    Inventario inicial de Enero 10000 ltrsInventario final deseado para Enero 15000 ltrs

    Inventario final deseado para Febrero 30000 ltrs

    Inventario final deseado para Marzo 20000 ltrs

    La produccin programada para los tres meses es la siguiente:

    Produccin enero 5000 productos

    Produccin febrero 9000 productos

    Produccin marzo 14000 productos

    Se pide:

    PRESUPUESTOS EMPRESARIALESEJERCICIOS PROPUESTOS

    EJERCICIO 7.1

    1) La compaa Alfas S.A., usa el componente Alfa-Omega para la fabricacin de su producto, el refrigerante industri

    cada unidad de producto se necesitan 2 litros de componente, cuyo precio es de $20 dlares el litro. La compaa pl

    inventarios con anticipacin, de manera que no existan faltantes en el inventario. El departamento de compras sig

    ordenar su materia prima al proveedor el primer da del mes. A continuacin se dan los siguientes datos:

    Suponiendo que se llevan a cabo los planes citados, Cul sera el costo total de los materiales comprados

    los tres meses iniciales?Cul sera el costo suponiendo que el precio permanece constante durante el prime

  • 7/27/2019 7.1 Yesenia Guanochanga

    2/8

    COSTO UNITARIO DE MATERIA PRIMA 20.00

    REQUERIMIENTO DE MP C/PRODUCTO 2 ltrs

    INV INICIAL ENERO 10000 ltrsIN FINAL DESEADO ENERO 15000 ltrs

    INV FINAL DESEADO FEBRERO 30000 ltrs

    INV FINAL DESEADO MARZO 20000 ltrs

    ENERO 5000 uni

    FEBRERO 9000 uni

    MARZO 14000 uni

    ENERO FEBRERO

    5000 9000

    2 ltrs 2 ltrs

    10000 ltrs 18000 ltrs

    -10000 ltrs -15000 ltrs

    +INV FINAL D MP 15000 ltrs 30000 ltrs

    =COMPRAS DE MP 15000 ltrs 33000 ltrs

    COSTO UNITARIO DE MP 20.00$ 20.00$

    300,000$ 660,000$

    Compaa Alfas S.A

    SOLUCIN EJERCICIO 7.1

    VARIABLES

    INVENTARIOS

    PRODUCCION

    REQUERIMIENTO DE MATERIA PRIMA

    PRODUCCION REQUERIDA DE REFRIGERANTE

    *REQUERIMIENTO DE MP POR C/PRODUCTO

    =REQUERIMIENTO MP C/REFRIGERANTE

    -INV INICIAL D MP

    COSTO TOTAL DE REQUERIMIENTO DE MP

  • 7/27/2019 7.1 Yesenia Guanochanga

    3/8

    Inventory Initial of January 10000 ltrs

    Invetory final desired for January 15000 ltrs

    Invetory final desired for February 30000 ltrs

    Invetory final desired for March 20000 ltrs

    Scheduled production for three months is as follows:

    Production in January 5000 productos

    Production in February 9000 productos

    Production in March 14000 productos

    Perform:

    EXERCISE 7.1

    1) The company Alfas SA, used the Alpha-Omega component for the manufacture of its prod

    coolant (Polar Bear). For each item you need 2 liters of component, which is priced at $ 20 a liter.

    plans to their level of inventories in advance, so that there are no shortages in inventory. Tdepartment has a policy of ordering the raw material supplier on the first day of the month.

    following:

    Assuming perform such plans, what would be the total cost of purchased materials in each of t

    months? What would be the cost assuming the price remains constant during the first half?

  • 7/27/2019 7.1 Yesenia Guanochanga

    4/8

    UNIT COST OF RAW MATERIAL 20.00

    RAW MATERIAL REQUIREMENTS FOR PRODUCT 2 ltrs

    INV INITYAL JANUARY 10000 ltrsIN FINAL DESIRED JANUARY 15000 ltrs

    INV FINAL DESIRED FEBRUARY 30000 ltrsINV FINAL DESIRED MARCH 20000 ltrs

    JANUARY 5000 uni

    FEBRUARY 9000 uni

    MARCH 14000 uni

    JANUARY FEBRUARY

    5000 9000

    2 ltrs 2 ltrs

    10000 ltrs 18000 ltrs

    -10000 ltrs -15000 ltrs+ INVENTORY FINAL OF RAW MATERIAL 15000 ltrs 30000 ltrs

    = SHOPPING OF RAW MATERIALS 15000 ltrs 33000 ltrs

    * UNIT COST OF RAW MATERIALS 20.00$ 20.00$

    INVENTARIOS

    EXERCISE SOLUTION 7.1

    VARIABLES

    = REQUIREMENT OF RAW MATERIAL BY REFRIGERANT

    - INVENTORY INITIAL OF RAW MATERIAL

    PRODUCCION

    MODEL

    Compaa Alfas S.A

    Requirement of Raw Materials

    REQUIRED PRODUCTION OF REFRIGERANT

    *REQUIREMENT OF RAW MATERIAL BY EACH PRODUCT

  • 7/27/2019 7.1 Yesenia Guanochanga

    5/8

    l Oso Polar. Por

    nea su nivel de

    e la poltica de

    n cada uno de

    r semestre?

  • 7/27/2019 7.1 Yesenia Guanochanga

    6/8

    MARZO

    14000

    2 ltrs

    28000 ltrs

    -30000 ltrs

    20000 ltrs

    18000 ltrs

    20.00$

    360,000$

  • 7/27/2019 7.1 Yesenia Guanochanga

    7/8

    ct, industrial

    The company

    e purchasingelow are the

    he first three

  • 7/27/2019 7.1 Yesenia Guanochanga

    8/8

    MARCH

    14000

    2 ltrs

    28000 ltrs

    -30000 ltrs20000 ltrs

    18000 ltrs

    20.00$