 POZO EST. FLUJO MET. DE PROD. CHEVRON # BN_0808 10 PRB RO8200 NETA POTENCIAL DIFERIDA 0 215 215 COD B.G/CAM/TUB HRS. TRAB. LIMPIO HASTA 103 BG 8725' ANC. TUB. ANC. GAS TUB. DRAIN BARRA PULIDA TUB. SUCC. PROF. SUCCION N/A N/A N/A N/A 4-1/2" N/A FECHA INST: FECHA INST: DIAMETRO GRADO CANTIDAD LONG.(Pies) SECCION DIAMETRO GRADO CANTIDAD LONG.(Pies) 4-1/2" N-80 154 4837 N/A N/A N/A N/A N/A 4-1/2" N-80 110 3454 DIAMETRO GRADO PESO DESDE HASTA ROSCA TAPON / TD 13-3/8" K-55 54.5 0' 608' BTC 9-5/8" TAC-95 47 0' 8513' BUTT 7" N-80 26 8368' 9119' LTC CHECK VALVE  SI NO  SI NO ◄◄ FECHA INACTIVO HORAS EST. TRAB. REAL HORAS ACT. PROD EST. %AyS EST. PRIORIDAD CO. SERVICIO 96 215 30 18.8 BORETS Costos ($) : TUBERIA FECHA 17-May-14 29-Aug-2014 CASING BRUTA DRAW DOWN ES TAT ICA(Lpc ) O NF(P ie s) DI NAMICA(Lpc ) O NF(P ie s) FECHA DEL PROGRAMA : 811 1865 1054 0 PROGRAMA DE SUBSUELO CAMPO 290 PRODUCCION ACTUAL TIRO: MAXIMO/ ACTUAL N/A Bembeo Electrosumergible UNIDAD DE BOMBEO PRESION ACTUAL TRAB. EST. 1.1S  TIPO DE TRABAJO A REALIZAR PONER CINTA TEFLON EN TODAS LAS CONEXIONES DEL CABEZAL  # AFE / # MEJ Iris Carroz 22-Mar-14 REEMPLAZO  SI NO SIN PROD. DESDE NUMERO DE T RABAJOS REALIZADOS N/A N.F. ESTATICO EQUIPO DE SUBSUELO INSTALADO DESCRIPCION Aseguró pozo con tubería punta libre S/I TIPO REVESTIDORES N/A 9136' PERFORACIONES 8587'-9051' ACTIVO 2007 (0) 2008 (1) 2009 (0) 2010 (0) 2011 (1) 2013 (2) 2014 (1) ESTADO DEL POZO MESHRITE *****PROGRAMA***** DRAIN VALVE ULTIMO TRABAJO 1 2 INGENIERO BOMBA TIPO Y TAMAÑO SECCION SERIAL 1.- 2.- 3.- 4.- 5.- 6.- 7.- 8.- 9.- 10.- 11.- 12.- 13.- 2.- 3.- Cumpl ir con todas las normas de seguridad de Petr oboscan 4.- Contactar al ingeniero encargado del pozo Iris Carroz, 0412-0700886 . Ingeniero de guardia 0416-5033507 5.- Persona contacto Boret s: Marcelino Mota: 0414-8315085 Bajar la siguiente Configuracion del equipo BES (configuracion de abajo hacia arriba): Sensor de fondo View Point ESP-HT + motor 330 HP + 2 cuerpos de sellos 538 BPBSL + separador de gas + bombas upper / middle / lower (Equipo de fondo BES 400 -1250 de 354 Etapas + Descarga + Valvula Check / Drain + 02 tubos de 4-1/2" N-80 + Valvula de drenaje + 259 tubos de 4-1/2" N-80 , colocando protectores de cable en cada cuello de tubería y haciendo mediciones electricas F-F y F-T del equipo de fondo y cable de potencia durante la bajada cada 20 tubos o cada 600'. Bajar a una velocidad de 20 tubos/hora y verificar continuamente el peso de la sarta durante la bajada del equipo. Verificar la alineacion de la cabria con respecto al hoyo. A partir de +/- 4816' (100 pies por encima del KOP= 4916') reducir la velocidad de bajada a 10 tubos/hora.  Bajar los ultimos cuatro (4) tubos lo mas lento posible, para el asentamiento final del equipo. Dejar succion @ +/- 8267' (MD). Fondo del equipo BES @ +/- 8316' (MD) y Fin de las camisas @ +/- 8334' (MD) Dejar produciendo y en condiciones seguras en común acuerdo con Operaciones de Producción. Limpiar el área debidamente. Eliminar toda condición insegura en la localización. Verificar y reportar presion de tuberia y de casing  1. - El poz o no debe ser arrancado hast a que el repre sent ante de Operaciones fi rmeen señal de conf ormidad, el format o de entrega de pozo emit ido por el Dpto de Perforacion para Operaciones que se encuentra anexo a este programa. Equipo de Fondo BES 400 -1250 de 354 + Miscelaneos Suministrados por BORETS NOTAS: Desahogar pozo, controlar si es necesario Verificar y asegurar que el pozo no presente riesgos para ejecutar el trabajo OTROS: TUB / CABILLAS: ANCLA DE GAS: . + Arrancar el pozo de acuerdo al procedimiento de arranque a 48 Hz y dejarlo trabajando a 50 Hz.  El uso de BOP es estrictamente necesario FILTRO: DATOS DE INTERES: Misceláneos y Sensor suministrados por BORETS ANCLA DE TUBERIA: Mudar equipo. S.T.N. Sacar toda la completacion existente (264 juntas de tuberia de 4-1/2" punta libre). Reemplazar tuberia que este rota o dañada. En caso de que el pozo no quede produciendo, asegurar completamente el pozo. BOMBA: MATERIAL REQUERIDO: Instalar BOP Realizar limpieza del pozo hasta el fondo de las rejillas @ 9119' MD de acuerdo a programa emitido por perforacion, en su defecto hasta la profundidad de limpieza recomendada, 9020'. AUTORIZADO POR: FECHA DE AUTORIZACION: 29-Aug-2014  _____________________________ Danny Socorro

description

cambio de método de producción

Transcript of BN_0808 Programa Limpieza Cambio de Bomba (Ago 2014) FINAL

  • POZO EST. FLUJO MET. DE PROD. CHEVRON #BN_0808 10 PRB RO8200

    NETA POTENCIAL DIFERIDA0 215 215

    COD B.G/CAM/TUB HRS. TRAB. LIMPIO HASTA103 BG 8725'

    ANC. TUB. ANC. GAS TUB. DRAIN BARRA PULIDA TUB. SUCC. PROF. SUCCIONN/A N/A N/A N/A 4-1/2" N/A

    FECHA INST: FECHA INST:DIAMETRO GRADO CANTIDAD LONG.(Pies) SECCION DIAMETRO GRADO CANTIDAD LONG.(Pies)

    4-1/2" N-80 154 4837 N/A N/A N/A N/A N/A4-1/2" N-80 110 3454

    DIAMETRO GRADO PESO DESDE HASTA ROSCA TAPON / TD13-3/8" K-55 54.5 0' 608' BTC9-5/8" TAC-95 47 0' 8513' BUTT

    7" N-80 26 8368' 9119' LTC CHECK VALVE SI NO SI NO

    FECHAINACTIVO

    HORAS EST. TRAB. REAL HORAS ACT. PROD EST. %AyS EST. PRIORIDAD CO. SERVICIO96 215 30 18.8 BORETS

    Costos ($) :

    TUBERIA

    FECHA17-May-14

    29-Aug-2014

    CASING

    BRUTA DRAW DOWNESTATICA(Lpc) O NF(Pies) DINAMICA(Lpc) O NF(Pies)

    FECHA DEL PROGRAMA :

    8111865 10540

    PROGRAMA DE SUBSUELOCAMPO

    290

    PRODUCCION ACTUAL

    TIRO: MAXIMO/ ACTUALN/ABembeo Electrosumergible

    UNIDAD DE BOMBEO

    PRESION ACTUAL

    TRAB. EST.1.1S

    POZO S/P. LIMPIEZA + CAMBIO DE BOMBA ELECTROSUMERGIBLE (BES) CON CAMISA TIPO DE TRABAJO A REALIZAR

    PONER CINTA TEFLON EN TODAS LAS CONEXIONES DEL CABEZAL # AFE / # MEJ

    Iris Carroz

    22-Mar-14REEMPLAZO

    SI NOSIN PROD. DESDE NUMERO DE TRABAJOS REALIZADOS

    N/A

    N.F. ESTATICO

    EQUIPO DE SUBSUELO INSTALADO

    DESCRIPCIONAsegur pozo con tubera punta libre S/I

    TIPOREVESTIDORES

    N/A

    9136'

