REDES AGUA PARA CONSUMO HUMANO
HUAMAN (1)
N° CALLES Y/O AVENIDAS LONGITUD Ø T.S.R. T.S.R.
1 MONDOÑEDO 358.93 4 PF PF
2 LOS GIRASOLES 23.50 4 TR PR
3 TAICO 110.57 4 PF Tr
4
5
493.00
TRUPAL (2)
N° CALLES Y/O AVENIDAS LONGITUD Ø T.S.R. T.S.R.
1 ICA 383.33 6 PF PF
2 ICA 85.92 4 PF PR
3 BANGKOK 348.91 4 PF Tr
4 KABUL 171.22 4 PF
5 SEUL 237.00 4 PF
6 AV. ANTENOR ORREGO 508.25 4 PF
7 AV. ANTENOR ORREGO 340.33 4 PF
8 AV. ROMA 331.04 4 PF
9 CALLE 17 35.30 4 PF
10 AMSTERDAN 345.89 4 PF
11 BUCAREST 136.40 4 PF
12 CALI 81.80 4 PF
13 CARTAGENA 87.60 4 PF 3,753.67
14 ESTOCOLMO 156.10 4 PF 0.00
15 ALEJANDRIA 336.24 4 PF
16 CALLE 19A 168.34 4 PF
17
18
3,753.67
SAN VICENTE (3)
N° CALLES Y/O AVENIDAS LONGITUD Ø T.S.R. T.S.R.
1 LA PLANICIE 349.80 4 PF PF
2 CASCADAS 160.00 4 PF PR
3 JOSE JOAQUIN INCLAN 467.15 4 PF Tr
4 LA MOLINA 127.30 4 PF
5 LAS DUNAS 165.55 4 PF
6 LA COLINA 183.85 4 PF
7 LA ALAMEDA 249.30 4 PF
8 AV. LA MARINA 356.38 4 PF 2,059.33
9 0.00
10
2,059.33
FLORENCIA DE MORA (4)
N° CALLES Y/O AVENIDAS LONGITUD Ø T.S.R. T.S.R.
1 24 DE ABRIL 33.80 12 PF PF
2 24 DE ABRIL 9.50 10 PF PR
3 24 DE ABRIL 222.50 10 PF Tr
4 24 DE ABRIL 239.70 10 PF
5
6
7
8
9
10
505.50
EL PORVENIR (5)
N° CALLES Y/O AVENIDAS LONGITUD Ø T.S.R. T.S.R.
1 PF
2 PR
3 Tr
4
5
6
7
8
9
10
0.00
HUAMAN TRUPAL SAN VICENTE FLORENCIA PORVENIR
1 TUBO PVC 50 MM (1 1/2") 0.00 0.00 0.00 0.00 0.00
2 TUBO PVC 63 MM (2") 0.00 0.00 0.00 0.00 0.00
3 TUBO PVC 90 MM (3") 0.00 0.00 0.00 0.00 0.00
4 TUBO PVC 110 MM (4") 493.00 3,370.34 2,059.33 0.00 0.00
5 TUBO PVC 160 MM (6") 0.00 383.33 0.00 0.00 0.00
6 TUBO PVC 200 MM (8") 0.00 0.00 0.00 0.00 0.00
7 TUBO PVC 250 MM (10") 0.00 0.00 0.00 471.70 0.00
8 TUBO PVC 315 MM (12") 0.00 0.00 0.00 33.80 0.00
9 TUBO PVC 355 MM (14") 0.00 0.00 0.00 0.00 0.00
10 TUBO PVC 400 MM (16") 0.00 0.00 0.00 0.00 0.00
493.00 3,753.67 2,059.33 505.50 0.00 6,811.50
REDES AGUA PARA CONSUMO HUMANO
HUAMAN (1)
T.S.R.
469.50
0.00
23.50
493.00
TRUPAL (2)
T.S.R.
3,753.67
0.00
0.00
3,753.67
TRUPAL + SAN VICENTE
5,813.00 TOTAL
SAN VICENTE (3)
T.S.R.
2,564.83
0.00
0.00
2,564.83
FLORENCIA DE MORA (4)
T.S.R.
505.50
0.00
0.00
505.50
EL PORVENIR (5)
T.S.R.
