  • S10 CALCULO DEL FLETE AULAS

    Obra:

    Ubicacin : Localidad: San Lorenzo Distrito: Barranca Provincia: Datem del Maraon Regin: LoretoNoviembre del 2012

    INSUMOS Unidad Cantidad PESO PARCIALACEITE PARA MOTOR GRADO 30 gln 2.59 4.60 11.91ALAMBRE NEGRO N16 kg 275.5500 4.50 1239.98ALAMBRE NEGRO N8 kg 1,071.6400 4.50 4822.38ASFALTO RC-250 gln 1,034.8800 14.00 14488.32CARTEL DE OBRA DE GIGANTOGRAFIA 3.60X7.20 M und 2.00 20.00 40.00CEMENTO PORTLAND TIPO I (42.5KG) BOL 37,387.0000 42.50 1588947.50CLAVOS PARA MADERA C/C 2 1/2" kg 117.1600 1.00 117.16CLAVOS PARA MADERA C/C 3" kg 1,210.2600 1.00 1210.26CURADOR ANTISOL gln 604.2700 4.00 2417.08FIERRO CORRUGADO PROMEDIO kg 2,760.4900 1.00 2760.49GASOLINA 84 OCTANOS gln 227.7000 4.60 1047.42KEROSENE gln 115.8400 0.01 1.16PINTURA DE TRAFICO gln 162.5300 4.60 747.64PINTURA ESMALTE gln 25.4000 4.80 121.92PINTURA ESMALTE PARA TRAFICO gln 97.8200 4.80 469.54SELLADOR gln 2.4500 4.60 11.27TEKNOPOR DE 1" x 4' x 8' pln 603.8300 4.50 2717.24THINER gln 393.4800 4.60 1810.01YESO DE 28 Kg BOL 273.9200 28.00 7669.76

    TOTAL DE LA CARGA EN KG 1630651.02TOTAL DE LA CARGA EN TONELADAS 1630.65

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR I SAN LORENZO

  • PLANILLA DE METRADOS

    MUNICIPALIDAD PROVINCIAL DE DATEM DEL MARAON

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    01.00.00 OBRAS PRELIMINARES01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO MET

    MESAlmacen de obra 1.00 1.00TOTAL

    01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIGANTOGRAFIAITEM MEDIDAS

    LARGO ANCHOCARTEL DE OBRATOTAL

    01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM MET. N

    VECESDESPUES DE PROCESAR EL PRESUPUESTO

    1.00 1.00TOTAL

    02.00.00 TRABAJOS PRELIMINARES02.01.00 LIMPIEZA DE TERRENO MANUAL

    ITEM MEDIDASLARGO ANCHOcalle maronal desde av. Oleoducto 101.28 9.06

    calle pachacutec desde av. Oleoducto 100.17 11.59calle inca roca desde av. Oleoducto 99.86 10.97

    calle tnte. Pinglo a desde av. Oleoducto 94.23 11.80

    calle palcazu desde av. Oleoducto 195.43 12.92

    calle juan ramirez desde av. Oleoducto 534.81 15.83

    calle requena desde av. Oleoducto 388.99 15.57

    calle manco capac desde av. Oleoducto 404.65 14.71

    calle venezuela desde calle tacna 184.93 12.05

    424.55 12.60

    PROYECTO: CREACION DE PISTAS, VEREDAS y SARDINELES DEL SECTOR - A - SAN LORENZO, DISTRITO BARRANCA - PROVINCIA DE DATEM DEL MARAN - REGIN LORETO.

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    699.86 11.83

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 10.86

    calle costa rica desde juan ramirez hasta jose olaya 390.18 11.53

    calle borja desde calle juan ramirez hasta jose olaya 397.66 11.48

    TOTAL

    02.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO

    ITEMMEDIDAS

    REA ANCHO

    se tomar todo el rea del terreno (02.01.00) 59,878.49

    TOTAL

    03.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    ITEMMEDIDAS

    Largo ANCHOcalle maronal desde av. Oleoducto 101.28 7.50

    calle pachacutec desde av. Oleoducto 100.17 7.50calle inca roca desde av. Oleoducto 99.86 7.50calle tnte. Pinglo a desde av. Oleoducto 94.23 7.50

    area 73.82calle palcazu desde av. Oleoducto 195.43 7.50

    area 73.82

    calle juan ramirez desde av. Oleoducto 534.81 7.50

    area 73.82calle requena desde av. Oleoducto 388.99 7.50

    area 221.46

    calle manco capac desde av. Oleoducto 404.65 7.50

    area 221.46

    calle venezuela desde calle tacna 184.93 7.50

    area 147.64

    424.55 7.50

    area 147.64

    calle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    699.86 7.50

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 7.50

    calle costa rica desde juan ramirez hasta jose olaya 390.18 7.50

    calle borja desde calle juan ramirez hasta jose olaya 397.66 7.50

    calle garcilazo desde calle maronal hasta manco calle capac

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    TOTAL

    03.02.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 7.50

    calle costa rica desde juan ramirez hasta jose olaya 390.18 7.50

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle borja desde calle juan ramirez hasta jose olaya 397.66 7.50

    TOTAL

    03.04.00

    ITEM

    ES LA MISMA AREA de PARTIDA DE LA CONFORMACION(03.03.00)

    TOTAL

    03.05.00

    ITEM

    RELLENO CON MATERIAL OVER Dmax=4", H=30 cm INC COMPACTACION EQUIPO PESADO(INC CONFORMACIN)

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMACION)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    ES LA MISMA AREA de PARTIDA DE LA CONFORMACION(03.04.00)TOTAL

    04.00.00 PAVIMENTO DE CONCRETO

    04.01.00 ENCOFRADO Y DESENCOFRADO DE LOSA

    ITEMMEDIDAS

    LARGO ANCHODE LA LONGITUDcalle maronal desde av. Oleoducto 101.28 0.20

    7.50 0.20

    calle pachacutec desde av. Oleoducto 100.17 0.20

    7.50 0.20

    calle inca roca desde av. Oleoducto 99.86 0.20

    7.50 0.20

    calle tnte. Pinglo a desde av. Oleoducto 94.23 0.20

    7.50 0.20

    6.27 0.20

    calle palcazu desde av. Oleoducto 195.43 0.20

    7.50 0.20

    6.27 0.20

    calle juan ramirez desde av. Oleoducto 534.81 0.20

    7.50 0.206.27 0.20

    calle requena desde av. Oleoducto 388.99 0.20

    7.50 0.206.27 0.20

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle manco capac desde av. Oleoducto 404.65 0.20

    7.50 0.20

    6.27 0.20

    calle venezuela desde calle tacna 184.93 0.20

    7.50 0.20

    6.27 0.20

    424.55 0.20

    7.50 0.206.27 0.20

    699.86 0.20

    7.50 0.20

    calle tacna desde calle tnte. Pinglo hasta jose olaya 390.18 0.20

    7.50 0.20

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.20

    7.50 0.20

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.20

    7.50 0.20

    TOTAL

    04.02.00

    ITEM MEDIDAS

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    calle jose olaya desde av. Oleoducto hasta la calle borjaTRANSVERSAL( Sale de la division entera del largo entre 3.60)

    calle garcilazo desde calle maronal hasta manco calle capacTRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    CONCRETO f'c= 210 kg/cm2., PARA LOSA

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETOITEM LARGO/REA ANCHO

    calle maronal desde av. Oleoducto 101.28 7.50calle pachacutec desde av. Oleoducto 100.17 7.50calle inca roca desde av. Oleoducto 99.86 7.50calle tnte. Pinglo a desde av. Oleoducto 94.23 7.50

    areacalle palcazu desde av. Oleoducto 195.43 7.50

    areacalle juan ramirez desde av. Oleoducto 534.81 7.50

    areacalle requena desde av. Oleoducto 388.99 7.50

    calle manco capac desde av. Oleoducto 404.65 7.50

    calle venezuela desde calle tacna 184.93 7.50

    424.55 7.50

    699.86 7.50

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 7.50

    calle costa rica desde juan ramirez hasta jose olaya 390.18 7.50

    calle borja desde calle juan ramirez hasta jose olaya 397.66 7.50

    TOTAL

    04.03.00 JUNTA CON ASFALTO e= 1"

    ITEMMEDIDAS MET

    LARGO/REA UND

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle garcilazo desde calle maronal hasta manco calle capac

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle maronal desde av. Oleoducto 101.28 1.00

    7.50 1.00

    calle pachacutec desde av. Oleoducto 100.17 1.00

    7.50 1.00

    calle inca roca desde av. Oleoducto 99.86 1.00

    7.50 1.00

    calle tnte. Pinglo a desde av. Oleoducto 94.23 1.00

    7.50 1.00

    6.27 1.00

    calle palcazu desde av. Oleoducto 195.43 1.00

    7.50 1.00

    6.27 1.00

    calle juan ramirez desde av. Oleoducto 534.81 1.00

    7.50 1.00

    6.27 1.00

    calle requena desde av. Oleoducto 388.99 1.00

    7.50 1.00

    6.27 1.00

    calle manco capac desde av. Oleoducto 404.65 1.00

    7.50 1.00

    6.27 1.00

    calle venezuela desde calle tacna 184.93 1.00

    7.50 1.00

    6.27 1.00

    424.55 1.00

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    7.50 1.00

    6.27 1.00

    699.86 1.00

    7.50 1.00

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.00

    7.50 1.00

    calle costa rica desde juan ramirez hasta jose olaya 390.18 1.00

    7.50 1.00

    calle borja desde calle juan ramirez hasta jose olaya 397.66 1.00

    7.50 1.00TOTAL

    04.04.00 CURADO DE CONCRETO

    ITEM

    AREA DE PAVIMENTO

    TOTAL

    05.00.00 SARDINELES Y VEREDAS

    05.01.00 EXCAVACION PARA SARDINELES

    ITEM MEDIDASLargo ANCHOcalle maronal desde av. Oleoducto 101.28 0.30calle pachacutec desde av. Oleoducto 100.17 0.30calle inca roca desde av. Oleoducto 99.86 0.30calle tnte. Pinglo a desde av. Oleoducto 94.23 0.30calle palcazu desde av. Oleoducto 195.43 0.30calle juan ramirez desde av. Oleoducto 534.81 0.30calle requena desde av. Oleoducto 388.99 0.30calle manco capac desde av. Oleoducto 404.65 0.30calle venezuela desde calle tacna 184.93 0.30

    424.55 0.30

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    calle garcilazo desde calle maronal hasta manco calle capacTRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    TRANSVERSAL( Sale de la division entera del largo entre 3.60)

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    699.86 0.30

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.30

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.30

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.30

    TOTAL

    05.02.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)

    ITEMMEDIDAS

    LARGO ALTO

    calle maronal desde av. Oleoducto 101.28 0.40

    cara interna 101.28 0.20

    rampa 0.50

    calle pachacutec desde av. Oleoducto 100.17 0.40

    cara interna 100.17 0.20

    rampa 0.50

    calle inca roca desde av. Oleoducto 99.86 0.40

    cara interna 99.86 0.20

    rampa 0.50

    calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40

    cara interna 94.23 0.20

    rampa 0.42

    calle palcazu desde av. Oleoducto 195.43 0.40

    cara interna 195.43 0.20

    rampa 0.75

    calle juan ramirez desde av. Oleoducto 534.81 0.40

    cara interna 534.81 0.20

    rampa 2.10

    calle requena desde av. Oleoducto 388.99 0.40

    calle garcilazo desde calle maronal hasta manco calle capac

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    cara interna 388.99 0.20

    rampa 0.50

    calle manco capac desde av. Oleoducto 404.65 0.40

    cara interna 404.65 0.20

    rampa 1.00

    calle venezuela desde calle tacna 184.93 0.40cara interna 184.93 0.20

    rampa 1.55

    424.55 0.40

    cara interna 424.55 0.20

    rampa 0.50

    699.86 0.40

    cara interna 699.86 0.20

    rampa 0.50

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40

    cara interna 618.04 0.20

    0.50

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40

    cara interna 390.18 0.20

    rampa 0.88

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40

    cara interna 397.66 0.20

    rampa 0.50

    TOTAL 9279.48

    05.03.00

    ITEMMEDIDAS

    LARGO ALTO

    DE LA LONGITUD DE SARDINELES 4634.64 0.40

    DEL PIE DE SARDINEL 4634.64 0.10

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle garcilazo desde calle maronal hasta manco calle capac

