CONSTRUCTORA VARGAS NICARAGUA
http://www.consorciovargas.com
Building Inspection
Las Delicias – San Juan del Sur - Rivas Nicaragua
Client: Teague
Inspector: Jimmy Ricardo Vargas
Date of the Inspection: Wednesday, Sep 28 - 2016
CONTENT
General Datas of the Inspector _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 02
Objective of the Inspection _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 03
Activities Performed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 03
Type of materials used in the construction _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 04-24
Building Inspection Checklist (Pictures and notes) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 04-24
Maintenances plan _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 04-24
Repairs Plan _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 04-24
Additions plan _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 04-24
General budget _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 04-24
Recommendations and conclusions _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 25
2
Brief Description of the Inspector
Jimmy Ricardo Vargas, Nicaraguan, 34 years old, civil
engineer and consultant. Post graduate degree in design
and evaluation of projects, specialist in housing and
building construction. This includes supervising, budgeting,
design, inspection, and housing consultation. With more
than ten years’ experience with NGOs, Private Sector,
Government Institutions, and Cooperation Agencies.
Some Last Experiences Building Inspection in two houses: La Talanguera, San Juan del
Sur, Client: Patrick Keenan, evaluation of the condition of the structure, materials, style,
life expectancy, costs for maintenance and repairs, this for support the choice of the
potential client to buy the properties or not.
Septic Tank construction and design in Malpaisillo Leon, included one treatment system of
residual waters, purification filter and distribution system to use the water for agricultural
activities
Design of new annexes for some properties located in San Juan del Sur Nicaragua, one
little office in playa remanso and one wood deck beside the pool of one property in San
Juan del Sur town.
Building Inspection in Apartments: Colinas de Miramar San Juan del Sur, Client: Jean
Carr, it was determined if the current construction contains the constructive technical
elements of a apartment without risk of collapse, irreversible damage, short-term or
destruction caused by forces of nature. Proposals to change some parts in the
construction that was not built properly.
Building Inspection in playa Marsella, Client: Karen Weiner, it was determined if the house
contained the constructive technical elements of a home without risk of collapse,
irreversible damage, short-term or destruction caused by forces of nature. Plan for repairs
and maintenance, a calculation of life expectancy of the building, and estimated total
replacement costs.
Engineer Supervisor of a project to repair and construct 50 houses for lowing income
housing in the municipality of Chinandega. Formation and distribution of team project,
logistics, and location of construction materials. Contracts and negotiations with
homeowners for physical adjustment according to materials available, works of repair or
construction, working sessions with staff of the municipality of Chinandega, periodic
supervision of workers, gathering data, photos, and reports.
3
Objectives of the Inspection
-Building inspection in Las Delicias, San Juan del Sur Nicaragua, to determine if the
current construction contains the constructive technical elements of a home without risk of
collapse, irreversible damage, short-term or destruction caused by forces of nature,
-Quote for adding renovations, additions, repairs, cleaning or maintenance.
Performed Activities
-Exchange of information with the client to determine the required needs
-Coordination of the inspection with the owner of the building and realtor
-Inspection of the site, comments on the materials used, technical specifications of
construction, damage, tests and inspections, photographic survey
-Photo editing
-Preparation of report
-Delivery
Maintenance, Repairs and Cleaning
The activities included in the budget for the item mentioned are those that are focused in
change the appearance of the current structure, replace parts or damaged objects, to
enlarge the life expectancy of the constructive elements, the ultimate goal is to build in
base of the current construction, using the same type, model and quality. The activities
also includes the total cleaning of the house, removing all the corrosion, dirt, moths.
Painting the metal elements with anticorrosive paint, sealing cracks and leaks,
compaction subsidence in the ground, removal of weeds and vegetation.