0.00
0.00
0.00
0.00
6,811.50
HUAMAN
CONEXIONES DOMICILIARIAS
CORTES
IZQUIERDA
N° conexØ EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA)
ABRAZ. M. tuberia Total tub. M. Asf -0.4 Total Asf. Pav. Rig
1-1 0 4 0.00 0.00 0.00 0.00 0.00 0.00
2-2 0 4 0.00 0.00 0.00 0.00 0.00 0.00
3-3 0 4 0.00 0.00 0.00 0.00 0.00 0.00
4-4 0 4 0.00 0.00 0.00 0.00 0.00 0.00
5-5 0 4 0.00 0.00 0.00 0.00 0.00 0.00
6-6 0 4 0.00 0.00 0.00 0.00 0.00 0.00
7-7 0 4 0.00 0.00 0.00 0.00 0.00 0.00
8-8 0 4 0.00 0.00 0.00 0.00 0.00 0.00
9-9 0 4 0.00 0.00 0.00 0.00 0.00 0.00
10-10 0 4 0.00 0.00 0.00 0.00 0.00 0.00
11-11 0 4 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
RESUMENABRAZADERAS CONEXIONES
2" 3" 4" 6" SUMA 1/2" 3/4"
CONEXIONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXCAVACION 0.00
PAVIMENTO 0.00
0.00
vereda RIGIDO 0.00
EMPALMES
CORTE I D CORTE I D1 12 13 11 0 02 17 53 6 64 0 45 0 06 0 07 0 08 0 09 0 0
10 0 0
PAVIMENTO FLEXIBLE
IZQUIERDA DERECHACONEX. LONG. DESC. PARCIAL CONEX. LONG. DESC.
1 12 0.50 0.10 1.20 13 2.00 1.602 17 0.60 0.20 3.40 5 2.00 1.603 6 2.00 1.60 9.60 6 0.50 0.104 0 0.00 -0.40 0.00 4 0.50 0.10
PAVIMENTO RIGIDO
5 0 0.00 -0.40 0.00 0 0.00 -0.406 0 0.00 -0.40 0.00 0 0.00 -0.407 0 0.00 -0.40 0.00 0 0.00 -0.408 0 0.00 -0.40 0.00 0 0.00 -0.409 0 0.00 -0.40 0.00 0 0.00 -0.40
10 0 0.00 -0.40 0.00 0 0.00 -0.4011 0 0.00 -0.40 0.00 0 0.00 -0.40
CONEXIONES DOMICILIARIAS
IZQUIERDA DERECHA
PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)N° conex
Ø EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE
P. Rígido Conex Pav. Rig P. Rígido ABRAZ. M. tuberia Total tub M. asf
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00
63.00 EMPALMES
Total instalacion conexiones 0.00Empalme conexiones a tubberia DN110 63.00Empalme conexiones a tubberia DN160 0
DERECHAPARCIAL
20.80 44.00 M8.000.600.40
0.000.000.000.000.000.000.00
CONEXIONES DOMICILIARIAS
DERECHA
PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)
-0.4 Total Asf. Pav. Rig P. Rígido Conex Pav. Rig P. Rígido
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
TRUPAL
CONEXIONES DOMICILIARIAS
CORTES
IZQUIERDA
N° conexØ EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA)
ABRAZ. M. tuberia Total tub. M. Asf -0.4 Total Asf. Pav. Rig
1-1 0 4 0.00 0.00 0.00 0.00 0.00 0.00
2-2 0 4 0.00 0.00 0.00 0.00 0.00 0.00
3-3 0 4 0.00 0.00 0.00 0.00 0.00 0.00
4-4 0 4 0.00 0.00 0.00 0.00 0.00 0.00
5-5 0 4 0.00 0.00 0.00 0.00 0.00 0.00
6-6 0 4 0.00 0.00 0.00 0.00 0.00 0.00
7-7 0 4 0.00 0.00 0.00 0.00 0.00 0.00
8-8 0 4 0.00 0.00 0.00 0.00 0.00 0.00
9-9 0 4 0.00 0.00 0.00 0.00 0.00 0.00
10-10 14 4 4.40 61.60 0.40 0.00 0.00 0.00
11-11 20 4 5.40 108.00 0.40 0.00 0.00 0.00
12-12 13 4 10.75 139.75 6.10 5.70 74.10 0.00
13-13 0 4 0.00 0.00 0.00 0.00 0.00 0.00
14-14 0 4 0.00 0.00 0.00 0.00 0.00 0.00
15-15 3 4 2.82 8.46 0.00 0.00 0.00 0.00
16-16 0 4 0.00 0.00 0.00 0.00 0.00 0.00
17-17 0 4 0.00 0.00 0.00 0.00 0.00 0.00
18-18 0 4 0.00 0.00 0.00 0.00 0.00 0.00
19-19 0 4 0.00 0.00 0.00 0.00 0.00 0.00
20-20 0 4 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 50.00 317.81 74.10
RESUMENABRAZADERAS CONEXIONES
2" 3" 4" 6" SUMA 1/2" 3/4"
CONEXIONES 101.00 0.00 0.00 101.00 0.00 101.00 101.00
EXCAVACION 532.07
PAVIMENTO 74.10
0.00
vereda RIGIDO 0.00
EMPALMES
CORTE I D CORTE I D1 0 0 11 0 252 16 0 12 0 03 0 0 13 0 04 28 18 14 2 05 5 0 15 16 06 12 19 16 20 07 16 4 17 2 48 0 7 18 1 3
PAVIMENTO RIGIDO
9 4 0 19 3 310 0 2 20 14 0
