EVALUACION LINEA DE CONDUCCION DEL EFLUENTE-ZARUMILLA

CAUDAL (l/s) 42.30 42.30 42.30 42.30 42.30 23.96 23.96 23.96 23.96 23.96 23.96

CAUDAL (m^3/s) 0.042 0.042 0.042 0.042 0.042 0.024 0.024 0.024 0.024 0.024 0.024 0.000 0.000 0.000 0.000

D (pulg) 12 14 16 18 20 12 14 16 18 20 16

D (m) 0.30 0.36 0.41 0.46 0.51 0.30 0.36 0.41 0.46 0.51 0.41 0.00 0.00 0.00 0.00

Area (m^2) 0.07 0.1 0.13 0.16 0.2 0.07 0.1 0.13 0.16 0.2 0.13 0 0 0 0

C 140 140 140 140 140 140 140 140 140 140 140

A 0,000426*C*D^2,63 41.09 61.64 87.57 119.37 157.49 41.09 61.64 87.57 119.37 157.49 87.57 0 0 0 0

B Q/A 1.03 0.69 0.48 0.35 0.27 0.58 0.39 0.27 0.20 0.15 0.27 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

S (m/km) B^(1/0,54) 1.0550 0.4980 0.2599 0.1464 0.0877 0.3682 0.1738 0.0907 0.0511 0.0306 0.0907 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

L (Km) 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172 1.172

Hf (m) 1.24 0.58 0.30 0.17 0.10 0.43 0.20 0.11 0.06 0.04 0.11 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

V (m/s) 0.58 0.43 0.33 0.26 0.21 0.33 0.24 0.18 0.15 0.12 0.18 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

D (mm) 300 350 400 450 500 300 350 400 450 500 400 0 0 0 0

NOTAS: DIFERENCIA DE COTAS INICIO Y FINAL= 0,6m

FORMULA DE H&W

FORMULA DE HAZEN Y WILLIAMSQ = 0,2785 * C * 2,63 * S0,54 S = { Q / ( 0,2785 * C * 2,63 ) }1,85 = { Q / ( 0,2785 * C * S0,58 ) }0,38 Hf = S * L

Q = CAUDAL C = COEFICIENTE DE RUGOSIDAD DE H&W = DIAMETRO S = GRADIENTE HIDRAULICA L = LONGITUD

(m3/seg) (mts.) (mts/mts.) (mts.)

CALCULO DE "Q" CALCULO DE Q LA MERCED : Tramo Planta Tratamiento- CRP 16 C= 110

=S= EL CAUDAL ES:

10

(pulg)

=

0.25

(mts)

0.0107

(mts/mts)

Q = 0.0719 (m3/seg)

Q=

71.88

(lts/seg)

Pgina 3

CALCULO DE "S" CALCULO DE LA GRADIENTE HIDRAULICA Y LA VELOCIDAD Introduzca el valor del coeficiente de rugosidad de H&W C en la celda B:5 C= 130

Introduzca el valor del coeficien C= Introduzca el valor del dimetro

Introduzca el valor del dimetro en (pulg) en la celda B:09

=

12

(pulg)

=

0.300

(mts)

=

Introduzca el valor del caudal Q en (lts/seg) en la celda B:13 Q= 50.00 (lts/seg) Q= 0.0500 (m3/seg)

Introduzca el valor del caudal Q Q=

LA GRADIENTE HIDRAULICA ES:

LA GRADIENTE HIDRAULICA E

S = 0.001792 (mts/mts) L= Hf = A= V= 1292.00 2.32 0.0707 0.71 (mts) (mts) (m2) (m/s)1549.6

S= L= Hf = A= V=

Pgina 4

CALCULO DE "S"

Introduzca el valor del coeficiente de rugosidad de H&W C en la celda B:5 130 Introduzca el valor del dimetro en (pulg) en la celda B:09 10 (pulg)

Introduzca el valor del coeficiente de rugosida C= 130

Introduzca el valor del dimetro 0.250 (mts)

