10
INVERSION TOTAL POR COMPONENTES ALTERNATIVA 01 - PRECIOS PRIVADO ITEM RUBROS UND PARCIAL TOTAL 01.00 ESTUDIOS 30,000.00 01.01 EXPEDIENTE TECNICO GLB 30,000.00 02.00 COSTO DIRECTO 1,080,286.55 02.01 OBRAS PROVISIONALES GLB 61,651.16 02.02 OBRAS PRELIMINARES GLB 123,319.96 02.03 DEMOLICIONES GLB 94,934.29 02.04 MOVIMIENTOS DE TIERRAS GLB 509,729.35 02.05 PAVIMENTOS GLB 2,076,270.47 02.06 OBRAS DE ARTE Y DRENAJE GLB 3,733,797.42 02.07 SEÑALIZACION Y SEGURIDAD VIAL GLB 132,148.14 02.08 JARDINERIA Y VARIOS GLB 103,361.83 02.09 MITIGACION AMBIENTAL GLB 41,500.00 03.00 SUPERVISION 37,810.03 03.01 SUPERVISION DE OBRA (6.81%) GLB 37,810.03 04.00 PLAN DE CONTINGENCIA 10,000.00 04.01 PLAN DE CONTINGENCIA GLB 10,000.00 05.00 GASTOS GENERALES 86,422.92 05.01 GASTOS GENERALES (10.97%) GLB 86,422.92 06.00 UTILIDAD 0.00 06.01 UTILIDAD (5%) GLB 0.00 07.00 IGV 0.00 07.01 IGV (18%) GLB 0.00 TOTAL INVERSION 1,244,519.50

Transcript of Cuadro PP Pistas LamasS

INVERSION TOTAL POR COMPONENTES

ALTERNATIVA 01 - PRECIOS PRIVADO

ITEM RUBROS UND PARCIAL TOTAL

01.00 ESTUDIOS 30,000.00

01.01 EXPEDIENTE TECNICO GLB 30,000.00

02.00 COSTO DIRECTO 1,080,286.55

02.01 OBRAS PROVISIONALES GLB 61,651.16

02.02 OBRAS PRELIMINARES GLB 123,319.96

02.03 DEMOLICIONES GLB 94,934.29

02.04 MOVIMIENTOS DE TIERRAS GLB 509,729.35

02.05 PAVIMENTOS GLB 2,076,270.47

02.06 OBRAS DE ARTE Y DRENAJE GLB 3,733,797.42

02.07 SEÑALIZACION Y SEGURIDAD VIAL GLB 132,148.14

02.08 JARDINERIA Y VARIOS GLB 103,361.83

02.09 MITIGACION AMBIENTAL GLB 41,500.00

03.00 SUPERVISION 37,810.03

03.01 SUPERVISION DE OBRA (6.81%) GLB 37,810.03

04.00 PLAN DE CONTINGENCIA 10,000.00

04.01 PLAN DE CONTINGENCIA GLB 10,000.00

05.00 GASTOS GENERALES 86,422.92

05.01 GASTOS GENERALES (10.97%) GLB 86,422.92

06.00 UTILIDAD 0.00

06.01 UTILIDAD (5%) GLB 0.00

07.00 IGV 0.00

07.01 IGV (18%) GLB 0.00

TOTAL INVERSION 1,244,519.50

6,876,712.62 ok

5,796,426.07

74,416.40

2,627,499.82

-2,553,083.42

INVERSION TOTAL A PRECIOS PRIVADOS

ALTERNATIVA 01

INVERSION

ALTERNATIVA 01

INFRAESTRUCTURA 1,166,709.47

MANO DE OBRA 425,084.66

CALIFICADA 84,374.18

340,710.48

MATERIALES, INSUMOS 552,789.36

EQUIPOS 90,418.58

HERRAMIENTAS 11,993.95

SUBCONTRATOS 0.00

TOTAL COSTO DIRECTO 1,080,286.55

GASTOS GENERALES (8% CD) 86,422.92

UTILIDAD (0% CD) 0.00

SUBTOTAL 1,166,709.47

IGV (0%) 0.00

TOTAL INFRAESTRUCTURA 1,166,709.47

ESTUDIOS 30,000.00

PLAN DE CONTINGENCIA 10,000.00

SUPERVISION (3.5%) 37,810.03

TOTAL INVERSION 1,244,519.50

PRECIOS PRIVADOS

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN

NO CALIFICADA*

INVERSION TOTAL A PRECIOS SOCIALES

ALTERNATIVA 01

INVERSION FC

ALTERNATIVA 01

INFRAESTRUCTURA 1,166,709.47 941,413.67

MANO DE OBRA 425,084.66 291,428.10

CALIFICADA 84,374.18 0.91 76,780.50

340,710.48 0.63 214,647.60

MATERIALES O INSUMOS 552,789.36 0.85 469,870.96

EQUIPO 90,418.58 0.85 76,855.79

HERRAMIENTAS 11,993.95 0.85 10,194.86

SUBCONTRATOS 0.00 0.85 0.00

TOTAL COSTO DIRECTO 1,080,286.55 848,349.71

GASTOS GENERALES (8% CD) 86,422.92 93,063.96

UTILIDAD (5% CD) 0.00 0.00

SUBTOTAL 1,166,709.47 941,413.67

IGV (0%) 0.00 0.00

TOTAL INFRAESTRUCTURA 1,166,709.47 941,413.67

30,000.00 1.00 30,000.00

PLAN DE CONTINGENCIA 10,000.00 0.85 8,500.00

SUPERVISION 37,810.03 1.00 37,810.03

TOTAL INVERSION 1,244,519.50 1,017,723.70

PRECIOS DE MERCADO

PRECIOS SOCIALES

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN

NO CALIFICADA*

ESTUDIOS (Infraestructura+Plan de Contingencia)