PAVIMENTO FLEXIBLE
IZQUIERDA DERECHACONEX. LONG. DESC. PARCIAL CONEX. LONG. DESC.
1 0 0.00 -0.40 0.00 0 0.00 -0.402 16 0.40 0.00 0.00 0 0.00 -0.403 0 0.00 -0.40 0.00 0 0.00 -0.404 28 0.40 0.00 0.00 18 2.00 1.605 5 0.40 0.00 0.00 0 0.00 -0.406 12 2.00 1.60 19.20 19 0.40 0.007 16 0.40 0.00 0.00 4 2.00 1.608 0 0.00 -0.40 0.00 7 0.40 0.009 4 2.00 1.60 6.40 0 0.00 -0.40
10 0 0.00 -0.40 0.00 2 2.00 1.6011 0 0.00 -0.40 0.00 25 0.40 0.0012 0 0.00 -0.40 0.00 0 0.00 -0.4013 0 0.00 -0.40 0.00 0 0.00 -0.4014 2 2.00 1.60 3.20 0 0.00 -0.4015 16 0.40 0.00 0.00 0 0.00 -0.4016 20 0.40 0.00 0.00 0 0.00 -0.4017 2 2.00 1.60 3.20 4 0.40 0.0018 1 2.00 1.60 1.60 3 0.40 0.0019 3 2.00 1.60 4.80 3 0.40 0.0020 14 0.40 0.00 0.00 0 0.00 -0.40
CONEXIONES DOMICILIARIAS
IZQUIERDA DERECHA
PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)N° conex
Ø EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE
P. Rígido Conex Pav. Rig P. Rígido ABRAZ. M. tuberia Total tub M. asf
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 22 4 4.38 96.36 0.40
0.00 14.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 20.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 13.00 0.00 0.00 14 4 5.10 71.40 0.40
0.00 0.00 0.00 0.00 15 4 3.10 46.50 0.40
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 3.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 51.00 214.26
224 0
Total instalacion conexiones 101Empalme conexiones a tubberia DN110 197Empalme conexiones a tubberia DN160 27
DERECHAPARCIAL DESC. PARCIAL
0.00 76.80 M 0.00 0.00 76.80 M0.00 0.00 0.000.00 0.00 0.00
28.80 1.60 28.800.00 0.00 0.000.00 0.00 0.006.40 1.60 6.400.00 0.00 0.000.00 0.00 0.003.20 1.60 3.200.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.000.00 0.00 0.00
CONEXIONES DOMICILIARIAS
DERECHA
PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)
-0.4 Total Asf. Pav. Rig P. Rígido Conex Pav. Rig P. Rígido
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 22.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 14.00 0.00 0.00
0.00 0.00 0.00 0.00 15.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
SAN VICENTE
CONEXIONES DOMICILIARIAS
CORTES
IZQUIERDA
N° conexØ EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA)
ABRAZ. M. tuberia Total tub. M. Asf -0.4 Total Asf. Pav. Rig
1-1 0 4 0.00 0.00 0.00 0.00 0.00 0.00
2-2 0 4 0.00 0.00 0.00 0.00 0.00 0.00
3-3 14 4 4.95 69.30 0.40 0.00 0.00 0.00
4-4 0 4 0.00 0.00 0.00 0.00 0.00 0.00
5-5 1 4 10.40 10.40 7.80 7.40 7.40 0.00
6-6 0 4 0.00 0.00 0.00 0.00 0.00 0.00
7-7 0 4 0.00 0.00 0.00 0.00 0.00 0.00
8-8 0 4 0.00 0.00 0.00 0.00 0.00 0.00
9-9 0 4 0.00 0.00 0.00 0.00 0.00 0.00
10-10 0 4 0.00 0.00 0.00 0.00 0.00 0.00
11-11 17 4 10.70 181.90 6.90 6.50 110.50 0.00
12-12 0 4 0.00 0.00 0.00 0.00 0.00 0.00
13-13 0 4 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 32.00 261.60 117.90
RESUMENABRAZADERAS CONEXIONES
2" 3" 4" 6" SUMA 1/2" 3/4"
CONEXIONES 99.00 0.00 0.00 99.00 0.00 99.00 99.00
EXCAVACION 752.00
PAVIMENTO 311.10
0.00
vereda RIGIDO 0.00
EMPALMES
CORTE I D1 0 22 0 03 0 04 0 35 0 06 2 107 10 158 5 169 6 0
10 0 011 0 012 9 313 0 0
32.00 49.00 81.0084.00 UND
IZQUIERDA DERECHACONEX. LONG. DESC. PARCIAL CONEX. LONG. DESC.
PAVIMENTO RIGIDO
1 0 0.00 -0.40 0.00 2 2.00 1.602 0 0.00 -0.40 0.00 0 0.00 -0.403 0 0.00 -0.40 0.00 0 0.00 -0.404 0 0.00 -0.40 0.00 3 0.00 0.005 0 0.00 -0.40 0.00 0 0.00 -0.406 2 0.00 0.00 0.00 10 2.00 1.607 10 2.00 1.60 16.00 15 0.00 0.008 5 2.00 1.60 8.00 16 0.00 0.009 6 0.00 0.00 0.00 0 0.00 -0.40
