ESTRUCTURAS 1/54 PLANILLA DE METRADOS - ESTRUCTURAS PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIO PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA REGION : ANCASH PROVINCIA : SANTA DISTRITO : NUEVO CHIMBOTE FECHA : JULIO 2013 DESCRIPCION UND. N° DE MEDIDAS N° DE ELEMENTOS LONG. ANCHO ALTO VECES ESTRUCTURAS 01. TRABAJOS PROVISIONALES 01.01 CARTEL DE IDENTIFICACION DE OBRA 5.40 M X 3.60m. GLB 01.02 CERCO PROVISIONAL C/RASCHEL ML 49.00 39.00 2.00 01.03 CASETA ,GUARDIANIA Y ALMACEN GLB 01.04 AGUA PARA LA CONSTRUCCION GLB 01.05 ENERGIA PARA LA CONSTRUCCION GLB 02. TRABAJOS PRELIMINARES 02.01 LIMPIEZA MANUAL DE TERRENO M2 49.00 39.00 02.02 TRAZO DURANTE LA EJECUCION DE LA OBRA M2 45.00 35.00 02.03 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA GLB 02.04 CAMINOS DE ACCESO- INGRESO GARITA DE OBRA M2 150.00 4.00 02.05 REMOCION DE POSTES DE LUZ U 02.06 TALA Y RETIRO DE ARBOLES U 02.07 REUBICACION DE RED DE AGUA POTABLE GLB 02.08 REUBICACION DE RED DE DESAGUE TUB. 200MM GLB 02.09 SEGURIDAD Y SALUD 02.09.01 EQUIPOS DE PROTECCION INDIVIDUAL UND 02.09.02 EQUIPOS DE PROTECCION COLECTIVA GLB 02.09.03 SENALIZACION TEMPORAL DE SEGURIDAD GLB 03 MOVIMIENTO DE TIERRAS 03.01 CORTE HASTA ALCANZAR NIVEL DE SUBRSANTE M3 . VER PLANO TOPOGRAFICO 453.29 03.02 EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL M3 BLOQUE 1 ZAPATA - 01 1.00 2.40 2.00 1.75 2.00 ZAPATA - 02 1.00 2.80 2.40 1.75 4.00 ZAPATA - 03 1.00 6.20 2.20 1.75 2.00 ZAPATA - 04 1.00 2.85 2.80 1.75 1.00 ZAPATA - 05 1.00 2.60 2.20 1.75 2.00 ZAPATA - 06 1.00 3.40 3.00 1.75 3.00 ZAPATA - 07 1.00 6.60 2.90 1.75 2.00 ZAPATA 08 1.00 3.25 3.20 1.75 1.00 CORTE X - X 1.00 6.00 0.80 1.15 1.00 BLOQUE 2=BLOQUE 3 ZAPATA - 01 2.00 3.50 3.20 1.75 3.00 ZAPATA - 02 2.00 3.20 3.10 1.75 3.00 AREA ZAPATA - 03 2.00 7.05 1.75 4.00 ESCALERAS 2.00 2.10 0.60 0.55 1.00

Transcript of 001 .- Metrados Estrcutras (1)

Page 1: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 1/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

ESTRUCTURAS

01. TRABAJOS PROVISIONALES

01.01 CARTEL DE IDENTIFICACION DE OBRA 5.40 M X 3.60m. GLB 1.00 GLB

01.02 CERCO PROVISIONAL C/RASCHEL ML 49.00 39.00 2.00 176.00 176.00 ML

01.03 CASETA ,GUARDIANIA Y ALMACEN GLB 1.00 GLB

01.04 AGUA PARA LA CONSTRUCCION GLB 1.00 GLB

01.05 ENERGIA PARA LA CONSTRUCCION GLB 1.00 GLB

02. TRABAJOS PRELIMINARES

02.01 LIMPIEZA MANUAL DE TERRENO M2 49.00 39.00 1911.00 1911.00 M2

02.02 TRAZO DURANTE LA EJECUCION DE LA OBRA M2 45.00 35.00 1575.00 1575.00 M2

02.03 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA GLB 1.00 GLB

02.04 CAMINOS DE ACCESO- INGRESO GARITA DE OBRA M2 150.00 4.00 600.00 600.00 M2

02.05 REMOCION DE POSTES DE LUZ U 4.00 U

02.06 TALA Y RETIRO DE ARBOLES U 8.00 U

02.07 REUBICACION DE RED DE AGUA POTABLE GLB 1.00 GLB

02.08 REUBICACION DE RED DE DESAGUE TUB. 200MM GLB 1.00 GLB

02.09 SEGURIDAD Y SALUD

02.09.01 EQUIPOS DE PROTECCION INDIVIDUAL UND 60.00 UND

02.09.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 GLB

02.09.03 SENALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 GLB

03 MOVIMIENTO DE TIERRAS

03.01 CORTE HASTA ALCANZAR NIVEL DE SUBRSANTE M3 453.29 M3

.

VER PLANO TOPOGRAFICO 453.29 453.29

03.02 EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL M3 611.67 M3

BLOQUE 1

ZAPATA - 01 1.00 2.40 2.00 1.75 2.00 16.80

ZAPATA - 02 1.00 2.80 2.40 1.75 4.00 47.04

ZAPATA - 03 1.00 6.20 2.20 1.75 2.00 47.74

ZAPATA - 04 1.00 2.85 2.80 1.75 1.00 13.97

ZAPATA - 05 1.00 2.60 2.20 1.75 2.00 20.02

ZAPATA - 06 1.00 3.40 3.00 1.75 3.00 53.55

ZAPATA - 07 1.00 6.60 2.90 1.75 2.00 66.99

ZAPATA 08 1.00 3.25 3.20 1.75 1.00 18.20

CORTE X - X 1.00 6.00 0.80 1.15 1.00 5.52

BLOQUE 2=BLOQUE 3

ZAPATA - 01 2.00 3.50 3.20 1.75 3.00 117.60

ZAPATA - 02 2.00 3.20 3.10 1.75 3.00 104.16

AREA

ZAPATA - 03 2.00 7.05 1.75 4.00 98.70

ESCALERAS 2.00 2.10 0.60 0.55 1.00 1.39

Page 2: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 2/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

03.03 EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION EN TERRENO NORMAL M3 172.93 M3

BLOQUE 1

EJE 1 - 1 = EJE 12 -12 1.00 6.70 1.20 1.15 2.00 18.49

EJE 2-2 = EJE 5-5 = EJE 8-8 = EJE 11-11 1.00 6.10 1.20 1.15 4.00 33.67

EJE 3-3 = EJE 4-4 = EJE 9-9 = EJE 10-10 1.00 6.65 1.20 1.15 4.00 36.71

EJE 6-6 = EJE 7-7 1.00 6.20 1.70 1.15 1.00 12.12

BLOQUE 2 = BLOQUE 3

EJE A-A = EJE E-E 2.00 1.56 1.20 1.15 2.00 8.61

EJE B-B = EJE C-C =EJE D-D 2.00 1.88 1.20 1.15 3.00 15.57

EJE 1-1 ENTRE A Y B 2.00 1.88 1.20 1.15 1.00 5.19

EJE 1-1 ENTRE B Y C 2.00 2.88 1.20 1.15 1.00 7.93

EJE 1-1 ENTRE C Y D 2.00 2.75 1.20 1.15 1.00 7.59

EJE 1-1 ENTRE D Y E 2.00 1.75 1.20 1.15 1.00 4.83

EJE 2-2 ENTRE A Y B 2.00 1.68 1.20 1.15 1.00 4.62

EJE 2-2 ENTRE B Y C 2.00 2.48 1.20 1.15 1.00 6.83

EJE 2-2 ENTRE C Y D 2.00 2.35 1.20 1.15 1.00 6.49

EJE 2-2 ENTRE D Y E 2.00 1.55 1.20 1.15 1.00 4.28

03.04 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL M3 5.75 M3

ESCENARIO 1.00 6.55 0.40 0.85 1.00 2.23

SALA DE PROYECCION 1.00 6.20 0.40 0.85 1.00 2.11

SS.HH. MUJERES 1.00 2.00 0.40 0.85 1.00 0.68

1.00 2.15 0.40 0.85 1.00 0.73

03.05 RELLENO CON MATERIAL PROPIO M3 323.15 M3

BLOQUE 1 AREA

ZAPATA 01 1.00 3.92 1.05 2.00 8.23

1.00 0.24 0.45 2.00 0.22

ZAPATA 02 1.00 5.40 1.05 4.00 22.68

1.00 0.45 0.45 4.00 0.81

ZAPATA 03 1.00 10.82 1.05 2.00 22.72

1.00 0.69 0.45 2.00 0.62

ZAPATA 04 1.00 5.94 1.05 1.00 6.24

1.00 0.60 0.45 1.00 0.27

ZAPATA 05 1.00 4.77 1.05 2.00 10.02

1.00 0.27 0.45 2.00 0.24

ZAPATA 06 1.00 8.58 1.05 2.00 18.02

1.00 0.59 0.45 2.00 0.53

ZAPATA 07 1.00 15.92 1.05 2.00 33.43

1.00 0.85 0.45 2.00 0.77

ZAPATA 08 1.00 8.08 1.05 1.00 8.48

1.00 0.72 0.45 1.00 0.32

BLOQUE 2 = BLOQUE 3

AREA

ZAPATA - 01 2.00 9.66 1.05 3.00 15.71

2.00 0.42 0.45 3.00 5.87

Page 3: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 3/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