    SARDINELES-CONCRETO fc= 140 Kg/cm2 C/ MEZCLADORA INCLUYE CURADO.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    TOTAL

    05.04.00

    ITEM MEDIDASAREA ANCHOcalle maronal desde av. Oleoducto 101.28 1.00calle pachacutec desde av. Oleoducto 100.17 1.00calle inca roca desde av. Oleoducto 99.86 1.00calle tnte. Pinglo a desde av. Oleoducto 94.23 1.00calle palcazu desde av. Oleoducto 195.43 1.00

    calle juan ramirez desde av. Oleoducto 534.81 1.00

    calle requena desde av. Oleoducto 388.991.00

    calle manco capac desde av. Oleoducto 404.65 1.00

    calle venezuela desde calle tacna 184.931.00

    424.551.00

    699.861.00

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.00calle costa rica desde juan ramirez hasta jose olaya 390.18 1.00calle borja desde calle juan ramirez hasta jose olaya 397.66 1.00

    MARTILLOS CALLE CANTIDADcalle tnte. Pinglo a desde av. Oleoducto 1 5.00calle palcazu desde av. Oleoducto 1 4.00calle juan ramirez desde av. Oleoducto 1 11.00calle requena desde av. Oleoducto 1 14.00calle manco capac desde av. Oleoducto 1 10.00calle venezuela desde calle tacna 1 8.00

    1 14.00TOTAL

    05.05.00 COMPACTACIN DE TERRENO (PARA VEREDAS).

    ITEMMEDIDAS

    AREA ANCHO

    calle maronal desde av. Oleoducto 101.28

    CORTE DE TERRENO MANUAL PARA VEREDAS, E

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle pachacutec desde av. Oleoducto 100.17calle inca roca desde av. Oleoducto 99.86calle tnte. Pinglo a desde av. Oleoducto 94.23calle palcazu desde av. Oleoducto 195.43calle juan ramirez desde av. Oleoducto 534.81calle requena desde av. Oleoducto 388.99calle manco capac desde av. Oleoducto 404.65calle venezuela desde calle tacna 184.93

    424.55

    699.86

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04

    calle costa rica desde juan ramirez hasta jose olaya 390.18

    calle borja desde calle juan ramirez hasta jose olaya 397.66

    MARTILLOS CALLE CANTIDAD

    calle tnte. Pinglo a desde av. Oleoducto 1 5.00

    calle palcazu desde av. Oleoducto 1 4.00calle juan ramirez desde av. Oleoducto 1 11.00calle requena desde av. Oleoducto 1 14.00calle manco capac desde av. Oleoducto 1 10.00calle venezuela desde calle tacna 1 8.00

    1 14.00

    TOTAL

    05.06.00 RELLENO CON MATERIAL GRANULAR e=4"ITEM MEDIDASAREA ALTO

    DEL AREA DE VEREDAS 5268.16 0.10TOTAL

    05.07.00 ENCOFRADO Y DESENCOFRADO PARA VEREDA

    ITEMMEDIDAS

    LARGO ALTO/AREADEL AREA DE VEREDAS

    calle maronal desde av. Oleoducto 101.28 0.20

    1.00 0.20calle pachacutec desde av. Oleoducto 100.17 0.20

    1.00 0.20calle inca roca desde av. Oleoducto 99.86 0.20

    1.00 0.20calle tnte. Pinglo a desde av. Oleoducto 94.23 0.20

    calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 0.20calle palcazu desde av. Oleoducto 195.43 0.20

    1.00 0.20calle juan ramirez desde av. Oleoducto 534.81 0.20

    1.00 0.20calle requena desde av. Oleoducto 388.99 0.20

    1.00 0.20calle manco capac desde av. Oleoducto 404.65 0.20

    1.00 0.20calle venezuela desde calle tacna 184.93 0.20

    1.00 0.20424.55 0.20

    1.00 0.20

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    699.86 0.201.00 0.20

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.201.00 0.20

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.201.00 0.20

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.201.00 0.20

    TOTAL

    05.08.00 ENCOFRADO DE MARTILLOS DE VEREDASMARTILLOS LONGITUD CANTIDADcalle tnte. Pinglo a desde av. Oleoducto 6.26 5.00calle palcazu desde av. Oleoducto 6.25 4.00calle juan ramirez desde av. Oleoducto 6.23 11.00calle requena desde av. Oleoducto 6.3 14.00calle manco capac desde av. Oleoducto 6.25 10.00calle venezuela desde calle tacna 6.76 8.00

    6.12 14.00TOTAL 15.83

    05.09.00ITEM MEDIDASLARGO ALTO/AREA

    LA MISMA QUE EL AREA DE LAS VEREDAS (05.06.00) 5268.16UAS 5268.16 0.043

    TOTAL

    05.10.00 JUNTA CON ASFALTO E=1"ITEM MEDIDASLONGITUD LONGITUD

    DE LAS VEREDAS, CADA 3 METROS (4518.71/3.00) 1.00DE LOS SARDINELES, CADA 3.00 m(3572.00/3) 0.15

    TOTAL

    05.11.00 CURADO DE CONCRETO VEREDASITEM

    AREA DE VEREDASTOTAL

    07.00.00 CUNETAS07.01.00 CORTE DE TERRENO MANUAL PARA CUNETAS

    ITEM MEDIDASLargo ANCHOcalle maronal desde av. Oleoducto 101.28 0.40calle pachacutec desde av. Oleoducto 100.17 0.40calle inca roca desde av. Oleoducto 99.86 0.40

    calle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

    CONCRETO fc=140 kg/cm2. VEREDA

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40calle palcazu desde av. Oleoducto 195.43 0.40calle juan ramirez desde av. Oleoducto 534.81 0.40calle requena desde av. Oleoducto 388.99 0.40calle manco capac desde av. Oleoducto 404.65 0.40calle venezuela desde calle tacna 184.93 0.40

    424.55 0.40

    699.86 0.40

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40martillocalle tnte. Pinglo a desde av. Oleoducto 6.26 0.40calle palcazu desde av. Oleoducto 6.25 0.40calle juan ramirez desde av. Oleoducto 6.23 0.40calle requena desde av. Oleoducto 6.3 0.40calle manco capac desde av. Oleoducto 6.25 0.40calle venezuela desde calle tacna 6.76 0.40

    6.12 0.40TOTAL

    calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    07.02.00 COMPACTACIN DE TERRENO (PARA CUNETAS).

    ITEM MEDIDASLargo ANCHOcalle maronal desde av. Oleoducto 101.28 0.40calle pachacutec desde av. Oleoducto 100.17 0.40calle inca roca desde av. Oleoducto 99.86 0.40calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40calle palcazu desde av. Oleoducto 195.43 0.40calle juan ramirez desde av. Oleoducto 534.81 0.40calle requena desde av. Oleoducto 388.99 0.40calle manco capac desde av. Oleoducto 404.65 0.40calle venezuela desde calle tacna 184.93 0.40

    424.55 0.40

    699.86 0.40

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40

    martillo 0.40calle tnte. Pinglo a desde av. Oleoducto 6.26 0.40calle palcazu desde av. Oleoducto 6.25 0.40calle juan ramirez desde av. Oleoducto 6.23 0.40

    calle requena desde av. Oleoducto 6.3 0.40

    calle manco capac desde av. Oleoducto 6.25 0.40calle venezuela desde calle tacna 6.76 0.40

    6.12 0.40TOTAL

    07.03.00 ENCOFRADO Y DESENCOFRADO PARA CUNETAS

    ITEM MEDIDASLARGO ANCHO

    DE LA LONGITUDcalle maronal desde av. Oleoducto 101.28 0.20

    0.40 0.20calle pachacutec desde av. Oleoducto 100.17 0.20

    0.40 0.20calle inca roca desde av. Oleoducto 99.86 0.20

    0.40 0.20calle tnte. Pinglo a desde av. Oleoducto 94.23 0.20

    0.40 0.20calle palcazu desde av. Oleoducto 195.43 0.20

    calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    0.40 0.20calle juan ramirez desde av. Oleoducto 534.81 0.20calle requena desde av. Oleoducto 388.99 0.20calle requena desde av. Oleoducto 388.99 0.20

    0.40 0.20calle manco capac desde av. Oleoducto 404.65 0.20

    0.40 0.20calle venezuela desde calle tacna 184.93 0.20

    0.40 0.20

    424.55 0.20

    0.40 0.20

    699.86 0.20

    0.40 0.20

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.20

    0.40 0.20

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.20

    0.40 0.20

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.20

    martillocalle tnte. Pinglo a desde av. Oleoducto 6.26 0.20

    0.40 0.20calle palcazu desde av. Oleoducto 6.25 0.20

    0.40 0.20calle juan ramirez desde av. Oleoducto 6.23 0.20

    0.40 0.20calle requena desde av. Oleoducto 6.3 0.20

    0.20calle manco capac desde av. Oleoducto 6.25 0.20

    0.40 0.20calle venezuela desde calle tacna 6.76 0.20

    0.40 0.20

    6.12 0.20

    0.40 0.20TOTAL

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)calle jose olaya desde av. Oleoducto hasta la calle borjaTRANSVERSAL( Sale de la division entera del largo entre 3.0)calle garcilazo desde calle maronal hasta manco calle capacTRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)

    TRANSVERSAL( Sale de la division entera del largo entre 3.0)calle jose olaya desde av. Oleoducto hasta la calle borjaTRANSVERSAL( Sale de la division entera del largo entre 3.0)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    07.04.00 SOLADO MEZCLA C:H 1:12, E=10 cm

    ITEM MEDIDAS

    Largo ANCHO

    calle maronal desde av. Oleoducto 101.28 0.40

    calle pachacutec desde av. Oleoducto 100.17 0.40calle inca roca desde av. Oleoducto 99.86 0.40calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40

    calle palcazu desde av. Oleoducto 195.43 0.40

    calle juan ramirez desde av. Oleoducto 534.81 0.40calle requena desde av. Oleoducto 388.99 0.40calle manco capac desde av. Oleoducto 404.65 0.40calle venezuela desde calle tacna 184.93 0.40

    424.55 0.40

    699.86 0.40

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40martillocalle tnte. Pinglo a desde av. Oleoducto 6.26 0.40calle palcazu desde av. Oleoducto 6.25 0.40calle juan ramirez desde av. Oleoducto 6.23 0.40calle requena desde av. Oleoducto 6.3 0.40

    calle manco capac desde av. Oleoducto 6.25 0.40

    calle venezuela desde calle tacna 6.76 0.40

    6.12 0.40

    TOTAL

    07.05.00 CONCRETO fC= 140 kg/cm2 PARA CUNETAS

    ITEM MEDIDASLargo AREAcalle maronal desde av. Oleoducto 101.28 0.06calle pachacutec desde av. Oleoducto 100.17 0.06calle inca roca desde av. Oleoducto 99.86 0.06calle tnte. Pinglo a desde av. Oleoducto 94.23 0.06calle palcazu desde av. Oleoducto 195.43 0.06calle juan ramirez desde av. Oleoducto 534.81 0.06calle requena desde av. Oleoducto 388.99 0.06calle manco capac desde av. Oleoducto 404.65 0.06calle venezuela desde calle tacna 184.93 0.06