4
Chart One
Exterior Good OK Bad
Back Doors
House 1 contains one back door /
Good condition / wood assembled
Not back door in House 2, /
Good option to build one /
wood assembled
Deck, porch, patio Not deck, Enough patio and front porch in House 1 and 2 / Good condition
Good option to build one side porch, terrace
Doorbell Good condition in House 1 and 2
Driveway
In front of the property, enough
space in House 1 and 2
Front Doors
Good condition in House 1 and 2 /
wood assembled
Garage Doors None
Garbage receptacle None / Good option to build one metal receptacle
House number None
Mailbox None
Outdoor lights Good condition in House 1 and 2
Paint and trim Not trim and acceptable paint in house 1, Good trim and paint in house 2
Trim needs some little maintenance in house 1
Parking In front and beside of the property, enough space in house 1 and 2
Recycling receptacle None / Good option to buy plastic units or build metal receptacle
Sidewalks None / Good option to build sidewalks beside and back the properties
Siding (brick/stone/cement) Cement finishing in good condition in house 1 and 2
Traffic noise None
Windows PVC and glass windows with insect mesh in good condition in house 1 and 2
-To build and install one back or side door in house 2, U$ 300 –To build one Garbage metal receptacle shared for both houses U$ 250 –Some little maintenance for the trim in house 1 U$ 100 –To build or buy recycling receptacle U$ 200 –To build sidewalks beside and back the properties U$ 2,000 –To build one side porch, terrace U$ 4,000 Estimated costs for repairs, cleaning and maintenance U$ 100 Estimated costs for new construction, renovation and replaced objects U$ 6,750
5
Left side patio in
house 1
Back door in
house 1,
varnished wood
assembled door
with glass right
frame
Porch house
1, nonskid
floor
Shared
garden
Motion
sensor, house
2
Front door
house 2, wood
assembled door
Outdoor light,
house 1
Outdoor
outlets house
2
6
Parking area
house 1
Hooks for
hammocks house
1
Glass
window
with insect
mesh house
1
Front door,
house 1,
varnished
wooden
door with
glass left
frame
Sample of garbage and recycling
receptacles Sample of porch
7
Chart Two
Yard Good OK Bad
Drainage Acceptable
Fences and gates None / Good option to build fences
Retaining wall None
Shed None
Sprinklers None
Swimming pool None / Good option to build one
–Construction of the fences U$ 16,000 –Construction of swimming pool U$ 20,000 Estimated costs for new construction, renovation and replaced objects U$ 36,000
Sample of fences
Fences
Area for
swimming
pool
Sample of swimming pool
8
Roof Good OK Bad
Roof structure Zinc type tile and ridges, good condition
Gutters and downspouts PVC in good condition
Soffits and fascia Good condition, synthetic material (PVC Plastic)
Good option to replace it when reach the life expentancy
Metal zinc
house 1
Metal
zinc
house 2
Ridges
house 1
Soffits and
fascias
house 1
Gutters
house 1
Soffits and
fascias
house 2
9
Chart four
Garage Good OK Bad
Ceiling
In front of the property only the parking area / Good option to build one shared garage beside the house for 4 cars or to build one garage per house for 2 cars
Doors
Floors
Lights
Storage
Walls
Windows
Construction of the garage U$ 10,000 Estimated costs for new construction U$ 10,000
Chart five
Fireplace Good OK Bad
Blockages None
Carbon Monoxide Detector None
Mantle None
Soot None
Tiles None
Area for the garage Sample of new garage
10
Chart six
Bathrooms Bathroom 1 / House 2 Bathroom 2 / House 2 Bathroom 2 / House 1 Bathroom 1 / House 1
Good OK Bad Good OK Bad Good OK Bad Good OK Bad
Baseboards Acceptable, PVC plastic Acceptable Acceptable Acceptable
Cabinets, shelves, & drawers
Wood assembled, good Wood assembled, good Wood assembled, good Wood assembled, good
Ceiling PVC plastic, acceptable PVC plastic, acceptable PVC plastic, acceptable PVC plastic, acceptable
Counter Good condition Good condition Good condition Good condition
Doors Wood assembled door good condition
Melamine door, good condition