2.00 0.42 0.45 2.00 4.87

2.00 0.21 0.45 1.00 3.66

ZAPATA - 02 2.00 7.32 1.05 3.00 13.37

2.00 0.36 0.45 3.00 5.81

2.00 0.36 0.45 2.00 4.81

2.00 0.18 0.45 1.00 3.63

ZAPATA - 03 2.00 5.64 1.05 4.00 12.69

2.00 0.18 0.45 4.00 6.63

EJE A-A = EJE E-E 2.00 3.51 1.15 2.00 8.66

2.00 0.59 0.45 2.00 5.04

EJE B-B = EJE C-C =EJE D-D 2.00 4.23 1.15 3.00 10.38

2.00 1.41 0.45 3.00 6.86

EJE 1-1 ENTRE A Y B 2.00 1.97 1.15 1.00 6.12

2.00 0.28 0.45 1.00 3.73

EJE 1-1 ENTRE B Y C 2.00 3.02 1.15 1.00 7.17

2.00 0.43 0.45 1.00 3.88

EJE 1-1 ENTRE C Y D 2.00 2.89 1.15 1.00 7.04

2.00 0.41 0.45 1.00 3.86

EJE 1-1 ENTRE D Y E 2.00 1.84 1.15 1.00 5.99

2.00 0.26 0.45 1.00 3.71

EJE 2-2 ENTRE A Y B 2.00 1.76 1.15 1.00 5.91

2.00 0.25 0.45 1.00 3.70

EJE 2-2 ENTRE B Y C 2.00 2.60 1.15 1.00 6.75

2.00 0.37 0.45 1.00 3.82

EJE 2-2 ENTRE C Y D 2.00 2.47 1.15 1.00 6.62

2.00 0.35 0.45 1.00 3.80

EJE 2-2 ENTRE D Y E 2.00 1.62 1.15 1.00 5.77

2.00 0.25 0.45 1.00 3.70

03.06 NIVELACION Y COMPACTACION DE SUBRAZANTE C/EQUIPO M2 1645.90 M2

BLOQUE 1 AREA

SS. HH . VARONES 1.00 45.43 1.00 45.43

VESTIDORES Y ESCENARIO 1.00 43.58 1.00 43.58

ESCENARIO NPT -1.00 1.00 31.21 1.00 31.21

ESCENARIO 1.00 216.84 1.00 216.84

CAFETERIA 1.00 42.62 1.00 42.62

SS.HH. MUJERES 1.00 37.54 1.00 37.54

BLOQUE 2 = BLOQUE 3 AREA

LAB. MAESTRANZA = LAB. AUXILIARES 2.00 92.82 1.00 185.63

LAB. MAQ. HIDRAULICAS =LAB. MAQ. TERMICAS 2.00 92.54 1.00 185.08

CIRCULACION 1.00 328.98 1.00 328.98

PATIO CENTRAL 1.00 528.99 1.00 528.99

03.07 AFIRMADO DE 8" EXTENDIDO Y COMPACTADO M2 1465.85 M2

BLOQUE 01

SS. HH . VARONES 1.00 45.43 1.00 45.43

VESTIDORES Y ESCENARIO 1.00 43.58 1.00 43.58

ESCENARIO NPT -1.00 1.00 31.21 1.00 31.21

ESCENARIO 1.00 216.84 1.00 216.84

CAFETERIA 1.00 42.62 1.00 42.62

Page 4: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 4/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

SS.HH. MUJERES 1.00 37.54 1.00 37.54

BLOQUE 2 = BLOQUE 3 AREA

LAB. MAESTRANZA = LAB. AUXILIARES 2.00 92.82 1.00 185.63

LAB. MAQ. HIDRAULICAS =LAB. MAQ. TERMICAS 2.00 92.54 1.00 185.08

CIRCULACION 1.00 328.98 1.00 328.98

PATIO CENTRAL 1.00 348.94 1.00 348.94

03.08 ELIMINACION MATERIAL EXCEDENTE CON TRANSPORTE M3 288.52 M3

ESCAVACION - RELLENO 288.52

04 CONCRETO SIMPLE

04.01 SOLADOS CONCRETO f``c=100 kg/cm2 E=4" M2 350.38 M2

BLOQUE 01

ZAPATA - 01 1.00 2.40 2.00 2.00 9.60

ZAPATA - 02 1.00 2.80 2.40 4.00 26.88

ZAPATA - 03 1.00 6.20 2.20 2.00 27.28

ZAPATA - 04 1.00 2.85 2.80 1.00 7.98

ZAPATA - 05 1.00 2.60 2.20 2.00 11.44

ZAPATA - 06 1.00 3.40 3.00 3.00 30.60

ZAPATA - 07 1.00 6.60 2.90 2.00 38.28

ZAPATA 08 1.00 3.25 3.20 1.00 10.40

CORTE X - X 1.00 6.00 0.80 1.00 4.80

BLOQUE 02 = BLOQUE 03

ZAPATA - 01 2.00 3.50 3.20 3.00 67.20

ZAPATA - 02 2.00 3.20 3.10 3.00 59.52

AREA

ZAPATA - 03 2.00 7.05 4.00 56.40

04.02. FALSO PISO DE 4" DE CONCRETO 1:10 M2 787.93 M2

BLOQUE 01 AREA

SS. HH . VARONES 1.00 45.43 1.00 45.43

VESTIDORES Y ESCENARIO 1.00 43.58 1.00 43.58

ESCENARIO NPT -1.00 1.00 31.21 1.00 31.21

ESCENARIO 1.00 216.84 1.00 216.84

CAFETERIA 1.00 42.62 1.00 42.62

SS.HH. MUJERES 1.00 37.54 1.00 37.54

BLOQUE 02 = BLOQUE 03 AREA

LAB. MAESTRANZA = LAB. AUXILIARES 2.00 92.82 1.00 185.63

LAB. MAQ. HIDRAULICAS =LAB. MAQ. TERMICAS 2.00 92.54 1.00 185.08

04.03. CONCRETO PARA VEREDAS Y LOSAS F'C =175 KG/CM2 E=4" ACABADO 1:2 BRUÑADO INC. CURADO M2 617.46 M2

BLOQUE 01 45.00 2.00 1.00 90.00

BLOQUE 02 23.00 2.00 1.00 46.00

BLOQUE 03 23.00 2.00 1.00 46.00

CIRCULACION PERIMETRICA 37.40 1.20 2.00 89.76

CIRCULACION PERIMETRICA 45.00 1.20 2.00 108.00

PATIO CENTRAL 198.76 1.00 198.76

23.60 1.65 1.00 38.94

Page 5: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 5/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

04.04. ENCOFRADO Y DESENCOFRADO PARA VEREDAS M2 164.62 M2

BLOQUE 1

CIRCULACION 1.00 27.60 0.30 2.00 16.56

1.00 2.00 0.30 2.00 1.20

BLOQUE 2, BLOQUE 3

CIRCULACION 2.00 23.00 0.30 2.00 27.60

1.00 2.00 0.30 2.00 1.20

PATIO CENTRAL 1.00 21.36 0.30 1.00 6.41

1.00 1.79 0.30 2.00 1.07

1.00 5.84 0.30 2.00 3.50

1.00 57.52 0.30 2.00 34.51

1.00 14.94 0.30 2.00 8.96

1.00 23.60 0.30 2.00 14.16

VEREDAS EXTERNAS 1.00 37.40 0.30 2.00 22.44

VEREDAS EXTERNAS 1.00 45.00 0.30 2.00 27.00

04.05. CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS M3 14.11 M3

ESCENARIO 1.00 6.55 0.40 0.50 1.00 1.31

SALA DE PROYECCION 1.00 6.20 0.40 0.50 1.00 1.24

SS.HH. MUJERES 1.00 2.00 0.40 0.50 1.00 0.40

1.00 2.15 0.40 0.50 1.00 0.43

04.06. CONCRETO 1:8 +25% P.G. PARA SOBRECIMIENTOS M3 54.40 M3

ESCENARIO 1.00 16.55 0.40 1.50 1.00 9.93

SALA DE PROYECCION 1.00 16.20 0.40 1.50 1.00 9.72

SS.HH. MUJERES 1.00 22.00 0.40 1.50 1.00 13.20

1.00 12.15 0.40 0.50 1.00 2.43

04.07. ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS M2 67.60 M2

ESCENARIO 2.00 6.55 2.00 26.20

SALA DE PROYECCION 2.00 6.20 2.00 24.80

SS.HH. MUJERES 2.00 2.00 2.00 8.00

2.00 2.15 2.00 8.60

05 CONCRETO ARMADO

05.01. ZAPATAS

05.01.01 CONCRETO f`'c=210 kg/cm2 EN ZAPATAS M3 367.28 M3

BLOQUE 01

ZAPATA - 01 1.00 2.40 2.00 0.60 2.00 5.76

ZAPATA - 02 1.00 2.80 2.40 0.60 4.00 16.13

ZAPATA - 03 1.00 6.20 2.20 0.60 2.00 16.37

ZAPATA - 04 1.00 2.85 2.80 0.60 1.00 4.79

ZAPATA - 05 1.00 2.60 2.20 0.60 2.00 6.86

ZAPATA - 06 1.00 3.40 3.00 0.60 3.00 18.36

ZAPATA - 07 1.00 6.60 2.90 0.60 2.00 22.97

ZAPATA 08 1.00 3.25 3.20 0.60 1.00 6.24

CORTE X - X 1.00 6.00 0.80 30.00 1.00 144.00

BLOQUE 02 = BLOQUE 03

ZAPATA - 01 2.00 3.50 3.20 0.60 3.00 40.32

ZAPATA - 02 2.00 3.20 3.10 0.60 3.00 35.71

Page 6: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 6/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

AREA

ZAPATA - 03 2.00 7.05 0.60 4.00 33.84

CISTERNA 1.00 5.65 4.70 0.60 1.00 15.93

05.01.02. ACERO CORRUGADO fy=4200 kg/cm2 EN ZAPATAS KG 8717.85 KG

BLOQUE 01

ZAPATA - 01

Φ 5/8" 10.00 2.87 2.00 89.00

14.00 2.42 2.00 104.90

ZAPATA - 02

Φ 5/8" 16.00 2.77 4.00 274.88

13.00 3.26 4.00 262.92

ZAPATA - 03

Φ 5/8" 24.00 6.59 2.00 490.44

68.00 2.60 2.00 547.87

ZAPATA - 04

Φ 5/8" 16.00 3.20 1.00 79.31

15.00 3.25 1.00 75.47

ZAPATA - 05

Φ 5/8" 14.00 2.61 2.00 113.23

12.00 2.95 2.00 109.89

ZAPATA - 06

Φ 5/8" 20.00 3.33 3.00 309.88

16.00 3.80 3.00 282.57

ZAPATA - 07

Φ 5/8" 30.00 6.86 2.00 637.79

72.00 3.25 2.00 726.29

ZAPATA - 08

Φ 5/8" 18.00 3.60 1.00 100.52

18.00 3.65 1.00 101.84

CORTE X-X

Φ 3/8" 4.00 6.00 1.00 13.44

24.00 0.73 1.00 9.81

BLOQUE 02 = BLOQUE 03

ZAPATA - 01

Φ 5/8" 18.00 3.93 3.00 328.61

19.00 3.63 3.00 321.06

ZAPATA - 02

Φ 5/8" 16.00 3.53 3.00 262.63

17.00 3.24 3.00 256.28

Page 7: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 7/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