    424.55 0.06

    calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    699.86 0.06

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.06

    calle costa rica desde juan ramirez hasta jose olaya 390.18 0.06

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.06martillo 0.06

    calle tnte. Pinglo a desde av. Oleoducto 6.26 0.06

    calle palcazu desde av. Oleoducto 6.25 0.06

    calle juan ramirez desde av. Oleoducto 6.23 0.06

    calle requena desde av. Oleoducto 6.3 0.06calle manco capac desde av. Oleoducto 6.25 0.06calle venezuela desde calle tacna 6.76 0.06

    6.12 0.06TOTAL

    07.06.00 JUNTA CON ASFALTO E=1"

    ITEM

    MEDIDAS MET

    LARGO/REA UND

    DE LAS CALLES

    calle maronal desde av. Oleoducto 101.28 1.00TRANSVERSAL 0.40 1.00calle pachacutec desde av. Oleoducto 100.17 1.00TRANSVERSAL 0.40 1.00calle inca roca desde av. Oleoducto 99.86 1.00TRANSVERSAL 0.40 1.00calle tnte. Pinglo a desde av. Oleoducto 94.23 1.00TRANSVERSAL 0.40 1.00calle palcazu desde av. Oleoducto 195.43 1.00TRANSVERSAL 0.40 1.00calle juan ramirez desde av. Oleoducto 534.81 1.00TRANSVERSAL 0.40 1.00calle requena desde av. Oleoducto 388.99 1.00TRANSVERSAL 0.40 1.00calle manco capac desde av. Oleoducto 404.65 1.00TRANSVERSAL 0.40 1.00calle venezuela desde calle tacna 184.93 1.00TRANSVERSAL 0.40 1.00

    424.55 1.00TRANSVERSAL 0.40 1.00

    699.86 1.00TRANSVERSAL 0.40 1.00

    calle garcilazo desde calle maronal hasta manco calle capac

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle garcilazo desde calle maronal hasta manco calle capac

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.00TRANSVERSAL 0.40 1.00calle costa rica desde juan ramirez hasta jose olaya 390.18 1.00TRANSVERSAL 0.40 1.00calle borja desde calle juan ramirez hasta jose olaya 397.66 1.00TRANSVERSAL 0.40 1.00martillocalle tnte. Pinglo a desde av. Oleoducto 1.00TRANSVERSAL 6.26 1.00calle palcazu desde av. Oleoducto 0.40 1.00TRANSVERSAL 6.25 1.00calle juan ramirez desde av. Oleoducto 0.40 1.00TRANSVERSAL 6.23 1.00calle requena desde av. Oleoducto 0.40 1.00TRANSVERSAL 6.3 1.00calle manco capac desde av. Oleoducto 1.00TRANSVERSAL 6.25 1.00calle venezuela desde calle tacna 0.40 1.00TRANSVERSAL 6.76 1.00

    0.40 1.00TRANSVERSAL 6.12 1.00TOTAL

    08.00.00 SEALIZACIN

    08.01.00 PINTADO DE PAVIMENTO

    ITEM MEDIDASLARGO ANCHOarea del pavimentocalle maronal desde av. Oleoducto Linea Discontinua, central 101.28 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle pachacutec desde av. Oleoducto Linea Discontinua, central 100.17 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle inca roca desde av. Oleoducto Linea Discontinua, central 99.86 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle tnte. Pinglo a desde av. Oleoducto Linea Discontinua, central 94.23 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle palcazu desde av. Oleoducto Linea Discontinua, central 195.43 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle juan ramirez desde av. Oleoducto Linea Discontinua, central 534.81 0.10Lineas de pase peatonal 3.00 0.5

    calle jose olaya desde av. Oleoducto hasta la calle borja

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    Linea Transversal 7.50 0.5calle requena desde av. Oleoducto Linea Discontinua, central 388.99 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle manco capac desde av. Oleoducto Linea Discontinua, central 404.65 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle venezuela desde calle tacnaLinea Discontinua, central 184.93 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5

    Linea Discontinua, central 424.55 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5

    Linea Discontinua, central 699.86 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle tacna desde calle tnte. Pinglo hasta jose olayaLinea Discontinua, central 618.04 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle costa rica desde juan ramirez hasta jose olayaLinea Discontinua, central 390.18 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle borja desde calle juan ramirez hasta jose olayaLinea Discontinua, central 397.66 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5TOTAL

    08.02.00 PINTADO DE SARDINELES ITEM MEDIDASLONGITUD ANCHO

    LONG. TOTAL DE sardineles 4634.64 0.35TOTAL

    09.00.00 MANTENIMIENTO DE TRANSITO

    09.01.00 MANTENIMIENTO DE TRANSITOITEM MET. MET.Glb. TOTAL

    MANTENIMIENTO DE TRANSITO 1.00 1.00TOTAL 1.00

    10.00.00 FLETE

    calle jose olaya desde av. Oleoducto hasta la calle borja

    calle garcilazo desde calle maronal hasta manco calle capac

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    10.01.00 ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    11.02.00 SEMBRADO DE GRASS EN JARDINERAS

    ITEM MEDIDASLARGO ANCHODEL SEMBRADO DE GRASScalle maronal desde av. Oleoducto 101.28 0.84calle pachacutec desde av. Oleoducto 100.17 0.47

    calle inca roca desde av. Oleoducto 99.86 0.00

    calle tnte. Pinglo a desde av. Oleoducto 94.23 0.48

    calle palcazu desde av. Oleoducto 195.43 1.20

    calle juan ramirez desde av. Oleoducto 534.81 2.50

    calle requena desde av. Oleoducto 388.99 0.64

    calle manco capac desde av. Oleoducto 404.65 2.55

    calle venezuela desde calle tacna 184.93 0.94

    424.55 0.69

    699.86 0.49

    calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.65

    calle costa rica desde juan ramirez hasta jose olaya 390.18 1.60

    calle borja desde calle juan ramirez hasta jose olaya 397.66 0.65

    TOTAL

    11.03.00 SEMBRADO DE PLANTONES

    ITEM MET. NCALLEScalle costa rica desde juan ramirez hasta jose olaya 2.00

    2.00

    2.00

    12.00TOTAL

    11.04.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET. NVECES

    Acondicionamiento de botaderos1.00 1.00Programacin de sealizacin ambiental

    Capacitacin en operacin y mantenimiento

    calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac

    calle requena capac desde av. Oleoducto entre calle costa rica y calle tacnacalle manco capac desde av. Oleoducto entre calle costa rica y calle tacnacalle costa rica desde calle venezuela hasta calle jose olaya

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    TOTAL

    11.05.00 MANTENIMIENTO DE TRANSITOITEM MET. NVECES

    Cinta de sealizacion de peligro1.00 6.00Cartel de sealizacion

    TranquerasTOTAL

    11.06.00 LIMPIEZA FINAL DE OBRAITEM MET. NM2 VECES

    LIMPIEZA FINAL DE LA OBRA 59878.49 1.00TOTAL

    RESUMEN DE METRADOS01.00.00 OBRAS PRELIMINARES01.01.00 ALQUILER DE LOCAL PARA LA OBRA

    01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIG01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPO

    02.00.00 TRABAJOS PRELIMINARES02.01.00 LIMPIEZA DE TERRENO MANUAL 02.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO

    03.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    03.02.00

    03.03.00 CONFORMACION Y COMPACTACION DE SUBRASANTE

    03.04.00

    03.05.00

    04.00.00 PAVIMENTO DE CONCRETO04.01.00 ENCOFRADO Y DESENCOFRADO DE LOSA04.02.0004.03.00 JUNTA CON ASFALTO e= 1"04.04.00 CURADO DE CONCRETO

    05.00.00 SARDINELES Y VEREDAS05.01.00 EXCAVACION PARA SARDINELES05.02.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)05.03.00

    05.04.0005.05.00 COMPACTACIN DE TERRENO (PARA VEREDAS).05.06.00 RELLENO CON MATERIAL GRANULAR e=4"05.07.00 ENCOFRADO Y DESENCOFRADO PARA VEREDA05.08.00 ENCOFRADO DE MARTILLOS DE VEREDAS05.09.0005.10.00 JUNTA CON ASFALTO E=1"05.11.00 CURADO DE CONCRETO VEREDAS

    06.00.00 CUNETAS06.01.00 CORTE DE TERRENO MANUAL PARA CUNETAS06.02.00 COMPACTACIN DE TERRENO (PARA CUNETAS).06.03.00 ENCOFRADO Y DESENCOFRADO PARA CUNETAS06.04.00 SOLADO MEZCLA C:H 1:12, E=10 cm06.05.00 CONCRETO fC= 140 kg/cm2 PARA CUNETAS06.06.00 JUNTA CON ASFALTO E=1"

    07.00.00 SEALIZACIN07.01.00 PINTADO DE PAVIMENTO 07.02.00 PINTADO DE SARDINELES

    08.00.00 FLETE08.01.00 ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

  • PLANILLA DE METRADOS

    MUNICIPALIDAD PROVINCIAL DE DATEM DEL MARAON

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    METTOTAL

    1.00

    CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIGANTOGRAFIAN MET METREP Glb TOTAL

    2.002.00 Und.

    MOVILIZACION Y DEZMOVILIZACION DE EQUIPOMETTOTAL

    1.001.00

    N MET METREP TOTAL

    1.00 917.60 917.60

    1.00 1160.97 1160.971.00 1095.46 1095.46

    1.00 1111.91 1111.9173.82 73.82

    1.00 2524.96 2524.96

    73.82 73.82

    1.00 8466.04 8466.04

    73.82 73.82

    1.00 6056.57 6056.57

    221.46 221.46

    1.00 5952.40 5952.40

    221.46 221.46

    1.00 2228.41 2228.41

    147.64 147.64

    1.00 5349.33 5349.33

    PROYECTO: CREACION DE PISTAS, VEREDAS y SARDINELES DEL SECTOR - A - SAN LORENZO, DISTRITO BARRANCA - PROVINCIA DE DATEM DEL MARAN - REGIN LORETO.

    m2.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    147.64 147.64

    1.00 8279.34 8279.34

    1.00 6711.91 6711.91

    1.00 4498.78 4498.78

    1.00 4565.14 4565.14

    59,878.49

    TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPON MET MET

    VECES TOTAL1.00 59,878.49 59,878.49

    59,878.49

    MOVIMIENTO DE TIERRAS PAVIMENTOCORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    MEDIDAS N VOLALTO VOLUMEN

    0.90 1.00 683.64

    0.90 1.00 676.150.90 1.00 674.060.90 1.00 636.050.90 1.00 66.440.90 1.00 1319.15

    0.90 1.00 66.44

    0.90 1.00 3609.97

    0.90 1.00 66.440.90 1.00 2625.68

    0.90 1.00 199.31

    0.90 1.00 2731.39

    0.90 1.00 199.31

    0.90 1.00 1248.28

    0.90 1.00 132.88

    0.90 1.00 2865.71

    0.90 1.00 132.88

    m2.

