Examen Parcial abastecimiento

14
PROBLEMA N° 01: FECHA CURVA MASA 1966 ENERO 29.30 28.49 73857.10 42.50 44.00 73857.10 0.00 14.01 0.00 FEBREBRO 26.20 25.48 66042.86 42.50 44.00 139899.96 0.00 17.02 0.00 MARZO 25.70 24.99 64782.50 42.50 44.00 204682.46 0.00 17.51 0.00 ABRIL 24.50 24.50 63504.00 42.50 44.00 268186.46 0.00 18.00 0.00 MAYO 28.50 28.50 73872.00 42.50 44.00 342058.46 0.00 14.00 0.00 JUNIO 31.10 31.10 80611.20 42.50 44.00 422669.66 0.00 11.40 0.00 JULIO 68.70 74.75 193740.60 42.50 44.00 616410.26 32.25 0.00 30.75 AGOSTO 90.90 98.90 256346.73 42.50 44.00 872756.99 56.40 0.00 54.90 SEPTIEMBRE 88.80 96.61 250424.52 42.50 44.00 1123181.51 54.11 0.00 52.61 OCTUBRE 49.60 49.60 128563.20 42.50 44.00 1251744.71 7.10 0.00 5.60 NOVIEMBRE 34.70 34.70 89942.40 42.50 44.00 1341687.11 0.00 7.80 0.00 DICIEMBRE 31.60 31.60 81907.20 42.50 44.00 1423594.31 0.00 10.90 0.00 1967 ENERO 37.00 35.98 93266.64 42.50 44.00 1516860.95 0.00 6.52 0.00 FEBREBRO 22.30 21.69 56212.06 42.50 44.00 1573073.01 0.00 20.81 0.00 MARZO 17.20 16.73 43356.38 42.50 44.00 1616429.39 0.00 25.77 0.00 ABRIL 16.40 16.40 42508.80 42.50 44.00 1658938.19 0.00 26.10 0.00 MAYO 19.80 19.80 51321.60 42.50 44.00 1710259.79 0.00 22.70 0.00 JUNIO 58.70 58.70 152150.40 42.50 44.00 1862410.19 16.20 0.00 14.70 JULIO 59.90 65.17 168923.75 42.50 44.00 2031333.94 22.67 0.00 21.17 AGOSTO 71.60 77.90 201918.87 42.50 44.00 2233252.81 35.40 0.00 33.90 SEPTIEMBRE 198.00 215.42 558379.01 42.50 44.00 2791631.82 172.92 0.00 171.42 OCTUBRE 127.00 127.00 329184.00 42.50 44.00 3120815.82 84.50 0.00 83.00 NOVIEMBRE 52.90 52.90 137116.80 42.50 44.00 3257932.62 10.40 0.00 8.90 DICIEMBRE 38.50 38.50 99792.00 42.50 44.00 3357724.62 0.00 4.00 0.00 TOTAL 491.96 216.54 476.96 Extracción Sobrante= 275.42 m3/s ## Extracción Adicional= 36.0 m3/s Si se tiene que diseñar una Presa, en una cuenca determinada, para desarrollar el presente problema debe trabajar con los datos de la practic dirigida domiciliaria que fu el profesor, teniendo en cuenta que en los meses de invierno incrementa en un 8.8% y en los meses de verano baja en 2.75%; además que la capacidad de almacenamiento que s incrementar el gasto mínimo de 14.2 m3/seg a un gasto seguro de 42.5 m3/seg. Encontrar las extracciones al vaso, adicionales a las entradas, para completar los 44 m3/ extracciones acumuladas para planificar el sistema de riego de una zona agrícola arrocera. FLUJO (m3/seg) FLUJO MODIFICADO POR ESTACIONES (m3/seg) EN MILES DE (m3/mes) GASTO SEGURO (42.5m3/s en m3/mes) GASTO SEGURO (44m3/s en m3/mes) EXTRACCIONES NECESARIAS (para 42.5m3/s) CAPTACION REQUERIDA (para 42.5m3/s) EXTRACCIONES NECESARIAS (para 44m3/s)

description

abastecimiento de agua

Transcript of Examen Parcial abastecimiento

PROBLEMA N 01PROBLEMA N 01:Si se tiene que disear una Presa, en una cuenca determinada, para desarrollar el presente problema debe trabajar con los datos de la practic dirigida domiciliaria que fue realizada con el profesor, teniendo en cuenta que en los meses de invierno incrementa en un 8.8% y en los meses de verano baja en 2.75%; adems que la capacidad de almacenamiento que se requiere para incrementar el gasto mnimo de 14.2 m3/seg a un gasto seguro de 42.5 m3/seg. Encontrar las extracciones al vaso, adicionales a las entradas, para completar los 44 m3/seg, y las extracciones acumuladas para planificar el sistema de riego de una zona agrcola arrocera.