ZAPATA - 03

Φ 5/8" 28.00 1.95 4.00 338.52

32.00 3.43 4.00 680.91

ESCALERAS - CISTERNA

Φ 5/8" 33.00 6.60 2.00 675.18

Φ 1/2" 39.00 5.50 2.00 424.71

Φ 5/8" 33.00 6.60 2.00 675.18

Φ 1/2" 39.00 5.50 2.00 424.71

05.02. VIGAS DE CIMENTACION

05.02.01 CONCRETO EN VIGAS DE CIMENTACION f'`c=210 kg/cm2 M3 56.15 M3

BLOQUE 01

EJE 1 - 1 HASTA EJE 12 -12 1.00 8.40 0.30 0.60 12.00 18.14

EJE A-A ENTRE 1 Y 2 = EJE B-B ENTRE 1 Y 2 1.00 4.45 0.30 0.60 2.00 1.60

EJE A-A ENTRE 2 Y 3 = EJE B-B ENTRE 2 Y 3 1.00 3.70 0.30 0.60 2.00 1.33

EJE A-A ENTRE 3 Y 4 = EJE B-B ENTRE 3 Y 4 1.00 1.80 0.30 0.60 2.00 0.65

EJE A-A ENTRE 4 Y 5 = EJE B-B ENTRE 4 Y 5 1.00 4.00 0.30 0.60 2.00 1.44

EJE A-A ENTRE 5 Y 6 = EJE B-B ENTRE 5 Y 6 1.00 3.92 0.30 0.60 2.00 1.41

EJE A-A ENTRE 7 Y 8 = EJE B-B ENTRE 7 Y 8 1.00 3.28 0.30 0.60 2.00 1.18

EJE A-A ENTRE 8 Y 9 = EJE B-B ENTRE 8 Y 9 1.00 5.20 0.30 0.60 2.00 1.87

EJE A-A ENTRE 9 Y 10 = EJE B-B ENTRE 9 Y 10 1.00 1.80 0.30 0.60 2.00 0.65

EJE A-A ENTRE 10 Y 11 = EJE B-B ENTRE 10 Y 11 1.00 3.90 0.30 0.60 2.00 1.40

EJE A-A ENTRE 11 Y 12 = EJE B-B ENTRE 11 Y 12 1.00 3.70 0.30 0.60 2.00 1.33

VESTIDORES - ESCENARIO 1.00 6.55 0.15 0.30 1.00 0.29

SALA DE PROYECCION 1.00 5.60 0.15 0.30 1.00 0.25

SS.HH. MUJERES 1.00 7.45 0.15 0.30 1.00 0.34

BLOQUE 02

EJE A-A = EJE E-E 2.00 5.10 0.30 0.60 2.00 3.67

EJE B-B = EJE C-C = EJE D-D 2.00 7.30 0.30 0.60 3.00 7.88

EJE 1-1 ENTRE A-B = EJE 2-2 ENTRE A-B 2.00 3.67 0.30 0.60 2.00 2.64

EJE 1-1 ENTRE B-C = EJE 2-2 ENTRE B-C 2.00 5.28 0.30 0.60 2.00 3.80

EJE 1-1 ENTRE C-D = EJE 2-2 ENTRE C-D 2.00 5.15 0.30 0.60 2.00 3.71

EJE 1-1 ENTRE D-E = EJE 2-2 ENTRE D-E 2.00 3.55 0.30 0.60 2.00 2.56

05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION M2 501.49 M2

BLOQUE 01

EJE 1 - 1 HASTA EJE 12 -12 12.00 16.80 0.60 2.00 241.92

EJE A-A ENTRE 1 Y 2 = EJE B-B ENTRE 1 Y 2 1.00 8.90 0.60 2.00 10.68

EJE A-A ENTRE 2 Y 3 = EJE B-B ENTRE 2 Y 3 1.00 7.40 0.60 2.00 8.88

EJE A-A ENTRE 3 Y 4 = EJE B-B ENTRE 3 Y 4 1.00 3.60 0.60 2.00 4.32

EJE A-A ENTRE 4 Y 5 = EJE B-B ENTRE 4 Y 5 1.00 8.00 0.60 2.00 9.60

EJE A-A ENTRE 5 Y 6 = EJE B-B ENTRE 5 Y 6 1.00 7.84 0.60 2.00 9.41

EJE A-A ENTRE 7 Y 8 = EJE B-B ENTRE 7 Y 8 1.00 6.56 0.60 2.00 7.87

EJE A-A ENTRE 8 Y 9 = EJE B-B ENTRE 8 Y 9 1.00 10.40 0.60 2.00 12.48

EJE A-A ENTRE 9 Y 10 = EJE B-B ENTRE 9 Y 10 1.00 3.60 0.60 2.00 4.32

EJE A-A ENTRE 10 Y 11 = EJE B-B ENTRE 10 Y 11 1.00 7.80 0.60 2.00 9.36

EJE A-A ENTRE 11 Y 12 = EJE B-B ENTRE 11 Y 12 1.00 7.40 0.60 2.00 8.88

VESTIDORES - ESCENARIO 1.00 13.40 0.30 1.00 4.02

SALA DE PROYECCION 1.00 11.95 0.30 1.00 3.58

Page 8: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 8/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

SS.HH. MUJERES 1.00 14.75 0.30 1.00 4.43

BLOQUE 02

EJE A-A = EJE E-E 2.00 10.20 0.60 2.00 24.48

EJE B-B = EJE C-C = EJE D-D 2.00 14.60 0.60 3.00 52.56

EJE 1-1 ENTRE A-B = EJE 2-2 ENTRE A-B 2.00 7.34 0.60 2.00 17.62

EJE 1-1 ENTRE B-C = EJE 2-2 ENTRE B-C 2.00 10.55 0.60 2.00 25.32

EJE 1-1 ENTRE C-D = EJE 2-2 ENTRE C-D 2.00 10.30 0.60 2.00 24.72

EJE 1-1 ENTRE D-E = EJE 2-2 ENTRE D-E 2.00 7.10 0.60 2.00 17.04

05.02.03. ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 5256.50 KG

BLOQUE 01

EJE 1 - 1 HASTA EJE 12 -12

Φ 5/8" 8.00 8.50 12.00 1264.80

Φ 1/2" 2.00 8.48 12.00 201.48

□Φ 3/8" 52.00 1.64 12.00 573.08

EJE A-A ENTRE 1 Y 2 = EJE B-B ENTRE 1 Y 2

Φ 5/8" 8.00 4.55 2.00 112.84

Φ 1/2" 2.00 4.53 2.00 17.94

□Φ 3/8" 37.00 1.64 2.00 67.96

EJE A-A ENTRE 2 Y 3 = EJE B-B ENTRE 2 Y 3

Φ 5/8" 8.00 3.90 2.00 96.72

Φ 1/2" 2.00 3.86 2.00 15.29

□Φ 3/8" 34.00 1.64 2.00 62.45

EJE A-A ENTRE 3 Y 4 = EJE B-B ENTRE 3 Y 4

Φ 5/8" 8.00 1.90 2.00 47.12

Φ 1/2" 2.00 1.88 2.00 7.44

□Φ 3/8" 18.00 1.64 2.00 33.06

EJE A-A ENTRE 4 Y 5 = EJE B-B ENTRE 4 Y 5

Φ 5/8" 8.00 4.10 2.00 101.68

Φ 1/2" 2.00 4.08 2.00 16.16

□Φ 3/8" 34.00 1.64 2.00 62.45

EJE A-A ENTRE 5 Y 6 = EJE B-B ENTRE 5 Y 6

Φ 5/8" 8.00 4.02 2.00 99.70

Φ 1/2" 2.00 3.00 2.00 11.88

□Φ 3/8" 34.00 1.64 2.00 62.45

EJE A-A ENTRE 7 Y 8 = EJE B-B ENTRE 7 Y 8

Φ 5/8" 8.00 3.38 2.00 83.82

Φ 1/2" 2.00 3.36 2.00 13.31

□Φ 3/8" 30.00 1.64 2.00 55.10

EJE A-A ENTRE 8 Y 9 = EJE B-B ENTRE 8 Y 9

Φ 5/8" 8.00 5.30 2.00 131.44

Φ 1/2" 2.00 5.28 2.00 20.91

□Φ 3/8" 39.00 1.64 2.00 71.64

Page 9: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 9/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

