6_Construccion de Defensa Ribereña y Encauzamiento Rio Callazas

2
(EN NUEVOS SOLES) FU DIVF GRPF PROD/PROY ACT/AI/OBR PRG ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DIC JUN M E N S U A L I Z A D O PIM SALDO 13/01/2015 1 de 2 11:06:10 Fecha Hora Pag. : : : RB FF ESPECIFICA DET SEC. FUNC CATEGORIA TOTAL DEVENGADOS DEVENGADOS Vs MARCO PRESUPUESTAL - 2014 23 02 TACNA CANDARAVE MUNICIPALIDAD PROVINCIAL DE CANDARAVE [301787] 01 DEPARTAMENTO : PROVINCIA : PLIEGO : SIAF - Módulo de Proceso Presupuestario Versión 14.09.00 0038 0068.2144244.4000122 CONTROL DE INUNDACIONES Y DEFENSAS RIBEREÑAS 05.016 .0035 Meta: 00001 - 0081356 CONSTRUCCION DE DEFENSA RIBEREÑA Y ENCAUZAMIENTO DEL RIO CALLAZAS EN EL C.P. ARICOTA, EN EL DISTRITO CANDARAVE - CANDARAVE - TACNA, METRO LINEAL: 1000.000, TACNA, CANDARAVE, CANDARAVE 4 DONACIONES Y TRANSFERENCIAS 13 DONACIONES Y TRANSFERENCIAS 2.6 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.11 3,634,199 GEN ADQUISICION DE ACTIVOS NO 880,428.30 2,753,770.70 2.6. 2 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.11 3,634,199 CONSTRUCCION DE EDIFICIOS Y 880,428.30 2,753,770.70 2.6. 2 3 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.11 3,634,199 OTRAS ESTRUCTURAS 880,428.30 2,753,770.70 2.6. 2 3. 4 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.11 3,634,199 INFRAESTRUCTURA AGRICOLA 880,428.30 2,753,770.70 2.6. 2 3. 4 3 0.00 0.00 0.00 0.00 0.00 0.00 63,677.95 21,453.75 83,338.47 3,287.92 0.00 128,138.10 566,498 COSTO DE CONSTRUCCION POR 266,601.81 299,896.19 2.6. 2 3. 4 4 0.00 0.00 0.00 0.00 0.00 0.00 2,280,000.00 2,530.00 14,361.50 2,785.00 0.00 450.00 2,627,262 COSTO DE CONSTRUCCION POR 327,135.50 2,300,126.50 2.6. 2 3. 4 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,160.00 37,150.00 9,005.00 101,433.01 440,439 COSTO DE CONSTRUCCION POR 286,690.99 153,748.01 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.11 3,634,199 13 PARCIAL RUBRO 2,753,770.70 880,428.30 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.11 3,634,199 4 PARCIAL FTE 2,753,770.70 880,428.30 5 RECURSOS DETERMINADOS 18 CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES 2.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96 553,346 GEN ADQUISICION DE ACTIVOS NO 55,270.68 498,075.32 2.6. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96 553,346 CONSTRUCCION DE EDIFICIOS Y 55,270.68 498,075.32 2.6. 2 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96 553,346 OTRAS ESTRUCTURAS 55,270.68 498,075.32 2.6. 2 3. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96 553,346 INFRAESTRUCTURA AGRICOLA 55,270.68 498,075.32 2.6. 2 3. 4 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 166,369.96 498,331 COSTO DE CONSTRUCCION POR 30,885.68 467,445.32 2.6. 2 3. 4 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,655.00 9,655 COSTO DE CONSTRUCCION POR 0.00 9,655.00 2.6. 2 3. 4 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,975.00 45,360 COSTO DE CONSTRUCCION POR 24,385.00 20,975.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96 553,346 18 PARCIAL RUBRO 498,075.32 55,270.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96 553,346 5 PARCIAL FTE 498,075.32 55,270.68 TOTAL META 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 191,592.06 161,711.22 427,021.07 4,187,545 3,251,846.02 935,698.98 TOTAL EJECUTORA 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 191,592.06 161,711.22 427,021.07 4,187,545 3,251,846.02 935,698.98

description

defensas ribereñas muy importante para el centro poblado !!!

Transcript of 6_Construccion de Defensa Ribereña y Encauzamiento Rio Callazas

Page 1: 6_Construccion de Defensa Ribereña y Encauzamiento Rio Callazas

(EN NUEVOS SOLES)

FU DIVF GRPFPROD/PROY ACT/AI/OBRPRG

ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DICJUN

M E N S U A L I Z A D O

PIM SALDO

13/01/2015

1 de 211:06:10

FechaHoraPag.