10 0 0.00 -0.40 0.00 0 0.00 -0.4011 0 0.00 -0.40 0.00 0 0.00 -0.4012 9 0.00 0.00 0.00 3 2.00 1.6013 0 0.00 -0.40 0.00 0 0.00 -0.40
CONEXIONES DOMICILIARIAS
IZQUIERDA DERECHA
PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)N° conex
Ø EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE
P. Rígido Conex Pav. Rig P. Rígido ABRAZ. M. tuberia Total tub M. asf
0.00 0.00 0.00 0.00 10 4 18.00 180.00 14.10
0.00 0.00 0.00 0.00 4 4 14.35 57.40 7.65
0.00 14.00 0.00 0.00 4 4 11.80 47.20 7.20
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 1.00 0.00 0.00 28 4 4.20 117.60 0.40
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 17.00 0.00 0.00 21 4 4.20 88.20 0.40
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0 4 0.00 0.00 0.00
0.00 0.00 67.00 490.40
DERECHAPARCIAL
3.20 48.00 M0.000.000.000.00
16.000.000.000.000.000.004.800.00
CONEXIONES DOMICILIARIAS
DERECHA
PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)
-0.4 Total Asf. Pav. Rig P. Rígido Conex Pav. Rig P. Rígido
13.70 137.00 0.00 0.00 10.00 0.00 0.00
7.25 29.00 0.00 0.00 4.00 0.00 0.00
6.80 27.20 0.00 0.00 4.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 28.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 21.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
193.20 0.00 0.00
ACCESORIOS DE PVC UF
N° ACCESORIOS
CU
RV
A 1
1.25
°
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN63 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN75 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN90 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN110 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN140 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN160 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN200 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN250 MM
CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN315 MM
CU
RV
A 2
2.5°
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN63 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN75 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN90 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN110 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN140 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN160 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN200 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN250 MM
CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN315 MM
CU
RV
A 4
5°
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN63 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN75 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN90 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN110 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN140 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN160 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN200 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN250 MM
CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN315 MM
CU
RV
A 9
0°
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN63 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN75 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN90 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN110 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN140 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN160 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN200 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN250 MM
CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN315 MM
TE
E
TEE PVC DN63 MM INYECTADO P/TUB.PVC UF PN10 DN63 MM
TEE PVC DN75 MM INYECTADO P/TUB.PVC UF PN10 DN75 MM
TEE PVC DN90 MM INYECTADO P/TUB.PVC UF PN10 DN90 MM
TEE PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM
TEE PVC DN140 MM INYECTADO P/TUB.PVC UF PN10 DN140 MM
TEE PVC DN160 MM INYECTADO P/TUB.PVC UF PN10 DN160 MM
TEE PVC DN200 MM INYECTADO P/TUB.PVC UF PN10 DN200 MM
TEE PVC DN250 MM INYECTADO P/TUB.PVC UF PN10 DN250 MM
TEE PVC DN315 MM INYECTADO P/TUB.PVC UF PN10 DN315 MM
TE
E U
F C
ON
RE
DU
CC
ION
TEE PVC DN 75 X 63 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 90 X 63 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 90 X 75 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 110 X 63 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 110 X 75 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 110 X 90 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 140 X 63 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 140 X 75 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 140 X 90 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 140 X 110 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 160 X 63 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 160 X 90 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 160 X 110 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 160 X 140 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 200 X 90 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 200 X 110 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 200 X 140 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 200 X 160 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 250 X 110 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 250 X 140 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 250 X 160 MM INYECTADO P/TUB.PVC UF PN10
TE
E U
F C
ON
RE
DU
CC
ION
TEE PVC DN 250 X 200 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 315 X 160 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 315 X 200 MM INYECTADO P/TUB.PVC UF PN10
TEE PVC DN 315 X 250 MM INYECTADO P/TUB.PVC UF PN10
CR
UZ
CRUZ PVC DN63 MM INYECTADO P/TUB.PVC UF PN10 DN63 MM
CRUZ PVC DN75 MM INYECTADO P/TUB.PVC UF PN10 DN75 MM
CRUZ PVC DN90 MM INYECTADO P/TUB.PVC UF PN10 DN90 MM
CRUZ PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM
CRUZ PVC DN160 MM INYECTADO P/TUB.PVC UF PN10 DN160 MM
CR
UZ
/R
ED
. CRUZ PVC DN90X63 MM INYECTADO P/TUB.PVC UF PN10
CRUZ PVC DN110X63 MM INYECTADO P/TUB.PVC UF PN10
CRUZ PVC DN110X90 MM INYECTADO P/TUB.PVC UF PN10
CRUZ PVC DN160X90 MM INYECTADO P/TUB.PVC UF PN10
CRUZ PVC DN160X110 MM INYECTADO P/TUB.PVC UF PN10
TA
PO
N
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN63 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN75 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN90 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN110 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN140 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN160 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN200 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN250 MM
TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN315 MM
RE
DU
CC
ION
REDUCCION PVC INYECTADO DN63X32 P/TUB.PVC PN10 UF/SP