EJE A-A ENTRE 9 Y 10 = EJE B-B ENTRE 9 Y 10

Φ 5/8" 8.00 1.90 2.00 47.12

Φ 1/2" 2.00 1.88 2.00 7.44

□Φ 3/8" 18.00 1.64 2.00 33.06

EJE A-A ENTRE 10 Y 11 = EJE B-B ENTRE 10 Y 11

Φ 5/8" 8.00 4.00 2.00 99.20

Φ 1/2" 2.00 3.98 2.00 15.76

□Φ 3/8" 34.00 1.64 2.00 62.45

EJE A-A ENTRE 11 Y 12 = EJE B-B ENTRE 11 Y 12

Φ 5/8" 8.00 3.50 2.00 86.80

Φ 1/2" 2.00 3.48 2.00 13.78

□Φ 3/8" 31.00 1.64 2.00 56.94

VESTIDORES - ESCENARIO

Φ 3/8" 4.00 6.63 1.00 14.85

□Φ 1/4" 36.00 0.80 1.00 6.34

SALA DE PROYECCION

Φ 3/8" 4.00 8.00 1.00 17.92

□Φ 1/4" 32.00 0.80 1.00 5.63

SS.HH. MUJERES

Φ 3/8" 4.00 7.45 1.00 16.69

□Φ 1/4" 46.00 0.80 1.00 8.10

BLOQUE 02 = BLOQUE 03

EJE A-A = EJE E-E

Φ 5/8" 8.00 5.20 2.00 128.96

Φ 1/2" 2.00 5.18 2.00 20.51

□Φ 3/8" 60.00 1.64 2.00 110.21

EJE B-B = EJE C-C = EJE D-D

Φ 5/8" 8.00 7.40 3.00 275.28

Φ 1/2" 2.00 7.38 3.00 43.84

□Φ 3/8" 49.00 1.64 3.00 135.00

EJE 1-1 ENTRE A-B = EJE 2-2 ENTRE A-B

Φ 5/8" 8.00 3.77 2.00 93.50

Φ 1/2" 2.00 3.75 2.00 14.85

□Φ 3/8" 49.00 1.64 2.00 90.00

EJE 1-1 ENTRE B-C = EJE 2-2 ENTRE B-C

Φ 5/8" 8.00 5.38 2.00 133.30

Φ 1/2" 2.00 5.36 2.00 21.21

□Φ 3/8" 41.00 1.64 2.00 75.31

EJE 1-1 ENTRE C-D = EJE 2-2 ENTRE C-D

Φ 5/8" 8.00 5.25 2.00 130.20

Page 10: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 10/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

Φ 1/2" 2.00 5.23 2.00 20.71

□Φ 3/8" 41.00 1.64 2.00 75.31

EJE 1-1 ENTRE D-E = EJE 2-2 ENTRE D-E

Φ 5/8" 8.00 3.65 2.00 90.52

Φ 1/2" 2.00 3.63 2.00 14.37

□Φ 3/8" 33.00 1.64 2.00 60.61

05.03. SOBRECIMIENTO REFORZADO

05.03.01 CONCRETO f'c=210 KG/CM2 EN SOBRECIMIENTOS REFORZADOS M3 51.45 M3

BLOQUE 01

EJE 1 - 1 = EJE 2 - 2 = EJE 10 - 10 = EJE 12 - 12 1.00 8.40 0.30 0.85 4.00 8.57

EJE 11 - 11 1.00 7.20 0.30 0.85 1.00 1.84

EJE A-A ENTRE 1 Y 2 1.00 3.48 0.30 0.85 1.00 0.89

EJE A-A ENTRE 2 Y 3 1.00 2.25 0.30 0.85 1.00 0.57

EJE A-A ENTRE 4 Y 5 1.00 4.00 0.30 0.85 1.00 1.02

EJE A-A ENTRE 5 Y 6 1.00 3.93 0.30 0.85 1.00 1.00

EJE A-A ENTRE 7 Y 8 1.00 1.78 0.30 0.85 1.00 0.45

EJE A-A ENTRE 8 Y 9 1.00 5.20 0.30 0.85 1.00 1.33

EJE A-A ENTRE 10 Y 11 1.00 2.70 0.30 0.85 1.00 0.69

EJE A-A ENTRE 11 Y 12 1.00 2.70 0.30 0.85 1.00 0.69

EJE B-B ENTRE 1 Y 2 1.00 4.45 0.30 0.85 1.00 1.13

EJE B-B ENTRE 2 Y 3 1.00 3.70 0.30 0.85 1.00 0.94

EJE B-B ENTRE 4 Y 5 1.00 4.00 0.30 0.85 1.00 1.02

EJE B-B ENTRE 5 Y 6 1.00 3.93 0.30 0.85 1.00 1.00

EJE B-B ENTRE 7 Y 8 1.00 2.07 0.30 0.85 1.00 0.53

EJE B-B ENTRE 8 Y 9 1.00 5.20 0.30 0.85 1.00 1.33

EJE B-B ENTRE 10 Y 11 1.00 3.90 0.30 0.85 1.00 0.99

EJE B-B ENTRE 11 Y 12 1.00 3.70 0.30 0.85 1.00 0.94

VESTIDORES - ESCENARIO 1.00 7.40 0.15 0.30 1.00 0.33

SALA DE PROYECCION 1.00 5.60 0.15 0.35 1.00 0.29

SS.HH. MUJERES 1.00 7.45 0.15 0.35 1.00 0.39

BLOQUE 02 = BLOQUE 03

EJE A-A = EJE E-E 2.00 5.10 0.30 0.85 2.00 5.20

EJE C-C 2.00 7.30 0.30 0.85 1.00 3.72

EJE 1-1 ENTRE A-B 2.00 3.68 0.30 0.85 1.00 1.88

EJE 1-1 ENTRE B-C 2.00 5.28 0.30 0.85 1.00 2.69

EJE 1-1 ENTRE C-D 2.00 5.15 0.30 0.85 1.00 2.63

EJE 1-1 ENTRE D-E 2.00 3.55 0.30 0.85 1.00 1.81

EJE 2-2 ENTRE A- B 2.00 2.48 0.30 0.85 1.00 1.26

EJE 2-2 ENTRE B-C 2.00 4.07 0.30 0.85 1.00 2.08

EJE 2-2 ENTRE C-D 2.00 3.95 0.30 0.85 1.00 2.01

EJE 2-2 ENTRE D-E 2.00 2.35 0.30 0.85 1.00 1.20

PORTICO 1.00 4.50 0.15 0.75 2.00 1.01

05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS REFORZADOS M2 429.85 M2

BLOQUE 1

EJE A-A = EJE C-C 1.00 14.68 0.75 2.00 22.02

1.00 21.10 0.75 2.00 31.65

1.00 20.60 0.75 2.00 30.90

Page 11: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 11/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

1.00 14.20 1.35 2.00 38.34

1.00 0.00 1.35 2.00 0.00

1.00 0.00 1.35 2.00 0.00

1.00 0.00 0.75 2.00 0.00

1.00 16.80 0.75 2.00 25.20

1.00 14.40 0.75 2.00 21.60

1.00 6.96 0.75 2.00 10.44

EJE 1-1 = EJE 10-10 1.00 4.50 0.75 4.00 13.50

EJE 2-2 = EJE 8-8 = EJE 9-9 1.00 8.00 0.75 3.00 18.00

BAÑOS HOMBRES 1.00 7.86 0.65 1.00 5.11

1.00 3.56 0.65 1.00 2.31

1.00 10.40 0.65 1.00 6.76

1.00 5.40 0.65 4.00 14.04

1.00 5.40 0.65 1.00 3.51

1.00 8.90 0.65 3.00 17.36

1.00 7.40 0.65 1.00 4.81

1.00 8.00 0.65 1.00 5.20

1.00 7.86 0.65 1.00 5.11

AUDITORIO 1.00 4.14 0.65 2.00 5.38

1.00 10.40 0.65 1.00 6.76

1.00 7.80 0.65 1.00 5.07

1.00 7.40 0.65 2.00 9.62

BAÑOS MUJERES 1.00 2.00 0.65 1.00 1.30

1.00 2.80 0.65 5.00 9.10

1.00 2.60 0.65 1.00 1.69

1.00 2.30 0.65 2.00 2.99

1.00 4.20 0.65 1.00 2.73

BLOQUE 2 = BLOQUE 3 1.00 2.55 0.75 8.00 15.30

EJE A-A = EJE G-G 1.00 7.30 0.75 2.00 10.95

EJE D-D 1.00 3.67 0.75 4.00 11.01

EJE 1-1 = EJE 5-5 1.00 5.28 0.75 4.00 15.84

1.00 5.15 0.75 4.00 15.45

1.00 3.55 0.75 4.00 10.65

1.00 4.50 0.75 4.00 13.50

PORTICO 1.00 3.00 0.75 4.00 9.00

1.00 1.25 0.75 4.00 3.75

1.00 2.60 0.75 2.00 3.90

Page 12: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 12/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

05.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 1960.82 KG

05.04 COLUMNAS

05.04.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS M3 107.83 M3

PRIMER PISO

BLOQUE 1

C1 1.00 0.40 0.60 4.80 4.00 4.61

C2 1.00 0.40 0.80 4.80 12.00 18.43

BLOQUE 2 = BLOQUE 3

C1 1.00 0.40 0.70 4.80 12.00 16.13

SEGUNDO PISO = TERCER PISO

BLOQUE 1

C1 1.00 0.40 0.60 3.60 8.00 6.91

C2 1.00 0.40 0.80 3.60 24.00 27.65

BLOQUE 2 = BLOQUE 3

C1 1.00 0.40 0.70 3.60 24.00 24.19

PORTICO

C1 1.00 0.15 0.50 4.00 8.00 2.40

C2 1.00 0.25 0.25 4.00 3.00 0.75

C3 1.00 0.15 0.15 4.00 4.00 0.36

ESCALERA - CISTERNA

CC-E 1.00 0.25 0.50 12.80 4.00 6.40

05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 797.28 M2

PRIMER PISO

BLOQUE 1

C1 1.00 2.00 4.60 4.00 36.80

C2 1.00 2.40 4.60 12.00 132.48

BLOQUE 2 = BLOQUE 3

C1 1.00 2.20 4.60 12.00 121.44

SEGUNDO PISO = TERCER PISO

BLOQUE 1

C1 1.00 2.00 3.40 8.00 54.40

C2 1.00 2.40 3.40 24.00 195.84

BLOQUE 2 = BLOQUE 3

C1 1.00 2.20 3.40 24.00 179.52

ESCALERA - CISTERNA

CC-E 1.00 1.50 12.80 4.00 76.80

05.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 17758.31 KG

05.05 VIGAS

05.05.01 CONCRETO EN VIGAS F'C=210 kg/cm2 M3 152.13 M3

PRIMER PISO = SEGUNDO PISO = TERCER PISO

BLOQUE 1

EJE A-A = EJE C-C 1.00 4.45 0.30 0.60 6.00 4.81

1.00 3.70 0.30 0.60 6.00 4.00

1.00 1.80 0.30 0.60 6.00 1.94

1.00 4.90 0.30 0.80 6.00 7.06

1.00 7.15 0.30 0.80 6.00 10.30

1.00 5.20 0.30 0.80 6.00 7.49

Page 13: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 13/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

