12900 4.00 3,225.00

SUBTOTAL 1/2" $3,225.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 4.00 11,175.00 

SUBTOTAL 1/2" $11,175.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

 

SUBTOTAL $0.00

TOTAL COSTOS DIRECTOS 1/2" $77,425.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

RED HIDRAULICA PVC 1/2" (piso)

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 54: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 54/75

APU No. 20

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: LAVADERO PREFABRICADO 0.6 X 0.5 Mts. UNIDAD: UNCON BASE EN MAMPOSTERIA

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

Mamposteria tolete M2 0.80 27,972.00 22,378.00LLave terminal UNIDAD 1.00 15,750.00 15,750.00

 Accesorios, Rejilla Gl 1.00 6,825.00 6,825.00LAVADERO PREFABRICADO UNIDAD 1.00 89,000.00 89,000.00 

SUBTOTAL 133,953.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  1 12900 10.00 1,290.00 

SUBTOTAL $1,2903. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 44,700.00 44,700.00 10.00 4,470.00 

SUBTOTAL $4,470.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL 

SUBTOTAL $0.00

$139,713.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

TOTAL COSTOS DIRECTOS 80 X 60 PREF

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 55: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 55/75

APU No. 21

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: Und

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALRegistro de paso und 1.00 10,500.00 10,500.00

 

Subtotal $10,500.002. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 

Subtotal $03. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 44,700.00 44,700.00 15.00 2,980.00 

Subtotal $2,980.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

 

SUBTOTAL $0.00

TOTAL $13,480.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

REGISTRO DE PASO

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 56: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 56/75

APU No. 22

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD:  TANQUE DE RESERVA DE AGUA UNIDAD: UNPLASTICO DE 250 LTS

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

TANQUE DE RES. AGUA cap. 250lts und 1.00 134,000.00 134,000.00 Accesorios tanque Und 1.00 21,000.00 21,000.00Mamposteria m2 1.00 28,305.00 28,305.00

 

SUBTOTAL 183,305.002. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  1 12900 10.00 1,290.00 

SUBTOTAL $1,2903. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 44,700.00 44,700.00 10.00 4,470.00 

SUBTOTAL $4,470.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

 gl 500.00 500.00 

SUBTOTAL $500.00

$189,565.00TOTAL COSTOS DIRECTOS tanque

Herramienta menor

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 57: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 57/75

APU No. 23

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALCaja de circuito UNIDAD 1.00 20,800.00 20,800.00Interruptor 20 amp UNIDAD 1.00 8,400.00 8,400.00

 

2. MANO DE OBRA COMUNITARIA SUBTOTAL $29,200.00

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

SUBTOTAL $03. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 44,700.00 44,700.00 10.00 4,470.00

SUBTOTAL $4,470.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

 

Herramienta menor inst. caja gl 1,000.00 1,000.00

  SUBTOTAL $1,000.00

TOTAL COSTOS DIRECTOS $34,670.00

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

CAJ A CIRCUITO O DE INTERRUPTORE S

Page 58: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 58/75

APU No. 24

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: Gl

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Alambre encauchetado No. 14 Ml 10.00 2,730.00 27,300.00Tubo PVC conduit 1/2" Ml 10.00 6,510.00 65,100.00

 Accesorio terminal UNIDAD 20.00 3,465.00 69,300.00 Alambre encauchetado No. 12 Ml 10.00 2,730.00 27,300.00

 

SUBTOTAL $189,0002. MANO DE OBRA COMUNITARIA

TRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

SUBTOTAL $0.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial red interna 44,700.00 44,700.00 1.00 44,700.00

SUBTOTAL $44,700.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

Herramienta menor 300.00 

SUBTOTAL $300.00

TOTAL COSTOS DIRECTOS RED INTERNA $234,000.00

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

RED ELECTRICA INTERNA

Page 59: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 59/75

APU No. 25

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: PUNTO ELECTRICO UNIDAD: PUNTO

 

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALCaja Rectangular UNIDAD 1.00 1,470.00 1,470.00Caja Octagonal UNIDAD 1.00 1,500.00 1,500.00

 Alambre No.14 Ml 2.00 2,730.00 5,460.00Tubo P.V.C. Condiut Ml 2.00 4,200.00 8,400.00

 Adapatdor P.V.C. UNIDAD 2.00 3,150.00 6,300.00 Aparato electrico UNIDAD 1.00 6,300.00 6,300.00 Alambre Encauchetado No.12 Ml 2.00 2,730.00 5,460.00

 

SUBTOTAL $34,8902. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 

SUBTOTAL $0.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 6.00 7,450.00

 

SUBTOTAL $7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 300.00 300.00 

SUBTOTAL $300.00

TOTAL $42,640.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 60: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 60/75

