4to

1
PRESUPUESTO DE MATERIALES PROYECTO: CLASE 4 Moneda: Bolivianos Tipo de Cambio 6.96 PRECIO COSTO CÓDIGO DESCRIPCIÓN UND. CANTIDAD UNITARIO TOTAL 001 NACIONAL SXS ACERO CORRUGADO KG 209.63 9.05 1,896.70 ASEL ADITIVO SELLANTE ELáSTICO KG 1.10 1,843.43 2,027.77 SWS ALAMBRE DE AMARRE KG 15.02 14.96 224.76 CDF ARENA COMUN M3 1.55 119.99 186.47 AR_C ARENA CORRIENTE M3 1.19 939.60 1,118.12 AREN ARENA FINA M3 0.06 995.28 59.72 NHN CALAMINA ACANALADA GALVAN. # 28 M2 137.50 48.02 6,603.30 CSEP CáMARA SéPTICA PREFABICADA CIRCULAR (ELEM. FONDO,SUPE PZA 1.00 21,368.59 21,368.59 C-BL CEMENTO BLANCO KG 0.25 34.80 8.70 C-PT CEMENTO IP-30 KG 26.00 7.73 200.87 FRFR CEMENTO PORTLAND KG 2,086.00 1.25 2,613.34 YYJY CLAVO KG 9.16 19.98 182.97 CDC GASTOS MATERIALES REPLANTEO GLB 1,146.00 0.50 574.28 RFRF GRAVA M3 5.35 199.96 1,068.99 GRIF GRIFO DE 1/2" PZA 1.00 271.44 271.44 6H LADRILLO 6 HUECOS PZA 24.00 8.70 208.80 LAV LAVANDERIA DE H°A° PZA 1.00 1,183.20 1,183.20 FVFV MADERA DE CONSTRUCCION P2 218.00 7.45 1,623.49 PPVC PEGAMENTO PARA PVC LT 0.04 396.72 15.87 KIK PERNOS DE ESPERA ( J ) PZA 875.00 0.42 365.40 DFFV PINTURA ANTICORROSIVA GL 6.25 158.69 991.80 GB PLAQUETA DE ALUMINIO FUNDIDO DE 60 X 40 PZA 1.00 449.96 449.96 BVGB TONILLO Y RAMPLUG DE 2" X 6MM PZA 4.00 0.97 3.90 TPVC TUBERíA DE PVC 1" CONDUIT ML 3.00 22.27 66.82 SUBTOTAL NACIONAL 43,315.25 TOTAL 43,315.25

description

in

Transcript of 4to

Page 1: 4to

PRESUPUESTO DE MATERIALESPROYECTO: CLASE 4

Moneda: Bolivianos Tipo de Cambio 6.96

PRECIO COSTO

CÓDIGO DESCRIPCIÓN UND. CANTIDAD UNITARIO TOTAL

001 NACIONAL

SXS ACERO CORRUGADO KG 209.63 9.05 1,896.70

ASEL ADITIVO SELLANTE ELáSTICO KG 1.10 1,843.43 2,027.77

SWS ALAMBRE DE AMARRE KG 15.02 14.96 224.76

CDF ARENA COMUN M3 1.55 119.99 186.47

AR_C ARENA CORRIENTE M3 1.19 939.60 1,118.12

AREN ARENA FINA M3 0.06 995.28 59.72

NHN CALAMINA ACANALADA GALVAN. # 28 M2 137.50 48.02 6,603.30

CSEP CáMARA SéPTICA PREFABICADA CIRCULAR (ELEM. FONDO,SUPPZA 1.00 21,368.59 21,368.59

C-BL CEMENTO BLANCO KG 0.25 34.80 8.70

C-PT CEMENTO IP-30 KG 26.00 7.73 200.87

FRFR CEMENTO PORTLAND KG 2,086.00 1.25 2,613.34

YYJY CLAVO KG 9.16 19.98 182.97

CDC GASTOS MATERIALES REPLANTEO GLB 1,146.00 0.50 574.28

RFRF GRAVA M3 5.35 199.96 1,068.99

GRIF GRIFO DE 1/2" PZA 1.00 271.44 271.44

6H LADRILLO 6 HUECOS PZA 24.00 8.70 208.80

LAV LAVANDERIA DE H°A° PZA 1.00 1,183.20 1,183.20

FVFV MADERA DE CONSTRUCCION P2 218.00 7.45 1,623.49

PPVC PEGAMENTO PARA PVC LT 0.04 396.72 15.87

KIK PERNOS DE ESPERA ( J ) PZA 875.00 0.42 365.40

DFFV PINTURA ANTICORROSIVA GL 6.25 158.69 991.80

GB PLAQUETA DE ALUMINIO FUNDIDO DE 60 X 40 PZA 1.00 449.96 449.96

BVGB TONILLO Y RAMPLUG DE 2" X 6MM PZA 4.00 0.97 3.90

TPVC TUBERíA DE PVC 1" CONDUIT ML 3.00 22.27 66.82

SUBTOTAL NACIONAL 43,315.25