Obra: CONSTRUCCIÓN DE DOBLE TERNA DESDE SH HASTA NUEVA S/E PARAPARAL EN CONDUCTOR 336RESUMEN DE MATERIALES
Código Descripción UNIDAD
CAP CAMPANA DE BOQUILLA PZA
E0106-1 CABLE MONOPOLAR COBRE 34,5 KV CAL. 750MC M
E0158-1 COPA TERMINAL 35,5KV 750MCM PZA
E0243-1 POSTE 15 MTS. EC 646 KG 273-219-168 PZA
E0243-2 POSTE DE 18 MTS. 432 KG 244-219-168 PZA
E0289-1 VARILLA DE ARMADO PZA
GSNF GANCHO DE FIJACIÓN DE CABLE A PARED PZA
TAPA TAPA REDONDA FUNDIDA 80CM,PESADA PZA
ANC002-1 ANILLO CONDUIT 6 PULG. PZA
CD001 CINTA DENSOPLASTIL KG
CUCOO3-1 CURVA CONDUIT 6 PULG. PZA
E0280-1 TUBO CONDUIT 6 PULG. X 3 MTR M
E0281-1 TUBO PVC 6 PULGADAS M
ELEC01 ELECTRODO 3/16" (6013) KG KG
MET06 ACERO 1/2" KG.
MAD MADERA PARA ENCOFRADO M2
CON250-5 CONCRETO PREMEZ.Fc= 210 Kg/CM2 ASEN=5" M3
CON27B CONCRETO PREMEZCLADO RCC 250 A=5". M3.
E0116 CONCRETO 180 KG/CM2 PREMEZCLADO (1M3) M3
COKS23 CONECTOR KS 23 No.2 PZA
E0005 ABRAZ 3 TOR.TUER. 15.24-16.51 (6-6 1/2") PZA
E0020 ADAP. DE CRUCETA AL POSTE C/TOR. 89 PZA
E0021 AISLADOR PORCELANA T/ESP. 15 KV PZA
E0023 AISLADOR PORCELANA T/ESP. 34.5 KV PZA
E0024 AISL. SUSP. 15 KV TIPO PAS. Y CHAV. PZA
E0026 ALAMBRE RED. ALUM. P/ATAR # 6 AWG (1M) M
E0042 BARRA COBRE COOPERWELD C/CONECTOR 2.44 PZA
E0056 BORNE CONEX. DEL ALAMB.DE TIERRA AL POST PZA
E0122 CONDUCTOR DE COBRE DESNUDO SO. # 4 AWG M
E0169 CRUCETA ACERO GALV.DE 2.40M 75X75X8MM PZA
E0174 CRUCETA ACERO GALV.DE 3.20M 75X75X8MM PZA
E0180 FLEJES DE FIJACION AL POSTE CON SU GRAPA PZA
E0181 FULMINANTE PZA
E0193 MORDAZA TERMINAL ALUM.DEL #2/0 AL 300MCM PZA
E0196 GRILLETE DE 1/2"X5/8" CON PASADOR Y CHAV PZA
E0213 PALILLO ACERO P/CRUCETA DE HIERRO 15 KV PZA
E0215 PALILLO ACERO P/CRUCETA DE HIERRO 34.5KV PZA
E02221 CLAVO C/TUERCA P/FIJ.DE BORNE PZA
E0229 PINTURA ASFALTICA GALON
E0230 PINTURA DE ALUMINIO GALON
E0232 PLETINA DE 81.18 CMX3.18 CMX0.64 CM 32" PZA
E0255 SECCIONADOR MON. 34 KV 600 AMP KV BIL PZA
E0256 SEPARADORES DE BASE P/2 TUBOS PVC 5" D. PZA
E0259 TORNILLO DE MAQUINA 3/8 X 1 1/2 PLG PZA
E0296 PLANCHA CONEC.PERF. P/EST. 300X300X10mm PZA
E0300 CONDUCTOR DE COBRE TRENSADO # 2 AWG M
E0316 CONDUCTOR ARVIDAL # 336 MCM M
E0363 PERNO ROSCADO 12"X5/8" PZA
E0364 CONECTOR TER.A COM.C/TOR.3/8X1/2"ARV PZA
E0402 PLETINA DE 91.44 CMX3.18 CMX0.64 CM 36" PZA
E0403 PARARRAYO PARA LINEA DE 34,5 kV PZA
E0412 CONECT/AMPACT/T/CUÑA 350 CAT602381-5 PZA
E0501 CARTUCHO P/CONEC. T/CUÑA AMPAC O SIM. PZA
ELEC82 BARRA DE COBRE COPPERWELD C/CONEC.5/8X8? PZA
TUCO03 TUBO CONDUIT DE 1"X3 MTS. PZA
E0013 ABRAZ 4 TOR.TUER. 15.24-16.51 (6-6 1/2") PZA
Gastos de Administración ( 15.00 ) :
CONSTRUCCIÓN DE DOBLE TERNA DESDE SH HASTA NUEVA S/E PARAPARAL EN CONDUCTOR 336RESUMEN DE MATERIALES
Cantidad Costo Total Bs.
24.00 150.00 3,600.00
550.00 4,500.00 2,475,000.00
12.00 27,732.00 332,784.00
153.00 42,240.00 6,462,720.00
13.00 46,240.00 601,120.00
468.00 1,010.00 472,680.00
12.00 150.00 1,800.00
2.00 3,750.00 7,500.00
8.00 41.00 328.00
4.00 300.00 1,200.00
8.00 113.00 904.00
8.00 36.00 288.00
300.00 39.00 11,700.00
2,688.00 230.76 620,276.59
840.00 4,615.15 3,876,726.00
40.00 9,230.31 369,212.40
12.73 8,517.27 108,431.66
1.96 11,422.50 22,388.10
171.70 7,042.72 1,209,235.67
12.00 242.30 2,907.55
289.00 367.52 106,213.29
392.00 143.22 56,143.65
1.00 1,846.06 1,846.06
625.00 3,230.61 2,019,129.53
1,404.00 4,217.17 5,920,911.11
626.00 8.31 5,200.35
130.00 1,285.32 167,091.62
130.00 145.38 18,899.05
236.00 553.82 130,701.14
384.00 3,537.51 1,358,405.73
8.00 4,384.40 35,075.16
112.00 226.14 25,327.96
118.00 124.61 14,703.88
468.00 984.57 460,776.90
468.00 299.98 140,392.96
1.00 588.43 588.43
625.00 710.73 444,208.50
118.00 192.04 22,660.31
9.26 2,006.05 18,576.05
16.86 1,736.84 29,283.05
768.00 251.53 193,171.85
24.00 25,844.86 620,276.59
25.00 413.06 10,326.41
784.00 46.15 36,182.80
432.00 1,899.14 820,426.55
156.00 595.35 92,875.34
35,700.00 467.67 16,695,778.22
264.00 445.36 117,575.64
48.00 470.75 22,595.79
16.00 306.91 4,910.52
36.00 21,049.71 757,789.69
234.00 1,861.45 435,578.16
234.00 791.50 185,210.71
2.00 1,285.32 2,570.64
36.00 11,537.88 415,363.79
248.00 433.82 107,588.45Total Materiales Bs. : 48,075,157.87
Gastos de Administración ( 15.00 ) : 7,211,273.68Utilidad ( 10.00 ) : 5,528,643.16TOTAL GENERAL: 60,815,074.71