1.00 1.80 0.30 0.60 6.00 1.94

1.00 3.90 0.30 0.60 6.00 4.21

1.00 3.70 0.30 0.60 6.00 4.00

VOLADIZO 1.00 4.45 0.15 0.60 3.00 1.20

1.00 3.70 0.15 0.60 3.00 1.00

1.00 1.80 0.15 0.60 3.00 0.49

1.00 4.90 0.15 0.60 3.00 1.32

1.00 7.15 0.15 0.60 3.00 1.93

1.00 5.20 0.15 0.60 3.00 1.40

1.00 1.80 0.15 0.60 3.00 0.49

1.00 3.90 0.15 0.60 3.00 1.05

1.00 3.70 0.15 0.60 3.00 1.00

EJE 1-1 = EJE 10-10 1.00 2.40 0.30 0.60 12.00 5.18

EJE 2-2 = EJE … = EJE 9-9 1.00 8.40 0.40 0.80 24.00 64.51

VOLADIZO 1.00 2.10 0.30 0.60 6.00 2.27

1.00 2.10 0.40 0.60 24.00 12.10

PORTICO 1.00 5.00 0.90 0.20 2.00 1.80

1.00 3.56 0.90 0.20 2.00 1.28

1.00 1.77 0.90 0.20 2.00 0.64

1.00 3.00 0.90 0.20 1.00 0.54

ESCALERA - CISTERNA 1.00 4.25 0.30 0.50 6.00 3.82

1.00 5.35 0.25 0.40 6.00 3.21

1.00 4.25 0.30 0.20 2.00 0.51

1.00 5.35 0.30 0.20 2.00 0.64

05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 1158.41 M2

PRIMER PISO = SEGUNDO PISO = TERCER PISO

BLOQUE 1

EJE A-A 1.00 4.45 1.10 6.00 29.37

1.00 3.70 1.10 6.00 24.42

1.00 1.80 1.10 6.00 11.88

1.00 4.90 1.10 6.00 32.34

1.00 7.15 1.10 6.00 47.19

1.00 5.20 1.10 6.00 34.32

1.00 1.80 1.10 6.00 11.88

1.00 3.90 1.10 6.00 25.74

1.00 3.70 1.10 6.00 24.42

EJE C-C 1.00 4.45 1.30 6.00 34.71

1.00 3.70 1.30 6.00 28.86

1.00 1.80 1.30 6.00 14.04

1.00 4.90 1.30 6.00 38.22

1.00 7.15 1.30 6.00 55.77

1.00 5.20 1.30 6.00 40.56

1.00 1.80 1.30 6.00 14.04

1.00 3.90 1.30 6.00 30.42

1.00 3.70 1.30 6.00 28.86

VOLADIZO 1.00 4.45 1.15 3.00 15.35

1.00 3.70 1.15 3.00 12.77

1.00 1.80 1.15 3.00 6.21

1.00 4.90 1.15 3.00 16.91

1.00 7.15 1.15 3.00 24.67

Page 14: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 14/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

1.00 5.20 1.15 3.00 17.94

1.00 1.80 1.15 3.00 6.21

1.00 3.90 1.15 3.00 13.45

1.00 3.70 1.15 3.00 12.77

EJE 1-1 = EJE 10-10 1.00 2.40 1.30 12.00 37.44

EJE 2-2 = EJE … = EJE 9-9 1.00 8.40 1.60 24.00 322.56

VOLADIZO 1.00 2.10 1.30 6.00 16.38

1.00 2.10 1.20 24.00 60.48

ESCALERA CISTERNA 1.00 4.25 1.00 6.00 25.50

1.00 5.35 0.80 6.00 25.68

1.00 4.25 1.00 2.00 8.50

1.00 5.35 0.80 2.00 8.56

05.05.03 ACERO CORRUGADO fy=4200 KG/CM2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 38557.93 KG

05.06 PLACAS

05.06.01 CONCRETO f`c=210 kg/cm2 PARA PLACAS M3 292.61 M3

PRIMER PISO

BLOQUE 1 AREA

PL-01 1.00 1.20 4.80 2.00 11.52

PL-02 1.00 0.98 4.80 4.00 18.82

BLOQUE 2 = BLOQUE 3 AREA

PL-01 1.00 0.90 4.80 4.00 17.28

PL-02 1.00 0.60 4.80 8.00 23.04

SEGUNDO PISO = TERCER PISO

BLOQUE 1 AREA

PL-01 1.00 1.20 3.60 4.00 17.28

PL-02 1.00 0.98 3.60 8.00 28.22

BLOQUE 2 = BLOQUE 3 AREA

PL-01 1.00 1.20 3.60 8.00 34.56

PL-02 1.00 0.98 3.60 16.00 56.45

ESCALERA - CISTERNA AREA

PL-CE 1.00 2.34 14.00 2.00 65.52

PL-CISTERNA 1.00 7.75 0.25 1.20 2.00 18.60

1.00 3.30 4.25 0.20 2.00 1.32

05.06.02 ENCOFRADO Y DESENCOFRADO EN PLACAS M2 1875.33 M2

PRIMER PISO

BLOQUE 1

PL-01 1.00 8.60 4.80 2.00 82.56

PL-02 1.00 6.80 4.80 4.00 130.56

BLOQUE 2 = BLOQUE 3

PL-01 1.00 6.60 4.80 4.00 126.72

PL-02 1.00 4.60 4.80 8.00 176.64

SEGUNDO PISO = TERCER PISO

BLOQUE 1

PL-01 1.00 8.60 3.60 4.00 123.84

PL-02 1.00 6.80 3.60 8.00 195.84

BLOQUE 2 = BLOQUE 3

PL-01 1.00 6.60 3.60 8.00 190.08

PL-02 1.00 4.60 3.60 16.00 264.96

Page 15: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 15/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

ESCALERA - CISTERNA

PL-CE 1.00 19.20 14.00 2.00 537.60

PL CISTERNA 1.00 6.60 8.50 1.40 2.00 18.48

1.00 3.30 4.25 2.00 28.05

05.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 EN PLACAS KG VER PLANILLA DE METRADOS DE ACERO 26629.81 KG

05.07 LOSAS ALIGERADAS

05.07.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 M3 233.27 M3

PRIMER PISO = SEGUNDO PISO = TERCER PISO

BLOQUE 1 1.00 20.08 11.20 0.0875 6.00 118.04

BLOQUE 2 Y 3 2.00 21.50 9.95 0.0875 3.00 112.31

ESCALERA 2.00 4.45 3.75 0.0875 1.00 2.92

05.07.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS M2 2665.97 M2

PRIMER PISO = SEGUNDO PISO = TERCER PISO

BLOQUE 1 1.00 20.08 11.20 6.00 1349.04

BLOQUE 2 Y 3 2.00 21.50 9.95 3.00 1283.55

ESCALERA 2.00 4.45 3.75 1.00 33.38

05.07.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 20912.71 KG

05.07.04 LADRILLO HUECO DE ARCILLA h=0.15 cm PARA TECHO ALIGERADO UND 22208 UND

PRIMER PISO = SEGUNDO PISO = TERCER PISO

BLOQUE 1 1.00 20.08 11.20 8.33 6.00 11237.50

BLOQUE 2 Y 3 2.00 21.50 9.95 8.33 3.00 10691.97

ESCALERA 2.00 4.45 3.75 8.33 1.00 278.01

05.08 ESCALERAS

05.08.01 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS M3 43.11 M3

PRIMER NIVEL

CIMENTACION 1.00 5.50 3.60 0.50 2.00 19.80

LOSA 1.00 6.56 1.80 0.15 2.00 3.54

PASO CONTRAPASO 1.00 1.80 0.15 0.30 68.00 5.51

SEGUNDO NIVEL = TERCER NIVEL

LOSA 1.00 9.60 1.80 0.15 4.00 10.37

PASO CONTRAPASO 1.00 1.80 0.15 0.30 48.00 3.89

05.08.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS M2 315.56 M2

PRIMER NIVEL = SEGUNDO NIVEL = TERCER NIVEL

2.00 12.40 1.80 6.00 267.84

2.00 9.66 0.30 6.00 34.76

2.00 0.30 0.30 72.00 12.96

05.08.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 1453.36 KG

05.09 COLUMNAS DE AMARRE

05.09.01 CONCRETO f´c=175 kg/cm2 PARA COLUMNAS M3 31.79 M3

PRIMER NIVEL

BLOQUE 1

C-A 1.00 0.25 0.15 1.05 6.00 0.24

Page 16: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 16/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

C-A 1.00 0.25 0.15 1.60 41.00 2.46

C-A 1.00 0.25 0.15 2.20 14.00 1.16

C-A 1.00 0.25 0.15 2.80 38.00 3.99

C-A 1.00 0.25 0.15 3.20 13.00 1.56

BLOQUE 2= BLOQUE 3

C-A 1.00 0.25 0.15 1.05 16.00 0.63

C-A 1.00 0.25 0.15 1.60 16.00 0.96

C-A 1.00 0.25 0.15 2.80 16.00 1.68

SEGUNDO NIVEL = TERCER NIVEL

BLOQUE 1

C-A 1.00 0.25 0.15 1.05 40.00 1.58

C-A 1.00 0.25 0.15 1.60 76.00 4.56

C-A 1.00 0.25 0.15 2.20 12.00 0.99

C-A 1.00 0.25 0.15 2.80 18.00 1.89

C-A 1.00 0.25 0.15 3.20 12.00 1.44

BLOQUE 2= BLOQUE 3

C-A 1.00 0.25 0.15 1.05 32.00 1.26

C-A 1.00 0.25 0.15 1.60 32.00 1.92

C-A 1.00 0.25 0.15 2.80 32.00 3.36

VOLADIZO 1.00 0.25 0.15 1.05 54.00 2.13

05.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS M2 438.71 M2

PRIMER NIVEL

BLOQUE 1

C-A 1.00 0.65 1.05 6.00 4.10

C-A 1.00 0.50 1.60 41.00 32.80

C-A 1.00 0.50 2.20 14.00 15.40

C-A 1.00 0.50 2.80 38.00 53.20

C-A 1.00 0.50 3.20 13.00 20.80

BLOQUE 2= BLOQUE 3

C-A 1.00 0.65 1.05 16.00 10.92

C-A 1.00 0.50 1.60 16.00 12.80

C-A 1.00 0.50 2.80 16.00 22.40

SEGUNDO NIVEL = TERCER NIVEL

BLOQUE 1

C-A 1.00 0.65 1.05 40.00 27.30

C-A 1.00 0.50 1.60 76.00 60.80

C-A 1.00 0.50 2.20 12.00 13.20

C-A 1.00 0.50 2.80 18.00 25.20

C-A 1.00 0.50 3.20 12.00 19.20

BLOQUE 2= BLOQUE 3

C-A 1.00 0.65 1.05 32.00 21.84

C-A 1.00 0.50 1.60 32.00 25.60

C-A 1.00 0.50 2.80 32.00 44.80

VOLADIZO 1.00 0.50 1.05 54.00 28.35

05.09.03 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 3386.78 KG

05.10 VIGAS DE AMARRE

05.10.01 CONCRETO EN VIGAS f´c=175 kg/cm2 M3 22.73 M3

PRIMER PISO = SEGUNDO PISO = TERCER PISO

Page 17: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 17/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