APU No. 26

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALTuberia P.V.C. 2" Ml 2.00 4,200.00 8,400.00Codo P.V.C. 2" 90° UNIDAD 2.00 4,200.00 8,400.00Soldadura P.V.C. lt 0.01 73,500.00 735.00Limpiador lt 0.01 36,750.00 367.00Sifón P.V.C 2" UNIDAD 1.00 5,250.00 5,250.00

SUBTOTAL 2" $23,152

2. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 

SUBTOTAL 2" 0.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 2" 44,700.00 44,700.00 6.00 7,450.00

SUBTOTAL 2" $7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 200.00 200.00 

SUBTOTAL $200.00

TOTAL 2" $30,802.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

PUNTO SANITARIO P.V.C. 2"

Page 61: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 61/75

APU No. 27

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: Gl

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALCodo de 4" PVC UNIDAD 1.00 36,750.00 36,750.00Y de 4" x 2" UNIDAD 1.00 8,003.00 8,003.00Tuberia sanitaria P.V.C 4" Ml 6.00 10,500.00 63,000.00Union de 4" UNIDAD 2.00 13,650.00 27,300.00Limpiador P.V.C. lt 0.10 36,750.00 3,675.00Soldador P.V.C lt 0.10 73,500.00 7,350.00

 

SUBTOTAL $146,078.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 

SUBTOTAL $0.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 2.00 22,350.00

 

SUBTOTAL $22,350.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 2,000.00 2,000.00 

SUBTOTAL $2,000.00

TOTAL COSTOS DIRECTOS $170,428.00

RED SANITARIA PISO 4"

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 62: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 62/75

APU No. 28

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALTuberia P.V.C. 4" Ml 2.00 10,500.00 21,000.00Codo P.V.C. 4" 90° UNIDAD 1.00 36,750.00 36,750.00Soldadura P.V.C. lt 0.01 73,500.00 735.00Limpiador lt 0.01 36,750.00 367.00

Union 4" UNIDAD 1.00 13,650.00 13,650.00

SUBTOTAL 4" $72,502.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 

SUBTOTAL 4" 0.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

Oficial 4" 44,700.00 44,700.00 6.00 7,450.00

SUBTOTAL 4" $7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 500.00 500.00 

SUBTOTAL $500.00

$80,452.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

TOTAL COSTOS DIRECTOS 4"

PUNTO SANITARIO P.V.C. 4"

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 63: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 63/75

APU No.

29

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: Gl

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Accesorios Und 4.00 3,045.00 12,180.00Tuberia sanitaria P.V.C 2" Ml 6.00 4,200.00 25,200.00Rejilla UNIDAD 1.00 4,725.00 4,725.00Limpiador P.V.C. lt 0.10 36,750.00 3,675.00Soldador P.V.C lt 0.10 73,500.00 7,350.00

 

SUBTOTAL $53,130.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

SUBTOTAL $0.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 5.00 8,940.00

 

SUBTOTAL $8,940.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 500.00 500.00 

SUBTOTAL $500.00

TOTAL $62,570.00

RED SANITARIA PISO 2"

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 64: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 64/75

APU No. 30

DEP RT MENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

Concreto Base m3 0.04 343,120.00 13,725.00Mampostería m2 1.00 27,972.00 27,972.00Concreto Tapa m3 0.03 343,120.00 10,293.00Hierro 3/8" kgr 1.54 3,600.00 5,544.00

 Tuberia gres perforada (campo de infiltraci ml 3 4,200.00  12,600.00

SUB TOTAL 60X60X30 $70,134.002. MANO DE OBR A COMUNITARIA

 TRABAJ ADOR J ORNAL PR ES TAC . J ORNAL/TOT. RE NDIMIENT. VALOR TOTALAyudante 60X60X30 12,900.00 2.00 6,450.00

SUB TOTAL 60X60X30 $6,450.003. OTRA MANO DE OB RA

 TRABAJ ADOR J ORNAL PR ES TAC . J ORNAL/TOT. RE NDIMIENT. VALOR TOTALOficial 60X60X30 44,700.00 44,700.00 2.00 22,350.00

SUB TOTAL 60X60X30 $22,350.00

4. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor 2,500.00

  TOTAL COSTO DIRECTO SUBTOTAL $2,500.00

TOTAL COSTOS DIRECTOS 60X60X30 101,434.00

CAJ A DE DISTRIBUCION Y TAPA 60 X 60 x 30

  N L ISIS DE PRECI OS UNIT RIOS

PROYECTO DE VIVI END DE INTERES SOCI L

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DECALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES,