=

=

8

Introduzca el valor del caudal Q en (lts/seg) en la celda B:13 50.00 (lts/seg) Q= 0.0500 (m3/seg)

Introduzca el valor del caudal Q en (lts/seg) e Q= 50.00

LA GRADIENTE HIDRAULICA ES:

LA GRADIENTE HIDRAULICA ES:

0.004352 (mts/mts) 36.00 0.16 0.0491 1.02 (mts) (mts) (m2) (m/s)1549.6

S = 0.012889 L= Hf = A= V= 3.00 0.04 0.0314 1.59

Pgina 5

CALCULO DE "S"

alor del coeficiente de rugosidad de H&W C en la celda B:5

alor del dimetro en (pulg) en la celda B:09 (pulg)

=

0.200

(mts)

alor del caudal Q en (lts/seg) en la celda B:13 (lts/seg) Q= 0.0500 (m3/seg)

E HIDRAULICA ES:

(mts/mts) (mts) (mts) (m2) (m/s)2.51

Pgina 6

CALCULO DE "" CALCULO DE Introduzca el valor del coeficiente de rugosidad de H&W C en la celda B:5 C= 140

Introduzca el valor del caudal Q en (lts/seg) en la celda B:09 Q= 30.00 (lts/seg) Q= 0.030 (m3/seg)

Introduzca el valor de la gradiente S en (mts/mts) en la celda B:13 S= 0.0030 (mts/mts)

EL DIAMETRO ES:

= 0.2160 (mts) c = 10 (pulg)

=

8.50

(pulg)

MANUAL MANUAL

Pgina 7

TUBERAS PVC - SAPNorma Tcnica Peruana (ITINTEC) 399.002 Para conduccin de fluidos a presin (agua fra) 5 Precio x Tubo US$ S/. * Clase 7.5 Precio x Tubo US$ S/. * Longitud (m)= 10 Precio x Tubo US$ S/. * 2.28 3.59 2.93 4.61 3.68 5.80 5.28 8.32 6.92 10.90 10.91 17.18 16.02 25.23 23.40 36.86 38.24 60.23 84.25 132.69 135.59 213.55 222.08 349.78 311.21 490.16 5.00

D. Nom. (pulg) D Int. (mm) 1/2 3/4 1 1 1/4 1 1/2 2 56.4 2 1/2 69.4 3 84.1 4 108.4 6 159.8 8 208.4 10 259.6 12 307.2

S/. / m

D Int. (mm)

S/. / m

6.89 8.43 12.42 20.46 44.25 74.42 110.42 162.71

10.85 13.28 19.56 32.22 69.69 117.21 173.91 256.27

2.17 2.66 3.91 6.44 13.94 23.44 34.78 51.25

44.4 55.6 67.8 82.1 105.8 155.8 203.2 253.2 299.6

5.42 7.54 12.03 18.00 32.97 65.01 109.57 171.13 239.29

8.54 11.88 18.95 28.35 51.93 102.39 172.57 269.53 376.88

1.71 2.38 3.79 5.67 10.39 20.48 34.51 53.91 75.38

D Int. (mm) 17.4 22.9 29.4 38.0 43.0 54.2 66.0 80.1 103.2 152.0 198.2 247.0 292.2

S/. / m 0.72 0.92 1.16 1.66 2.18 3.44 5.05 7.37 12.05 26.54 42.71 69.96 98.03

TUBERAS PVC - SISTEMAS UF - URNorma Tcnica Peruana ISO 4422 Para conduccin de fluidos a presin 5 Precio x Tubo US$ S/. * 6.60 10.40 9.33 14.69 12.98 20.44 19.48 30.68 32.10 50.56 41.93 66.04 64.21 101.13 101.55 159.94 150.98 237.79 Clase 7.5 Precio x Tubo US$ S/. * 9.36 14.74 13.60 21.42 19.21 30.26 28.50 44.89 46.24 72.83 60.10 94.66 94.50 148.84 147.29 231.98 232.55 366.27 10 Precio x Tubo US$ S/. * 12.10 19.06 17.29 27.23 24.76 39.00 37.29 58.73 60.02 94.53 78.79 124.09 122.81 193.43 190.38 299.85 302.36 476.22 Long (m)= Anillo de Jebe S/. / m 3.18 4.54 6.50 9.79 15.76 20.68 32.24 49.97 79.37 US$ 0.83 1.26 1.32 1.61 2.48 2.52 3.85 5.90 9.58 S/. * 1.31 1.98 2.08 2.54 3.91 3.97 6.06 9.29 15.09 S/. / m 0.218 0.331 0.347 0.423 0.651 0.662 1.011 1.549 2.515 6.00