    (m3)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    0.90 1.00 4724.06

    0.90 1.00 4171.77

    0.90 1.00 2633.72

    0.90 1.00 2684.21m3

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    32,147.51

    ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 4635.30 4635.30

    1.00 2926.35 2926.35

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 2982.45 2982.45

    35,719.46

    CANTIDAD ESPESOR VOL

    e=

    35,719.46 0.30 10715.84

    10,715.84

    CANTIDAD ESPESOR VOL

    e=

    RELLENO CON MATERIAL OVER Dmax=4", H=30 cm INC COMPACTACION EQUIPO PESADO(INC CONFORMACIN)

    (m3)

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC

    (m3)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    35,719.46 35719.46 35,719.46

    ENCOFRADO Y DESENCOFRADO DE LOSA

    CANTIDADN MET.

    REP

    3.00 1.00 60.7727.75 1.00 41.63

    3.00 1.00 60.10

    27.44 1.00 41.16

    3.00 1.00 59.92

    27.74 1.00 41.61

    3.00 1.00 56.54

    26.18 1.00 39.27

    4.00 1.00 5.02

    3.00 1.00 117.26

    54.29 1.00 81.44

    6.00 1.00 7.52

    3.00 1.00 320.89

    54.29 1.00 81.4412.00 1.00 15.05

    3.00 1.00 233.39

    54.29 1.00 81.4414.00 1.00 17.56

    m2.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    3.00 1.00 242.79

    54.29 1.00 81.44

    12.00 1.00 15.05

    3.00 1.00 110.96

    54.29 1.00 81.44

    8.00 1.00 10.03

    3.00 1.00 254.73

    54.29 1.00 81.4414.00 1.00 17.56

    3.00 1.00 419.92

    54.29 1.00 81.44

    3.00 1.00 234.11

    54.29 1.00 81.44

    3.00 1.00 234.11

    54.29 1.00 81.44

    3.00 1.00 238.60

    54.29 1.00 81.44

    3,709.86

    AREA ESPESOR MET.., PARA LOSA

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    m2. m. m3.759.60 0.20 151.92751.28 0.20 150.26748.95 0.20 149.79706.73 0.20 141.35

    73.82 0.20 14.761465.73 0.20 293.15

    73.82 0.20 14.764011.08 0.20 802.22

    73.82 0.20 14.762917.43 0.20 583.49

    221.46 0.20 44.293034.88 0.20 606.98

    221.46 0.20 44.291386.98 0.20 277.40

    147.64 0.20 29.53

    3184.13 0.20 636.83

    147.64 0.20 29.53

    5248.95 0.20 1049.79

    4635.30 0.20 927.06

    2926.35 0.20 585.27

    2982.45 0.20 596.49

    35719.46 7,143.89

    N CANTIDAD

    VECES m.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    3.00 303.84

    27.75 208.13

    3.00 300.51

    27.44 205.80

    3.00 299.58

    27.74 208.05

    3.00 282.69

    26.18 196.35

    4.00 25.08

    3.00 586.29

    54.29 407.18

    6.00 37.62

    3.00 1604.43

    54.29 407.18

    12.00 75.24

    3.00 1166.97

    54.29 407.18

    14.00 87.78

    3.00 1213.95

    54.29 407.18

    12.00 75.24

    3.00 554.79

    54.29 407.18

    8.00 50.16

    3.00 1273.65

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    54.29 407.18

    14.00 87.78

    3.00 2099.58

    54.29 407.18

    3.00 1854.12

    54.29 407.18

    3.00 1170.54

    54.29 407.18

    3.00 1192.98

    54.29 407.18 19,232.90 m.

    CANTIDADN MET.

    VECES

    35719.460 1.00 35719.46

    35,719.46

    MEDIDAS N VOLALTO VECES

    0.50 2.00 30.380.50 2.00 30.050.50 2.00 29.960.50 2.00 28.270.50 2.00 58.630.50 2.00 160.440.50 2.00 116.700.50 2.00 121.400.50 2.00 55.480.50 2.00 127.37

    m2.

    (m3)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    0.50 2.00 209.96

    0.50 2.00 185.41

    0.50 2.00 117.05

    0.50 2.00 119.30

    1,390.39

    SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)

    N N MET

    VECES REPETICIONES TOTAL

    1.00 1.00 40.51

    1.00 2.00 40.51

    1.00 2.00 1.00

    1.00 1.00 40.07

    1.00 2.00 40.07

    1.00 2.00 1.00

    1.00 1.00 39.94

    1.00 2.00 39.94

    1.00 2.00 1.00

    1.00 1.00 37.69

    1.00 2.00 37.69

    1.00 2.00 0.84

    1.00 1.00 78.17

    1.00 2.00 78.17

    1.00 2.00 1.50

    1.00 1.00 213.92

    1.00 2.00 213.92

    1.00 2.00 4.20

    1.00 1.00 155.60

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 2.00 155.60

    1.00 2.00 1.00

    1.00 1.00 161.86

    1.00 2.00 161.86

    1.00 2.00 2.00

    1.00 1.00 73.971.00 2.00 73.97

    1.00 2.00 3.10

    1.00 1.00 169.82

    1.00 2.00 169.82

    1.00 2.00 1.00

    1.00 1.00 279.94

    1.00 2.00 279.94

    1.00 2.00 1.00

    1.00 1.00 247.22

    1.00 2.00 247.22

    1.00 2.00 1.00

    1.00 1.00 156.07

    1.00 2.00 156.07

    1.00 2.00 1.76

    1.00 1.00 159.06

    1.00 2.00 159.06

    1.00 2.00 1.00

    3,729.11

    MEDIDAS N N VOL. TOTAL

    ANCHO VECES REPETICIONES m3

    0.15 1.00 1.00 278.078

    0.30 1.00 1.00 139.039

    SARDINELES-CONCRETO fc= 140 Kg/cm2 C/ MEZCLADORA INCLUYE CURADO.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    417.12

    MEDIDAS N VOLALTO VECES0.20 1.00 20.260.20 1.00 20.030.20 1.00 19.97

    0.20 1.00 18.85

    0.20 1.00 39.09

    0.20 1.00 106.96

    0.201.00 77.80

    0.20 1.00 80.93

    0.201.00 36.99

    0.201.00 84.91

    0.201.00 139.97

    0.20 1.00 123.61

    0.20 1.00 78.04

    0.20 1.00 79.53

    AREA ALTURA CORTE 0.008.19 0.20 8.199.41 0.20 7.53

    11.97 0.20 26.339.89 0.20 27.699.28 0.20 18.568.81 0.20 14.10

    8.68 0.20 24.30 1,053.63

    COMPACTACIN DE TERRENO (PARA VEREDAS).

    N MET METREP TOTAL

    1.00 101.28

    CORTE DE TERRENO MANUAL PARA VEREDAS, EPROM.=0.20m.

    (m3)

    m2.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 100.171.00 99.861.00 94.231.00 195.431.00 534.811.00 388.991.00 404.651.00 184.931.00 424.55

    1.00 699.86

    1.00 618.04

    1.00 390.18

    1.00 397.66

    AREA ALTURA CORTE 0.00

    8.19 1.00 40.95

    9.41 1.00 37.6411.97 1.00 131.67

    9.89 1.00 138.469.28 1.00 92.808.81 1.00 70.488.68 1.00 121.52

    5,268.16

    RELLENO CON MATERIAL GRANULAR e=4"N VOL. MET

    VECES m3 TOTAL1.00 526.82 526.82

    526.82

    ENCOFRADO Y DESENCOFRADO PARA VEREDAN N MET

    VECES REPETICIONES TOTAL

    2.00 1.00 40.512

    33.76 1.00 6.7522.00 1.00 40.068

    33.39 1.00 6.6782.00 1.00 39.944

    33.28 1.00 6.6562.00 1.00 37.692

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    31.41 1.00 6.2822.00 1.00 78.172

    65.15 1.00 13.0302.00 1.00 213.924

    178.27 1.00 35.6542.00 1.00 155.596

    129.66 1.00 25.9322.00 1.00 161.860

    134.88 1.00 26.9762.00 1.00 73.972

    61.64 1.00 12.3282.00 1.00 169.820

    141.52 1.00 28.304

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    2.00 1.00 279.944233.29 1.00 46.658

    2.00 1.00 247.216206.01 1.00 41.202206.00 1.00 16075.416

    2.00 1.00 0.4002.00 1.00 159.064

    132.55 1.00 26.510 18,056.56

    ENCOFRADO DE MARTILLOS DE VEREDASALTURA 0.00

    0.20 6.260.20 5.000.20 13.710.20 17.640.20 12.500.20 10.820.20 17.14

    83.06

    MEDIDAS N METANCHO REPETICIONES TOTAL

    0.10 1.00 526.821.00 226.53

    753.35

    JUNTA CON ASFALTO E=1"N MET MET

    VECES m. TOTAL1756.00 1756.00 1756.001545.00 231.75 231.75

    1987.75

    CANTIDAD N METVECES TOTAL

    5268.16 1.00 5268.16 5,268.16

    CORTE DE TERRENO MANUAL PARA CUNETASMEDIDAS N VOL

    ALTO VECES0.50 2.00 40.510.50 2.00 40.070.50 2.00 39.94

    . VEREDA

    (m3)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    0.50 2.00 37.690.50 2.00 78.170.50 2.00 213.920.50 2.00 155.600.50 2.00 161.860.50 2.00 73.970.50 2.00 169.82

    0.50 2.00 279.94

    0.50 2.00 247.22

    0.50 2.00 156.070.50 2.00 159.06

    0.50 5.00 6.260.50 4.00 5.000.50 11.00 13.710.50 14.00 17.640.50 10.00 12.500.50 8.00 10.820.50 14.00 17.14

    1,936.91

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    COMPACTACIN DE TERRENO (PARA CUNETAS).MEDIDAS N AREA

    ALTO VECES2.00 81.022.00 80.142.00 79.892.00 75.382.00 156.342.00 427.852.00 311.192.00 323.722.00 147.942.00 339.64

    2.00 559.89

    2.00 494.43

    2.00 312.14

    2.00 318.13

    0.005.00 12.524.00 10.00

    11.00 27.41

    14.00 35.28

    10.00 25.008.00 21.63

    14.00 34.27 3,873.83

    ENCOFRADO Y DESENCOFRADO PARA CUNETAS

    CANTIDAD N MET.REP

    2.00 1.00 40.512.00 1.00 0.162.00 1.00 40.072.00 1.00 0.162.00 1.00 39.942.00 1.00 0.162.00 1.00 37.692.00 1.00 0.162.00 1.00 78.17

    (m2)

    m2.

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    2.00 1.00 0.162.00 1.00 213.922.00 1.00 155.602.00 1.00 155.602.00 1.00 0.162.00 1.00 161.862.00 1.00 0.162.00 1.00 73.972.00 1.00 0.16

    2.00 1.00 169.82

    2.00 1.00 0.16

    2.00 1.00 279.94

    2.00 1.00 0.16

    2.00 1.00 247.22

    2.00 1.00 0.16

    2.00 1.00 156.07

    2.00 1.00 0.16

    2.00 1.00 159.06

    0.002.00 1.00 2.505.00 1.00 0.402.00 1.00 2.504.00 1.00 0.322.00 1.00 2.49

    11.00 1.00 0.882.00 1.00 2.52

    14.00 1.00 0.002.00 1.00 2.50

    10.00 1.00 0.802.00 1.00 2.708.00 1.00 0.64

    2.00 1.00 2.45

    14.00 1.00 1.12 3,281.31

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    MEDIDAS N AREA

    ALTO VOLUMEN

    0.00 1.00 40.51

    0.00 1.00 40.070.00 1.00 39.940.00 1.00 37.69

    0.00 1.00 78.17

    0.00 1.00 213.920.00 1.00 155.600.00 1.00 161.860.00 1.00 73.970.00 1.00 169.82

    0.00 1.00 279.94

    0.00 1.00 247.22

    0.00 1.00 156.07

    0.00 1.00 159.06

    0.00 1.00 2.500.00 1.00 2.500.00 1.00 2.490.00 1.00 2.52

    0.00 1.00 2.50

    0.00 1.00 2.70

    0.00 1.00 2.45

    1,871.52

    CONCRETO fC= 140 kg/cm2 PARA CUNETAS

    MEDIDAS N VOLUMENALTO VOLUMEN

    0.00 1.00 6.080.00 1.00 6.010.00 1.00 5.990.00 1.00 5.650.00 1.00 11.730.00 1.00 32.090.00 1.00 23.340.00 1.00 24.280.00 1.00 11.100.00 1.00 25.47

    (m2)

    (m3)

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    0.00 1.00 41.99

    0.00 1.00 37.08

    0.00 1.00 23.41

    0.00 1.00 23.860.00 1.00 0.00

    0.00 1.00 0.38

    0.00 1.00 0.38

    0.00 1.00 0.37

    0.00 1.00 0.380.00 1.00 0.380.00 1.00 0.410.00 1.00 0.37

    280.73

    N CANTIDAD

    VECES m.