    PERFORACIONES

    8587'-9051'

    ACTIVO 2007 (0) 2008 (1) 2009 (0) 2010 (0) 2011 (1) 2013 (2) 2014 (1)ESTADO DEL POZO

    MESHRITE

    *****PROGRAMA*****

    DRAIN VALVE

    ULTIMO TRABAJO

    12

    INGENIERO

    BOMBA TIPO Y TAMAO

    SECCION

    SERIAL

    1.-2.-3.-4.-5.-6.-

    7.-

    8.-9.-10.-11.-12.-13.-

    2.-3.- Cumplir con todas las normas de seguridad de Petroboscan4.- Contactar al ingeniero encargado del pozo Iris Carroz, 0412-0700886 . Ingeniero de guardia 0416-50335075.- Persona contacto Borets: Marcelino Mota: 0414-8315085

    Bajar la siguiente Configuracion del equipo BES (configuracion de abajo hacia arriba): Sensor de fondo View Point ESP-HT + motor 330 HP + 2 cuerpos de sellos 538 BPBSL + separador de gas + bombas upper / middle / lower (Equipo de fondo BES 400 -1250 de 354 Etapas + Descarga + Valvula Check / Drain + 02 tubos de 4-1/2" N-80 + Valvula de drenaje + 259 tubos de 4-1/2" N-80, colocando protectores de cable en cada cuello de tubera y haciendo mediciones electricas F-F y F-T del equipo de fondo y cable de potencia durante la bajada cada 20 tubos o cada 600'. Bajar a una velocidad de 20 tubos/hora y verificar continuamente el peso de la sarta durante la bajada del equipo. Verificar la alineacion de la cabria con respecto al hoyo. A partir de +/- 4816' (100 pies por encima del KOP= 4916') reducir la velocidad de bajada a 10 tubos/hora. Bajar los ultimos cuatro (4) tubos lo mas lento posible, para el asentamiento final del equipo. Dejar succion @ +/- 8267' (MD). Fondo del equipo BES @ +/- 8316' (MD) y Fin de las camisas @ +/- 8334' (MD)

    Dejar produciendo y en condiciones seguras en comn acuerdo con Operaciones de Produccin.

    Limpiar el rea debidamente. Eliminar toda condicin insegura en la localizacin.

    Verificar y reportar presion de tuberia y de casing

    1.- El pozo no debe ser arrancado hasta que el representante de Operaciones firme en seal de conformidad, el formato de entrega de pozo emitido por el Dpto de Perforacionpara Operaciones que se encuentra anexo a este programa.

    Equipo de Fondo BES 400 -1250 de 354 + Miscelaneos Suministrados por BORETS

    NOTAS:

    Desahogar pozo, controlar si es necesarioVerificar y asegurar que el pozo no presente riesgos para ejecutar el trabajo

    OTROS:

    TUB / CABILLAS:

    ANCLA DE GAS:

    POZO S/P. LIMPIEZA + CAMBIO DE BOMBA ELECTROSUMERGIBLE (BES) CON CAMISA

    Arrancar el pozo de acuerdo al procedimiento de arranque a 48 Hz y dejarlo trabajando a 50 Hz.

    AUTORIZADO POR: FECHA DE AUTORIZACION: 29-Aug-2014

    El uso de BOP es estrictamente necesario

    FILTRO:

    DATOS DE INTERES:Miscelneos y Sensor suministrados por BORETS

    ANCLA DE TUBERIA:

    Mudar equipo.

    Danny Socorro

    S.T.N. Sacar toda la completacion existente (264 juntas de tuberia de 4-1/2" punta libre). Reemplazar tuberia que este rota o daada.

    En caso de que el pozo no quede produciendo, asegurar completamente el pozo.

    BOMBA:

    MATERIAL REQUERIDO:

    Instalar BOP

    Realizar limpieza del pozo hasta el fondo de las rejillas @ 9119' MD de acuerdo a programa emitido por perforacion, en su defecto hasta la profundidad de limpieza recomendada, 9020'.

    AUTORIZADO POR: FECHA DE AUTORIZACION: 29-Aug-2014

    _____________________________

    Danny Socorro

  • Actualizado por Iris Carroz Junio 2014

    HISTORIA DEL POZO BN_0808

    POZO: BN-808 (LOC. AH-61) E.M.R.: 151 YACIMIENTO: BOSCAN SUPERIOR REVESTIDORES: 13-3/8 , 54.5 # / PIE, K-55 A 608

    9-5/8, 47 # / PIE, TAC-95, A 8513 (MD) y 8126 (TVD) FORRO: MESHRITE COMPRESSED 7, 26 # / PIE, N-80, DESDE 8373 (MD) HASTA 9119 (MD) RANURAS: 8587- 9051 (MD) PROFUNDIDAD TOTAL: 9136 (MD), 8661 (TVD) EF. : 10 ESTADO ACTUAL: PRB

    HISTORIA

    El Pozo BN_0808 fue perforado como desviado el 25 de Diciembre de 2005, en la arena de

    Boscn Superior, especficamente en el intervalo 8513-9136 (MD), hasta llegar a la

    profundidad final @ 9136 (MD). Las labores de perforacin culminaron el 14 de Enero de 2006.

    Realiz completacin del pozo con Meshrite Comprimido de 7 dejando el tope del mismo @

    8373 (MD).

    El 06 de Febrero del 2006, entr maquina de servicio para realizar completacin original del

    pozo. Baj y cheque fondo a 9119 con una pequea muestra de arena y un nivel esttico de

    fluido a 4200. Baj tubera de 4-1/2 + equipo de fondo BCP MOYNO 95-N-275 (E-158) con

    niple perforado + sarta de cabillas con centralizadores segn programa. La succin de la

    bomba qued a 8283.

    Prueba al 25-Mar-06 194 BFPD, 184 BPPD. 5 % AyS

    Prueba al 21-Sep-06 140 BFPD, 132 BPPD. 5 % AyS

    EL 01 de Noviembre del 2006, entr maquina de servicio al pozo, para sacar completacin

    existente y bajar nueva completacin con nuevos centralizadores. Baj bomba Grant para

    chequear fondo y se encontr fondo limpio sin muestra de arena (9123) y detecto un nivel de

    fluido esttico a 4050. El pozo fue completado nuevamente con una bomba 95N275 @ 8311

    con un total de 274 cabillas distribuidas de la siguiente manera: 1 cabilla de 1-1/8 + 74

    cabillas con 3 centralizadores y 198 cabillas de 4 centralizadores C/U. Se procedi a darle

    arranque el 03-Nov-06.

  • Actualizado por Iris Carroz Junio 2014

    Actualmente el pozo BN_0808 esta produciendo una tasa de 280 BPPD y 10% de AyS a una

    presin dinmica de 1116 Lpc y 160 RPM. Este pozo tiene la capacidad de producir un valor

    esperado de 500 BPPD (714 BFPD) con una presin dinmica de 700 Lpc, cuyas condiciones no

    pueden ser alcanzadas con el sistema de bombeo existente, debido a que por ser un pozo

    desviado, ha sido necesario la utilizacin de centralizadores de cabillas para evitar la friccin

    generada por el roce de las cabillas con la tubera de produccin y como consecuencia la

    generacin de alto torque, lo cual no permite optimizar el pozo, por lo cual se propuso la

    conversin del mtodo de levantamiento artificial de BCP a BES.

    Desde Febrero del 2008, los niveles de torque han estado por encima de 1200 lbs*pie, por lo

    que la velocidad ha tenido que ser reducida progresivamente hasta 90 RPM. La ultima medida

    validada del pozo para el 30 de septiembre del 2008 es de 158 BFPD / 142 BOPD / 90 RPM /

    PIP: 1062 PSI.

    El 07 de diciembre del 2008, entro maquina de servicio para realizar cambio de mtodo de

    PCB a BES. Saco sarta de cabillas de 1 1/8 con centralizadores + rotor. Saco tubera de 4

    con tecline + estator. Bajo sarta de limpieza compuesta por taper mill 6 + tubera combinada

    de de 3 4 . Toco @ 8388 donde consigui apoyo (TD: 9119). Maniobro sin lograr

    avance. Saco 1 tubo y bombeo 104 bls de agua por tubing @ 4 BPM. Baja nuevamente para

    maniobrar sin avance. Decide vestir power swivel. Maniobro para pasar 8388, 30-60 RPM, 1-

    1.5 Klbs de peso, tensin 6-8 Klbs. Continuo trabajando en obstruccin sin xito. Decide

    desvestir power swivel y sacar sarta de tubera combinada + taper mill 6. Saco taper mill

    trabajado. Bajo taper mill de 5 5/8 + sarta de tubera combinada tocando @ 9110 fondo

    limpio. No hay obstruccin en el tope del liner. Saco taper mill sin muestra de arena ni

    elastmero. Bajo camisas de 7 x 26 #. Bajo equipo BES encamisado 538-P17 SXD de 192

    etapas + tubera de 4 . Succin @ 8227. Fin de la instalacin @ 8298.