D. Nom. (pulg) (mm) D Int. (mm) 2 63 59.8 2 1/2 75 71.2 3 90 85.6 4 110 104.6 5 1/2 140 133.0 6 160 152.0 8 200 190.2 10 250 237.6 12 315 299.6

S/. / m 1.73 2.45 3.41 5.11 8.43 11.01 16.86 26.66 39.63

D Int. (mm) 58.40 69.40 83.40 102.00 126.60 148.40 185.40 231.80 292.20

S/. / m 2.46 3.57 5.04 7.48 12.14 15.78 24.81 38.66 61.04

D Int. (mm) 57.0 67.8 81.4 99.4 120.4 144.6 180.8 226.2 321.2

TUBERAS PVC - SISTEMAS UF - URNorma Tcnica Peruana ISO 4435-1 Para Alcantarillado Serie D. Nom. (pulg) (mm) 4 110 6 160 8 200 10 12 250 315 D. Int. (mm) 153.6 192.2 240.2 302.6 25 Precio x Tubo US$ S/. * 33.71 51.38 80.69 120.64 53.09 80.92 127.09 190.01 S/. / m 8.85 13.49 21.18 31.67 D. Int. (mm) 104.0 152.0 190.2 237.6 299.6 20 Precio x Tubo US$ S/. * 19.40 30.56 41.93 66.04 64.21 101.13 101.55 150.98 159.94 237.79 S/. / m 5.09 11.01 16.86 26.66 39.63 Long (m)= 6.00

Anillo de Jebe US$ 1.61 1.71 2.48 4.32 5.83 S/. * 2.54 2.69 3.91 6.80 9.18 S/. / m 0.423 0.449 0.651 1.134 1.530

TUBERAS PVC - SISTEMAS NOVAFORTNorma Tcnica Peruana 399.163 Para Alcantarillado D. Nom Precio x Tubo (mm) US$ S/. * 110 21.20 33.39 160 33.68 53.05 200 51.34 80.86 250 80.62 126.98 315 112.13 176.60 400 254.48 400.81 Long (m)= 6.00 Anillo de Jebe US$ S/. * S/. / m 5.57 0.45 0.71 0.118 8.84 0.74 1.17 0.194 13.48 1.34 2.11 0.352 21.16 2.30 3.62 0.604 29.43 4.79 7.54 1.257 66.80 9.50 14.96 2.494

S/. / m

Tuberas D. Nom. (pulg) (mm) 2 63 2 1/2 75 3 90 4 110 6 160 8 200 10 250 12 315 Long. til (m) % 5.91 98.4% 5.90 98.3% 5.90 98.3% 5.89 98.1% 5.86 97.6% 5.85 97.4% 5.82 96.9% 5.78 96.3% Long. Insercin Consumo por m (mm) % 95 1.6% 1.0161 105 1.8% 1.0178 105 1.8% 1.0178 115 1.9% 1.0195 145 2.4% 1.0248 155 2.6% 1.0265 185 3.1% 1.0318 225 3.8% 1.0390

Lubricante por unin 0.002 0.002 0.003 0.003 0.004 0.004 0.007 0.010 gln/ m 0.0004 0.0004 0.0004 0.0004 0.0007 0.0007 0.0012 0.0017 S/. / m 0.068 0.072 0.077 0.081 0.122 0.128 0.214 0.308