MARMATO, NEIRA, PACORA, P ENSILVANIA,RIOSUCIO, RISARALDA, SAMANA, SAN JOSE, SUPIA,

VILLAMARIA

Page 65: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 65/75

APU No. 31

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: UN

A. COSTOS DIRECTOSI. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALConcreto Base m3 0.04 343,120.00 13,725.00Mampostería m2 1.20 27,972.00 33,565.00Concreto Tapa m3 0.03 343,120.00 10,293.00Hierro 3/8" kgr 1.54 3,600.00 5,544.00Tuberia gres perforada (campo de infiltraci ml 3 4,200.00  12,600.00

SUBTOTAL 60X60X50 $75,727.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00 2.00 6,450.00

SUBTOTAL 60X60X50 $6,450.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 2.00 22,350.00

SUBTOTAL 60X60X50 $22,350.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor 2,500.00

  SUBTOTAL $2,500.00

TOTAL COSTOS DIRECTOS 60X60X50 $107,027.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE

CALDAS, CON RESOLUCION DECALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

 TRAMPA DE GRASAS Y TAP A 60 X 60 x 50

Page 66: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 66/75

APU No. 32

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: SANITARIO (Instalado) UNIDAD: UN

 

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALSanitario tipo MANCESA Und 1.00 165,200.00 165,200.00Cemento Blanco Kg 1.00 588.00 588.00

 Acople Und 1.00 4,000.00 4,000.00

 

SUBTOTAL $169,7882. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  1 12900 6.00 2,150.00 

SUBTOTAL $2,1503. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 6.00 7,450.00

 

SUBTOTAL $7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 1,000.00 1,000.00 

SUBTOTAL $1,000.00

TOTAL COSTOS DIRECTOS $180,388.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 67: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 67/75

APU No. 33

DEPARTAMENTO CATEGORIA

CALDAS

CONSTRUCCION DE516 VIVIENDAS EN 18

MUNICIPIOS DELDEPARTAMENTO DE

CALDAS, CON

ACTIVIDAD: LAVAMANOS PORCELANA (Instalado) UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALLavamanos tipo Acuacer UNIDAD 1.00 54,600.00 54,600.00

 Acople Lavamanos UNIDAD 1.00 4,000.00 4,000.00

 

SUBTOTAL PORCELANA $58,600.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  1 12900 10.00 $1,290.00

 

SUBTOTAL $1,290.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 10.00 $4,470.00

 

SUBTOTAL $4,470.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor $1,000.00

 

SUBTOTAL $1,000.00

TOTAL COSTOS DIRECTOS $65,360.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 68: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 68/75

APU No. 34

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD:  J UEGO DE INCRUSTACIONES (Instalados) UNIDAD:  J uego

 

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALJuego de incrustaciones UNIDAD 1.00 36,750.00 36,750.00 

SUBTOTAL $36,7502. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 

SUBTOTAL $03. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 10.00 4,470.00

 

SUBTOTAL $4,470.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor 200.00 

SUBTOTAL $200.00

TOTAL COSTOS DIRECTOS $41,420.00

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 69: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 69/75

APU No. 35

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALBaldosa común m2 1.10 19,500.00 21,450.00Mortero de pega m3 0.02 286,864.00 5,800.00

 

SUBTOTAL MUROS $27,250.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  6.00 2,150.00- 

SUBTOTAL MUROS $2,150.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 6.00 7,450.00

 

SUBTOTAL MUROS $7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor 1,000.00 1,000.00 

SUBTOTAL $1,000.00

$37,850.00TOTAL COSTOS DIRECTOS MUROS

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ENCHAPE DE MUROS E N PORCELANA COMUN

Page 70: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 70/75

APU No. 36

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: M2

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Enchape meson cocina m2 1.60 19,500.00 31,200.00Mortero de pega m3 0.02 286,864.00 5,800.00

 

SUBTOTAL MESÓN $37,000.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  6.00 2,150.00

 

SUBTOTAL MESÓN $2,150.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 6.00 7,450.00

 

SUBTOTAL MESÓN $7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

Herramienta menor 100.00 

SUBTOTAL $100.00

$46,700.00TOTAL COSTOS DIRECTOS MESON

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ENCHAPE MESON DE LA COCINA EN PORCELANA COMUN

Page 71: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 71/75

APU No. 37

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: PUE RTA METALICA (0.93 * 2.0) Mts. UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL Puerta Metalica calibre 20 un 1.00 140,000.00 140,000.00Marco lámina Und 1.00 36,000.00 36,000.00Cerradura Und 1.00 23,100.00 23,100.00

 

SUBTOTAL $199,100.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  3.00 4,300.00

 

SUBTOTAL $4,300.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 3.00 14,900.00

 

SUBTOTAL $14,900.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor glb 1,000.00 1,000.00

 

SUBTOTAL $1,000.00

$219,300.00TOTAL COSTOS DIRECTOS

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 72: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 72/75

APU No.