    El 18 de Octubre del 2011, fue reportado el pozo detenido. El Tcnico de Recorrido realiz un

    intento de arranque sin xito limitndose en 10 Hz, procedi a desconectar el equipo de fondo

    a nivel de caja de venteo para tomar medidas elctricas, observando desbalanceo entre fases y

    bajo aislamiento. El pozo queda fuera de servicio por equipo de fondo. Run Life de 1043

    das.

    El 30 de Octubre del 2011, sali maquina de servicio de realizar cambio de bomba. Sac

    sarta de tubera de 4 (262 jtas) + equipo de fondo ESP P17 de 192 etapas. Baj tubera de

    4 para medir fondo tocando @ 9104 (15 de relleno), base de la rejilla de 7 @ 9119, NFE

  • Actualizado por Iris Carroz Junio 2014

    @ 4564. Sac sarta de tubera. Baj equipo BES encamisado P8 de 360 etapas + sarta de

    tubera de 4 (261 jtas). Succin @ 8237. Fin de la instalacin @ 8290.

    El 13 de Junio del 2013, fue reportado el pozo detenido. El tcnico de recorrido lleg al pozo

    y lo encontr parado por Low Speed, se realizaron varios intentos de arranque sin xito

    quedando limitado en 10 Hz el equipo BES. Desconect equipo de fondo en superficie y se

    cheque elctricamente encontrndolo balanceado entre fases y con buen aislamiento con

    respecto a tierra. Lo reporto a personal de CIBO fuera de servicio por atascamiento del equipo

    de fondo.

    Medidas elctricas:

    Fase-Fase= 3.7 3.7 3.7 Ohms

    Fase-Tierra= 100 100 100 M Ohms

    Bajo estas condiciones el equipo no levanta produccin y queda fuera de servicio parado por

    atascamiento del equipo de fondo. Este equipo de Fondo tena un Run Life de 591 das. El

    Sensor tipo Centinel 3 estuvo operativo hasta el momento de la falla.

    El 02 de Julio del 2013, sali maquina de servicio luego de intentar realizar cambio de

    bomba (s/e). Sac sarta de tubera de 4 + equipo de fondo ESP P17 de 192 etapas. Arm y

    baj bomba grant para medir fondo tocando @ 8670 (449 de relleno). Suspendi operaciones

    para entrar con mquina con capacidad de limpieza.

    El 31 de Julio del 2013, entro maquina de servicio para realizar limpieza + cambio de

    mtodo de PCB a BES. Desvisti equipo en el pozo BN_0640 da 10/07/2013 mud y visti

    equipo Bohai 73 en el pozo BN_0808, en un 100% el da 11/07/2013. Desahog pozo, bombe

    60bls de agua industrial, instal BOP y desinstal colgador. Sac 258 juntas de tubera de 4-

    1/2" EUE con dificultad hasta superficie. Realiz prueba de hermeticidad de la BOP con 2500

    psi x 15 min. con xito. Instal tubo campan y lnea de retorno. Arm y baj BHA de limpieza

    con Junk Mill de 5-3/4". Baj 246 tubos de 4-1/2" HYD 533 y consigui apoyo @ 8657 (tope

    del relleno). Trabaj sarta de limpieza con Junk Mill de 5-3/4" desde 8657' hasta 8768' con los

    siguientes parmetros psm= 0 lbs; torque= 0 lbs-pie; rpm = 40-60, tasa de bombeo 3 - 3,6

    bpm. En la junta 248 bajo con los mismos parmetros anteriores, al reciprocar observ

    incremento de torque y psm. Trabaj sarta desde 8768' a 8778' con los siguientes parmetros

    torque =0 - 2500 lbs-pie (el torque incrementaba y disminua rpidamente); psm= 2-4 lbs, al

    levantar kelly para hacer siguiente conexin, perdi circulacin total el pozo. Bombe 490 bls

    para buscar circulacin sin xito. Baj y esper 2 horas de decantacin de la arena. Baj

    tubera 4-1/2" HYD 1x1 para medir fondo consiguiendo apoyo a 8791' (317' de relleno) Nota:

  • Actualizado por Iris Carroz Junio 2014

    132' limpiados, rejillas de 7" 26 lbs desde 8586'- 9050' (205' de rejillas sin relleno), por orden

    de la gerencia Pdvsa Servicios decidi preparar pldora y trabajar sarta con peso en el tope del

    relleno. Maniobr para avanzar con peso sin bomba sin xito, prob avanzar con bomba y peso

    avanzando 10' sac sarta por no tener circulacin. Nota: consult con gerencia Pdvsa Servicio y

    decidi sacar sarta y evaluar trabajo en el Junk Mill. Sac y quebr BHA de limpieza, sac 249

    tbg 4-1/2" HYD 533 hasta superficie. Baj 10 tbg 4-1/2" para asegurar pozo. Gerencia Pdvsa

    Servicio decidi utilizar bomba Schlumberger y bajar Junk Mill de 5-1/2". Esper 6 hrs. por

    suministro de herramienta Cia. Baker (Junk Mill de 5-1/2"). Saco 10 tbg HYD 4-1/2" de

    asegurar pozo. Arm, calibr y baj BHA de limpieza con tbg de 4-1/2 HYD y Junk Mill 5-1/2",

    consiguiendo apoyo contundente con el tbg # 249 + 20' del tbg # 250 @ 8792'. Baj tbg 4-

    1/2" HYD @ 8898'. (6 bpm/ 860 psi). (Limpieza en circuito cerrado) Nota: despus del chequeo

    de fondo, se bombe 265 bls @ 6,5- 7 bpm/ 1075 psi, hasta obtener nuevamente circulacin

    para continuar limpieza. Baj tbg 4-1/2" HYD a limpiar arena, hasta conseguir apoyo

    contundente con el tubo # 258 + 30' del kelly @ 9086'; realiz fondo y medio arriba (circuito

    cerrado), bombeando 1338 bls; al sacar hasta el tope de liner se present pega de la tubera y

    perdi circulacin de manera inmediata. Se mantuvo una rata de bombeo de 6 bpm con

    presin de 825 psi. Maniobr sarta con 70 klbs de peso, 1100-1200 lbs/pie de torque y un

    mx. De over pool de 250 klbs (sin xito). Se realiz registro punto libre determinando estar

    libre hasta 8710'. Por las condiciones del pozo se recomienda realizar desenrosque de tubera.

    Baj y corri segundo registro free point corroborando punto libre @ 8710' (tbg # 2 de 3-1/2"

    HYD). Baj herramienta string shoot o back off para desenrosque @ 8716' (sin xito), enrosc

    4-1/2" HYD tubera nuevamente. Decidi realizar corte qumico. Al aplicar los 130 klbs de

    tensin para bajar cortador qumico, la sarta perdi tensin y se consigui accin del martillo,

    lo que permiti trabajar la sarta hasta liberar la pega, sac tubera y BHA de limpieza # 2

    hasta superficie sin problemas, arm y baj BHA # 3 con Bull Dog Bailer, Baj tbg 4-1/2" HYD

    y BHA de limpieza # 3 con Bull Dog Bailer (en pareja), consigui apoyo contundente con 23'

    del tbg # 257 @ 9049'. Trabaj sarta de limpieza, limpi desde 9049' el tbg # 257 @ 9060'

    (11' limpiados) sin lograr ms avance, registrando apoyo contundente y sin accin de la

    herramienta, se repaso de 5-6 veces la zona limpiada. Trabaj sarta de limpieza con Bull Dog

    Bailer, se presentaron 2 conatos de pega tensionando la sarta hasta 160 klbs (56 klbs de over

    pool), en ambas ocasiones se logr liberar trabajando la misma. Segn programa, el Dpto. de

    Geologa recomienda realizar limpieza hasta 9025', se lleg hasta 9060' (35' por debajo de lo

    recomendado). Limpieza exitosa. Sac y quebr 257 tbg 4-1/2" HYD y BHA de limpieza # 3

    con Bull Dog Bailer. Sac 30' de arena con flejes metlicos desde el rotary shoe. A nivel de la

    zapata se observ que la herramienta trabaj con material metlico. Se tom muestra de la

    arena para estudio granulomtrico y del fleje en fondo. Baj camisa de refrigerante de 7",

  • Actualizado por Iris Carroz Junio 2014

    intent bajar sensor de fondo, sin pasar a nivel del centralizador. Arm, lubric y baj equipo

    BES desde superficie hasta 30' consigui obstruccin. Decidi sacar equipo de fondo y camisa y

    evaluar componentes. Sac sellos, motor, sensor, centralizador, camisa de refrigeracin y

    evalu componentes. Baj 5 tbg 4-1/2" EUE para asegurar pozo. Nota: por orden de supervisor

    de campo decidi reemplazar centralizador. Sac 5 tbg 4-1/2" EUE de asegurar pozo, baj

    camisa de refrigeracin de 7". Arm, lubric y baj equipo BES. Reemplaz centralizador.