1 gln: $

117.32

TUBERAS PVCNorma Tcnica Peruana 399.003 Para Desague Clase D. Nom. (pulg) D Int. (mm) 1 1/2 38.4 2 51.4 3 77.2 4 101.6 6 162.4 8 212.0 10 264.2 12 312.6 Liviano Precio x Tubo US$ S/. * 2.41 3.80 3.16 4.98 5.29 8.33 8.17 12.87 35.93 56.59 58.43 92.03 109.89 173.08 131.73 207.47 S/. / m 1.27 1.66 2.78 4.29 11.32 18.41 34.62 41.49 Pesado Precio x Tubo US$ S/. * 4.10 7.94 12.43 52.22 6.46 12.51 19.58 82.25 S/. / m 2.15 4.17 6.53 16.45 Long. (m) 3 3 3 3 5 5 5 5

D Int. (mm) 54.4 80.9 106.0

Nota: Los precios corresponden a Tuberas AMANCO en Lima. * Los precios en Nuevos Soles, consideran 55% de descuento Exonerado de IGV, para uso agrcola, Ley 27400.

Descuento= T. Cambio=

55% 3.50

12/20/2010

CALCULOS PARA REDES DE AGUA POTABLE 1.- NOMBRE DEL PROYECTO 2.- NUMERO DEL EXPEDIENTE 3.- OFICINA ZONAL AGUA POTABLE ASIA( Santa Cruz y 9 de Octubre) LIMA

A.- POBLACION ACTUAL B.- TASA DE CRECIMIENTO (%) C.- PERIODO DE DISEO (AOS) D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) E.- DOTACION (LT/HAB/DIA) F.- CONSUMO PROMEDIO ANUAL (LT/SEG) Q = Pob.* Dot./86,400 G.- CONSUMO MAXIMO DIARIO (LT/SEG) Qmd = 1.30 * Q H.- CAUDAL DE LA FUENTE (LT/SEG) I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 * Qmd *86400/1000 A UTILIZAR : J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmh = 1.30 * Qmd = 2.60 Q LINEA DE CONDUCCIONELEMENTO NIVEL DINAMICO LONGITUD (KM) CAUDAL DEL TRAMO PENDIENTE S DIAMETRO (")

816 2.60 26 1368

70 1.11

1.44

31.1 50.00 2.88

DIAM.COMERCIAL

VELOCIDAD FLUJO

Hf 1.79 1.41 1.69

CC CRP-2 CRP-2 R-2 R-2 A B R-2 B

165.50 106.00 106.00 67.00 67.00 20.00 39.00 67.00 39.00

4.238 3.337 4.002 3.500 7.502

1.44 1.44 1.44 2.28 1.44

14.04 11.69 11.74 -5.43 3.73

1.95 #VALUE! 2.03 #VALUE! 2.02 #VALUE! #VALUE! 2.56 #VALUE!

4.00 4.00 4.00

0.18 0.18 0.18

4.00

0.18

3.17

H PIEZOM. PRESION 165.50 163.71 57.71 106.00 0.00 104.59 37.59 67.00 0.00 65.31 45.31 #VALUE! ### 67.00 0.00 63.83 24.83 #VALUE! ###

RED DE DISTRIBUCIONELEMENTO NIVEL DINAMICO LONGITUD (KM) CAUDAL DEL TRAMO PENDIENTE S DIAMETRO (") DIAM.COMERCIAL VELOCIDAD FLUJO

Hf

H PIEZOM. PRESION COTA PIEZO.SALIDA #VALUE! #VALUE! ### ### #VALUE!

