Transcript of Eng Fieldtrip Presentation
-
8/6/2019 Eng Fieldtrip Presentation
1/52
Pico Hydropower Project Workshop in Xiengkhuang
Presented By:
Mr. Thongsanti B. VONGSALYMr. Sopha SOULINEYADETH
1
-
8/6/2019 Eng Fieldtrip Presentation
2/52
LIRE Staffs
2
-
8/6/2019 Eng Fieldtrip Presentation
3/52
Presentation OutlineAbout LIRE
LIRE PartnersLIRE ProjectsPico Hydro Project
Workshop ObjectivesFindingsConclusions
Discussion
3
-
8/6/2019 Eng Fieldtrip Presentation
4/52
LIRE IN GENERAL
4
-
8/6/2019 Eng Fieldtrip Presentation
5/52
About LIRELIRE = Lao Institute for Renewable EnergyNon Profit Organisation, etablished in 2006Do the researches on renewable energySupport intern students
Provide a free public resource of infomation
5
-
8/6/2019 Eng Fieldtrip Presentation
6/52
LIREs Partners
6
Lao Promotion OrganicProduct Association
-
8/6/2019 Eng Fieldtrip Presentation
7/52
-
8/6/2019 Eng Fieldtrip Presentation
8/52
-
8/6/2019 Eng Fieldtrip Presentation
9/52
2.Biomass Gasification
9
-
8/6/2019 Eng Fieldtrip Presentation
10/52
3.Biogas
10
-
8/6/2019 Eng Fieldtrip Presentation
11/52
4. Solar-powered water purification
11
-
8/6/2019 Eng Fieldtrip Presentation
12/52
5.PICO HYDRO PROJECT
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania 12
-
8/6/2019 Eng Fieldtrip Presentation
13/52
Nature of Project
Phase IStart from Nov 2008-Apr 2009
Phase IIStart from May 2009-Dec 2010
FundingGiven by ETC Energy (Dutch Organization) tosupport pico hydro
Fund only for supporting technical informationnot to provide subprojects for end users or shopowners
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania 13
-
8/6/2019 Eng Fieldtrip Presentation
14/52
Objectives of the Project
For end-usersImprove the quality, safety, efficiency
Promote increased use and sharing of pico hydrounits
For shopkeepers
Be able to distinguish between different typesand qualities of units to provide better goods &service to customersProvide information that enables shop owners to
sell more variety of goods related to picoFind more market opportunities
-
8/6/2019 Eng Fieldtrip Presentation
15/52
-
8/6/2019 Eng Fieldtrip Presentation
16/52
Findings
-
8/6/2019 Eng Fieldtrip Presentation
17/52
Market surveyType of pico sold
Propeller (low-head)
Turgo (high-head)Spare parts soldBearing
WindingCableLight bulbs
-
8/6/2019 Eng Fieldtrip Presentation
18/52
-
8/6/2019 Eng Fieldtrip Presentation
19/52
Propeller (low-head)
Use for low landareas
Some shopshave Chinesemanuals
-
8/6/2019 Eng Fieldtrip Presentation
20/52
Turgo (high-head)
-
8/6/2019 Eng Fieldtrip Presentation
21/52
Problems for shop ownersGrid expansionLack of load controllers (NB: different from
voltage stabilizer!)
21
Figure 2 Electronic Load Controller (PowerPal) and dump load.
Stabilizer
Load Controller
-
8/6/2019 Eng Fieldtrip Presentation
22/52
Problems for shop owners (cont)
Lack of prefab draft tube and channel
Lack of manuals in Lao language
After sale servicesExtension services (Technical Advisor)
22
-
8/6/2019 Eng Fieldtrip Presentation
23/52
End Users CommentsLow outputInstallation problems
Location not availableBroken light bulbsLow quality of pico unit
Short life timeFrequent broken
Need manual
Chinese manual
23
-
8/6/2019 Eng Fieldtrip Presentation
24/52
-
8/6/2019 Eng Fieldtrip Presentation
25/52
Standing
Good draft tube and channel Bad draft tube and channel
-
8/6/2019 Eng Fieldtrip Presentation
26/52
Cable useChinese CableVietnam Cable
Thai Cable
-
8/6/2019 Eng Fieldtrip Presentation
27/52
Villages visited
Village PopTotalHH
Nr.pico
Nongbone-Nameuang 563 69 8
Naxay-Nasay 638 91 26
Hinh 521 86 7
Sopjam 376 62 9Meuang Ngoi Kao 754 143 40
Sobkhan 443 82 22
Nalin 539 113 50Hatsaykham 281 57 26
-
8/6/2019 Eng Fieldtrip Presentation
28/52
Nr Pico Vs Nr Pico SharedNr. Pico and Nr. Shared Pico(Kham Dist)