    Acopl separador de gas a camisa de refrigeracin. Baj y lubric bomba inferior. Arm y

    lubric bomba #2 resultando eje de la misma pegado, intent despegar sin xito. Nota:

    desarm y baj bomba #2 de la planchada para intentar despegar eje logrando despegar pero

    quedando giro del mismo forzado, consult con Ing. de Produccin Petroboscan y se decidi

    reemplazo de la misma. Arm, lubric y baj bomba superior, instal descarga de la bomba, x-

    over 2 3/8" EUE pin x 4-1/2" EUE pin, cuello 4-1/2" EUE, Vlvula check drain + 02 tbg 4-1/2"

    EUE + Vlvula drain. Baj 259 tbg 4-1/2" EUE @ 8299 con cable de potencia y protectores

    Cannon, probando hermeticidad de la tubera con 500psi x 5 min. y megando cable de potencia

    cada 600' con xito. Instal y asent colgador de tubera succin 8228' final de la completacin

    8299'. Realiz pack off al cable de potencia megando antes y despus de realizarlo arrojando

    los siguiente valores: f-f= 4,5; f-t= 700; pip=1964psi-1996psi; ti=180f-185f; tm=171f-176f.

    Nota: fases balanceadas. Retir pateclas del cable de potencia. Cia. Tisvenca afloj esprragos

    del conjunto BOP. Retir preventor anular. Instal vlvula corona. Megando consigui equipo

    ido a tierra, prob en diferentes puntos sin xito. Nota: por orden de equipo de guardia Pdvsa

    Servicios se orden sacar 02 tbg EUE 4-1/2" cortar cable y megar. Maniobr e instal BOP.

    Sac sarta de completacin BES @203 Nota: se realiz reparacin del cable en el 4-1/2 # 176

    @5548 sin obtener xito en la megada (cable se encontr golpeado en 3 puntos ms sin

    reparar). Sac sarta de tubera 4-1/2" EUE, observ explosin en el MLE. Desarm equipo BES,

    prob motor de fondo, organiz planchada para bajar equipo nuevamente Nota: desinstal

    equipo BES para reemplazo de los sellos. Sac camisa de 7" y asegur pozo con 10 tbg de 4-

    1/2" EUE para esperar suministro de cable de potencia. Sac 10 tbg EUE 4-1/2" EUE y baj

    camisa de refrigeracin @ 71'. Arm, lubric y baj equipo BES + 259 tbg de 4-1/2 @ 8300

    (final de la completacin); succin @8229' con cable de potencia y protectores Cannon. Cia.

    Tisvenca afloj pernos del preventor anular. Retir patleca de Cia. Backer Centrilift. Asent

    colgador en cabezal. Maniobr y retir BOP. Ajust prisioneros al colgador. Nota: realiz

    megado de prueba.

    Su ultima medida de produccin fue el 03 de Marzo de 2014, con 325 BPPD, 30 %AyS, 9

    PCN/BN, 3.69 lbs de arena / 1000 bls de fluido.

  • Actualizado por Iris Carroz Junio 2014

    El da sbado 22 de Marzo de 2014, fue reportado parado el pozo BN-808_R3. El tcnico de

    recorrido lleg a la locacin encontrando el VSD detenido, se procedi a dar arranque al equipo

    sin xito. Se desconect equipo de fondo y se tomaron medidas elctricas encontrando el

    equipo de fondo desbalanceado entre fases y con bajo aislamiento con respecto a tierra, el

    pozo queda fuera de servicio por equipo de fondo.

    Medidas Elctricas:

    Fase-Fase = 5.3 3.7 4.7 Ohms

    Fase-Tierra = 0 MOhms

    Con estas medidas elctricas el equipo no puede arrancar y queda fuera de servicio parado por

    equipo de fondo. Este equipo de fondo tena un tiempo de operacin de 231 das. Las ltimas

    lecturas del Sensor tipo Centinel III fueron el 18 de Octubre de 2013 = PIP: 1330 psi y TM:

    214 F. El equipo instalado actualmente es el siguiente

    Se prepara programa para cambio de bomba BES. Se instalara una bomba P6 con triple sello.

    El 07 de Junio de 2014, sali maquina de servicio de realizar cambio de bomba. Sac

    tubera de 4-1/2 EUE llena de crudo, agua y arena. Recuper bomba BES P6 400PMSSD. Baj

    casco de mula 2-7/8 y TBG 4-1/2 combinada para chequear fondo. Toc tope de relleno a

    8725. Se decide suspender cambio de bomba y realizar limpieza con equipo de coiled tubing.

    Dej pozo asegurado con 264 jtas de tubera de 4-1/2 y empacadura arrow set 9-5/8.

  • Actualizado por Iris Carroz Junio 2014

    El 16 de Junio de 2014, se prepara programa de limpieza con Maquina de Servicio y cambio

    de bomba BES con maquina de servicio. Se instalar una bomba BES 400 -1250 de 340

    etapas.

  • Hoyo de 12-1/4 hasta 8526 MD / 8137 TVD

    Revestidor 13 3/8, 54.5#, K-55 @ 608 (MD)

    COMPLETACION MECANICA ACTUALBN_0808 (Loc:AH-61)

    Junio 2014

    Punto de Desviacin (KOP) @ 4916 MD/TVD, DLS: 3 /100 ft, inc: 2.43 deg

    264 Jtas tub 4-1/2 N-80 Punta Libre

    Punto final de la curva (EOC) @ 5917 MD / 5879TVD, inc: 29.95 deg

    Empacadura arrow set 9-5/8

    @ 4783,5 MD

    Revestidor 9-5/8, 47#, TAC-95, BUTT @ 8513 MD / 8126 TVD

    E.M.R. : 151PF: 9136 MD / 8661 TVD

    Compressed Meshrite 7, 26#, N-80: Fondo @ 9119 MD / 8655 TVD

    Rejillas: 8587-9051 MD

    Intervalo Completado:Boscn Superior8513-9136 MD8126-8661 TVD

    Fin de la Instalacin @ 8335,5 (MD)

    Hoyo de 8-1/2 @ 9136 MD / 8661 TVD, inc:

    31.08 deg

    Empacadura 9-5/8 x 7 @ 8373 MD

    ltimo HUD @ 8725 (394 de relleno)

    (Mayo 2014)

  • Hoyo de 12-1/4 hasta 8526 MD / 8137 TVD

    Revestidor 13 3/8, 54.5#, K-55 @ 608 (MD)

    COMPLETACION MECANICA PROPUESTABN_0808 (Loc:AH-61)

    Agosto 2014

    Punto de Desviacin (KOP) @ 4916 MD/TVD, DLS: 3 /100 ft, inc: 2.43 deg

    261 Jtas tub 4-1/2 N-80

    Punto final de la curva (EOC) @ 5917 MD / 5879TVD, inc: 29.95 deg

    Revestidor 9-5/8, 47#, TAC-95, BUTT @ 8513 MD / 8126 TVD

    Empacadura 9-5/8 x 7 @ 8373 MD

    E.M.R. : 151PF: 9136 MD / 8661 TVD

    Compressed Meshrite 7, 26#, N-80: Fondo @ 9119 MD / 8655 TVD

    Rejillas: 8587-9051 MD

    Intervalo Completado:Boscn Superior8513-9136 MD8126-8661 TVD

    Camisa de 7, 26 lbs/ftFin de las camisas @ 8334 (MD)

    Hoyo de 8-1/2 @ 9136 MD / 8661 TVD, inc:

    31.08 deg

    Bomba Electro Sumergible BES 400 -1250 de 354 etapas.