*

1 2 1 6 2 3 2 4 4 5 6 7 6 8 8 9 9 10 10 11 10 12 9 13 13 14 13 15 15 16

47.000 #VALUE! 25.000 65.000 47.000 149.000 52.000 32.500 8.000 39.000 80.000 104.000 13.000 64.000 76.000 78.000 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

REDES DE AGUA POTABLE CLCULOS DE LA DEMANDA 1.- PROYECTO: 2.- AGENCIA: Demanda Poblacional Pecuario 355 N familias 65 2.0 20 497 50 1.500 Agrcola Total

A.- POBLACIN ACTUAL

B.- TASA DE CRECIMIENTO (%) C.- PERIODO DE DISEO (AOS) D.- POBLACIN FUTURA Pf = Po * ( 1+ r*t/100 ) E.- DOTACIN (LT/HAB/DIA) Poblacin rural en Sierra sobre 1500 msnm. F.- CAUDAL DE LA FUENTE (LT/SEG)

G.- CONSUMO PROMEDIO DIARIO ANUAL (LT/SEG) Q = Pob* Dot./86400; Qp= 1.05*Tot Q'p

0.288 H.- CONSUMO MXIMO DIARIO (LT/SEG) < Lnea de Conduccin > Qmd = 1.30 * Q; Qmdp= 1.15*Qp 0.374 0.182 I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 * Qmd *86.4 ; Vp= 0.10*Qmdp*86.4 A UTILIZAR : J.- CONSUMO MXIMO HORARIO (LT/SEG) < Red de Distribucin > Qmh = 2.6 * Q ; Qmhp = 2*Qp. 0.748 0.728 K.- CAUDAL UNITARIO (LT/SEG) Qu= Qmh / N familias; Qup= Qmhp/N abrev Familia 65 0.012 Abrevadero 2 0.364 8.076 7.865

0.550 11.880

1.106 27.821 28.00

0.413 Huerto 65 0.006

1.160

1.160

DEMANDA PECUARIA - DOTACIN (LT/ANIMAL/DA) - CONSUMO PROMEDIO DIARIO ANUAL (LT/SEG)

Dotp Q'p= Cabezas*Dotp/86400 Dotp Vacunos Auquenidos Ovinos Total 30.00 18.00 10.00 Cab/fam. 3 4 8 15 Cabezas 195 260 520 975

Tomas de agua/da

Volumen de agua diario requerido para ganado (m3)

2 7.87

Estructura Pta 01 Pta 02

Familias 6 8

Caudal (l/s) 0.069 0.092

Pta 03 Pta 04 Pta 05 Pta 06 Pta 07 Pta 08 Pta 09 Abrev 01 Abrev 02 Abrev 03 Total huertos (h) Mr (l/s/h) Q (l/s) 1 0.55 0.55

9 8 6 8 5 12 3 65

0.104 0.092 0.069 0.092 0.058 0.138 0.035 0.121 0.121 0.121

OK

Q'p 0.068 0.054 0.060 0.182

CARACTERSTICAS HIDRULICAS - TUBERAS A PRESINLNEA DE CONDUCCINELEMENTO PROGRESIVA NIVEL DINAMICO LONG. (KM) CAUDAL (lps) PENDIENTE (/oo)CALCULADO (mm)

DIMETRONOMINAL " INTERIOR (mm)

Captacin 1 Pto 01 C. Reunin C. Reunin Pto 02 Pto 03 Pto 04 Pto 05 Pto 06 Pto 07 Pto 08 Pto 09 Pto 10 Pto 11 Pto 12 Pto 13 Reservorio

0+000 0+050 0+075 0+075 0+150 0+300 0+425 0+575 0+600 0+675 0+700 0+800 1+000 1+050 1+075 1+100 1+117

3776.09 3771.09 3761.97 3761.97 3755.44 3752.76 3745.16 3739.80 3733.29 3728.23 3729.20 3732.27 3669.80 3664.49 3653.99 3650.56 3646.95

0.050 0.025

1.11 1.11

100.00 364.80

29.9 22.9

1.25 1.00

38.0 29.4

0.075 0.150 0.125 0.150 0.025 0.075 0.025 0.100 0.200 0.050 0.025 0.025 0.017 1.117

1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11

87.07 47.67 85.06 83.73 672.55 282.50 726.32 144.01 376.84 1230.35 2689.10 2502.84 3752.12