BLOQUE 1

EJE A-A 1.00 0.98 0.15 0.20 3.00 0.09

1.00 1.28 0.15 0.20 3.00 0.12

1.00 3.65 0.15 0.20 3.00 0.33

1.00 4.85 0.15 0.20 3.00 0.44

1.00 5.92 0.15 0.20 3.00 0.53

1.00 5.15 0.15 0.20 3.00 0.46

1.00 1.67 0.15 0.20 3.00 0.15

1.00 1.58 0.15 0.20 3.00 0.14

1.00 1.07 0.15 0.20 3.00 0.10

EJE C-C 1.00 4.40 0.15 0.20 3.00 0.40

1.00 3.65 0.15 0.20 3.00 0.33

1.00 4.85 0.15 0.20 3.00 0.44

1.00 5.92 0.15 0.20 3.00 0.53

1.00 5.15 0.15 0.20 3.00 0.46

1.00 3.85 0.15 0.20 3.00 0.35

1.00 3.65 0.15 0.20 3.00 0.33

EJE 1-1 1.00 2.35 0.15 0.20 6.00 0.42

EJE 2-2 1.00 8.35 0.15 0.20 12.00 3.01

VOLADIZO 1.00 2.10 0.15 0.20 4.00 0.25

1.00 12.20 0.15 0.20 2.00 0.73

BAÑOS HOMBRES 1.00 1.40 0.15 0.20 20.00 0.84

1.00 0.40 0.15 0.20 4.00 0.05

1.00 1.00 0.15 0.20 2.00 0.06

1.00 2.80 0.15 0.20 2.00 0.17

BAÑOS MUJERES 1.00 1.40 0.15 0.20 16.00 0.67

1.00 1.20 0.15 0.20 6.00 0.22

1.00 0.40 0.15 0.20 4.00 0.05

BLOQUE 2 = BLOQUE 3

EJE A-A = EJE G-G 1.00 2.50 0.15 0.20 24.00 1.80

EJE D-D 1.00 7.25 0.15 0.20 6.00 1.31

EJE 1-1 = EJE 10-10 1.00 3.63 0.15 0.20 6.00 0.65

1.00 5.23 0.15 0.20 6.00 0.94

1.00 5.10 0.15 0.20 6.00 0.92

1.00 3.50 0.15 0.20 6.00 0.63

EJE 5-5 = EJE 6-6 1.00 2.45 0.15 0.20 6.00 0.44

1.00 4.05 0.15 0.20 6.00 0.73

1.00 3.92 0.15 0.20 6.00 0.71

1.00 2.33 0.15 0.20 6.00 0.42

VOLADOS 1.00 2.25 0.15 0.20 4.00 0.27

1.00 18.85 0.15 0.20 4.00 2.26

05.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 416.64 M2

PRIMER PISO = SEGUNDO PISO = TERCER PISO

BLOQUE 1

EJE A-A 1.00 0.98 0.55 3.00 1.62

1.00 1.28 0.55 3.00 2.11

1.00 3.65 0.55 3.00 6.02

1.00 4.85 0.55 3.00 8.00

1.00 5.92 0.55 3.00 9.77

1.00 5.15 0.55 3.00 8.50

Page 18: 001 .- Metrados Estrcutras (1)

ESTRUCTURAS 18/27

PLANILLA DE METRADOS - ESTRUCTURAS

PROYECTO :“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

PROPIETARIO : UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

N° DESCRIPCION UND.N° DE MEDIDAS N° DE

PARCIAL TOTAL UND.ELEMENTOS LONG. ANCHO ALTO VECES

1.00 1.67 0.55 3.00 2.76

1.00 1.58 0.55 3.00 2.61

1.00 1.07 0.55 3.00 1.77

EJE C-C 1.00 4.40 0.55 3.00 7.26

1.00 3.65 0.55 3.00 6.02

1.00 4.85 0.55 3.00 8.00

1.00 5.92 0.55 3.00 9.77

1.00 5.15 0.55 3.00 8.50

1.00 3.85 0.55 3.00 6.35

1.00 3.65 0.55 3.00 6.02

EJE 1-1 1.00 2.35 0.55 6.00 7.76

EJE 2-2 1.00 8.35 0.55 12.00 55.11

VOLADIZO 1.00 2.10 0.55 4.00 4.62

1.00 12.20 0.55 2.00 13.42

BAÑOS HOMBRES 1.00 1.40 0.55 20.00 15.40

1.00 0.40 0.55 4.00 0.88

1.00 1.00 0.55 2.00 1.10

1.00 2.80 0.55 2.00 3.08

BAÑOS MUJERES 1.00 1.40 0.55 16.00 12.32

1.00 1.20 0.55 6.00 3.96

1.00 0.40 0.55 4.00 0.88

BLOQUE 2 = BLOQUE 3

EJE A-A = EJE G-G 1.00 2.50 0.55 24.00 33.00

EJE D-D 1.00 7.25 0.55 6.00 23.93

EJE 1-1 = EJE 10-10 1.00 3.63 0.55 6.00 11.98

1.00 5.23 0.55 6.00 17.26

1.00 5.10 0.55 6.00 16.83

1.00 3.50 0.55 6.00 11.55

EJE 5-5 = EJE 6-6 1.00 2.45 0.55 6.00 8.09

1.00 4.05 0.55 6.00 13.37

1.00 3.92 0.55 6.00 12.94

1.00 2.33 0.55 6.00 7.69

VOLADOS 1.00 2.25 0.55 4.00 4.95

1.00 18.85 0.55 4.00 41.47

05.10.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG VER PLANILLA DE METRADOS DE ACERO 3014.17 KG