    Succin @ 8267 (MD) y Fin del equipo BES @ 8316 (MD)

  • Rep

    ort

    e d

    e T

    ub

    ing

    Lan

    din

    g D

    eta

    ils

    PD

    VS

    A P

    ET

    RO

    BO

    SC

    AN

    Pgin

    a 1

    de 1

    Nom

    . Legal P

    ozo :

    Pro

    yecto

    :

    Report

    e #

    :

    Chevro

    n N

    o.

    :

    Pro

    yecto

    No.

    :

    Fec.

    Inic

    io :

    Inic

    . P

    erf

    :

    Fec.

    Report

    e :

    Fec.

    Fin

    :

    BN

    _0808

    WE

    LL S

    ER

    VIC

    E

    2

    RO

    8200

    7 17/0

    5/2

    014

    28/1

    2/2

    005

    07/0

    6/2

    014

    07/0

    6/2

    014

    Impre

    so:

    16/0

    6/2

    014

    03:5

    1:0

    6 p

    .m.

    Com

    ponente

    :F

    echa I

    nsta

    laci

    n:

    LO

    NG

    TU

    BIN

    G07/0

    6/2

    014

    Suspend D

    esde:

    Fecha R

    etiro

    : S

    UR

    FA

    CE

    EQ

    UIP

    ME

    NT

    @

    (ft)

    Corr

    ecci

    n T

    MD

    :P

    eso F

    inal S

    art

    a:

    (ft

    ) (

    lb)

    Long.

    Tota

    l:P

    eso A

    ncla

    do:

    8.3

    35,5

    (ft

    ) (

    lb)

    Di

    metr

    oC

    om

    ponente

    # J

    unta

    sD

    im

    Int

    Di

    m E

    xt

    Peso

    Gra

    do

    Long

    Tope

    Con

    ecci

    nC

    om

    enta

    rios

    (in)

    (in)

    (in)

    (lb/f

    t)(f

    t)(f

    t)

    9,6

    25

    TU

    BIN

    G H

    AN

    GE

    R1

    9,6

    25

    0,5

    00

    CO

    LG

    AD

    OR

    DE

    9-5

    /8"

    X 4

    -1/2

    "

    4,5

    00

    TU

    BIN

    G154

    4,5

    00

    12,7

    5N

    80

    4.8

    73,0

    00

    0,5

    0B

    TC

    154 T

    BG

    DE

    4-1

    /2"

    EU

    E N

    -80

    9,6

    25

    HY

    DR

    AU

    LIC

    PA

    CK

    ER

    19,6

    25

    8,0

    00

    4.8

    73,5

    0E

    MP

    AC

    AD

    UR

    A A

    RR

    OW

    SE

    T D

    E 9

    -5/8

    "

    4,5

    00

    TU

    BIN

    G110

    4,5

    00

    12,7

    5N

    80

    3.4

    54,0

    00

    4.8

    81,5

    0B

    TC

    154 T

    BG

    DE

    4-1

    /2"

    EU

    E N

    -80

    1,0

    00

    1,0

    00

    8.3

    35,5

    0F

    IN D

    E L

    A I

    NS

    TA

    LA

    CIO

    N

  • Well: BN_0808

    DATE PLOTTED: 26-Jun-2008

    HORIZONTAL UNITS: FEET

    Y COORDINATE: 3778404.13

    X COORDINATE: 556110.58

    LONGITUDE: 72.0000

    LATITUDE: 10.0000

    LOCATION: PI-527

    COMPANY: Chevron

    VERTICAL SCALE: 1:500

    DATE LOGGED: 23/01/2006

    VERTICAL UNITS: FEET

    DRILLED DEPTH: 9136.00

    ELEVATION MEAS. REF.: 151.22

    MEASUREMENT REF.: KB

    SURFACE ELEVATION: -

    DATUM FOR ELEVATION: MSL

    RM

    - @ -

    RMC

    - @ -

    RMF

    - @ -

    DFD

    -

    BHT

    - -

    DEPTH (FEET)

    8576.81-9136.00 -

    SHT BIT SIZE

    Composite

    WIRE.VSH_1V/V0 1

    WIRE.GR_BOS_1GAPI0 150

    WIRE.GR_1GAPI0 150

    wire.calMV6 16

    8590

    8610

    8620

    8630

    8640

    8660

    8670

    8680

    8690

    8710

    8720

    8730

    8740

    8760

    8770

    8780

    8790

    8810

    8820

    8830

    8840

    8860

    8870

    8880

    8890

    8910

    8920

    8930

    8940

    8960

    8970

    8980

    8990

    9010

    9020

    9030

    9040

    9060

    9070

    9080

    9090

    9110

    9120

    8600

    8650

    8700

    8750

    8800

    8850

    8900

    8950

    9000

    9050

    9100

    8576.8

    9136.0

    DEPTHFEET

    -8029.6

    -8050

    -8100

    -8150

    -8200

    -8250

    -8300

    -8350

    -8400

    -8450

    -8500

    -8510.2

    Elevation(T

    VD

    )F

    EE

    T

    85907" H

    igh Com

    pressed Meshrite

    460

    9050

    PE

    RF

    .FO

    RM

    AT

    ION

    MEMORY.RACHM_1OHMM0.2 200

    MEMORY.RACLM_1OHMM0.2 200

    MEMORY.RPCHM_1OHMM0.2 200

    MEMORY.RPCLM_1OHMM0.2 200

    WIRE.RT_1OHMM0.2 200

    WIRE.SW_INDO_1V/V1 0

    WIRE.SAND_1V/V0 10

    WIRE.NERR_1V/V10 0

    WIRE.KCALB_1MD1 10000

    WIRE.PAY_110 0

    PHIT_1V/V0.5 0

    BVW_1V/V0.5 0

    PHIE_1V/V0.5 0

    formpressV/V5000 0

    hydrostaticV/V5000 0

    wire.zdenG/C31.9 2.9

    wire.cncfV/V45 -15

    wire.nphiV/V0.45 -0.15

    wire.zcorG/C3-0.3 0.2

    wire.peB/E0 10

    EoceneO

    ligUnconf

    454

    9030B

    aseUpperR

    eservoir106

    TO

    PS

    .FO

    RM

    AT

    ION

    9020 MD

    Recomendacin: Si encuentran relleno a 9020 MD o por encima a esta profundidad proceder a limpiar hasta el fondo

  • De: Ramos, Leudy J [mailto:[email protected]]

    Enviado el: Monday, March 24, 2014 9:37 AM Para: MONICA DI CATERINA [Petroboscan]; JUAN VERGARA [Petroboscan]

    CC: ANNY DOMINGUEZ [Petroboscan]; Cedeno, Jesus E; Colina, Ricksy A; Matos, Fabian A; Safayeh, Daniel S; DANNY SOCORRO [Petroboscan]; DOUGLAS CHIRINOS [Petroboscan C]

    Asunto: PARADA POZO BN-808_R3 - RL: 231dias

    Buenos Das,

    El da sbado 22 de Marzo de 2014, fue reportado parado el pozo BN-808_R3. El tcnico de

    recorrido lleg a la locacin encontrando el VSD detenido, se procedi a dar arranque al

    equipo sin xito. Se desconect equipo de fondo y se tomaron medidas elctricas

    encontrando el equipo de fondo desbalanceado entre fases y con bajo aislamiento con

    respecto a tierra, el pozo queda fuera de servicio por equipo de fondo.

    Medidas Elctricas:

    Fase-Fase = 5.3 3.7 4.7 Ohms

    Fase-Tierra = 0 MOhms

    Con estas medidas elctricas el equipo no puede arrancar y queda fuera de servicio parado

    por equipo de fondo. Este equipo de fondo tena un Run Life de 231 das. Las ltimas lecturas del

    Sensor tipo Centinel III fueron el 18 de Octubre de 2013 = PIP: 1330 psi y TM: 214 F.

    El equipo instalado actualmente es el siguiente

    Favor enviar la ltimas medidas de produccin, agua, arena, e IPR para ir trabajando en el diseo del prximo equipo a instalar. Saludos..

  • Leudy (Len) J. Ramos | C&P Application Engineering Baker Hughes | Completion & Production Office: +58 261.730.5400 Cell: + 58 412.250.0454 | [email protected] http://www.bakerhughes.com | Advancing Reservoir Performance

    This message is intended exclusively for the individual or entity to which it is addressed. This communication may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. If you are not the named addressee, or have been inadvertently and erroneously referenced in the address line, you are not authorized to read, print, retain, copy or disseminate this message or any part of it. If you have received this message in error, please notify the sender immediately by e-mail and delete all copies of the message.