    2.00 202.562.00 0.802.00 200.342.00 0.802.00 199.722.00 0.802.00 188.462.00 0.802.00 390.862.00 0.802.00 1069.622.00 0.802.00 777.982.00 0.802.00 809.302.00 0.802.00 369.862.00 0.802.00 849.102.00 0.802.00 1399.722.00 0.80

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    2.00 1236.082.00 0.802.00 780.362.00 0.802.00 795.322.00 0.80

    2.00 0.005.00 31.302.00 0.804.00 25.002.00 0.80

    11.00 68.532.00 0.80

    14.00 88.202.00 0.00

    10.00 62.502.00 0.808.00 54.080.00 0.00

    14.00 85.68 9,698.97

    N N METVECES CANTIDAD

    1.00 1.00 10.1289.00 1.00 13.51.00 1.00 3.75

    1.00 1.00 10.0179.00 1.00 13.51.00 1.00 3.75

    1.00 1.00 9.9869.00 1.00 13.51.00 1.00 3.75

    1.00 1.00 9.4239.00 3.00 40.51.00 3.00 11.25

    1.00 1.00 19.5439.00 3.00 40.51.00 3.00 11.25

    1.00 1.00 53.4819.00 7.00 94.5

    m2

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 7.00 26.25

    1.00 1.00 38.8999.00 7.00 94.51.00 7.00 26.25

    1.00 1.00 40.4659.00 7.00 94.51.00 7.00 26.25

    1.00 1.00 18.4939.00 4.00 541.00 4.00 15

    1.00 1.00 42.4559.00 7.00 94.51.00 7.00 26.25

    1.00 1.00 69.9869.00 14.00 1891.00 14.00 52.5

    1.00 1.00 61.8049.00 12.00 1621.00 12.00 45

    1.00 1.00 39.0189.00 8.00 1081.00 8.00 30

    1.00 1.00 39.7669.00 7.00 94.51.00 7.00 26.25

    1877.96

    N MET METVECES m.2 TOTAL

    1.00 1622.12 1622.124 1,622.12

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    SEMBRADO DE GRASS EN JARDINERASN MET MET

    REP TOTAL

    85.0847.08

    0.00

    45.23

    234.52

    1337.03

    248.95

    1031.86

    173.83

    292.94

    342.93

    1019.77

    624.29

    258.48

    5,741.98

    N MET.PLANTAS TOTAL

    20 40

    10 20

    20 40

    20 240 340.00 UND

    MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALMET.

    TOTAL

    m2.

    m2

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    1.00 GLB

    MET.TOTAL

    6.00 GLB

    LIMPIEZA FINAL DE OBRAMET.

    TOTAL59878.49

    59,878.49 M2

    RESUMEN DE METRADOS

    1.00 mesCARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIG 2.00 und.MOVILIZACION Y DEZMOVILIZACION DE EQUIPO 1.00 und.

    59878.49 m2TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO 59878.49 m2

    MOVIMIENTO DE TIERRAS PAVIMENTO

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

    CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO 32147.51 m3

    42077.24 m3CONFORMACION Y COMPACTACION DE SUBRASANTE 35719.46 m2

    10715.84 m3

    35719.46 m2

    ENCOFRADO Y DESENCOFRADO DE LOSA 3709.86 m37143.89 m2

    19232.90 m35719.46 m2

    1390.39 m3SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M) 3729.11 m2

    417.12 m3

    1053.63 m3COMPACTACIN DE TERRENO (PARA VEREDAS). 5268.16 m2RELLENO CON MATERIAL GRANULAR e=4" 526.82 m3ENCOFRADO Y DESENCOFRADO PARA VEREDA 18056.56 m2ENCOFRADO DE MARTILLOS DE VEREDAS 83.06 m2

    753.35 m31987.75 m5268.16 m2

    3.00CORTE DE TERRENO MANUAL PARA CUNETAS 1936.91 m3COMPACTACIN DE TERRENO (PARA CUNETAS). 3873.83 m2ENCOFRADO Y DESENCOFRADO PARA CUNETAS 3281.31 m2

    1871.52 m2CONCRETO fC= 140 kg/cm2 PARA CUNETAS 280.73 m3

    9698.97 m

    1877.96 m21622.12 m2

    ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO

  • PLANILLA DE METRADOS

    MUNICIPALIDAD PROVINCIAL DE DATEN DEL MARAON

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR I SAN LORENZO1.00.00 OBRAS PRELIMINARES

    01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO N MET

    MESAlmacen de obra 6 6.00TOTAL

    01.02.00 CARTEL DE OBRA EN MADERA DE 3.60M X 2.40M

    ITEM MEDIDAS N METLARGO ANCHO REP Glb

    CARTEL DE OBRA 2.00TOTAL

    01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM VOL FACTOR DE VOL. TOTAL

    ESPONJAMIE (m3)DESPUES DE PROCESAR EL PRESUPUESTOPIEDRA PARA ADOQUIN 1.000 1.00 1.00TOTAL 1.00

    2.00.00 TRABAJOS PRELIMINARES

    2.01.00 LIMPIEZA DE TERRENO MANUAL

    ITEM MEDIDAS N METLARGO ANCHO REP M2

    502.337.80 1.00 3918.17

    629.607.80 1.00 4910.88

    246.21 7.80 1.00 1920.44

    1114.117.80 1.00 8690.06

    TOTAL 2492.25 31.20

    2.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPOITEM MEDIDAS N MET

    area ANCHO VECES M219439.55 1.00 19439.55

    (m3)

    calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta MaraonCalle Maraon, desde Huallaga hasta Sargento LouresCalle Tigre, desde Oleoducto hasta Amazonas

    se tomara todo el area de la obra

  • PLANILLA DE METRADOS

    TOTALobra

  • PLANILLA DE METRADOS

    2.03.00 Reparacion y Reposicion de cajas de agua, incluye instalacionITEM MEDIDAS N MET

    cantidad VECES M2

    Para nivelar las cajas de agua150.00 1 150.00

    TOTAL

    2.04.00 Reparacion y Reposicion de cajas de desague ITEM MEDIDAS N MET

    cantidad ANCHO VECES M2

    Para nivelar las cajas de desague150.00 1 150.00

    TOTAL

    3.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO

    03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    ITEM MEDIDAS NLargo ANCHO ALTO VECES

    para el pavimento y veredas

    502.33 7.80 0.60 1.00

    629.60 7.80 0.60 1.00

    246.21 7.80 0.601.00

    1114.11 7.80 0.601.00

    TOTAL

    03.02.00 DEMOLICIN DE VEREDAS

    ITEMMEDIDAS VOL FACTOR DE

    AREA (m2) EXPANSIN

    DEMOLICION DE VEREDAS 1800.00 1800.00 1.12

    TOTAL

    03.03.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    2016.00 0.15

    TOTAL

    DEL MATERIAL QUE ES ACAREADO A UN A ESQUINA DE LA OBRA, PARA LUEGO SER ELIMINADO CON VOLQUETE Y EQUIPO

  • PLANILLA DE METRADOS

    03.04.00 CONFORMACION Y COMPACATACION DE SUBRASANTE

    ITEMMEDIDAS N MET

    LARGO ancho REP M2

    502.33 7.80 1.00 3918.17

    629.6 7.80 1.00 4910.88

    246.21 7.80 1.00 1920.44

    1114.11 7.80 1.00 8690.06

    TOTAL

    03.05.00 COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)

    ITEM MEDIDAS N MET

    LARGO/area ANCHO REP M2

    502.33 1.00 1.00 502.33

    629.601.00 1.00 629.60

    246.211.00 1.00 246.21

    1114.111.00 1.00 1114.11

    0 0.001.00 1.00 0.00

    TOTAL

    03.06.00

    ITEMCANTIDAD ESPESOR

    E

    ES LA MISMA AREA QUE LA CONFORMACION 19439.55 0.20TOTAL

    03.07.00

    ITEMCANTIDAD ESPESOR

    E

    ES LA MISMA AREA QUE LA CONFORMACION 19439.55

    TOTAL

    calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta MaraonCalle Maraon, desde Huallaga hasta Sargento LouresCalle Tigre, desde Oleoducto hasta Amazonas

    calle Huallaga, desde Oleducto hasta Maraon

    calle Napo, desde Oleducto hasta Maraon

    Calle Maraon, desde Huallaga hasta Sargento Loures

    Calle Tigre, desde Oleoducto hasta Amazonas

    RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)

  • PLANILLA DE METRADOS

    04.00.00 PAVIMENTO DE CONCRETO

    04.01.00 ENCOFRADO Y DESENCOFRADO DE LOSA

    ITEM MEDIDASCANTIDAD

    N

    LARGO/area ANCHO REP

    DE LA LONGITUD

    502.33 0.20 1.00 3.00

    TRANSVERSAL 7.00 0.20 11.00 1.00

    629.60 0.20 1.00 1.00TRANSVERSAL 7.00 0.20 210.00 1.00

    246.21 0.20 1.00 3.00

    TRANSVERSAL 7.00 0.20 82.00 1.00

    1114.11 0.20 1.00 1.00TRANSVERSAL 7.00 0.20 371.00 1.00

    0 0.00 0.20 1.00 3.00TRANSVERSAL 7.00 0.20 0.00 1.00CRUCE DE CALLES 5.00 0.20 15.00 2.00TOTAL

    04.02.00 CONCRETO F'C= 210 KG/CM2, LOSA

    ITEMCANTIDAD espesor

    m

    LA MISMA AREA QUE LA CONFORMACION 19439.550 0.20

    TOTAL

    04.03.00 JUNTA CON ASFALTO E= 1"

    ITEM MEDIDAS MET N CANTIDAD

    LARGO/area UND VECES UND

    DE LAS CALLES

    502.33 1.00 1.00 502.33

    629.60 1.00 1.00 629.60

    calle Huallaga, desde Oleducto hasta Maraon

    calle Napo, desde Oleducto hasta Maraon

    Calle Maraon, desde Huallaga hasta Sargento Loures

    Calle Tigre, desde Oleoducto hasta Amazonas

    calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta Maraon

  • PLANILLA DE METRADOS

    246.211.00

    1.00246.21

    1114.111.00

    1.001114.11

    transversales 7.00 1.00 623.00 4361.00TOTAL 6,853.25

    04.04.00 CURADO DE CONCRETO

    ITEMCANTIDAD N

    VECES

    AREA DE PAVIMENTO 19439.550 1.00TOTAL

    05.00.00 SARDINELES Y VEREDAS

    05.01.00 RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOITEM MEDIDAS N VOLUMEN

    AREA ALTO VECES TOTALDEL AREA DE VEREDAS 2492.25 0.10 1.00 249.23TOTAL

    05.02.00 VEREDAS ENCOFRADO Y DESENCOFRADOITEM MEDIDAS N N REPECICIONES

    LARGO alto/AREA VECESDEL AREA DE VEREDAS

    502.330.20 1.00 2.00

    629.600.20 1.00 2.00

    246.210.20 1.00 2.00

    1114.110.20 1.00 2.00

    TRANSERSALES 1.00 0.20 2492.00 0.00TOTAL

    05.03.00 CONCRETO PARA VEREDAS FC= 140 KG/ CM2ITEM MEDIDAS N REPECICIONES

    LARGO alto/AREA anchola misma que la conformacion 2492.25 0.10 1.00DE LAS UAS 1318.26 0.4 0.20 1.00