30.8 34.8 30.9 31.0 20.2 24.2 19.9 27.8 22.8 17.9 15.2 15.4 14.2

1.25 1.25 1.25 1.50 1.25 1.25 1.25 1.50 1.00 1.00 0.75 1.00 1.00

38.0 38.0 38.0 43.0 38.0 38.0 38.0 43.0 29.4 29.4 22.9 29.4 29.4

RED DE DISTRIBUCINELEMENTO NIVEL DINAMICO LONG. (KM) CAUDAL (lps) PENDIENTE (/oo)CALCULADO (mm)

DIMETRONOMINAL " INTERIOR (mm)

Reservorio PTO K CRP 1 PTO K PTA 1 CRP 1 PTO L PTO A PTO B PTO C PTO D PTO E Abrev 1 PTO A PTO G PTO H CRP 2

3646.95 3644.00 3575.00 3644.00 3635.00 3575.00 3572.00

0.075 0.095

1.160 1.110

39.33 744.39

36.91 19.85

1.50 1.00

43.0 29.4

0.156

0.050

68.70

9.96

0.75

22.9

0.025

1.060

120.00

28.37

1.25

38.0

CRP 2 PTO I PTO J PTO L PTA 2 PTO B PTA 3

0.00

NORMA TCNICA DEL MIN. SALUD - REQUERIMIENTOS MNIMOS Lnea de Conduccin V mn= 0.60 m/seg V mx= 5.00 m/seg Redes de Distribucin mn= 3/4 " P mn= 3.50 m P mx= 50.00 m

BERAS A PRESINC=VELOCIDAD (m/s) Hf (m) H PIEZOM.

150PRESIN (mca)

0.98 1.63

1.37 2.40

3776.09 3774.72 3768.69 3761.97 3759.91 3755.79 3752.36 3750.10 3749.42 3747.36 3746.67 3745.17 3726.01 3721.22 3713.13 3710.74 3709.11

3.63 6.72

0.98 0.98 0.98 0.76 0.98 0.98 0.98 0.76 1.63 1.63 2.69 1.63 1.63

2.06 4.12 3.43 2.26 0.69 2.06 0.69 1.50 19.16 4.79 8.09 2.40 1.63

4.47 3.03 7.20 10.30 16.13 19.13 17.47 12.90 56.21 56.73 59.14 60.18 62.16

VELOCIDAD (m/s)

Hf (m) H PIEZOM.

PRESIN (mca)

0.80 1.64

1.23 9.17

3646.95 3645.72 3636.55 3645.72 3645.55 3575.00 3574.37

1.72 61.55

0.12

0.16

10.55

0.93

0.63

2.37

0.00

Resumen Longitud Tuberas" 0.50 0.75 1.00 1.25 1.50 2.00 2.50 3.00 4.00 Cond 0.025 0.317 0.525 0.250 1.092 Distr. 0.156 0.095 0.025 0.075 0.195 Total 0.181 0.412 0.550 0.325 1.468

CALCULO HIDRAULICO DE RED DE DISTRIBUCION A PILETAS Y BEBEDEROSComunidad: NUEVA ESPERANZA Localidad: Nueva Esperanza Provincia: Huancayo Departamento:Junin Region: Andres A. Cacerez

Q aguas Q del Q aguas L DIAM V PERDIDA DE CARGA (") m/s UNIT (%) TRAMO (m) ELEM. arriba (m/s) tramo(m/s)abajo (m/s) (m)2-P1 2-B2 .1-2 1-B1 R-1 TOTAL 0.000 0.000 0.813 0.000 1.179 0.391 0.400 0.365 0.022 1.113 0.39 0.40 1.18 0.02 2.29 90 92 84 5 256 527 1 1 2 1 2 0.77 0.79 0.58 0.04 1.13 0.033 0.034 0.009 0.000 0.029 2.931 3.120 0.721 0.001 7.522

Cot. PIEZOM.(msnm) INICIAL FINAL2717.557 2717.557 2718.278 2718.278 2725.80 2714.627 2714.437 2717.557 2718.278 2718.278