  • Scale

    Max Dog Leg / 100 ft 3.97 @ 5917FT

    Casing-1 Casing-2

    Tope Tope

    Base Base

    Tubing-1 Tubing-2

    Tope Tope

    Base Base

    Intervalos perforados Colgador Ft

    Desde: Ft Hasta: Ft Modelo de Afluencia

    Marca Minimandril

    Modelo Maximandril

    API

    Grav. Gas sg

    Grav. Agua sg

    %Ays

    RGP RGL PIP Mnima

    Pb. Rsb

    CO2 N2 H2S

    Parafinas, Aromticos

    y Asfaltenos

    Correlacin de flujo multifsico vertical

    60 50

    Capilar

    cP @ F y psi VSD TX Elevador

    cP @ F y psi Marca: Marca:

    cP @ F y psi KVA: KVA:

    Nombre: Johana Villasmil Nombre: Ing. Marcelino Mota

    C.I.: 17.335.346

    Firma: Firma:

    BV-MPR-VA-R-003-F01 Revisin N 2 (16-04-2012) Pgina 1 de 1

    BV-MPR-VA-R-003-F01

    Hoja de Datos - Equipos BES

    Instrucciones: Complete todos los campos posibles y anexe cualquier informacin que considere importante

    No de pedido: Contrato Chevron

    Cliente PDVSA Contacto Johana Villasmil

    Cel: 0424-6736122

    Campo CAMPO BOSCAN e-mail [email protected]

    Nombre del Pozo BN_0808 Instalacion: Telfono 0261-7302046

    Vertical: Horizontal: Inclinado Datum 9136

    Fecha 29 de agosto de 2014

    DIAGRAMA MECNICO INFORMACIN DEL YACIMIENTO

    Pais VENEZUELA

    Formacin Productora N/S

    0 Nivel Esttico N/S

    Presin @ Datum 1540

    Temp @ Datum 190

    8220

    9136 CHP Esttico N/S

    DATOS DE AFLUENCIA

    8513 9136

    Cabezal

    N/S Indice de Productividad N/S

    8373

    0

    N/S Ql @ Prueba 365

    DATOS DE FLUIDOS Pwf @ Prueba 1054

    30% Produccin deseada 365

    10.6 Nivel dinmico @ Prueba N/S

    0.66 CHP @ Prueba N/S

    200 140 300

    1350 N/S Presin en cabezal (THP) 120

    1.06 ESPECIFICACIONES DEL DISEO

    Arena Temperatura en cabezal 120

    Carbonatos

    INFORMACIN ADICIONAL

    Y Tool Hz

    Potenciales Problemas Presin Anular (CHP) N/S

    NO NO NO Prof. de Asentamiento 8334

    Datos para calibracin por viscosidad

    REPRESENTANTE CLIENTE REPRESENTANTE BORETS VENEZUELA S.A

    COMENTARIOS Y OBSERVACIONES

    Cargo: ING. DE VENTAS Y APLICACIONES

    C.I.:

    Cargo: ING. DE OPTIMIZACION

  • BV-MPR-VA-R-003-F02

    P/N BORETS DESCRIPCIN DEL COMPONENTE COD. CLIENTE CANT U.M

    1. Seccin de bomba(s):

    1179769 BOLT ON DISCHARGE HEAD, ESP 400 2-7/8 EUE STAINLESS STEEL 914295 1 PZA

    2022958 Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 901940 1 PZA

    2022958 Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 901940 1 PZA

    2022958 Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 901940 1 PZA

    2. Seccin de separador(es) de gas / succin:

    826627 Gas Separator, ESP 538 VGS HSS SS 902177 1 PZA

    3. Seccin de sello(s) o protector(s):

    1396991 Motor Seal, ESP Guardian 538 BPBSL HL HT MT 902046 1 PZA

    1396991 Motor Seal, ESP Guardian 538 BPBSL HL HT MT 902046 1 PZA

    4. Seccin de motor(es):

    1223117 Motor, ESP 562 IL200T 330HP 1950V 102A UT MT HT 923491 1 PZA

    5. Sensor de fondo:

    1271542 Sensor, ViewPoint ESP-HT Series-5 SS 912580 1 PZA

    6. Cable(s) de potencia:

    955680 Cable, ESP round SL-450 #1/7 str cpt EETB G 5kV 795118 8800 FT

    6. Miscelneos:

    2005544 Centralizer, ESP 7in 32 lb/ft carbon steel 922485 1 PZA

    604698 Protector, tubing clamp 4-1/2 OD 1-2 flat Cannon 4500-A-05SR 923508 300 PZA

    1192820 Connector, wellhead surface 5kV 100A BIW-EM42201-276-030 922487 1 PZA

    1192821 Lower Connector, wellhead 5kV 100A BIW-EM43208-766-012 922490 1 PZA

    1192644 Feedthru, wellhead 5kV 100A 26in BIW-EM41218-2 922488 1 PZA

    794977 MLE, ESP 540/562 4KELB TM 4kV 120ft 922494 1 PZA

    922493 Kit, installation 400 922493 1 KIT

    923838 SPLICE KIT 923838 3 KIT

    593421 Hanger, motor shroud 513/538 pump x 7 inch shroud 922483 1 PZA

    C.I.: C.I.: 17.335.346

    Firma: Firma:REPRESENTE CLIENTE REPRESENTANTE BORETS VENEZUELA S.A

    Fecha:

    BV-MPR-VA-R-003-F02 Revisin N 3 (10-06-2013) Pgina 1 de 3

    29-Aug-14

    Tiempo de entrega ofrecido: 20 SEMANAS despus de recibido el pedido u ODC del Cliente

    CARACTERISTICAS TECNICAS EQUIPO RECOMENDADO

    RESUMEN DE LA CONFIGURACIN PROPUESTA

    Cargo: ING. DE OPTIMIZACION Cargo: ING. DE VENTAS Y APLICACIONES

    Nombre: Johana Villasmil Nombre: Ing. Marcelino Mota

    Se realiz el diseo considerando la informacin recibida por Ud.(s) la cual se encuentra adjunta en el formato

    identificado como "BV-MPR-VA-R-003-F01" teniendo en cuenta las expectativas de produccin y las condiciones

    actuales del pozo.

    Se propone un Equipo BES asentado a una profundidad de 8316.15 ft la cual garantiza un nivel de fluido mnimo

    suficiente sobre la Bomba para su operacin normal (PIPmin= 300 psi para la tasa deseada de 365 bfpd. Los resultados

    indican la necesidad de instalar un Separador de Gas de alta eficiencia el cual garantice la operacin adecuada de la

    Bomba considerando la Relacin Gas / Petrleo del pozo de 200 pcpd/bnpd . Se recomienda el siguiente equipo BES

    convencional:

    BN_0808

    PROPUESTA DE EQUIPOS

  • BV-MPR-VA-R-003-F02

    POZO: Fecha:

    OD (in)Longitud

    (ft)

    Base

    (ft)

    1.37

    4.00 0.50 8220.5

    4.00 14.80 8235.3

    4.00 14.80 8250.1

    4.00 14.80 8264.9

    5.38 2.71 8267.6

    5.38 9.00 8276.6

    5.38 9.00 8285.6

    5.62 25.80 8311.4

    3.75 3.74 8315.2

    5.70 1.00 8316.2

    Camisa de Refrigeracion (Longitud Minima) 5.70 96.15 8,316.15

    66.00 FT - 7" 26Lb

    Fondo de Camisa Distancia entre fondo de camisa y tope del liner

    8333.61 FT 39 FT

    BV-MPR-VA-R-003-F02 Revisin N 3 (10-06-2013)Pgina 2 de 3

    1.37

    8.0

    Lb/ft

    8220.0

    1.8

    379.0

    1863.0

    Motor Seal, ESP Guardian 538 BPBSL HL HT MT

    CONFIGURACIN DE EQUIPO A INSTALAR

    BN_0808 29-Aug-14

    Peso

    (lb)Descripcin de Componentes

    8220.0

    Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 317.0

    14796.0

    Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT

    BOLT ON DISCHARGE HEAD, ESP 400 2-7/8 EUE STAINLESS STEEL

    Cable, ESP round SL-450 #1/7 str cpt EETB G 5kV

    317.0

    Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 317.0

    123.5

    3,794.5

    Gas Separator, ESP 538 VGS HSS SS

    Sensor, ViewPoint ESP-HT Series-5 SS 71.0

    Motor Seal, ESP Guardian 538 BPBSL HL HT MT 379.0

    Centralizer, ESP 7in 32 lb/ft carbon steel 20.0

    Motor, ESP 562 IL200T 330HP 1950V 102A UT MT HT

    PROPUESTA DE EQUIPOS

  • 50 1) Tiempo de entrega ofrecido

    151.9 ( ) Excelente ( ) Bueno ( ) Regular ( ) Malo

    2940.1

    59.8 2) Tiempo de repuesta del Ing. Ventas

    1625 ( ) Excelente ( ) Bueno ( ) Regular ( ) Malo

    0.654

    No 3) Calidad tcnica del equipo ofertado.