REDUCCION PVC INYECTADO DN75X63 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN90X63 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN90X75 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN110X63 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN110X75 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN110X90 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN140X63 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN140X75 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN140X90 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN140X110 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN160X63 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN160X90 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN160X110 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN160X140 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN200X90 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN200X110 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN200X140 P/TUB.PVC PN10 UF
REDUCCION PVC INYECTADO DN200X160 P/TUB.PVC PN10 UF
ACCESORIOS DE FFD UF - P/TUB. PVC PN10 UF
N° ACCESORIOS
CO
DO
CODO FFD 11.25° P/TUB.PVC PN10 UF DN200 MM
CODO FFD 11.25° P/TUB.PVC PN10 UF DN250 MM
CODO FFD 11.25° P/TUB.PVC PN10 UF DN315 MM
CODO FFD 11.25° P/TUB.PVC PN10 UF DN355 MM
CO
DO
CODO FFD 22.5° P/TUB.PVC PN10 UF DN200 MM
CODO FFD 22.5° P/TUB.PVC PN10 UF DN250 MM
CODO FFD 22.5° P/TUB.PVC PN10 UF DN315 MM
CODO FFD 22.5° P/TUB.PVC PN10 UF DN355 MM
CO
DO
CODO FFD 45° P/TUB.PVC PN10 UF DN200 MM
CODO FFD 45° P/TUB.PVC PN10 UF DN250 MM
CODO FFD 45° P/TUB.PVC PN10 UF DN300 MM
CODO FFD 45° P/TUB.PVC PN10 UF DN355 MM
CO
DO
CODO FFD 90° P/TUB.PVC PN10 UF DN200 MM
CODO FFD 90° P/TUB.PVC PN10 UF DN250 MM
CODO FFD 90° P/TUB.PVC PN10 UF DN300 MM
CODO FFD 90° P/TUB.PVC PN10 UF DN355 MM
TE
E
TEE FFD DN200 MM P/TUB.PVC UF PN10 DN200 MM
TEE FFD DN250 MM P/TUB.PVC UF PN10 DN250 MM
TEE FFD DN300 MM P/TUB.PVC UF PN10 DN300 MM
TE
E
TEE FFD DN200 X 90 MM P/TUB.PVC UF PN10
TEE FFD DN200 X 100 MM P/TUB.PVC UF PN10
TEE FFD DN200 X 150 MM P/TUB.PVC UF PN10
TE
ETEE FFD DN200 X 160 MM P/TUB.PVC UF PN10
TEE FFD DN250 X 110 MM P/TUB.PVC UF PN10
TEE FFD DN250 X 140 MM P/TUB.PVC UF PN10
TEE FFD DN250 X 160 MM P/TUB.PVC UF PN10
TEE FFD DN250 X 200 MM P/TUB.PVC UF PN10
TEE FFD DN300 X 160 MM P/TUB.PVC UF PN10
TEE FFD DN300 X 200 MM P/TUB.PVC UF PN10
TEE FFD DN300 X 250 MM P/TUB.PVC UF PN10
TEE FFD DN350 X 160 MM P/TUB.PVC UF PN10
TEE FFD DN350 X 200 MM P/TUB.PVC UF PN10
TEE FFD DN350 X 250 MM P/TUB.PVC UF PN10
TEE FFD DN350 X 300 MM P/TUB.PVC UF PN10
CR
UZ CRUZ FFD DN200 MM P/TUB.PVC UF PN10 DN200 MM
CRUZ FFD DN250 MM P/TUB.PVC UF PN10 DN250 MM
CRUZ FFD DN300 MM P/TUB.PVC UF PN10 DN300 MM
CR
UZ
CRUZ FFD DN200x110 MM P/TUB.PVC UF PN10
CRUZ FFD DN200x160 MM P/TUB.PVC UF PN10
CRUZ FFD DN200x250 MM P/TUB.PVC UF PN10
CRUZ FFD DN250x160 MM P/TUB.PVC UF PN10
CRUZ FFD DN250x200 MM P/TUB.PVC UF PN10
CRUZ FFD DN300x110 MM P/TUB.PVC UF PN10
CRUZ FFD DN300x150 MM P/TUB.PVC UF PN10
CRUZ FFD DN300x200 MM P/TUB.PVC UF PN10
CRUZ FFD DN300x250 MM P/TUB.PVC UF PN10
CRUZ FFD DN350x160 MM P/TUB.PVC UF PN10
CRUZ FFD DN350x200 MM P/TUB.PVC UF PN10
CRUZ FFD DN350x250 MM P/TUB.PVC UF PN10
CRUZ FFD DN350x300 MM P/TUB.PVC UF PN10
RE
DU
CC
ION