Melamine door, good condition Melamine door, good condition
Floors Smooth ceramics, good condition
Anti-slip ceramics, good condition
Anti-slip ceramics, good condition
Anti-slip ceramics, good condition
GFCI outlet None None None
Lights Good condition Good condition Good condition Good condition
Mirror Good condition Good condition Good condition Good condition
Outlets and switches Good condition Good condition Good condition Good condition
Sink Acceptable, porcelain Acceptable, porcelain Acceptable, porcelain Acceptable, porcelain
Toilet Acceptable, porcelain Acceptable, porcelain Acceptable, porcelain Acceptable, porcelain
Towel hook Good Good Good Good
Trim PVC Tile Tile Tile
Tub and shower Good Good Good Good
Walls Acceptable, PVC and aluminum
Acceptable, ceramic tile
Acceptable, ceramic tile
Acceptable, ceramic tile
Window Glass and PVC, Good Glass and PVC, Good Glass and PVC, Good Glass and PVC, Good
11
Bathroom 1 / House 2 Bathroom 2 / House 2 Bathroom 2 / House 1 Bathroom 1 / House 1
12
Bathroom 1 / House 2 Bathroom 2 / House 2 Bathroom 2 / House 1 Bathroom 1 / House 1
Shower,
bathroom 1
Mirror,
bathroom 2
13
Chart seven
Bedrooms Bedroom 2 / House 2 Master bedroom / House 2 Bedroom 2 / House 1 Master Bedroom / House 1
Good OK Bad Good OK Bad Good OK Bad Good OK Bad
Baseboards Concrete Concrete Concrete Concrete
Ceiling PVC plastic, acceptable
PVC plastic, acceptable
PVC plastic, acceptable
PVC plastic, acceptable
Closet Melamine furniture, good condition
Melamine furniture, good condition
Melamine furniture, good condition
Melamine furniture, good
Doors Wood assembled door, good condition
Wood assembled door, good condition
Wood assembled door, good condition
Wood assembled door, good
Floors Smooth ceramic
Smooth ceramic Two pieces chapped
Smooth ceramic One piece chapped
Smooth ceramic
Lights Good, ceiling fan light Good, ceiling fan light Good, ceiling fan light Good, ceiling fan light
Outlets and switches
Good Two empty outlet
boxes Good
Good
Good
Trim Wood
Painting trim
Painting trim A small area damaged
Painting trim
Walls Concrete covering Concrete covering Concrete covering Concrete covering
Windows Glass and PVC
Glass and PVC
Glass and PVC
Need curtains and tubes
Glass and PVC
-To install new utilities in the empty outlet boxes U$ 150 –To buy curtains and tubes for windows U$ 100 Estimated costs for new construction, renovation and replaced objects U$ 250
14
Bedroom 1 / House 2 Master Bedroom 2 / House 2 Bedroom 2 / House 1 Master Bedroom 1 / House 1
15
Bedroom 1 / House 2 Master Bedroom 2 / House 2 Bedroom 2 / House 1 Master Bedroom 1 / House 1
Shower,
bathroom 1
Mirror,
bathroom 2
16
Chart eight
Dining Room Features House 2 House 1
Baseboards
House 2 There is one bar (Marble ) to eat in surface, PVC Basement
the kitchen and one wooden table beside House 1 There is one bar (Wooden
) to eat in surface, PVC Basementthe kitchen and one wooden table beside
Concrete Concrete
Ceiling PVC Plastic PVC Plastic
Floors Smooth ceramic
Lights Ceiling light Ceiling light
Outlets and switches Good Good
Trim Painting trim Painting trim
Walls Concrete Concrete
Windows PVC and Glass PVC and Glass
Wooden
table, house
2
Wooden
table, House
1
Bar, House 1
Bar, House 2
17
Chart nine
Living Room House 2 House 1 More comments
Baseboards Concrete Concrete No Sofas in the house 1
Ceiling PVC Plastic, good conditions PVC Plastic, good conditions
Ceiling fan Good Good
Doors Wood assembled door, good
Floors Smooth ceramic Smooth ceramic
Lights Ceiling fan lights Ceiling fan lights
Outlets and switches Good conditions Good conditions
Trim Wooden trim, good Painting trim
Walls Concrete Concrete
Windows PVC and glass windows PVC and glass windows
-To buy new sofas U$ 400 Estimated costs for new construction, renovation and replaced objects U$ 400
Living room,
house 2
House 1,
area for
living room
House 2,
area for
living room
Melamine
furnitures,
house 2
18
Chart ten
Kitchen House 2 House 1 More comments
Baseboards Concrete Concrete
All the stuffs for the kitchen are completed