    Calle Maraon, desde Huallaga hasta Sargento Loures

    Calle Tigre, desde Oleoducto hasta Amazonas

    calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta MaraonCalle Maraon, desde Huallaga hasta Sargento LouresCalle Tigre, desde Oleoducto hasta Amazonas

  • PLANILLA DE METRADOS

    TOTAL

    05.04.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)ITEM MEDIDAS N N REPECICIONES

    LARGO alto VECESDE LOS OCHAVOS 6.00 0.50 25.00 1.00TOTAL

  • PLANILLA DE METRADOS

    05.05.00 SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADOITEM MEDIDAS N

    LARGO alto ancho VECESDE LOS OCHAVOS 6.00 0.50 0.15 25.00TOTAL

    05.06.00 JUNTA CON ASFALTO E=1"

    ITEMMEDIDAS N MET

    CANTIDAD LONGITUD VECES Mde las veredas 1.00 831.00 1.00 831.00TOTAL

    05.07.00 CURADO DE CONCRETO CON ADITIVO

    ITEMCANTIDAD N

    VECES

    AREA DE VEREDAS 2492.25 1.00TOTAL

    06.00.00 PINTURA

    06.01.00 PINTADO DE PAVIMENTO LETRAS Y SIMBOLOSITEM MEDIDAS N N MET

    LARGO VECES CALLES M2area del pavimento 3.00 10 25.00 750.00

    3.00 75 1.00 225.00TOTAL

    06.02.00 PINTADO DE SARDINELES Y VEREDASITEM longitud N MET

    m REP mla longitud total de veredas 2493.00 1.00 2493.00TOTAL 2,493.00

    07.00.00 CONTROL DE CALIDAD Y ENSAYOS

    07.01.00 ENSAYO DE CBR ITEM metrado UNIDAD

    und undDE LA SUB RASANTE, UNA POR CALLE 25.0 25.0DE LOS MATERIALES 4.0 4.0TOTAL 29.00

    07.02.00 ENSAYO DE DENSIDAD DE CAMPOITEM metrado UNIDAD

    und und

  • PLANILLA DE METRADOS

    se efectuarn cada 500 m2 39.0 39.00DE LAS VEREDS 5.0 5.00TOTAL 44.00

  • PLANILLA DE METRADOS

    07.03.00 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETOITEM metrado UNIDAD

    und undse efectuarn cada 500 m2 39 39DE LAS VEREDAS 5 5TOTAL 44.00

    07.04.00 PRUEBA DE DISEO DE MEZCLAS DEL CONCRETOITEM metrado UNIDAD

    und und3 3

    TOTAL 3.00

    08.00.00 ACARREOS

    08.01.00 ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    09.00.00 VARIOS

    09.01.00 PLACA RECORDATORIAITEM MET CANTIDAD

    M3 M3INCLUYE COLOCACION Y PEDESTAL

    1.000 1.00TOTAL 1.00

    09.02.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET CANTIDAD

    UND UNDMITIGACION DEL IMPACTO AMBIENTAL

    1.000 1.00 1.00TOTAL 1.00

  • PLANILLA DE METRADOS

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR I SAN LORENZO

    METTOTAL

    6

    UNDMET

    TOTAL

    2

    METTOTAL

    3918.17

    4910.88

    1920.44

    8690.06

    19439.55 m2

    METTOTAL

    19439.55

  • PLANILLA DE METRADOS

    19439.550

  • PLANILLA DE METRADOS

    METTOTAL

    150.00

    150.000

    METTOTAL

    150.00

    150.000

    CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    VOLM3

    2350.90

    2946.53

    1152.26

    5214.03

    11663.73

    VOL. TOTAL(m2)

    2016.00

    2,016.00

    ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    181.44

    7,179.68

  • PLANILLA DE METRADOS

    CONFORMACION Y COMPACATACION DE SUBRASANTE

    MET M2TOTAL

    19439.55

    COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)

    MET M2

    TOTAL

    2492.25

    VOLM3

    3887.91 3,887.91

    M2VOLM3

    19439.55

    19,439.55

    RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC

  • PLANILLA DE METRADOS

    METR

    M2

    301.40

    15.40

    125.92294.00

    147.73

    114.80

    222.82519.40

    0.000.00

    30.00 1,771.47

    METRM2

    3887.91

    3,887.91

    ML

  • PLANILLA DE METRADOS

    METRM2

    19439.55 19,439.550

    RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOMET

    TOTAL249.23249.23

    MET METTOTAL TOTAL

    200.93 200.932

    251.84 251.840

    98.48 98.484

    445.64 445.644

    0.00 0.000996.90

    m3MET MET

    TOTAL TOTAL249.23 249.225105.46 105.461

  • PLANILLA DE METRADOS

    354.69

    MET METTOTAL TOTAL

    75.00 75.00075.00

  • PLANILLA DE METRADOS

    SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADON VOL. TOTAL

    REPETICIONES (m3)1.00 11.250

    11.25

    JUNTA CON ASFALTO E=1"MET

    TOTAL831.00

    831.00

    METRM2

    2492.25 2,492.25

    METTOTAL

    975.00

  • PLANILLA DE METRADOS

  • PLANILLA DE METRADOS

    UND

    TN

    DESCARGUIO Y CARGUIO DE MATERIALES EN PUERTO SAN LORENZO TN

    TN

  • PLANILLA DE METRADOS

    UND

  • PLANILLA DE METRADOS

    MUNICIPALIDAD PROVINCIAL DE DATEN DEL MARAON

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR III SAN LORENZO1.00.00 OBRAS PRELIMINARES

    01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO N MET

    MESAlmacen de obra 6 6.00TOTAL

    01.02.00 CARTEL DE OBRA EN MADERA DE 3.60M X 2.40M

    ITEM MEDIDAS N METLARGO ANCHO REP Glb

    CARTEL DE OBRA 2.00TOTAL

    01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM VOL FACTOR DE VOL. TOTAL

    ESPONJAMIEN (m3)DESPUES DE PROCESAR EL PRESUPUESTOPIEDRA PARA ADOQUIN 1.000 1.00 1.00TOTAL 1.00

    2.00.00 TRABAJOS PRELIMINARES

    2.01.00 LIMPIEZA DE TERRENO MANUAL

    ITEM MEDIDAS N METLARGO ANCHO REP M2

    692.49 7.80 1.00 5401.42

    438.81 7.80 1.00 3422.72

    109.28 7.80 1.00 852.38

    109.28 7.80 2.00 1704.77

    217.30 7.80 1.00 1694.94

    TOTAL 1567.16 39.00

    2.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPOITEM MEDIDAS N MET

    (m3)

    Calle Amazonas, desde Putumayo hasta Sargento Lores

    Jr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza

  • PLANILLA DE METRADOS

    area ANCHO VECES M213076.23 1.00 13076.23

    TOTAL

    se tomara todo el area de la obra

  • PLANILLA DE METRADOS

    2.03.00 Reparacion y Reposicion de cajas de agua, incluye instalacionITEM MEDIDAS N MET

    cantidad VECES M2

    Para nivelar las cajas de agua150.00 1 150.00

    TOTAL

    2.04.00 Reparacion y Reposicion de cajas de desague ITEM MEDIDAS N MET

    cantidad ANCHO VECES M2

    Para nivelar las cajas de desague150.00 1 150.00

    TOTAL

    3.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO

    03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    ITEM MEDIDAS NLargo ANCHO ALTO VECES

    para el pavimento y veredas

    692.49 7.80 0.601.00

    438.81 7.80 0.60 1.00

    109.28 7.80 0.60 2.00

    109.28 7.80 0.601.00

    217.30 7.80 0.60 1.00

    TOTAL

    03.02.00 DEMOLICIN DE VEREDAS

    ITEMMEDIDAS VOL FACTOR DE

    AREA (m2) EXPANSIN

    DEMOLICION DE VEREDAS 800.00 800.00 1.12

    TOTAL

    03.03.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    ITEM e=7845.74 1.00

    896.00 0.15

    TOTAL

    (m3)

    DEL MATERIAL QUE ES ACAREADO A UN A ESQUINA DE LA OBRA, PARA LUEGO SER ELIMINADO CON VOLQUETE Y EQUIPO

  • PLANILLA DE METRADOS

    03.04.00 CONFORMACION Y COMPACATACION DE SUBRASANTE

    ITEMMEDIDAS N MET

    LARGO ancho REP M2

    692.49 7.8 1.00 5401.42

    438.81 7.8 1.00 3422.72

    109.28 7.8 2.00 1704.77

    109.28 7.8 2.00 1704.77

    217.3 7.8 3.00 5084.82

    0 0 0TOTAL

    03.05.00 COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)

    ITEM MEDIDAS N MET

    LARGO/area ANCHO REP M2

    692.49 1.00 1.00 692.49

    438.811.00 1.00 438.81

    109.281.00 1.00 109.28

    109.281.00 1.00 109.28

    217.301.00 1.00 217.30

    0 0.001.00 1.00 0.00

    TOTAL

    03.06.00

    ITEMCANTIDAD ESPESOR

    E

    ES LA MISMA AREA QUE LA CONFORMACION 17318.50 0.20TOTAL

    03.07.00

    ITEMCANTIDAD ESPESOR

    E

    ES LA MISMA AREA QUE LA CONFORMACION

    Calle Amazonas, desde Putumayo hasta Sargento LoresJr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza

    Calle Amazonas, desde Putumayo hasta Sargento Lores

    Jr Maraon, desde Morona hasta Huallaga

    Calle Pastaza, desde Amazonas Hasta Maraon

    Calle Tigre, desde Amazonas Hasta Maraon

    Calle Jorge Chavez, desde Putumayo hasta Pastaza

    RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)

  • PLANILLA DE METRADOS

    ES LA MISMA AREA QUE LA CONFORMACION 17318.50

    TOTAL

  • PLANILLA DE METRADOS

    04.00.00 ADOQUINADO

    04.01.00 Colocacin de Cama de Arena E=0.10m para asentado de adoquines

    ITEMCANTIDAD N

    REP

    ES LA MISMA AREA QUE LA CONFORMACION 17318.50 1.00TOTAL

    04.02.00 Conformacin de cama de arena para asentado de adoquines e=0.05m

    ITEMCANTIDAD N

    REP

    ES LA MISMA AREA QUE LA CONFORMACION 17318.50 1.00TOTAL

    04.03.00 Acarreo de adoquines de concretoITEM MET N CANTIDAD

    UND VECES UNDDESPUES DE PROCESAR EL PRESUPUESTO

    917880.000 1.00 917880.00TOTAL 917,880.00

    04.04.00

    ITEMCANTIDAD N

    REP

    ES LA MISMA AREA QUE LA CAMA DE ARENA 17318.50 1.00TOTAL

    04.05.00 Corte de Adoquines de concreto de 0.21x0.105x0.06ITEM MEDIDAS N N VECES

    LARGO ANCHO REP

    692.49 2.00 1.00

    438.81 2.00 1.00

    109.28 2.00 1.00

    109.28 2.00 1.00

    217.30 2.00 1.00

    Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado, no inc. cama de arena grue)