::

:

RBFF ESPECIFICA DET

SEC.FUNC CATEGORIA

TOTALDEVENGADOS

DEVENGADOS Vs MARCO PRESUPUESTAL - 2014

2302

TACNACANDARAVEMUNICIPALIDAD PROVINCIAL DE CANDARAVE [301787]01

DEPARTAMENTO :PROVINCIA :

PLIEGO :

SIAF - Módulo de Proceso PresupuestarioVersión 14.09.00

0038 0068.2144244.4000122 CONTROL DE INUNDACIONES Y DEFENSAS RIBEREÑAS 05.016 .0035Meta: 00001 - 0081356 CONSTRUCCION DE DEFENSA RIBEREÑA Y ENCAUZAMIENTO DEL RIO CALLAZAS EN EL C.P. ARICOTA, EN EL DISTRITO CANDARAVE - CANDARAVE - TACNA, METRO LINEAL: 1000.000, TACNA, CANDARAVE, CANDARAVE

4 DONACIONES Y TRANSFERENCIAS13 DONACIONES Y TRANSFERENCIAS

2.6 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.113,634,199GEN ADQUISICION DE ACTIVOS NO 880,428.302,753,770.70

2.6. 2 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.113,634,199CONSTRUCCION DE EDIFICIOS Y 880,428.302,753,770.70

2.6. 2 3 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.113,634,199OTRAS ESTRUCTURAS 880,428.302,753,770.70

2.6. 2 3. 4 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.113,634,199INFRAESTRUCTURA AGRICOLA 880,428.302,753,770.702.6. 2 3. 4 3 0.00 0.00 0.00 0.00 0.00 0.00 63,677.95 21,453.75 83,338.47 3,287.92 0.00 128,138.10566,498COSTO DE CONSTRUCCION POR 266,601.81299,896.192.6. 2 3. 4 4 0.00 0.00 0.00 0.00 0.00 0.00 2,280,000.00 2,530.00 14,361.50 2,785.00 0.00 450.002,627,262COSTO DE CONSTRUCCION POR 327,135.502,300,126.502.6. 2 3. 4 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,160.00 37,150.00 9,005.00 101,433.01440,439COSTO DE CONSTRUCCION POR 286,690.99153,748.01

0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.113,634,19913PARCIAL RUBRO 2,753,770.70 880,428.30

0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92 9,005.00 230,021.113,634,1994PARCIAL FTE 2,753,770.70 880,428.30

5 RECURSOS DETERMINADOS18 CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

2.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96553,346GEN ADQUISICION DE ACTIVOS NO 55,270.68498,075.32

2.6. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96553,346CONSTRUCCION DE EDIFICIOS Y 55,270.68498,075.32

2.6. 2 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96553,346OTRAS ESTRUCTURAS 55,270.68498,075.32

2.6. 2 3. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96553,346INFRAESTRUCTURA AGRICOLA 55,270.68498,075.322.6. 2 3. 4 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 166,369.96498,331COSTO DE CONSTRUCCION POR 30,885.68467,445.322.6. 2 3. 4 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,655.009,655COSTO DE CONSTRUCCION POR 0.009,655.002.6. 2 3. 4 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,975.0045,360COSTO DE CONSTRUCCION POR 24,385.0020,975.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96553,34618PARCIAL RUBRO 498,075.32 55,270.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14 152,706.22 196,999.96553,3465PARCIAL FTE 498,075.32 55,270.68

TOTAL META 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 191,592.06 161,711.22 427,021.074,187,545 3,251,846.02 935,698.98

TOTAL EJECUTORA 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 191,592.06 161,711.22 427,021.074,187,545 3,251,846.02 935,698.98

Page 2: 6_Construccion de Defensa Ribereña y Encauzamiento Rio Callazas

(EN NUEVOS SOLES)

FU DIVF GRPFPROD/PROY ACT/AI/OBRPRG

ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DICJUN

M E N S U A L I Z A D O

PIM SALDO

13/01/2015

2 de 211:06:10

FechaHoraPag.

::

:

RBFF ESPECIFICA DET

SEC.FUNC CATEGORIA

TOTALDEVENGADOS

DEVENGADOS Vs MARCO PRESUPUESTAL - 2014

2302

TACNACANDARAVEMUNICIPALIDAD PROVINCIAL DE CANDARAVE [301787]01

DEPARTAMENTO :PROVINCIA :

PLIEGO :

SIAF - Módulo de Proceso PresupuestarioVersión 14.09.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 191,592.06 161,711.22 427,021.07 3,251,846.024,187,545

RESUMEN ...

2,753,770.700.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92TOTAL FUENTE 4 0.00 9,005.00 230,021.113,634,199

498,075.320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14TOTAL FUENTE 5 0.00 152,706.22 196,999.96553,346

2,753,770.700.00 0.00 0.00 0.00 0.00 2,343,677.95 23,983.75 103,859.97 43,222.92TOTAL RUBRO 13 0.00 9,005.00 230,021.113,634,199498,075.320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148,369.14TOTAL RUBRO 18 0.00 152,706.22 196,999.96553,346

RESUMEN ...

935,698.98

880,428.30

55,270.68

880,428.30

55,270.68