MANO DE OBRA DE VIVIENDA UNIFAMILIAR 01 piso
DESCRIPCION UNIDAD
CANTIDAD PRECIO PARCIAL TOTAL
COLUMNAS ACLADAS, ENCOFRADO, VACEADO Y ZAPTAS
und 18 700 12600
COLUMNAS ACLADAS, ENCOFRADO, VACEADO Y ZAPTAS
und 10 190 1900
CIMIENTOS m 36 80 2880SOBRECIMIETO m 36 40 1440MUROS Y TABIQUES m2 39 20 780FALSO PISO m2 100 20 2000
LOSA ALIGERADA m2 82 85 6970
INSTALACIONES ELECTRICAS glb 1 2500 2500INSTALACIONES SANITARIAS glb 1 2500 1600DEMOLICION ESTRUCTURAS EXISTENTES
glb 1 2000 2000 2 PAREDES Y BAÑO
PLACA UND 1 800 800VIGA DE CIMENTACION m 10.5 50 525
35,995.00 CONSTRUCCION DE CISTERNA GLB 1 2500 2500
38 450.00
NOTA: SE CONSIDERA MANO DE OBRA A TODO COSTO EL CUAL NO INCLUYE ESCALERA NI CISTERNA.
SE SUGIERE COMPRAR MATERIAL DEPENDIENDO AL AVANCE DE LA OBRA.
EL PRECIO DE LA MANO DE OBRA INCLUYE LOS GASTOS DEL MAESTRO DE OBRA Y HERRAMIENTAS.
ITEM MATERIALES DE FERRETERIA VIVIENDA UNIFAMILIAR 01 PISO
UNIDAD CANTIDAD PRECIO PARCIAL TOTAL
1 Cemento (bls) BLS 500.00 24.50 S/. 12,250.00
2 Arena gruesa (m3) M3 44.00 113.00 S/. 4,972.00
3 confitillo (m3) M3 40.00 132.00 S/. 5,280.00
4 Hormigón M3 30.00 119.00 S/. 3,570.00
5 Piedra pilka M3 13.00 125.00 S/. 1,625.00
6 fierro de3/4" (var) UND 8.00 42.20 S/. 337.60
7 fierro de 5/8" (var) UND 150.19 39.20 S/. 5,887.32
8 fierro de 1/2" (var) UND 111.30 24.20 S/. 2,693.35
9 fierro de 3/8" (var) UND 174.59 13.50 S/. 2,356.95
10 fierro de 1/4" (var) UND 112.84 5.50 S/. 620.64
11 Alambre N° 16 (kg) KG 145.40 4.20 S/. 610.68
12 Ladrillo King Kong 18 HUECOS
UND 2500.00 1.95 S/. 4,875.00
13 Ladrillo techo 12 HUECOS
UND 600.00 0.80 S/. 480.00
14 Clavos de 2" 1/2" (kg) 8.00 3.50 S/. 28.00
15 Clavos de 2" (kg) 5.00 3.50 S/. 17.50
16 Clavos de 3" (kg) 8.00 3.50 S/. 28.00
17 Tubo de 3/4" de luz (und) 120.00 2.80 S/. 336.00
18 Cajas octogonales (und) 20.00 3.70 S/. 74.00
19 Cajas rectangulares (und) 25.00 3.50 S/. 87.50
20 talero metalico 6 llaves TG (und)
1.00 25.50 S/. 25.50
21 talero metalico 3 llaves T D (und)
1.00 25.00 S/. 25.00
22 Tuvo de 4" para desague (und) 15.00 24.50 S/. 367.50
23 Tuvo de 2" para desague (und) 4.00 12.00 S/. 48.00
24 codo 2" x 90° (und) 12.00 2.00 S/. 24.00
25 codo 2" x 45° (und) 3.00 1.70 S/. 5.10
26 codo 4" x 45° (und) 1.00 5.50 S/. 5.50
27 Yee de 4" x 2" (und) 5.00 9.00 S/. 45.00
28 Yee de 4" x 4" (und) 2.00 15.00 S/. 30.00
29 Registros de 4" (und) 3.00 16.00 S/. 48.00
30 Registros sumideros de 2" (und)
2.00 5.00 S/. 10.00
31 Tubo de 3/4" de agua (und) 7.00 16.00 S/. 112.00
32 Tubo de 1/2" de agua (und) 3.00 11.00 S/. 33.00
33 codo de 3/4" x 90° (und) 15.00 1.50 S/. 22.50
34 codo de 1/2" x 90° (und) 8.00 1.00 S/. 8.00
35 tee de 3/4" (und) 1.00 2.60 S/. 2.60
36 tee de 1/2" (und) 5.00 1.80 S/. 9.00
S/. 46,950.24
SUMATORIA TOTAL: 36,010.00+
46,950.24
82,690.24