38

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: PUE RTA METALICA (0.65 * 2.0) Mts. UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

Marco lámina Und 1.00 34,600.00 34,600.00PASADOR Und 1.00 16,500.00 16,500.00Puerta Metalica calibre 20 Und 1.00 120,000.00 120,000.00

 

SUBTOTAL $171,100.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  3.00 4,300.00

 

SUBTOTAL $4,300.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 3.00 14,900.00

 

SUBTOTAL $14,900.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

Herramienta menor glb 1,000.00 1,000.00 

SUBTOTAL $1,000.00

$191,300.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

TOTAL COSTOS DIRECTOS

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 73: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 73/75

APU No. 39

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: PUE RTA METALICA (0.93 * 2.0) Mts. UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL 

Marco lámina Und 1.00 36,000.00 36,000.00PASADOR Und 1.00 16,500.00 16,500.00Puerta Metalica calibre 20 Und 1.00 140,000.00 140,000.00

 

SUBTOTAL $192,500.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  3.00 4,300.00

 

SUBTOTAL $4,300.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 3.00 14,900.00

 

SUBTOTAL $14,900.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTAL

Herramienta menor glb 1,000.00 1,000.00 

SUBTOTAL $1,000.00

$212,700.00

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

TOTAL COSTOS DIRECTOS

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

CONSTRUCCION DE 516 VIVIENDAS EN 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

Page 74: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 74/75

APU No. 40

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: VENTANA METALICA S=(1.06 X 0.96) Mts UNIDAD: UN

 

A. COSTOS DIRECTOS

I. MATERIALES  

DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTALVentana METALICA CALIBRE 20 UNIDAD 1.00 94,500.00 94,500.00 

SUBTOTAL 94,500.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL

 Ayudante 12,900.00  1 12,900.00  6.00 2,150.00 

SUBTOTAL 2,150.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 6.00 7,450.00

 

SUBTOTAL 7,450.004. OTROS

DESCRIPCION UNIDAD VALOR UNIT. VALOR TOTALHerramienta menor gl 500.00 500.00

 

SUBTOTAL 500.00

TOTAL COSTOS DIRECTOS 104,600.00

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCE D, VICTORIA, MANZANARES ,

MARMATO, NEIRA, PACORA, PE NSILVANIA, RIOSUCIO,RISARALDA, SAMANA, SAN J OSE, SUP IA, VILLAMARIA

Page 75: Memorias Tanque Septico y Campo de Infiltracion

8/13/2019 Memorias Tanque Septico y Campo de Infiltracion

http://slidepdf.com/reader/full/memorias-tanque-septico-y-campo-de-infiltracion 75/75

APU No. 41

DEPARTAMENTO LOCALIDAD

CALDAS

ACTIVIDAD: UNIDAD: UN

A. COSTOS DIRECTOS

I. MATERIALES  DESCRIPCION UNIDAD CANTIDAD VALOR UNIT. VALOR TOTAL

Concreto Base m3 0.22 343,120.00 75,486.00Mampostería m2 7.00 27,972.00 195,804.00Concreto Tapa m3 0.15 343,120.00 51,467.00Hierro 3/8" kgr 8.87 3,600.00 31,932.00

 Alambre Negro # 18 kgr 0.50 3,600.00 1,800.00Tabla formaleta ml 2.00 3,800.00 7,600.00Tuberia Sanitaria 3" ml 2.00 20,100.00 40,200.00Codo de 3" 90 un 1.00 22,050.00 22,050.00

 Accesorios pozo septico un 1.00 94,500.00 94,500.00

SUBTOTAL $520,839.002. MANO DE OBRA COMUNITARIATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTAL 

 Ayudante 12,900.00 U/H/D 0.50 25,895.00 

SUBTOTAL $25,895.003. OTRA MANO DE OBRATRABAJADOR JORNAL PRESTAC. JORNAL/TOT. RENDIMIENT. VALOR TOTALOficial 44,700.00 44,700.00 0.50 89,400.00

 

SUBTOTAL $89,400.004. OTROS

ANALISIS DE PRECIOS UNITARIOS

PROYECTO DE VIVIENDA DE INTERES SOCIAL

POZO SÉP TICO SISTEMA ARTESANAL 2.0 X 1.0 Mts. X 1

CONSTRUCCION DE 516 VIVIENDAS E N 18MUNICIPIOS DEL DEPARTAMENTO DE CALDAS,

CON RESOLUCION DE CALAMIDAD PÚBLICA.

MUNICIPIO

AGUADAS, BELALCAZAR, CHINCHINA, FILADELFIA, LADORADA, LA MERCED, VICTORIA, MANZANARES, MARMATO,

NEIRA, PACORA, PENSILVANIA, RIOSUCIO, RISARALDA,SAMANA, SAN JOS E, SUPIA, VILLAMARIA