8 8
26
13
7
00
5
10
15
20
25
30
Nr Pico Nr SharedPico Nr Pico Nr SharedPico Nr Pico Nr SharedPico
Nongbone Nameuang
Naxay Nasay
Hinh
-
8/6/2019 Eng Fieldtrip Presentation
29/52
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania29
Nr. Pico and Nr. of Shared Pico(LPB)
9
2
40
15
22
8
50
3426 25
0
10
20
30
40
50
60
P i c o
S h a
r e d P i
c o P i
c o
S h a
r e d P i
c o P i
c o
S h a
r e d P i
c o P i
c o
S h a
r e d P i
c o P i c o
S h a
r e d P i
c o
Sobjam Meuang Ngoi KaoSobkhan NalinHatsaykham
-
8/6/2019 Eng Fieldtrip Presentation
30/52
End Users Vs Non UsersNongbone Nameuang Village(Kham
District)
71%
29%
Non Users HH Nr HH End users
Naxay Nasay Village(Kham District)
57%
43%
Non Users HH Nr HH End users
Hinh Village(Kham District)
92%
8%
Non Users HH Nr HH End users
-
8/6/2019 Eng Fieldtrip Presentation
31/52
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania31
Sopjam Village(LPB)
73%
27%
Non Users HH Nr HH Use Pico
Meuang Ngoi Kao Village(LPB)
58%
42%
Non Users HH Nr HH Use Pico
Nalin Village(LPB)
73%
27%
Non Users HH Nr HH Use Pico
Hatsaykham Village(LPB)
0%
100%
Non Users HH Nr HH End users
-
8/6/2019 Eng Fieldtrip Presentation
32/52
Conclusions
People live near main road want to connect
grid, but expensiveRemote area people show their willingness touse pico. The usage is still common
32
-
8/6/2019 Eng Fieldtrip Presentation
33/52
CONCEPTS RESULTS
-
8/6/2019 Eng Fieldtrip Presentation
34/52
8 Concepts Presented to End Users
A: Draft Channel and TubeB: Electronic Load Controller C: Better CablesD: Community Owned SystemE: Purchasing Aids
F: Installation ToolkitG: Installation AdviceH: Shop Owner WorkshopI: Traveling Salesman
34
-
8/6/2019 Eng Fieldtrip Presentation
35/52
A: Draft Channel and Tube
35
-
8/6/2019 Eng Fieldtrip Presentation
36/52
B: Electronic Load Controller
36
-
8/6/2019 Eng Fieldtrip Presentation
37/52
C: Better Cables (only for end users)
37
-
8/6/2019 Eng Fieldtrip Presentation
38/52
D: Community Owned System
38
-
8/6/2019 Eng Fieldtrip Presentation
39/52
E: Purchasing Aids
39
-
8/6/2019 Eng Fieldtrip Presentation
40/52
F: Installation Toolkit
40
-
8/6/2019 Eng Fieldtrip Presentation
41/52
G: Installation Advice
41
-
8/6/2019 Eng Fieldtrip Presentation
42/52
H: Shop Owner Workshop(only for shop
owners)
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania42
-
8/6/2019 Eng Fieldtrip Presentation
43/52
I: Traveling Salesman
43
f
-
8/6/2019 Eng Fieldtrip Presentation
44/52
Results after concepts presentedScore of Concepts for HH(Kham
District)
2.83
22.2
2
1.5
2.6
00.5
1
1.5
2
2.5
3
3.5
A B C D E F G
A: Draft Channel and Tube B: Load Controller
C: Better Cables D: Community Own System
E: Purchasing Aids F: Installation Toolkit
G: Installation advice
R lt ft t t d
-
8/6/2019 Eng Fieldtrip Presentation
45/52
Results after concepts presented
45
Score of Concepts for HH(Luang phrabang)
1.75
3.62
2.622.2
1
2
1.121.38
0
0.5
1
1.5
2
2.5
3
3.5
4
A B C D E F G I
A: Draft Channel and Tube B: Load Controller
C: Better Cables D: Community Own System
E: Purchasing Aids F: Installation ToolkitG: Installation advice I: Travelling salesman
-
8/6/2019 Eng Fieldtrip Presentation
46/52
ConceptsElectronic Load Controller
-
8/6/2019 Eng Fieldtrip Presentation
47/52
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania 47
-
8/6/2019 Eng Fieldtrip Presentation
48/52
Installation and Use Guides
48
Informational Workshops for Shop O ners
-
8/6/2019 Eng Fieldtrip Presentation
49/52
Informational Workshops for Shop Owners
49
-
8/6/2019 Eng Fieldtrip Presentation
50/52
-
8/6/2019 Eng Fieldtrip Presentation
51/52
So what do think of these fourconcepts?Lets discussion begins
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania 51
-
8/6/2019 Eng Fieldtrip Presentation
52/52
THANK YOU