INVERSION TOTAL POR COMPONENTES

ALTERNATIVA 02 - PRECIOS PRIVADO

ITEM RUBROS UND PARCIAL TOTAL

01.00 ESTUDIOS 30,000.00

01.01 EXPEDIENTES TECNICOS GLB 30,000.00

02.00 COSTO DIRECTO 1,114,402.27

02.01 OBRAS PROVISIONALES GLB 61,651.16

02.02 OBRAS PRELIMINARES GLB 123,319.96

02.03 DEMOLICIONES GLB 94,934.29

02.04 MOVIMIENTOS DE TIERRAS GLB 530,207.35

02.05 PAVIMENTOS GLB 2,292,325.01

02.06 OBRAS DE ARTE Y DRENAJE GLB 3,799,864.42

02.07 SEÑALIZACION Y SEGURIDAD VIAL GLB 132,148.14

02.08 JARDINERIA Y VARIOS GLB 112,458.71

02.09 MITIGACION AMBIENTAL GLB 48,000.00

03.00 SUPERVISION 39,004.08

03.01 SUPERVISION DE OBRA (6.57%) GLB 39,004.08

04.00 PLAN DE CONTINGENCIA 10,000.00

04.01 PLAN DE CONTINGENCIA GLB 10,000.00

05.00 GASTOS GENERALES 89,152.18

05.01 GASTOS GENERALES (10.57%) GLB 89,152.18

06.00 UTILIDAD 0.00

06.01 UTILIDAD (5%) GLB 0.00

07.00 IGV 0.00

07.01 IGV (18%) GLB 0.00

TOTAL INVERSION 1,282,558.53

7,194,909.04 ok

-6,080,506.77

91,422.00

748,461.60

-657,039.60

INVERSION TOTAL A PRECIOS PRIVADOS

ALTERNATIVA 02

ALTERNATIVA 02:

INVERSION

INFRAESTRUCTURA 1,203,554.45

MANO DE OBRA 429,047.45

CALIFICADA 88,534.39

340,513.06

MATERIALES O INSUMOS 582,640.04

EQUIPO 90,176.00

HERRAMIENTAS 12,538.79

SUBCONTRATOS 0.00

TOTAL COSTO DIRECTO 1,114,402.27

GASTOS GENERALES (8%) 89,152.18

UTILIDAD (5% CD) 0.00

SUBTOTAL 1,203,554.45

IGV (18%) 0.00

TOTAL INFRAESTRUCTURA 1,203,554.45

30,000.00

PLAN DE CONTINGENCIA 10,000.00

SUPERVISION (3.5%) 39,004.08

TOTAL INVERSION 1,282,558.53

16,486.41

414,041.95

344,867.32

1,205,676.16

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN

PRECIOS PRIVADOS

NO CALIFICADA*

ESTUDIOS (Infraestructura+Plan de Contingencia)

INVERSION TOTAL A PRECIOS SOCIALES

ALTERNATIVA 02

INVERSION FC

ALTERNATIVA 02

INFRAESTRUCTURA 1,191,015.67 1,196,862.01

MANO DE OBRA 429,047.45 295,089.52

CALIFICADA 88,534.39 0.91 80,566.29

340,513.06 0.63 214,523.23

MATERIALES O INSUMOS 582,640.04 0.85 495,244.03

EQUIPO 90,176.00 0.85 76,649.60

HERRAMIENTAS 12,538.79 0.85 10,657.97

SUBCONTRATOS 0.00 0.85 0.00

TOTAL COSTO DIRECTO 1,101,863.49 877,641.12

GASTOS GENERALES (8% CD) 89,152.18 92,766.67

UTILIDAD (0% CD) 0.00 43,882.06

SUBTOTAL 1,191,015.67 1,014,289.84

IGV (0%) 0.00 182,572.17

TOTAL INFRAESTRUCTURA 1,191,015.67 1,196,862.01

30,000.00 1.00 30,000.00

PLAN DE CONTINGENCIA 10,000.00 0.85 8,500.00

SUPERVISION 39,004.08 1.00 39,004.08

TOTAL INVERSION 1,260,019.75 1,274,366.09

PRECIOS DE MERCADO

PRECIOS SOCIALES

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN

NO CALIFICADA*

ESTUDIOS (Infraestructura+Implementacion)

INVERSION TOTAL A PRECIOS DE MERCADO- ALTERNATIVA 01

ESTUDIOS 30,000

INFRAESTRUCTURA 1,166,709

PLAN DE CONTINGENCIA 10,000

SUPERVISION 37,810

TOTAL PRESUPUESTO 1,244,519

INVERSION TOTAL A PRECIOS DE MERCADO - ALTERNATIVA 02

ESTUDIOS 30,000

INFRAESTRUCTURA 1,203,554

PLAN DE CONTINGENCIA 10,000

SUPERVISION 39,004

TOTAL PRESUPUESTO 1,282,559

INVERSION TOTAL A PRECIOS SOCIAL - ALTERNATIVA 01

ESTUDIOS 30,000

INFRAESTRUCTURA 941,414

PLAN DE CONTINGENCIA 8,500

SUPERVISION 37,810

TOTAL PRESUPUESTO 1,017,724

INVERSION TOTAL A PRECIOS SOCIAL - ALTERNATIVA 02

ESTUDIOS 30,000

INFRAESTRUCTURA 1,196,862

PLAN DE CONTINGENCIA 8,500

SUPERVISION 39,004

TOTAL PRESUPUESTO 1,274,366