Page 19: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

01.05.08. SOBRECIMIENTOS REFORZADOS 1,960.82

BLOQUE 1

EJE A-A = EJE C-C 2.00 18.00 1.50 0.56 30.24

2.00 4.00 4.45 0.56 19.94

2.00 15.00 1.50 0.56 25.20

2.00 4.00 3.70 0.56 16.58

2.00 8.00 1.50 0.56 13.44

2.00 4.00 1.80 0.56 8.06

2.00 20.00 2.55 0.56 57.12

2.00 4.00 4.90 0.56 21.95

2.00 29.00 2.55 0.56 82.82

2.00 4.00 7.15 0.56 32.03

2.00 21.00 2.55 0.56 59.98

2.00 4.00 5.20 0.56 23.30

2.00 8.00 1.50 0.56 13.44

2.00 4.00 1.80 0.56 8.06

2.00 16.00 1.50 0.56 26.88

2.00 4.00 3.90 0.56 17.47

2.00 15.00 1.50 0.56 25.20

2.00 4.00 3.70 0.56 16.58

EJE 1-1 = EJE 10-10 4.00 4.00 2.40 0.56 21.50

4.00 10.00 1.50 0.56 33.60

EJE 2-2 = EJE 8-8 = EJE 9-9 3.00 34.00 1.50 0.56 85.68

3.00 4.00 8.40 0.56 56.45

BAÑOS HOMBRES

1.00 4.00 1.20 0.56 2.69

ESTRIBOS 1.00 5.00 0.90 0.22 0.99

1.00 4.00 0.70 0.56 1.57

ESTRIBOS 1.00 4.00 0.90 0.22 0.79

1.00 4.00 0.65 0.56 1.46

ESTRIBOS 1.00 4.00 0.90 0.22 0.79

4.00 4.00 1.05 0.56 9.41

ESTRIBOS 4.00 5.00 0.90 0.22 3.96

1.00 4.00 1.70 0.56 3.81

ESTRIBOS 1.00 7.00 0.90 0.22 1.39

3.00 4.00 2.00 0.56 13.44

ESTRIBOS 3.00 8.00 0.90 0.22 4.75

1.00 4.00 3.50 0.56 7.84

ESTRIBOS 1.00 16.00 0.90 0.22 3.17

1.00 4.00 2.30 0.56 5.15

ESTRIBOS 1.00 10.00 0.90 0.22 1.98

1.00 4.00 1.15 0.56 2.58

ESTRIBOS 1.00 5.00 0.90 0.22 0.99

AUDITORIO

2.00 4.00 0.80 0.56 3.58

ESTRIBOS 2.00 5.00 0.90 0.22 1.98

1.00 4.00 6.60 0.56 14.78

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

Page 20: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

ESTRIBOS 1.00 32.00 0.90 0.22 6.34

1.00 4.00 3.90 0.56 8.74

ESTRIBOS 1.00 18.00 0.90 0.22 3.56

2.00 4.00 3.30 0.56 14.78

ESTRIBOS 2.00 15.00 0.90 0.22 5.94

BAÑOS MUJERES

1.00 4.00 1.30 0.56 2.91

ESTRIBOS 1.00 6.00 0.90 0.22 1.19

5.00 4.00 1.70 0.56 19.04

ESTRIBOS 5.00 8.00 0.90 0.22 7.92

1.00 4.00 1.60 0.56 3.58

ESTRIBOS 1.00 8.00 0.90 0.22 1.58

2.00 4.00 1.45 0.56 6.50

ESTRIBOS 2.00 7.00 0.90 0.22 2.77

1.00 4.00 2.40 0.56 5.38

ESTRIBOS 1.00 11.00 0.90 0.22 2.18

BLOQUE 2 = BLOQUE 3

EJE A-A = EJE G-G 8.00 15.00 1.50 0.56 100.80

8.00 4.00 2.55 0.56 45.70

EJE D-D 2.00 39.00 1.50 0.56 65.52

2.00 4.00 7.30 0.56 32.70

EJE 1-1 = EJE 5-5 4.00 21.00 1.50 0.56 70.56

4.00 4.00 3.67 0.56 32.88

4.00 29.00 1.50 0.56 97.44

4.00 4.00 5.28 0.56 47.31

4.00 28.00 1.50 0.56 94.08

4.00 4.00 5.15 0.56 46.14

4.00 20.00 1.50 0.56 67.20

4.00 4.00 3.55 0.56 31.81

PORTICOS 2.00 20.00 5.00 0.56 112.00

2.00 4.00 1.50 0.56 6.72

2.00 14.00 3.56 0.56 55.82

2.00 4.00 1.50 0.56 6.72

2.00 7.00 1.77 0.56 13.88

2.00 4.00 1.50 0.56 6.72

1.00 12.00 3.00 0.56 20.16

1.00 4.00 1.50 0.56 3.36

01.05.11. COLUMNAS 17,758.31

BLOQUE 1

C-1 4.00 4.00 13.80 2.24 494.59

4.00 8.00 13.80 1.55 684.48

ESTRIBOS 4.00 75.00 2.00 0.56 336.00

4.00 75.00 1.20 0.56 201.60

C-2 12.00 8.00 13.80 2.24 2967.55

12.00 8.00 13.80 1.55 2053.44

ESTRIBOS 12.00 75.00 1.80 0.56 907.20

Page 21: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

12.00 75.00 1.80 0.56 907.20

BLOQUE 2 = BLOQUE 3

C-1 12.00 4.00 13.80 2.24 1483.78

12.00 12.00 13.80 1.55 3080.16

ESTRIBOS 12.00 75.00 1.70 0.56 856.80

12.00 75.00 1.70 0.56 856.80

PORTICO

C-1 8.00 8.00 5.40 0.99 342.14

C-2 3.00 6.00 5.40 0.99 96.23

C-3 4.00 4.00 5.40 0.99 85.54

ESTRIBOS 8.00 30.00 1.30 0.56 174.72

3.00 30.00 1.00 0.56 50.40

4.00 30.00 0.60 0.56 40.32

ESCALERA - CISTERNA

CC-E 4.00 8.00 12.80 1.55 634.88

ESTRIBOS 6.00 68.00 1.50 0.56 342.72

05.14.00 VIGAS 38,557.93

BLOQUE 1

EJE A-A = EJE C-C 6.00 4.00 45.50 2.24 2446.08

6.00 3.00 45.50 1.55 1269.45

6.00 2.00 45.50 0.99 540.54

ESTRIBOS 6.00 275.00 1.80 0.56 1663.20

VA 3.00 4.00 45.50 1.55 846.30

3.00 2.00 45.50 0.99 270.27

ESTRIBOS 3.00 275.00 1.50 0.56 693.00

EJE 1-1 = EJE 10-10

PRIMER NIVEL = SEGUNDO NIVEL

4.00 9.00 12.60 2.24 1016.06

4.00 2.00 12.60 1.55 156.24

4.00 2.00 12.60 0.99 99.79

ESTRIBOS 4.00 70.00 1.80 0.56 282.24

TERCER NIVEL

2.00 10.00 12.60 2.24 564.48

ESTRIBOS 2.00 70.00 1.80 0.56 141.12

EJE 2-2= ... = EJE 9-9

PRIMER NIVEL = SEGUNDO NIVEL

12.00 11.00 12.60 2.24 3725.57

12.00 2.00 12.60 1.55 468.72

12.00 2.00 12.60 0.99 299.38

ESTRIBOS 12.00 70.00 2.40 0.56 1128.96

TERCER NIVEL

6.00 6.00 12.60 2.24 1016.06

6.00 2.00 12.60 1.55 234.36

6.00 2.00 12.60 0.99 149.69

ESTRIBOS 6.00 70.00 2.40 0.56 564.48

EJE 5-5 = EJE 6-6

Page 22: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

PRIMER NIVEL = SEGUNDO NIVEL

4.00 12.00 12.60 2.24 1354.75

4.00 2.00 12.60 1.55 156.24

4.00 2.00 12.60 0.99 99.79

ESTRIBOS 4.00 70.00 2.40 0.56 376.32

TERCER NIVEL

2.00 7.00 12.60 2.24 395.14

2.00 1.00 12.60 1.55 39.06

2.00 2.00 12.60 0.99 49.90

ESTRIBOS 2.00 70.00 2.40 0.56 188.16

BLOQUE 2 = BLOQUE 3

EJE 1-1 = EJE 5-5 12.00 4.00 22.35 2.24 2403.07

12.00 3.00 22.35 1.55 1247.13

12.00 2.00 22.35 0.99 531.04

ESTRIBOS 12.00 155.00 1.80 0.56 1874.88

VA 6.00 4.00 45.50 1.55 1692.60

6.00 2.00 45.50 0.99 540.54

ESTRIBOS 6.00 155.00 1.50 0.56 781.20

EJE A-A = EJE G-G 12.00 4.00 11.45 2.24 1231.10

12.00 3.00 11.45 1.55 638.91

12.00 2.00 11.45 0.99 272.05

ESTRIBOS 12.00 70.00 1.80 0.56 846.72

EJE C-C = EJE D-D = EJE E-E

PRIMER NIVEL = SEGUNDO NIVEL 12.00 8.00 22.35 2.24 4806.14

12.00 2.00 22.35 0.99 531.04

ESTRIBOS 12.00 70.00 2.00 0.56 940.80

TERCER NIVEL 6.00 6.00 22.35 2.24 1802.30

6.00 2.00 22.35 0.99 265.52

ESTRIBOS 6.00 70.00 2.00 0.56 470.40

PORTICO 2.00 6.00 5.00 0.99 59.40

2.00 20.00 0.90 0.99 35.64

2.00 6.00 3.56 0.99 42.29

2.00 14.00 0.90 0.99 24.95

2.00 6.00 1.77 0.99 21.03

2.00 7.00 0.90 0.99 12.47

1.00 6.00 3.00 0.99 17.82

1.00 12.00 0.90 0.99 10.69

ESCALERA CISTERNA 8.00 4.00 4.75 2.24 340.48

8.00 4.00 4.75 1.55 235.60

8.00 2.00 4.75 0.99 75.24

ESTRIBOS 8.00 30.00 1.60 0.56 215.04

8.00 6.00 5.95 1.55 442.68

ESTRIBOS 8.00 34.00 1.30 0.56 198.02

01.05.17 PLACAS DE CORTE 26,629.81

BLOQUE 1

PL-01

Page 23: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

COLUMNA INTERIOR (1° N) 4.00 16.00 6.10 2.24 874.50

ESTRIBOS 4.00 34.00 2.00 0.56 152.32

COLUMNA INTERIOR (2°-3° N) 4.00 16.00 7.50 1.55 744.00

ESTRIBOS 4.00 26.00 2.00 0.56 116.48

MURO (VERTICAL) (1° N) 2.00 32.00 6.10 0.99 386.50

MURO (HORIZONTAL) (1° N) 2.00 52.00 4.60 0.99 473.62

MURO (VERTICAL) (2°-3° N) 2.00 18.00 7.50 0.99 267.30

MURO (HORIZONTAL) (2°-3° N) 2.00 52.00 4.60 0.99 473.62

PL-02

COLUMNA INTERIOR (1° N) 4.00 8.00 6.10 2.24 437.25

ESTRIBOS 4.00 34.00 1.40 0.56 106.62

COLUMNA INTERIOR (2°-3° N) 4.00 8.00 7.50 1.55 372.00

ESTRIBOS 4.00 26.00 1.40 0.56 81.54

MURO (VERTICAL) (1° N) 4.00 24.00 6.10 0.99 579.74

MURO (HORIZONTAL) (1° N) 4.00 52.00 3.20 0.99 658.94

MURO (VERTICAL) (2°-3° N) 4.00 12.00 7.50 0.99 356.40