    Calle Amazonas, desde Putumayo hasta Sargento Lores

    Jr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza

  • PLANILLA DE METRADOS

    TOTAL

  • PLANILLA DE METRADOS

    04.06.00 ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N MET

    ANCHO ALTO REP M2

    8.00 0.20 4.00 6.40

    8.00 0.20 4.00 6.40

    8.00 0.20 4.00 6.40

    8.000.20 4.00 6.40

    8.000.20 4.00 6.40

    TOTAL 40.00

    04.07.00 CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N

    LARGO alto ancho VECESCALLES 40.00 0.20 0.20 4.00TOTAL

    05.00.00 SARDINELES Y VEREDAS

    05.01.00 RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOITEM MEDIDAS N VOLUMEN

    AREA ALTO VECES TOTALDEL AREA DE VEREDAS 1567.16 0.10 1.00 156.72TOTAL

    05.02.00 VEREDAS ENCOFRADO Y DESENCOFRADOITEM MEDIDAS N N REPECICIONES

    LARGO alto/AREA VECESDEL AREA DE VEREDAS

    692.490.20 1.00 2.00

    438.810.20 1.00 2.00

    109.280.20 1.00 2.00

    109.280.20 1.00 2.00

    Calle Amazonas, desde Putumayo hasta Sargento LoresJr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza

    Calle Amazonas, desde Putumayo hasta Sargento LoresJr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta Maraon

    Calle Tigre, desde Amazonas Hasta Maraon

  • PLANILLA DE METRADOS

    217.300.20 1.00 2.00

    TRANSERSALES 1.00 0.20 1567.00 2.00TOTAL

    Calle Jorge Chavez, desde Putumayo hasta Pastaza

  • PLANILLA DE METRADOS

    05.03.00 CONCRETO PARA VEREDAS FC= 140 KG/ CM2ITEM MEDIDAS N REPECICIONES

    LARGO alto/AREA anchola misma que la conformacion 1567.16 0.10 1.00DE LAS UAS 1318.26 0.4 0.20 1.00TOTAL

    05.04.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)ITEM MEDIDAS N N REPECICIONES

    LARGO alto VECESDE LOS OCHAVOS 6.00 0.50 15.00 1.00TOTAL

    05.05.00 SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADOITEM MEDIDAS N

    LARGO alto ancho VECESDE LOS OCHAVOS 6.00 0.50 0.15 15.00TOTAL

    05.06.00 JUNTA CON ASFALTO E=1"

    ITEMMEDIDAS N MET

    CANTIDAD LONGITUD VECES Mde las veredas 1.00 522.00 1.00 522.00TOTAL

    05.07.00 CURADO DE CONCRETO CON ADITIVO

    ITEMCANTIDAD N

    VECES

    AREA DE VEREDAS 1567.16 1.00TOTAL

    06.00.00 PINTURA

    06.01.00 PINTADO DE PAVIMENTO LETRAS Y SIMBOLOSITEM MEDIDAS N N MET

    LARGO VECES CALLES M2area del pavimento 3.00 10 15.00 450.00

    3.00 45 1.00 135.00TOTAL

    06.02.00 PINTADO DE SARDINELES Y VEREDASITEM longitud N MET

    m REP mla longitud total de veredas 1566.00 1.00 1566.00

  • PLANILLA DE METRADOS

    TOTAL 1,566.00

  • PLANILLA DE METRADOS

    07.00.00 CONTROL DE CALIDAD Y ENSAYOS

    07.01.00 ENSAYO DE CBR ITEM metrado UNIDAD

    und undDE LA SUB RASANTE, UNA POR CALLE 15.0 15.0DE LOS MATERIALES 4.0 4.0TOTAL 19.00

    07.02.00 ENSAYO DE DENSIDAD DE CAMPOITEM metrado UNIDAD

    und undse efectuarn cada 500 m2 35.0 35.00DE LAS VEREDS 3.0 3.00TOTAL 38.00

    07.03.00 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETOITEM metrado UNIDAD

    und undse efectuarn cada 500 m2 35 35DE LAS VEREDAS 3 3TOTAL 38.00

    07.04.00 PRUEBA DE DISEO DE MEZCLAS DEL CONCRETOITEM metrado UNIDAD

    und und3 3

    TOTAL 3.00

    08.00.00 ACARREOS

    08.01.00 ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    ITEM MET CANTIDADUND UND

    CARGUIO DE MATERIALES EN YURIMAGUAS2923.000 1.00 2923.00

    TOTAL 2,923.00

  • PLANILLA DE METRADOS

    08.04.00 TRANSPORTE FLUVIAL DE MATERIALES ITEM MET CANTIDAD

    UND UNDTRANSPORTE FLUVIAL DE MATERIALES

    2923.000 1.00 2923.00TOTAL 2,923.00

    09.00.00 VARIOS

    09.01.00 PLACA RECORDATORIAITEM MET CANTIDAD

    M3 M3INCLUYE COLOCACION Y PEDESTAL

    1.000 1.00TOTAL 1.00

    09.02.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET CANTIDAD

    UND UNDMITIGACION DEL IMPACTO AMBIENTAL

    1.000 1.00 1.00TOTAL 1.00

  • PLANILLA DE METRADOS

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR III SAN LORENZO

    METTOTAL

    6

    UNDMET

    TOTAL

    2

    METTOTAL s

    5401.42

    3422.72

    852.38

    1704.77

    1694.94

    13076.23 m2

    MET

  • PLANILLA DE METRADOS

    TOTAL13076.23

    13076.232

  • PLANILLA DE METRADOS

    METTOTAL

    150.00

    150.000

    METTOTAL

    150.00

    150.000

    CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    VOLM3

    3240.85

    2053.63

    1022.86

    511.43

    1016.96

    7845.74

    VOL. TOTAL(m2)

    896.00

    896.00

    ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    (m3)4707.44

    80.64

    4,788.08

  • PLANILLA DE METRADOS

    CONFORMACION Y COMPACATACION DE SUBRASANTE

    MET M2TOTAL

    17318.50

    COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)

    MET M2

    TOTAL

    1567.16

    VOLM3

    3463.70 3,463.70

    M2VOLM3

    RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC

  • PLANILLA DE METRADOS

    17318.50 17,318.50

  • PLANILLA DE METRADOS

    METRM2

    17318.50 17,318.50

    METRM2

    17318.50 17,318.50

    UND

    METRM2

    17318.50 17,318.50

    METTOTAL

    1384.980

    877.620

    218.560

    218.560

    434.600

    Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado,

    ES EL PERIMETRO A PAVIMENTAR

  • PLANILLA DE METRADOS

    3134.32

  • PLANILLA DE METRADOS

    ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOMET

    TOTAL

    6.400

    6.400

    6.400

    6.400

    6.400

    32.00

    CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTON VOL. TOTAL

    REPETICIONES (m3)1.00 6.400

    6.400

    RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOMET

    TOTAL156.72156.72

    MET METTOTAL TOTAL

    277.00 276.996

    175.52 175.524

    43.71 43.712

    43.71 43.712

  • PLANILLA DE METRADOS

    86.92 86.920

    626.80 626.8001253.66

  • PLANILLA DE METRADOS

    m3MET MET

    TOTAL TOTAL156.72 156.716105.46 105.461

    262.18

    MET METTOTAL TOTAL

    45.00 45.00045.00

    SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADON VOL. TOTAL

    REPETICIONES (m3)1.00 6.750

    6.75

    JUNTA CON ASFALTO E=1"MET

    TOTAL522.00

    522.00

    METRM2

    1567.16 1,567.16

    METTOTAL

    585.00

  • PLANILLA DE METRADOS

  • PLANILLA DE METRADOS

    UND

    TN

    DESCARGUIO Y CARGUIO DE MATERIALES EN PUERTO SAN LORENZO TN

  • PLANILLA DE METRADOS

  • PLANILLA DE METRADOS

    TN

    UND

  • PLANILLA DE METRADOS

    MUNICIPALIDAD PROVINCIAL DE DATEN DEL MARAON

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR IIII SAN LORENZO1.00.00 OBRAS PRELIMINARES

    01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO N MET

    MESAlmacen de obra 6 6.00TOTAL

    01.02.00 CARTEL DE OBRA EN MADERA DE 3.60M X 2.40M

    ITEM MEDIDAS N METLARGO ANCHO REP Glb

    CARTEL DE OBRA 2.00TOTAL

    01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM VOL FACTOR DE VOL. TOTAL

    ESPONJAMIEN (m3)DESPUES DE PROCESAR EL PRESUPUESTOPIEDRA PARA ADOQUIN 1.000 1.00 1.00TOTAL 1.00

    2.00.00 TRABAJOS PRELIMINARES

    2.01.00 LIMPIEZA DE TERRENO MANUAL

    ITEM MEDIDAS N METLARGO ANCHO REP M2

    371.78 7.80 1.00 2899.88

    387.00 7.80 1.00 3018.60

    375.31 7.80 1.00 2927.42

    507.90 7.80 2.00 7923.24

    TOTAL 1641.99 31.20

    2.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO

    (m3)

    Calle Ucayali, desde Tigre hasta Sargento Lores

    Calle Calletano Ardanza, desde Oleoducto hasta MaraonCalle Sargento Loures, desde Oleoducto hasta MaraonCalle Maraon , desde Sargento Loures hasta Bolognesi

  • PLANILLA DE METRADOS

    ITEM MEDIDAS N METarea ANCHO VECES M2

    16769.14 1.00 16769.14

    TOTAL

    se tomara todo el area de la obra

  • PLANILLA DE METRADOS

    2.03.00 Reparacion y Reposicion de cajas de agua, incluye instalacionITEM MEDIDAS N MET

    cantidad VECES M2

    Para nivelar las cajas de agua150.00 1 150.00

    TOTAL

    2.04.00 Reparacion y Reposicion de cajas de desague ITEM MEDIDAS N MET

    cantidad ANCHO VECES M2

    Para nivelar las cajas de desague150.00 1 150.00

    TOTAL

    3.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO

    03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    ITEM MEDIDAS NLargo ANCHO ALTO VECES

    para el pavimento y veredas

    371.78 7.80 0.601.00

    387.00 7.80 0.601.00

    375.31 7.80 0.602.00

    507.90 7.80 0.601.00

    0 0.00 7.80 0.60 1.00

    TOTAL

    03.02.00 DEMOLICIN DE VEREDAS

    ITEMMEDIDAS VOL FACTOR DE

    AREA (m2) EXPANSIN

    DEMOLICION DE VEREDAS 1200.00 1200.00 1.12

    TOTAL

    03.03.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    ITEM e=9440.96 1.001344.00 0.15

    TOTAL

    (m3)

    DEL MATERIAL QUE ES ACAREADO A UN A ESQUINA DE LA OBRA, PARA LUEGO SER ELIMINADO CON VOLQUETE Y EQUIPO

  • PLANILLA DE METRADOS

    03.04.00 CONFORMACION Y COMPACATACION DE SUBRASANTE

    ITEMMEDIDAS N MET

    LARGO ancho REP M2

    371.78 7.8 1.00 2899.88

    387 7.8 1.00 3018.60

    375.31 7.8 2.00 5854.84

    507.9 7.8 2.00 7923.24

    0 0 7.8 3.00 0.00

    0 0 0TOTAL

    03.05.00 COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)

    ITEM MEDIDAS N MET

    LARGO/area ANCHO REP M2

    371.78 1.00 1.00 371.78

    387.001.00 1.00 387.00

    375.311.00 1.00 375.31

    507.901.00 1.00 507.90

    0 0.001.00 1.00 0.00

    0 0.001.00 1.00 0.00

    TOTAL

    03.06.00

    ITEMCANTIDAD ESPESOR

    E

    ES LA MISMA AREA QUE LA CONFORMACION 19696.56 0.20TOTAL

    03.07.00

    ITEMCANTIDAD ESPESOR

    E

    ES LA MISMA AREA QUE LA CONFORMACION

    Calle Ucayali, desde Tigre hasta Sargento LoresCalle Calletano Ardanza, desde Oleoducto hasta MaraonCalle Sargento Loures, desde Oleoducto hasta MaraonCalle Maraon , desde Sargento Loures hasta Bolognesi