REDUCCION FFD UF DN 150 X 100 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 200 X 100 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 200 X 160 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 250 X 160 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 250 X 200 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 300 X 160 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 300 X 200 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 300 X 250 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 350 X 110 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 350 X 160 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 350 X 200 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 350 X 250 MM P/TUB.PVC PN10 UF
REDUCCION FFD UF DN 350 X 300 MM P/TUB.PVC PN10 UF
TA
PO
N
TAPON FFD P/TUB.PVC PN10 UF DN160 MM
TAPON FFD P/TUB.PVC PN10 UF DN200 MM
TAPON FFD P/TUB.PVC PN10 UF DN250 MM
TAPON FFD P/TUB.PVC PN10 UF DN315 MM
VA
LV
UL
AS
VALVULA DE AIRE DOBLE FUNCION DE 1/2"
VALVULA DE AIRE DOBLE FUNCION DE 3/4"
VALVULA DE AIRE DOBLE FUNCION DE 1" (32MM)
VALVULA COMP. FFD P/TUB. PVC UF DN 63MM
VALVULA COMP. FFD P/TUB. PVC UF DN 90MM
VALVULA COMP. FFD P/TUB. PVC UF DN 110MM
VALVULA COMP. FFD P/TUB. PVC UF DN 160MM
VALVULA COMP. FFD P/TUB. PVC UF DN 200MM
VALVULA COMP. FFD P/TUB. PVC UF DN 250MM
VALVULA COMP. FFD P/TUB. PVC UF DN 300MM
VALVULA COMP. FFD P/TUB. PVC UF DN 350MM
VA
RIO
S
UNION DE AMPLIO RANGO DN 90MM
UNION DE AMPLIO RANGO DN 110MM
GRIFO CONTRAINCENDIO ACERO TIPO POSTE 2 BOCAS DN 110MM H=1.55M
GRIFO CONTRAINCENDIO ACERO TIPO POSTE 2 BOCAS DN 160MM H=1.55M
PLANILLAS DE METRADOS - RED SECUNDARIA AGUA HUAMAN
OBRA:
FECHA: MAYO - 2015
ITEM DESCRIPCION UND N° VECESMEDIDAS
TOTALLONGITUD ANCHO Prof. (m)
01 OBRAS PROVISIONALES
01.01 CASETA DE GUARDIANIA Y ALMACEN UND 1 1.00
01.02 OFICINAS P/RESIDENTE-INSPECCION UND 1 1.00
01.03 CARTEL DE OBRA 2.40Mx4.80M UND 1 1.00
01.04 CERCO PERIMETRICO PROVISIONAL P/OBRA M 1 60.00 60.00
01.05 BAÑOS PORTATIL DIA 25 25.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2 493.00 986.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1 2.00 2.00
02.04 PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONAL UND 1 1.00 1.00
02.05 SEÑALIZACION NOCTURNA DIA 25 25.00
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO M 1 493.00 493.00
03.02 TRAZOS Y REPLANTEOS FINALES DE LA OBRA M 1 493.00 493.00
03.03 TRASLADO MAQ/EQUP. MATERIALES Y HERRAMIENTAS A OBRA VJE 2 2.00
04 MOVIMIENTO DE TIERRAS
04.01 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 513.50 1,027.00
04.02 EXCAV.C/EQ.P.AGUA T.NORMAL DN 110MM M 1.00 493.00 0.80 493.00
04.03 REFINE Y NIVELACIÓN FONDO DE ZANJA TN P/TUBOS M 1.00 493.00 493.00
04.04 RELLENO ZANJA MAT.SELECC.COMPACT.C/EQUIPO P/TUB DN 110MM M 1.00 493.00 0.80 493.00
04.05 CAMA DE APOYO C/MATERIAL DE PRESTAMO M3 1.00 493.00 0.80 0.20 78.88
04.06 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 A(m2) L/H %esponj. 177.73
Por Tubería ø 110mm M3 1.00 0.0079 493.00 1.20 4.67
Por Tubería ø 20 mm M3 1.00 0.0003 126.00 1.20 0.05
Por Pavimento Flexible M3 1.00 393.20 0.05 1.30 25.56
Por Pavimento Flexible M3 1.00 393.20 0.30 1.25 147.45
05 SUMINISTRO DE TUBERIAS
05.01 TUBERIA PVC AGUA C-10 UF DN 110MM INC. ANILLOS M 1.00 493.00 493.00
06 SUMINISTRO E INSTALACION DE TUBERIAS
06.01 INSTALACION TUBERIA PVC C-10 UF DN 110 MM M 1.00 493.00 493.00
06.02 PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM M 1.00 493.00 493.00
06.03 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. S/N 020) UND 1.00 1.00
06.04 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. LOS GIRASOLES) UND 1.00 1.00