FECHAFLUJO (m3/seg)FLUJO MODIFICADO POR ESTACIONES (m3/seg)EN MILES DE (m3/mes)GASTO SEGURO (42.5m3/s en m3/mes)GASTO SEGURO (44m3/s en m3/mes)CURVA MASAEXTRACCIONES NECESARIAS (para 42.5m3/s)CAPTACION REQUERIDA (para 42.5m3/s)EXTRACCIONES NECESARIAS (para 44m3/s)CAPTACION REQUERIDA (para 44m3/s)

1966ENERO 29.3028.4973857.1042.5044.0073857.100.0014.010.0015.51FEBREBRO 26.2025.4866042.8642.5044.00139899.960.0017.020.0018.52MARZO25.7024.9964782.5042.5044.00204682.460.0017.510.0019.01ABRIL24.5024.5063504.0042.5044.00268186.460.0018.000.0019.50MAYO28.5028.5073872.0042.5044.00342058.460.0014.000.0015.50JUNIO31.1031.1080611.2042.5044.00422669.660.0011.400.0012.90JULIO68.7074.75193740.6042.5044.00616410.2632.250.0030.750.00AGOSTO90.9098.90256346.7342.5044.00872756.9956.400.0054.900.00SEPTIEMBRE88.8096.61250424.5242.5044.001123181.5154.110.0052.610.00OCTUBRE49.6049.60128563.2042.5044.001251744.717.100.005.600.00NOVIEMBRE34.7034.7089942.4042.5044.001341687.110.007.800.009.30DICIEMBRE31.6031.6081907.2042.5044.001423594.310.0010.900.0012.401967ENERO 37.0035.9893266.6442.5044.001516860.950.006.520.008.02FEBREBRO 22.3021.6956212.0642.5044.001573073.010.0020.810.0022.31MARZO17.2016.7343356.3842.5044.001616429.390.0025.770.0027.27ABRIL16.4016.4042508.8042.5044.001658938.190.0026.100.0027.60MAYO19.8019.8051321.6042.5044.001710259.790.0022.700.0024.20JUNIO58.7058.70152150.4042.5044.001862410.1916.200.0014.700.00JULIO59.9065.17168923.7542.5044.002031333.9422.670.0021.170.00AGOSTO71.6077.90201918.8742.5044.002233252.8135.400.0033.900.00SEPTIEMBRE198.00215.42558379.0142.5044.002791631.82172.920.00171.420.00OCTUBRE127.00127.00329184.0042.5044.003120815.8284.500.0083.000.00NOVIEMBRE52.9052.90137116.8042.5044.003257932.6210.400.008.900.00DICIEMBRE38.5038.5099792.0042.5044.003357724.620.004.000.005.50TOTAL491.96216.54476.96237.54E+xtraccin Sobrante= 275.42 m3/sE+xtraccin Sobrante= 239 m3/s

E+xtraccin Adicional= 36.0 m3/sb)Metodologas para la determinacin de la precipitacin media en una cuenca de estudioEstimacin del escurrimiento superficial, aplicado a un curso natural de agua en una cuenca hidrogrfica conocidaMtodos sobre la determinacin la escorrenta superficialc)Calculamos el hidrograma de crecidas y la cargas maxima, con la informacion brindada en clase de los flujos Se recominda tener en cuenta el buen diseo de la defensa riberea ya que son estructuras construidas para proteger de las crecidas de los rosse recomienda tener en cue ta para el diseo las temporadas de lluvia que puede tener dicho lugar donse se realizara el proyecto

PROBLEMA N 02PROBLEMA N 02Si en su trabajo domiciliario de la cuenca que ud seleccion, tiene que disear una Obra Hidraulica Cmo calcula el tiempo necesario para que el caudal se estabilice; si considera conveniente proponer un ejemplo?AOCAUDAL MEDIO ANUAL(m3/seg)

199913.90200016.70200114.80200217.50200316.50200430.20200529.80200632.20200731.60200831.50200916.90201015.20201117.50

Avenida de Diseo32.20 m3/segDesviacin Estndar7.65ANALISIS DE CONSISTENCIAPara el diseo del canal revestido de concreto, se tomar como avenida de diseo :39.85 m3/segLongitud17580.00 mPendiente (s)0.0480

Tiempo de ConcentracinTc=1.93 horas115.81 minutos

Tiempo de RetornoTr =69.49 minutosRPTA: El tiempo necesario para que el canal se estabilice 1.93 horas.

PROBLEMA N 03PROBLEMA N 03Si se tiene que disear una presa en una cuenca determinada con los datos que se adjunta.Calcular la avenida de diseo?.- Realizar anlisis y conclusiones.

AOCAUDALES DE DISEO (m3/seg)CAUDALES DE DISEO EN 500 AOS (miles de millones de m3/seg)CURVA MASA19531288.0020309.1820309.1819541043.5516454.7036763.881955735.7511601.3148365.191956648.8810231.5458596.731957634.5010004.8068601.521958628.609911.7678513.291959813.0012819.3891332.671960513.008088.9899421.661961507.608003.84107425.491962499.507876.12115301.611963486.547671.76122973.371964472.507450.38130423.751965496.757832.75138256.501966445.507024.64145281.151967425.256705.34151986.491968660.2510410.82162397.311969391.506173.17168570.481970854.2213469.34182039.831971357.755641.00187680.831972352.355555.85193236.681973346.285460.06198696.751974340.205364.27204061.021975334.805279.13209340.151976325.625134.38214474.521977308.614866.16219340.691986298.894712.90224053.581987291.604597.95228651.531988378.895974.34234625.871989654.3310317.48244943.341990288.894555.22249498.561991243.673842.19253340.751992163.352575.70255916.451993157.952490.56258407.011994234.683700.43262107.441995135.892142.71264250.16199697.871543.21265793.37 Promedio de los caudales468.24m3/segDATOS DE LAS SUBCUENCASLongitud17580.00 mrea7126.00 m2Pendiente (s)0.04802.191Precipitacin22.53 mmTiempo de ConcentracinTr =1.93 horas115.81 minutosIntensidadI =70.54 mm/hrCoeficiente de EscorrentaC =0.4CAUDAL MAXIMOQ max =CIA =558.54CAUDAL PROMEDIOQ prom =513.39m3/seg

Rpta: El tiempo de balance o de concentracion es 1.93 horas (2 horas aprox.). Y la avenida de diseo por el cual se vera afectada la presa ser de 513.39 m3/s.