MURO (HORIZONTAL) (2°-3° N) 4.00 52.00 3.20 0.99 658.94

BLOQUE 2 = BLOQUE 3

PL-01

COLUMNA INTERIOR (1° N) 8.00 16.00 6.10 2.24 1748.99

ESTRIBOS 8.00 34.00 1.60 0.56 243.71

COLUMNA INTERIOR (2° N) 8.00 8.00 4.00 2.24 573.44

ESTRIBOS 8.00 22.00 1.60 0.56 157.70

COLUMNA INTERIOR (3° N) 8.00 8.00 4.00 1.55 396.80

ESTRIBOS 8.00 22.00 1.60 0.56 157.70

MURO (VERTICAL) (1° N) 4.00 26.00 6.10 0.99 628.06

MURO (HORIZONTAL) (1° N) 4.00 68.00 3.60 0.99 969.41

MURO (VERTICAL) (2°-3° N) 4.00 26.00 7.50 0.56 436.80

MURO (HORIZONTAL) (2°-3° N) 4.00 88.00 3.60 0.56 709.63

PL-02

COLUMNA INTERIOR (1° N) 16.00 8.00 6.10 2.24 1748.99

ESTRIBOS 16.00 34.00 1.40 0.56 426.50

COLUMNA INTERIOR (2° N) 16.00 8.00 4.00 1.55 793.60

ESTRIBOS 16.00 22.00 1.40 0.56 275.97

COLUMNA INTERIOR (3° N) 16.00 6.00 4.00 1.55 595.20

ESTRIBOS 16.00 22.00 1.40 0.56 275.97

MURO (VERTICAL) 8.00 16.00 13.20 0.56 946.18

MURO (HORIZONTAL) (1° N) 8.00 68.00 2.60 0.56 792.06

MURO (HORIZONTAL) (2°-3° N) 8.00 88.00 2.60 0.56 1025.02

ESCALERAS

MURO (VERTICAL) 2.00 80.00 14.00 0.99 2217.60

MURO (HORIZONTAL) 2.00 112.00 10.10 0.99 2239.78

CISTERNA

MURO (VERTICAL) 2.00 120.00 2.00 0.56 268.80

MURO (HORIZONTAL) 2.00 16.00 15.10 0.56 270.59

LOSA 2.00 34.00 3.30 0.56 125.66

2.00 26.00 4.25 0.56 123.76

Page 24: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

01.05.20. COLUMNAS DE AMARRE 3,386.78

BLOQUE 1

PRIMER NIVEL

C-A 6.00 4.00 1.60 0.56 21.50

41.00 4.00 2.15 0.56 197.46

14.00 4.00 2.75 0.56 86.24

38.00 4.00 3.35 0.56 285.15

13.00 4.00 3.75 0.56 109.20

ESTRIBOS 6.00 5.00 0.80 0.22 5.28

41.00 8.00 0.80 0.22 57.73

14.00 10.00 0.80 0.22 24.64

38.00 12.00 0.80 0.22 80.26

13.00 14.00 0.80 0.22 32.03

SEGUNDO NIVEL = TERCER NIVEL

C-A 40.00 4.00 1.60 0.56 143.36

76.00 4.00 2.15 0.56 366.02

12.00 4.00 2.75 0.56 73.92

18.00 4.00 3.35 0.56 135.07

12.00 4.00 3.75 0.56 100.80

ESTRIBOS 40.00 5.00 0.80 0.22 35.20

76.00 8.00 0.80 0.22 107.01

12.00 10.00 0.80 0.22 21.12

18.00 12.00 0.80 0.22 38.02

12.00 14.00 0.80 0.22 29.57

BLOQUE 2 = BLOQUE 3

PRIMER NIVEL

C-A 16.00 4.00 1.60 0.56 57.34

16.00 4.00 2.15 0.56 77.06

16.00 4.00 3.35 0.56 120.06

ESTRIBOS 16.00 5.00 0.80 0.22 14.08

16.00 8.00 0.80 0.22 22.53

16.00 12.00 0.80 0.22 33.79

SEGUNDO NIVEL = TERCER NIVEL

C-A 32.00 4.00 1.60 0.56 114.69

32.00 4.00 2.15 0.56 154.11

32.00 4.00 3.35 0.56 240.13

ESTRIBOS 32.00 5.00 0.80 0.22 28.16

32.00 8.00 0.80 0.22 45.06

32.00 12.00 0.80 0.22 67.58

VOLADIZO

C-A 54.00 4.00 1.60 0.56 193.54

ESTRIBOS 54.00 5.00 0.80 0.22 47.52

01.05.23. VIGAS DE AMARRE 3,014.17

BLOQUE 1

V-A (EJE A-A) 3.00 4.00 1.80 0.56 12.10

Page 25: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

3.00 4.00 1.90 0.56 12.77

3.00 4.00 4.45 0.56 29.90

3.00 4.00 5.65 0.56 37.97

3.00 4.00 6.70 0.56 45.02

3.00 4.00 5.95 0.56 39.98

3.00 4.00 2.50 0.56 16.80

3.00 4.00 2.40 0.56 16.13

3.00 4.00 1.90 0.56 12.77

ESTRIBOS 3.00 8.00 0.70 0.22 3.70

3.00 10.00 0.70 0.22 4.62

3.00 30.00 0.70 0.22 13.86

3.00 38.00 0.70 0.22 17.56

3.00 48.00 0.70 0.22 22.18

3.00 38.00 0.70 0.22 17.56

3.00 12.00 0.70 0.22 5.54

3.00 10.00 0.70 0.22 4.62

3.00 8.00 0.70 0.22 3.70

V-A (EJE C-C) 3.00 4.00 5.20 0.56 34.94

3.00 4.00 4.45 0.56 29.90

3.00 4.00 5.65 0.56 37.97

3.00 4.00 6.70 0.56 45.02

3.00 4.00 5.95 0.56 39.98

3.00 4.00 4.65 0.56 31.25

3.00 4.00 3.45 0.56 23.18

3.00 36.00 0.70 0.22 16.63

3.00 32.00 0.70 0.22 14.78

3.00 36.00 0.70 0.22 16.63

3.00 40.00 0.70 0.22 18.48

3.00 37.00 0.70 0.22 17.09

3.00 32.00 0.70 0.22 14.78

3.00 22.00 0.70 0.22 10.16

V-A (EJE 1-1) 6.00 4.00 3.15 0.56 42.34

V-A (EJE 2-2) 12.00 4.00 9.15 0.56 245.95

ESTRIBOS 6.00 20.00 0.70 0.22 18.48

12.00 44.00 0.70 0.22 81.31

VOLADIZO 4.00 4.00 2.90 0.56 25.98

2.00 4.00 13.00 0.56 58.24

4.00 20.00 0.70 0.22 12.32

2.00 60.00 0.70 0.22 18.48

BAÑOS HOMBRES 20.00 4.00 2.20 0.56 98.56

4.00 4.00 1.20 0.56 10.75

2.00 4.00 1.80 0.56 8.06

2.00 4.00 3.60 0.56 16.13

ESTRIBOS 20.00 12.00 0.70 0.22 36.96

4.00 3.00 0.70 0.22 1.85

2.00 8.00 0.70 0.22 2.46

2.00 18.00 0.70 0.22 5.54

Page 26: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

BAÑOS MUJERES 16.00 4.00 2.20 0.56 78.85

6.00 4.00 2.00 0.56 26.88

4.00 4.00 1.20 0.56 10.75

ESTRIBOS 16.00 10.00 0.70 0.22 24.64

6.00 10.00 0.70 0.22 9.24

4.00 4.00 0.70 0.22 2.46

BLOQUE 2 = BLOQUE 3

EJE A-A = EJE G-G 24.00 4.00 3.30 0.56 177.41

ESTRIBOS 24.00 20.00 0.70 0.22 73.92

EJE D-D 6.00 4.00 8.05 0.56 108.19

ESTRIBOS 6.00 30.00 0.70 0.22 27.72

EJE 1-1 = EJE 10-10 6.00 4.00 4.45 0.56 59.81

6.00 4.00 6.10 0.56 81.98

6.00 4.00 5.90 0.56 79.30

6.00 4.00 4.30 0.56 57.79

ESTRIBOS 6.00 22.00 0.70 0.22 20.33

6.00 30.00 0.70 0.22 27.72

6.00 30.00 0.70 0.22 27.72

6.00 22.00 0.70 0.22 20.33

EJE 5-5 = EJE 6-6 6.00 4.00 3.25 0.56 43.68

6.00 4.00 4.85 0.56 65.18

6.00 4.00 4.75 0.56 63.84

6.00 4.00 3.20 0.56 43.01

ESTRIBOS 6.00 18.00 0.70 0.22 16.63

6.00 24.00 0.70 0.22 22.18

6.00 24.00 0.70 0.22 22.18

6.00 18.00 0.70 0.22 16.63

VOLADIZO 4.00 4.00 3.05 0.56 27.33

4.00 4.00 19.65 0.56 176.06

ESTRIBOS 4.00 18.00 0.70 0.22 11.09

4.00 70.00 0.70 0.22 43.12

01.05.26. LOSAS ALIGERADAS 20,912.71

BLOQUE 1

PRIMER PISO = SEGUNDO PISO

46.00 2.00 45.30 0.99 4125.92

46.00 1.00 45.30 0.56 1166.93

TEMPERATURA 2.00 180.00 12.10 0.22 958.32

TERCER PISO

23.00 1.00 45.30 0.99 1031.48

23.00 2.00 45.30 0.56 1166.93

TEMPERATURA 1.00 180.00 12.10 0.22 479.16

BLOQUE 2 = BLOQUE 3

PRIMER PISO = SEGUNDO PISO

80.00 2.00 23.15 0.99 3666.96

80.00 1.00 23.15 0.56 1037.12

TEMPERATURA 2.00 92.00 10.95 0.22 443.26

Page 27: 001 .- Metrados Estrcutras (1)

METRADO DE ACERO

PROYECTO

PROPIETARIO: UNIVERSIDAD NACIONAL DEL SANTA

REGION : ANCASH

PROVINCIA : SANTA

DISTRITO : NUEVO CHIMBOTE

FECHA : JULIO 2013

ITEM DESCRIPCION N° VECESACERO Fy = 4200 Kg/cm2 (LONGITUD EN METROS)

KG/ML TOTAL (KG)3/4" 5/8" 1/2" 3/8" 1/4"

:“MEJORAMIENTO DE LA CALIDAD ACADEMICA EN LA ESCUELA ACADEMICO PROFESIONAL DE INGENIERIA EN ENERGIA DE LA UNIVERSIDAD NACIONAL DEL SANTA”

N° ELEMENTOS

PARCIAL (KG)

TERCER PISO

40.00 1.00 23.15 0.99 916.74

40.00 2.00 23.15 0.56 1037.12

TEMPERATURA 1.00 92.00 10.95 0.22 221.63

VOLADIZO

BLOQUE 1

PRIMER PISO = SEGUNDO PISO

10.00 2.00 45.30 0.99 896.94

10.00 1.00 45.30 0.56 253.68

TERCER PISO

5.00 1.00 45.30 0.99 224.23

5.00 2.00 45.30 0.56 253.68

BLOQUE 2 = BLOQUE 3

PRIMER PISO = SEGUNDO PISO

20.00 2.00 23.15 0.99 916.74

20.00 1.00 23.15 0.56 259.28

TERCER PISO

10.00 1.00 23.15 0.99 229.19

10.00 2.00 23.15 0.56 259.28

01.05.34. ESCALERAS 1,453.36

PRIMER NIVEL 2 88 1.80 0.56 177.41

2 14 10.60 0.99 293.83

SEGUNDO NIVEL = TERCER NIVEL 4 88 1.80 0.56 354.82

4 14 9.60 0.99 532.22