    Calle Ucayali, desde Tigre hasta Sargento Lores

    Calle Calletano Ardanza, desde Oleoducto hasta Maraon

    Calle Sargento Loures, desde Oleoducto hasta Maraon

    Calle Maraon , desde Sargento Loures hasta Bolognesi

    RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)

  • PLANILLA DE METRADOS

    ES LA MISMA AREA QUE LA CONFORMACION 19696.56

    TOTAL

  • PLANILLA DE METRADOS

    04.00.00 ADOQUINADO

    04.01.00 Colocacin de Cama de Arena E=0.10m para asentado de adoquines

    ITEMCANTIDAD N

    REP

    ES LA MISMA AREA QUE LA CONFORMACION 19696.56 1.00TOTAL

    04.02.00 Conformacin de cama de arena para asentado de adoquines e=0.05m

    ITEMCANTIDAD N

    REP

    ES LA MISMA AREA QUE LA CONFORMACION 19696.56 1.00TOTAL

    04.03.00 Acarreo de adoquines de concretoITEM MET N CANTIDAD

    UND VECES UNDDESPUES DE PROCESAR EL PRESUPUESTO

    1.00 0.00TOTAL -

    04.04.00

    ITEMCANTIDAD N

    REP

    ES LA MISMA AREA QUE LA CAMA DE ARENA 19696.56 1.00TOTAL

    04.05.00 Corte de Adoquines de concreto de 0.21x0.105x0.06ITEM MEDIDAS N N VECES

    LARGO ANCHO REP

    371.78 2.00 1.00

    387.00 2.00 1.00

    375.31 2.00 1.00

    507.90 2.00 1.00

    0 0.00 2.00 1.00

    Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado, no inc. cama de arena grue)

    Calle Ucayali, desde Tigre hasta Sargento Lores

    Calle Calletano Ardanza, desde Oleoducto hasta MaraonCalle Sargento Loures, desde Oleoducto hasta Maraon

    Calle Maraon , desde Sargento Loures hasta Bolognesi

  • PLANILLA DE METRADOS

    TOTAL

    04.06.00 ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N MET

    ANCHO ALTO REP M2

    8.000.20 4.00 6.40

    8.000.20 4.00 6.40

    8.000.20 4.00 6.40

    8.000.20 4.00 6.40

    0 8.000.20 4.00 6.40

    TOTAL 40.00

    04.07.00 CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N

    LARGO alto ancho VECESCALLES 40.00 0.20 0.20 4.00TOTAL

    05.00.00 SARDINELES Y VEREDAS

    05.01.00 RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOITEM MEDIDAS N VOLUMEN

    AREA ALTO VECES TOTALDEL AREA DE VEREDAS 1641.99 0.10 1.00 164.20TOTAL

    05.02.00 VEREDAS ENCOFRADO Y DESENCOFRADOITEM MEDIDAS N N REPECICIONES

    LARGO alto/AREA VECESDEL AREA DE VEREDAS

    371.780.20 1.00 2.00

    387.000.20 1.00 2.00

    Calle Ucayali, desde Tigre hasta Sargento Lores

    Calle Calletano Ardanza, desde Oleoducto hasta Maraon

    Calle Sargento Loures, desde Oleoducto hasta MaraonCalle Maraon , desde Sargento Loures hasta Bolognesi

    Calle Ucayali, desde Tigre hasta Sargento Lores

    Calle Calletano Ardanza, desde Oleoducto hasta Maraon

  • PLANILLA DE METRADOS

    375.310.20 1.00 2.00

    507.900.20 1.00 2.00

    00.00

    0.20 1.00 2.00TRANSERSALES 1.00 0.20 1642.00 2.00TOTAL

    Calle Sargento Loures, desde Oleoducto hasta Maraon

    Calle Maraon , desde Sargento Loures hasta Bolognesi

  • PLANILLA DE METRADOS

    05.03.00 CONCRETO PARA VEREDAS FC= 140 KG/ CM2ITEM MEDIDAS N REPECICIONES

    LARGO alto/AREA anchola misma que la conformacion 1641.99 0.10 1.00DE LAS UAS 1318.26 0.4 0.20 1.00TOTAL

    05.04.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)ITEM MEDIDAS N N REPECICIONES

    LARGO alto VECESDE LOS OCHAVOS 6.00 0.50 17.00 1.00TOTAL

    05.05.00 SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADOITEM MEDIDAS N

    LARGO alto ancho VECESDE LOS OCHAVOS 6.00 0.50 0.15 17.00TOTAL

    05.06.00 JUNTA CON ASFALTO E=1"

    ITEMMEDIDAS N MET

    CANTIDAD LONGITUD VECES Mde las veredas 1.00 547.00 1.00 547.00TOTAL

    05.07.00 CURADO DE CONCRETO CON ADITIVO

    ITEMCANTIDAD N

    VECES

    AREA DE VEREDAS 1641.99 1.00TOTAL

    06.00.00 PINTURA

    06.01.00 PINTADO DE PAVIMENTO LETRAS Y SIMBOLOSITEM MEDIDAS N N MET

    LARGO VECES CALLES M2area del pavimento 3.00 10 17.00 510.00

    3.00 51 1.00 153.00TOTAL

    06.02.00 PINTADO DE SARDINELES Y VEREDASITEM longitud N MET

    m REP mla longitud total de veredas 1641.00 1.00 1641.00

  • PLANILLA DE METRADOS

    TOTAL 1,641.00

  • PLANILLA DE METRADOS

    07.00.00 CONTROL DE CALIDAD Y ENSAYOS

    07.01.00 ENSAYO DE CBR ITEM metrado UNIDAD

    und undDE LA SUB RASANTE, UNA POR CALLE 17.0 17.0DE LOS MATERIALES 4.0 4.0TOTAL 21.00

    07.02.00 ENSAYO DE DENSIDAD DE CAMPOITEM metrado UNIDAD

    und undse efectuarn cada 500 m2 39.0 39.00DE LAS VEREDS 3.0 3.00TOTAL 42.00

    07.03.00 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETOITEM metrado UNIDAD

    und undse efectuarn cada 500 m2 39 39DE LAS VEREDAS 3 3TOTAL 42.00

    07.04.00 PRUEBA DE DISEO DE MEZCLAS DEL CONCRETOITEM metrado UNIDAD

    und und3 3

    TOTAL 3.00

    08.00.00 ACARREOS

    08.01.00 ACARREO DE CEMENTO D max

  • PLANILLA DE METRADOS

    ITEM MET CANTIDADUND UND

    CARGUIO DE MATERIALES EN YURIMAGUAS1.000 1.00 1.00

    TOTAL 1.00

  • PLANILLA DE METRADOS

    08.04.00 TRANSPORTE FLUVIAL DE MATERIALES ITEM MET CANTIDAD

    UND UNDTRANSPORTE FLUVIAL DE MATERIALES

    1.000 1.00 1.00TOTAL 1.00

    09.00.00 VARIOS

    09.01.00 PLACA RECORDATORIAITEM MET CANTIDAD

    M3 M3INCLUYE COLOCACION Y PEDESTAL

    1.000 1.00TOTAL 1.00

    09.02.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET CANTIDAD

    UND UNDMITIGACION DEL IMPACTO AMBIENTAL

    1.000 1.00 1.00TOTAL 1.00

  • PLANILLA DE METRADOS

    CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR IIII SAN LORENZO

    METTOTAL

    6

    UNDMET

    TOTAL

    2

    METTOTAL

    2899.88

    3018.60

    2927.42

    7923.24

    16769.14 m2

  • PLANILLA DE METRADOS

    METTOTAL

    16769.14

    16769.142

  • PLANILLA DE METRADOS

    METTOTAL

    150.00

    150.000

    METTOTAL

    150.00

    150.000

    CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO

    VOLM3

    1739.93

    1811.16

    3512.90

    2376.97

    0.00

    9440.96

    VOL. TOTAL(m2)

    1344.00

    1,344.00

    ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D

  • PLANILLA DE METRADOS

    (m3)5664.58120.96

    5,785.54

  • PLANILLA DE METRADOS

    CONFORMACION Y COMPACATACION DE SUBRASANTE

    MET M2TOTAL

    19696.56

    COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)

    MET M2

    TOTAL

    1641.99

    VOLM3

    3939.31 3,939.31

    M2VOLM3

    RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC

    RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC

  • PLANILLA DE METRADOS

    19696.56 19,696.56

  • PLANILLA DE METRADOS

    METRM2

    19696.56 19,696.56

    METRM2

    19696.56 19,696.56

    UND

    METRM2

    19696.56 19,696.56

    METTOTAL

    743.560

    774.000

    750.620

    1015.800

    0.000

    Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado,

    ES EL PERIMETRO A PAVIMENTAR

  • PLANILLA DE METRADOS

    3283.98

    ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOMET

    TOTAL

    6.400

    6.400

    6.400

    6.400

    6.400

    32.00

    CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTON VOL. TOTAL

    REPETICIONES (m3)1.00 6.400

    6.400

    RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOMET

    TOTAL164.20164.20

    MET METTOTAL TOTAL

    148.71 148.712

    154.80 154.800

  • PLANILLA DE METRADOS

    150.12 150.124

    203.16 203.160

    0.00 0.000

    656.80 656.8001313.60

  • PLANILLA DE METRADOS

    m3MET MET

    TOTAL TOTAL164.20 164.199105.46 105.461

    269.66

    MET METTOTAL TOTAL

    51.00 51.00051.00

    SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADON VOL. TOTAL

    REPETICIONES (m3)1.00 7.650

    7.65

    JUNTA CON ASFALTO E=1"MET

    TOTAL547.00

    547.00

    METRM2

    1641.99 1,641.99

    METTOTAL

    663.00

  • PLANILLA DE METRADOS

  • PLANILLA DE METRADOS

    UND

    TN

    DESCARGUIO Y CARGUIO DE MATERIALES EN PUERTO SAN LORENZO TN

  • PLANILLA DE METRADOS

  • PLANILLA DE METRADOS

    TN

    UND

  • MUNICIPALIDAD PROVINCIAL DE DATEM DEL MARAONObra : CREACION CON PAVIMENTO RIGIDO, VEREDAS, SARDINELES DEL SECTOR I Lugar : SAN LORENZODistrito : BARRANCAProvincia : DATEM DEL MARAONDepartamento : LORETOFecha : DICIEMBRE DEL 2012

    MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO Y MAQUINARIA

    A. Mquinas pesadas trasladadas sobre plataforma (equipo transportado), desde Cix - Km. 22.Nmero

    Descripcin Peso (Tn) Total ObservacionesUnidades

    1 CAMION CISTERNA 4x2(AGUA)178-210HP 2000G 20.00 140.00 3.00 420.00 Autopropulsado

    1 CAMION VOLQUETE 6x4 330 HP 10 M3. 26.00 100.00 3.00 300.00 Autopropulsado1 CAMION VOLQUETE 10 M3. 26.00 100.00 3.00 300.00 Autopropulsado1 CARGADOR S/LLA