    14.7 ( ) Excelente ( ) Bueno ( ) Regular ( ) Malo

    84.8

    N/A

    N/A

    454.26 LEYENDA PONDERACION

    354 Excelente 10

    483.41 Bueno 7

    483.19 Regular 5

    27.7 Malo 3

    1.7

    6648.77

    646.8 ESCALA CALIFICACION

    3519 25-30 Excelente

    124.5 20-24 Bueno

    790.9 15-19 Regular

    6466.32

  • 48 49 50 51 52

    142 147 151.9 157 162

    2823 2882 2940.1 2999 3057

    57.8 58.8 59.8 60.9 62

    1560 1593 1625 1658 1690

    0.64 0.65 0.654 0.66 0.67

    No No No No No

    15.1 14.9 14.7 14.6 14.4

    84.4 84.6 84.8 85 85.1

    N/A N/A N/A N/A N/A

    N/A N/A N/A N/A N/A

    407 433 454.26 476 498

    354 354 354 354 354

    433 460 483.41 507 530

    433 460 483.19 506 530

    20.6 24.1 27.7 32 37.6

    1.2 1.4 1.7 2.1 2.6

    6225 6434 6648.8 6866 7083

    797 718 646.8 569 484

    3486 3498 3519 3535 3543

    112 118 124.5 131 138

    938 861 790.9 715 632

    6049 6268 6466.3 6682 6920

    45% 47% 48% 50% 51%

    284 285 286 288 289EQUIPO @48Hz

    EQUIPO @52Hz

    Motor Load, %:

    Operating Temp, F:

    Total Dynamic Head (TDH), ft:

    Pump Intake Pressure, psig:

    Pump Discharge Pressure, psig:

    Pump Operating Power, HP:

    Bottom Hole Pressure , psig:

    Fluid Level [MD], ft:

    Free Gas by Volume into Pump, %:

    Operating Power Factor :

    Adjusted for Motor Slip :

    Pump Efficiency, %:

    Motor Efficiency, %:

    Operating Thrust Load, lb:

    Maximum Thrust Load, lb:

    Surf. Final Liq. Rate(O+W), Bbl/D:

    Total Stages :

    Avg. Pump Final Fluid, Bbl/D

    Avg. Pump Total Rate, Bbl/D

    Free Gas by Volume @ Pump, %:

    Operating Voltage, Volts:

    Sensibilidades equipo 400-1250 354STG en pozo BN_0808

    Frequency, Hz:

    Required HP, HP:

    Operating Speed, RPM:

    Operating Current, Amps:

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 1

    DESCRIPCIN GENERAL

    Nombre de la Compaa: PETROBOSCANNombre del Pozo: BN-0808Nombre del Campo: CAMPO BOSCANNombre del Yacimiento:Analista: MARCELINO MOTATipo de Clculo: Diseo RigurosoUbicacin:

    Comentarios: 50hz IDEAL

    Fecha: Ago 29, 2014

    DATOS DEL POZO

    OD Wt ID Rugosidad Base MD Tope MDNo. in lb/ft in in ft ft

    Tubing 1 4.500 12.75 3.958 0.0006500 8220.00

    Cubierta 1 7.000 26.00 6.276 0.0006500 8320.00

    Casing 1 9.625 47.00 8.681 0.0006500 9136.00 0.00

    Survey Direccional

    MD TVD AnguloNo. ft ft Deg

    1 100.00 100.00 1.52 3048.00 3047.00 0.03 4006.00 4005.00 0.04 4916.00 4915.00 8.05 5534.00 5527.00 24.86 6012.00 5961.00 30.07 6585.00 6457.00 30.08 7063.00 6871.00 30.29 7668.00 7394.00 30.210 8014.00 7693.00 30.011 8395.00 8023.00 30.012 8589.00 8191.00 30.813 9136.00 8661.00 0.0

    Profundidad de la Bomba, ft: 8220.00Tope de las Perforaciones o Datum (MD), ft: 8513.00Temperatura del Yacimiento, F: 190.0Temperatura en el Cabezal del Pozo, F: 120.0Temperatura del Fluido Antes de pasar por el Motor, F:

    187.8Temperatura del fluido Despes de pasar por el Motor, F:

    187.8

    Correlaciones de Outflow para el Tubing Orkiszewski (1967)Factor de Ajuste de la Correlacin: 1.000

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 2

    DATOS DE LA LNEA DE FLUJO

    Correlacin de la Lnea de Flujo Ninguno CalculadoCorrelacin del Estrangulador No hay clculos hechos para el estrangulador

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 3

    CORRELACIONES PVT

    Descripcin Mtodo

    Viscosidad del Petrleo, (Muerto) Beggs & RobinsonViscosidad del Petrleo, (Saturado) Chew & ConnallyViscosidad del Petrleo, (Subsaturado) KartoatmodjoViscosidad del Gas LeeViscosidad del Agua Matthews & Russell Factor Volumtrico del Petrleo Vasquez & BeggsFactor Volumtrico del Agua de Formacin HP41CDensidad del Petrleo KatzFactor - Z Hall & YarboroughComprensibilidad Isotrmica del Petrleo Vasquez & BeggsCompresibilidad Isotrmica del Agua MeehanRelacin Gas/Petrleo en Solucin LasaterPresin del Punto de Burbuja LasaterDensidad del Gas BeggsDensidad del Agua BeggsCorrelacin de Tensin Superficial del Petrleo Baker y SwerdloffCorrelacin de Tensin Superficial del Agua Hough

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 4

    DATOS DEL FLUIDO

    Temperatura Estndar, F: 60.0 Relacin Gas/Petrleo Prod., scf/bbl: 200.00Presin Estndar, psi: 14.7 Relacin Gas/Lq Prod., scf/bbl: 140.00Gravedad del Petrleo, API: 10.6 Presin del Punto de Burbuja, psia: 1340.0Gravedad Especfica del Gas: 0.660 RGP en Solucin, scf/bbl: 154.91Gravedad Especfica del Agua: 1.060 Viscosidad Promedio del Fluido, cP: 586.2Salinidad del Agua, ppm: 80000 Grad. Fluido @ Entrada Bomba, psi/ft: 0.431Corte de Agua, %: 30.0

    Datos de calibracin de la Viscosidad

    Pnt. Pres. Temp. Visc. Medida Tipo Calc Visc Calib# psia F cP cP Factor

    1 14.7 100.0 7600.0 Muerto 1270.4 5.9822 14.7 180.0 500.0 Muerto 35.9 13.927

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 5

    DATOS INFLOW

    Mtodo de Clculo del IPR: Vogel corregido por Corte de Agua

    Caudal a la Presin de Fondo Fluyente de la Prueba, Bbl/D:365.00

    Indice de Productividad, blpd/psi: 0.464Caudal al punto de burbuja, Bbl/D: 250.44Caudal Mx de Petrleo, Bbl/D: 595.88Mx. Caudal Total, Bbl/D: 595.88

    Esttica Prueba

    Presin del Casing, psig: 0.0 0.0Nivel de Fluido, ft: 0.00 0.00Presin de Fondo (BHP), psig: 1865.0 1054.0

    DATOS DE PRESIN/CAUDAL

    Criterios de Diseo - Calcular: Condiciones de Entrada a la Bomba

    Caudal total de fluido, Bbl/D: 365.00Profundidad de la Bomba, ft: 8220.00Fluido sobre la Bomba, ft: 2526.06Nivel de fluido dinmico, ft: 5693.94Presin de Entrada a la Bomba, psig: 915.9Cabeza Dinmica Total, ft: 5889.69Presin del Tubing, psig: 120.0Presin del Casing, psig: 1.0Presin de Fondo , psig: 1054.0Gas a travs de la Bomba Comprimir Gas

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 6

    SEPARACIN DEL GAS

    Empacadura Instalada? NoGas Libre perm. en la Bomba, %: 16.0Separador de Gas Instalado? SiGas Libre dentro de la Bomba, %: 0.8Eficiencia de la Separacin Natural de Gas, %: 70.0Eficiencia de la Sep. del Gas, %: 85.0

    DETALLE DE LA CURVA DEL SISTEMA DEL POZO

    (+) (-) (=) Caudal en Caudal Prom. en Nivel deCabeza Cabeza TDH Superficie La Bomba fluidoTubing PIP P+A P+A+G Bombeado