Cot. TERRENO(msnm) PRESION ( m) COT. INICIAL COT. FINAL INICIAL FINAL2702.00 2702.00 2706.00 2706.00 2724.00 2698.30 2701.50 2702.00 2706.50 2706.00 15.56 15.56 12.28 12.28 1.80 16.33 12.94 15.56 11.78 12.28

RESUMEN DE METAS TUB. PVC SAP C-5 2" (ADUCCION) CAUDAL UNITARIO= 0 l/s/m TUB. PVC SAP C-10 1"(DISTRIBUCION) PILETAS ( P ) BEBEDEROS ( B ) CAPTACION ( C ) RESERVORIO DE 25 M3 ( R ) 340 187 1 2 1 1

Cota inicial tub.:

2,807.30

CALCULO HIDRAULICO NUEVA ESPERANZA

TRAMO

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Cota tubera (msnm) 2807.3 2796.7 2790.3 2783.3 2775.8 2770.3 2764.9 2760.5 2755.8 2752.1 2747.4 2744.5 2740.1 2735.3 2730.4 2725.5 2720.44 2715.06 2709.5 2704.5 2699.5

Pendiente s 0.106 0.064 0.070 0.075 0.055 0.054 0.044 0.047 0.037 0.047 0.029 0.044 0.048 0.049 0.049 0.051 0.054 0.056 0.050 0.050

Caudal (l/s) 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

Longitud tramo (km) 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

Progresiva (km) 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2

Acumulado Provicional (Km) 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 0.900 1.000 1.100 1.200 1.300 1.400 1.500 1.600 1.700 1.800 1.900 2.000

Diametro tub. (pulg) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

C

150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150

Hf Hazen (m) 3.03 6.06 9.09 12.11 15.14 18.17 21.20 24.23 27.26 30.28 33.31 36.34 39.37 42.40 45.43 48.45 51.48 54.51 57.54 60.57

v (m/s) 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23

Desnivel terreno (m) 10.60 6.40 7.00 7.50 5.50 5.40 4.40 4.70 3.70 4.70 2.90 4.40 4.80 4.90 4.90 5.06 5.38 5.56 5.00 5.00

Cota piezometrica (msnm) 2,807.30 2,804.27 2,801.24 2,798.21 2,795.19 2,792.16 2,789.13 2,786.10 2,783.07 2,780.04 2,777.02 2,773.99 2,770.96 2,767.93 2,764.90 2,761.87 2,758.85 2,755.82 2,752.79 2,749.76 2,746.73

Carga Neta (m) 7.57 10.94 14.91 19.39 21.86 24.23 25.60 27.27 27.94 29.62 29.49 30.86 32.63 34.50 36.37 38.41 40.76 43.29 45.26 47.23

Obra de Arte BOCATOMA TUBERIA PE TUBERIA PE TUBERIA PE TUBERIA PE TUBERIA PE TUBERIA PE TUBERIA PE TUBERIA PE TUBERIA PVC TUBERIA PVC TUBERIA PVC TUBERIA PVC TUBERIA PVC TUBERIA PVC TUBERIA PVC RESERVORIO TUBERIA PVC TUBERIA PVC TUBERIA PVC EMPALME RED

METAS TUBERIA PEHD C-4 2"

820

TUBERIA PVC C-5 2" CAPTACION

780

CALCULOS PARA LA DEMANDA DE AGUA POTABLE ( PILETAS Y BEBEDEROS ) Y RIEGO1.- NOMBRE DEL PROYECTO I . AGUA PARA USO DOMESTICO ( PILETAS ) A.- POBLACION ACTUAL B.- TASA DE CRECIMIENTO (%) C.- PERIODO DE DISEO (AOS) D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) E.- DOTACION (LT/HAB/DIA) F.- CONSUMO PROMEDIO ANUAL (LT/SEG) Q = Pob.* Dot./86,400 G.- CONSUMO MAXIMO DIARIO (LT/SEG) Qmd = 1.30 * Q H.- CAUDAL DE LA FUENTE (LT/SEG) I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 * Qmd *86400/1000 A UTILIZAR : J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmd = 2.60 Q 2.20 23.7 23.7 1.1 0.8 120