Cabinets and drawers Melamine cabinets Wooden cabinets
Ceiling PVC Plastic, good PVC Plastic, good
Counter Good conditions, marble surface, wooden basement
Good conditions, marble surface, wooden basement
Dishwasher In the sink
Floors Smooth ceramic Smooth ceramic
One good recommendation to keep cool the air, specially for the PVC materials
Garbage Disposal None None
GFCI outlet None None
Lights Ceiling lights Ceiling lights
Outlets and switches Good conditions Good conditions
Oven Good Good
Refrigerator Good Good
Sink In the counter, good In the counter, good
Smoke Detectors Good
Stove Good Good
Trim Wooden trim Painting trim
Walls Concrete in good conditions Concrete in good conditions
Windows PVC and glass windows PVC and glass windows
House 2 House 1
Light
Window
19
House 2 House 1
Rangehood
20
Chart eleven
Cellars House 2 House 1 More
comments
Baseboards
Good option to build one little cellar in the left side of the property
Good option to build one little cellar in the right side of the property
Ceiling
Ceiling fan
Doors
Floors
Lights
Outlets and switches
Trim
Walls
Windows
-To build two cellars U$ 16,000 Estimated costs for new construction, renovation and replaced objects U$ 16,000
Chart twelve
Attic House 2 House 1 More comments
Insulation
None
None
Ladder
Ventilation
21
Chart thirteen
Hallways House 2 House 1 More comments
Baseboards
None None
Ceiling
Closets
Floors
Lights
Outlets and switches
Skylights
Trim
Walls
Chart fourteen
Basement House 2 House 1 More comments
Baseboards
None
Ceiling
Doors
Floors
Foundation
Lights
Outlets and switches
Stairs
Storage
Sump pump
Trim
Walls
Washer and dryer
Windows
22
Chart fifteen
Stairs House 2 House 1 More comments
Floors
None
Landing
Lights
Railing
Treads
Walls
Chart sixteen
Utilities House 2 House 1 More comments
Air conditioning In the bedrooms and living room
In the bedrooms and living room
To build one structure to hold one air conditioning
Circuit breakers Good Good
Drainage Good Good
Furnace None None
Hot water heater None None
Main electrical panel Good Good
Water pressure Good Good
To build one metal structure to hold one air conditioning U$ 100 Estimated costs for repairs, cleaning and maintenance U$ 100
No metal
structure
23
House 2 House 1
Chart seventeen
Other House 2 House 1 More comments
Asbestos None None
Odor None None
Wash machine / Laundry area Good Good No wash machine
Water tanks Shared water tank
Water pump Shared water pump
Septic tank Shared septic tank
Water well None
Wood-eating insects None
-To buy one wash machine U$ 600 Estimated costs for new construction U$ 600
Wash
machine,
house 2
Laundry
area, house
1
24
Water tank,
shared
Water
pump,
shared
Hand
washer,
house 2
Hand
washer,
house 1
Garden,
shared
House 1, on
demand hot
water
heater
Septic tank,
shared
Laundry
area, house
2
25
Budget
I T E M Amount Specific estimated costs for maintenance, repairs or cleaning (Included in the charts) 200 General estimated costs for maintenance, repairs or cleaning (All the property) 1,500 Estimated costs for new construction, renovations and replaced objects (Included in the charts) 70,100
T O T A L B U D G E T U$ 71,800
Recommendations and conclusions
This budget is general and can vary in one 10 % less or 10 % more according the quality of the
materials to be used and the measurements of the new sections to build, the recommendation and
second phase in this process is to do one 3D Design for the new constructions and to fix the budget
to that design. The building inspection is basically the analysis of the current construction,
structural, architectural, current condition of the materials, type of the materials and one budget for
cleaning, maintenance and repairs of the damaged objects. The prices of the new construction are
based in the current prices of the housing construction industry and for intermediate models of
buildings, not luxury, not basic. (In this report are attached some pictures to give you one idea
about the model that you can build with this prices.)