    Punto # ft ft ft Bbl/D Bbl/D ft

    1 8050.40 4083.98 3966.43 5.72 6.09 3686.402 8003.14 3724.24 4278.90 76.55 81.43 4053.243 7965.52 3364.63 4600.89 147.38 156.76 4420.474 7944.37 3002.53 4941.84 218.20 232.10 4788.005 7955.96 2625.35 5330.61 289.03 307.44 5165.726 8005.07 2162.86 5842.20 359.86 382.78 5648.067 8088.34 1671.71 6416.64 430.69 458.11 6210.468 8193.96 1077.64 7116.32 501.51 533.45 6918.87PumpOff 8283.86 9.16 8274.70 572.34 608.79 8219.10

    Diseo 8011.72 2122.03 5889.69 365.00 388.25 5693.94

    COMPORTAMIENTO TERICO DE LA BOMBA

    Entrada Descarga Superficie

    Caudal de Petrleo, Bbl/D: 344.30 340.05 317.98Caudal de Gas en-sitio en la Bomba, Bbl/D: 4.15 1.08 N/ACaudal de Gas en-sitio en el casing, Bbl/D: 88.01 N/A N/ACaudal Total de Gas, Mscf/D: N/A N/A 63.60Porcentaje de Gas Libre, %: 1.69 0.31 N/ACaudal de Agua, Bbl/D: 140.81 139.86 136.28Caudal Total de Lquido, Bbl/D: 485.11 479.91 454.26

    Presin, psig: 646.8 3519.0 120.0 (cabezal)

    Gravedad especfica del Lquido, wtr=1: 0.97 0.98 N/AGravedad especfica de la Mezcla, wtr=1: 0.95 0.98 N/ADensidad del Lquido, lb/cf: 60.402 61.067 N/ADensidad de la Mezcla, lb/cf: 59.414 60.910 N/Aviscosidad de la Mezcla, cStokes: 325.9 481.1 N/Aviscosidad de la Mezcla, SSU: 1519.2 2242.5 N/ARGP en Solucin, scf/bbl: 74.48 74.48 N/ARGA en solucin, scf/bbl: 3.47 3.47 N/AFV del Lquido, yacimiento/superficie: 1.06 1.05 N/AFV de la Mezcla, yacimiento/superficie: 1.08 1.05 N/AFactor de desviacin del Gas: 0.944 0.900 N/A

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 7

    DATOS DE LA BOMBA 1

    Fabricantes: WfordSerie: 400Modelo: 400-1250& Fuente de Datos del Equipo:

    Mnimo Caudal Recomendado, Bbl/D: 346.32**Mximo Caudal Recomendado, Bbl/D: 747.45**Caudal a la Mxima Eficiencia, Bbl/D: 607.86**Potencia a la Mxima Eficiencia, HP: 154.5**Frecuencia, Hz: 50.0

    ** = Corregida para la Frecuencia & Viscosidad

    Nmero de Etapas: 354Etapas con Gas Libre: 354

    Factores de correccin por Viscosidad Introducidas por el Usuario

    Caudal: 0.599 SiCabeza: 0.848 SiPotencia: 1.799 SiEficiencia: 0.280Viscosidad: Fluido

    Diseo Catlogo

    Cabeza Dinmica Total (TDH), ft: 5889.69 6648.77Caudal en Superficie (P+A), Bbl/D: 365.00 454.26Promedio de Caudal por Etapas (P+G+A), Bbl/D: N/A 483.19Presin de Entrada a la Bomba, psig: 915.9 646.8Potencia de Operacin, HP: N/A 126.5Eficiencia de la Bomba, %: N/A 14.7

    Datos del Housing

    NO SE HA SELECCIONADO HOUSINGS

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 8

    DATOS DEL MOTOR

    Fabricantes: WfordSerie: 562Tipo: IL-200 - Upper

    Potencia en la Placa de Identificacin, HP: 330.0 Frecuencia de la Placa de Identificacin, Hz: 60Voltaje de la Placa de Identificacin, Volts: 1950.00Corriente de la Placa de Identificacin, Amp: 102.0

    Ajustar por Deslizamiento del Motor: No Corriente de Operacin, Amps: 59.8Frecuencia de Diseo, Hz: 50.0 Voltaje de Operacin, Volts: 1625.00Carga de operacin del Motor, HP: 126.5 Factor de Potencia de Operacin, frac: 0.654

    (@ Frecuencia de Diseo)Carga Operativa del Motor, %: 46.02 Eficiencia de Operacin, %: 84.79Velocidad de Operacin, RPM: 2940 Velocidad del Fluido, ft/sec: 0.694

    Catlogo Actual

    Total de Etapas 354 354Deslizamiento en las Etapas 0 0Cabeza Dinmica Total (TDH), ft 6648.77 6648.77Caudal en Superficie (P+A), Bbl/D 454.26 454.26Promedio de Caudal por Etapas (P+G+A), Bbl/D 483.19 483.19Presin de Entrada a la Bomba, psig 646.8 646.8Potencia de Operacin, HP 126.5 124.5Eficiencia de la Bomba, % 14.7 14.7Velocidad de Operacin, RPM 2916 2916

    DATOS DEL SELLO

    NO HAY SELLO SELECCIONADO

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

  • Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 9

    DATOS DEL CABLE

    Fabricantes: WfordTipo: E-Lead-Compacted-5KVTamao: 1 CuForma: FlatTipo de Conductor: Stranded Mx.Temp., F: 450.0Longitud del Cable, ft: 8320.00

    Calcular: Voltaje de SuperficieCosto de la Electricidad, $/kWH: 0.00

    Nota: *Indica que el cable est fuera de rango!

    DiseoFrec.

    Frecuencia, Hz 50 Mx. Amp Permisible, Amps 169.0 Amperaje, Amps 59.8 Kilovoltio Amperio, KVA 192.7 Kilovatios, kW 126.0 Kilovatios, $/mes 0 Voltaje de Superficie, Volts 1858.6 Cada de Voltaje @ 68.0 F, Volts 185.2 Cada de Voltaje @ 190.0 F BHT, Volts 233.6 Prdida de Kilovatios, kW 15.8 Costo de la Prdida de Voltaje, $/mes 0 Voltaje Requerido por el Motor, Volts 1625.0 Voltaje de Fondo del Motor, Volts 1625.0 Cada de Voltaje In-rush del Motor, Volts 934.4 Mnimo Voltaje de Arranque del Motor , Volts 924.2 Relacin Arranque/Operacin, Relacin 0.6

    Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45

    Nota: Los caudales en "superficie" son calculados a condiciones estndar

  • 10

    6

    1 4

    3

    87 9

    Vlvula de Aislamiento Estacin de Flujo

    2 5 Aguas Arriba Aguas Abajo

    Vlvulas:1. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe2. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe3. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe4. Check Vlvula Con Fuga / Sin Fuga Existe / No Existe5. Abierta / Cerrada Con Fuga / Sin Fuga Existe . No Existe6. Sello Con Fuga / Sin Fuga Existe / No Existe7. Indicador de Presin Aguas Arriba ___________________________ Psi8. Indicador de Presin Aguas Abajo___________________________ Psi9. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe10. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe

    Hoja de Entrega de Pozo P & C / Operaciones - BALANCIN

    Pozo: ______________

    Rep. P&C:___________Firma, fecha y hora

    Rep. OPS:___________Firma, fecha y hora

    TODOS los puntos deben ser marcados para efectuar la entrega del pozo. Si un punto no puede ser marcado poner la observacin.

    FLUIDOS DE REHABLITACIN SI NOBLS DEJADOS EN

    POZOFluidos de Limpieza (Salmuera)Fluidos de Limpieza ( )Geles TemporalesGeles PermanentesFluidos de Acarreo (Pildoras Viscosas)Fluidos RompedoresAcidosOtros fluidos

    Firmar dos copias Una permanecer en el taladro y la otra es para OperacionesEl taladro no esperara por la firma de Operaciones para evitar TNPEl pozo no debera producir hasta que operaciones haya firmado el formulario de entrega.

    BN_0808 Programa Limpieza + Cambio de Bomba (Ago 2014)BN_0808 HistoriaBN_0808 Diag actual y propuesto [Modo de compatibilidad]PDFDLBN_0808 Data de ProduccionBN_0808 IPRBN_0808 Recomendaciones de limpiezaBN_0808 XspocBN_0808 Aviso de fallasPropuesta de Sistema BES BORTES 400-1250 354STG MTR 330HP para pozo BN_0808Reporte detallado de SubPump Sistema BES 400-1250 354STG MTR 330HP para BN_0808Hoja de entrega de pozos