SAUM NUEVA ESPERANZA

400 2.60 20 608

II. AGUA PARA GANADO (BEBEDEROS) TENEMOS : cabezas vacuno 40 40 l/gan/dia 80 cabezas = 0.04 l/s = 0.05 l/s 0.1 l/s 1040 lts = 1.04 m3 3200 lts/ dia

40

cabezas ovino y

Teniendo en Cuenta la Dot. (Ganado cria / lechero) Pa (gan - 2000)=pf (ganado) Qm ganado Q max diario Q max horario Volumen de reservorio ( 0.25 x Qm ) = =

IV . VOLUMEN TOTAL DEL RESERVORIO ( consumo domestico y animal )volumen animal + volumen consumo humano = 1.04 1.10 2.20 23.71 0.05 0.10

= = =

25 1.146 2.292 0.004349 527 1600 2.5 de

m3/dia (caudal maximo diario) (caudal maximo horario)

V. CAUDAL DE DISEO DE LA RED DE CONDUCCION ( l/s ) = VI. CAUDAL DE DISEO DE LA RED DE DISTRIBUCION ( l/s )=CAUDAL UNITARIO DISTRIBUCIN ( l/s/m ) LONGITUD TOTAL DE LA RED DE DISTRIBUCION LONGITUD TOTAL DE LA RED DE CONDUCCION CAUDAL DE LA FUENTE ( l/s)

NOTA : El caudal de la fuente es mayor que el caudal maximo horario,por tanto se necesitara un reservorio para dosificar el caudal a solo lo necesario para el consumo humano y ademas para mantener presiones constantes en la red Segn el balance hidrico con la fuente de agua es posible beneficiar a las

25

80

familias

aximo diario)

aximo horario)

m3

CALCULOS JUSTIFICATORIOSPROYECTO : CONSTRUCCIN SAUM NUEVA ESPERANZA. POBLACION FUTURA (Mtodo del inters simple). POBLACION ACTUAL (Pa) 223.00 TASA DE CRECIM. ( r ) 0.0020 TIEMPO AOS (t) 20.00 POBLACION FUTURA (Pf) 232 Frmula utilizada. Pf = Pa ( 1+rt)

CONSUMO PROMEDIO ANUAL ( Q ). DOTACION 60.00 (Segn S.100) Q 0.16 Frmula utilizada Q = Pf * Dot / 86,400 (Lt/seg)

CONSUMO MAXIMO DIARIO (QMD). K1 1.30 QMD 0.21 Frmula utilizada QMD = K1 * Q (Lt/seg)

CONSUMO MAXIMO HORARIO (CMH). K2 1.50 QMH 0.31 Frmula utilizada QMH = K2 * QMD (Lt/seg)

VOLUMEN DEL RESERVORIO (M3). VOLUMEN REQUERIDO.(m3). MAS USO AGROPEC. ( ms 10%). CAUDAL DISPONIBLE (Lt/seg). VOL. MAX. EN 8 HORAS. (m3). 4.52 4.97 0.20 5.76 Frmula utilizada V = ( 0.25 * QMD * 86,400 ) / 1000 (M3)

LCULOS JUSTIFICATORIOSCONSTRUCCIN SAUM NUEVA ESPERANZA.

ION FUTURA (Mtodo del inters simple). Frmula utilizada. Pf = Pa ( 1+rt)

ONSUMO PROMEDIO ANUAL ( Q ). Frmula utilizada Q = Pf * Dot / 86,400 (Lt/seg)

CONSUMO MAXIMO DIARIO (QMD). Frmula utilizada QMD = K1 * Q (Lt/seg)

ONSUMO MAXIMO HORARIO (CMH). Frmula utilizada QMH = K2 * QMD (Lt/seg)

VOLUMEN DEL RESERVORIO (M3). Frmula utilizada V = ( 0.25 * QMD * 86,400 ) / 1000 (M3)