Post on 13-Apr-2017
PROJECT: BUILDINGS
AROUND THE SCHOOL
IRIA ,BIEL,JESICA AND ROGER.
INDEX1-GROUP MEMBERS AND RESPONSIBILITIES.2-SCHOOL LOCATION.3-PROJECT DEVELOPMENT:LOOKING FOR 2D SHAPES AND BUILDINGS AROUND THE SCHOOL.4- PROJECT DEVELOPMENT: BUILDINGS CONSTRUCTION WITH 3D SHAPES.5-PROJECT CONSOLIDATION:MAP DESCRIPTION.6- ENDING OF THE PROJECT.
1-GROUP MEMBERS AND RESPONSIBILITIES.
ARCHITECT : Proposes ideas about the designs and construction.
SPOKES PERSON: Asks questions to the teacher and represents the group.
TECHNOWIZARD: Controlling the computer. Takes the mouse and uses the laptop to search information.
PARTICIPETION MANAGER: Makes all members participate and avoids problems.
2-SCHOOL LOCATION.
Adress:
Can Fabra Primary School
34-56 Segre street
08030-Barcelona
3-PROJECT DEVELOPMENT:LOOKING FOR 2D SHAPES AND BUILDINGS
AROUND THE SCHOOL. BUILDINGS: Can Fabra school Can Fabra library Fountains
4- PROJECT DEVELOPMENT: BUILDINGS CONSTRUCTION WITH
3D SHAPES.Can Fabra school: rectangular prism
Can Fabra Library: rectangular prism and tringular prism
Fountains: Small rectangular prism.
5-PROJECT CONSOLIDATION:MAP DESCRIPTION.
Buildings: Can Fabra school is next to the Library,
the fountains are in front of the Library.
Jobs: At Can Fabra school, there are: teachers,
pupils, monitors, teacher trainees, a school keeper, cooks and cleaning staff.
There is a librarian at the library.
6- ENDING OF THE PROJECT. We can describe the buildings position
and the jobs around the school.