06.05 EMPALME DE TUBERIA A RED EXISTENTE DE 90MM (CA. LOS PINOS "CALLE 47") UND 1.00 1.00
06.06 EMPALME DE TUBERIA A RED EXISTENTE DE 90MM (CALLE 48) UND 1.00 1.00
06.07 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. LOS CEDROS) UND 1.00 1.00
06.08 EMPALME DE TUBERIA A RED EXISTENTE DE 90MM (CA. OLIVERA) UND 1.00 1.00
06.09 EMPALME DE TUBERIA A RED EXISTENTE DE 32MM (CA. SEMINARIO) UND 1.00 1.00
06.10 EMPALME DE TUBERIA A RED EXISTENTE DE 63MM (CA. VALERIANO) UND 1.00 1.00
06.11 EMPALME DE TUBERIA A RED EXISTENTE DE 90MM (CA. TAICO) UND 1.00 1.00
07 SUMINISTRO E INSTALACION DE ACCESORIOS
07.01 TEE PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM UND 8 8.00
07.02 CRUZ PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM UND 2 2.00
07.03 TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 1 1.00
07.04 REDUCCION PVC INYECTADO DN63X32 P/TUB.PVC PN10 UF/SP UND 1 1.00
07.05 REDUCCION PVC INYECTADO DN110X63 P/TUB.PVC PN10 UF UND 1 1.00
07.06 REDUCCION PVC INYECTADO DN110X90 P/TUB.PVC PN10 UF UND 3 3.00
07.07 VALVULA DE AIRE DOBLE FUNCION DE 1" (32MM) UND 2 2.00
07.08 VALVULA COMP. FFD P/TUB. PVC UF DN 110MM UND 6 6.00
07.09 GRIFO CONTRAINCENDIO ACERO TIPO POSTE 2 BOCAS DN 110MM H=1.55M UND 1 1.00
07.10 INSTALACION DE ACCESORIOS PVC UF DN(63-90)MM UND 1 1.00
07.11 INSTALACION DE ACCESORIOS PVC UF DN(110-160)MM UND 15 15.00
07.12 INST.VALVULA COMPUERTA FFD CC-PVC DN(110-160)mm INC. REGISTRO UND 6 6.00
07.13 INSTALACIÓN DE VALVULA AIRE DOBLE FUNCION (1" - 2") UND 2 2.00
07.14 INSTALACIÓN DE GRIFOS CONTRA INCENDIO DE DOS BOCAS UND 1 1.00
08 OBRAS DE CONCRETO SIMPLE
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1285
ITEM DESCRIPCION UND N° VECESMEDIDAS
TOTALLONGITUD ANCHO Prof. (m)
08.01 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(63-90)MM UND 3 3.00
08.02 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(110-160)MM UND 22 22.00
09 CONEXIONES DOMICILIARIAS DE AGUA POTABLE (EMPALMES)
09.01 EXCAVACIÓN ZANJA 0.60*0.80 MPP M 126.00 126.00
09.02 REFINE Y NIVELACIÓN DE TUBOS CONEXIÓN AGUA M 126.00 126.00
09.03 RELLENO COMP. ZANJA 0.60*0.80 MPP M 126.00 126.00
09.04 SUM. E INSTAL.TUBO PVC De(20-32)mm M 126.00 126.00
09.05 SUM. E INSTAL. VALVULA CORPORATION 1/2" UND 63 63.00
09.06 SUMINISTRO ABRAZADERA PVC DN (110x20)mm UND 63 63.00
10 PRE-PAVIMENTACION
10.01 SUB BASE e=0.10 M (HORMIGON) M2 393.20 393.20
10.02 BASE CON AFIRMADO e=0.20M M2 393.20 393.20
11 VARIOS
11.01 REPARACIONES VARIAS (REDES AGUA,ELECT.,TELEF., ETC.) UND 2.00 2.00
11.02 COSTO AMBIENTAL EN OBRAS DE AGUA POTABLE DIA 25.00 25.00
12 BUZON Y/O CAJA DE INSPECCIÓN
12.01 BUZON Di=1.50m x 1.20 MPP UND 2.00 2.00
METRADO POR PRE-PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.80 469.50 375.60
CONEXIONES M2 0.40 44.00 17.60
TOTAL 513.50 393.20
PLANILLAS DE METRADOS - RED SECUNDARIA AGUA TRUPAL
OBRA:
FECHA: MAYO - 2015
ITEM DESCRIPCION UND N° VECESMEDIDAS
LONGITUD ANCHO Prof. (m)
01 OBRAS PROVISIONALES
01.01 CASETA DE GUARDIANIA Y ALMACEN UND 1
01.02 OFICINAS P/RESIDENTE-INSPECCION UND 1
01.03 CARTEL DE OBRA 2.40Mx4.80M UND 1
01.04 CERCO PERIMETRICO PROVISIONAL P/OBRA M 1 60.00
01.05 BAÑOS PORTATIL DIA 105
02 SEÑALIZACION DE TRANSITO
02.01 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2 3,753.67
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1 2.00
02.04 PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONAL UND 1 1.00
02.05 SEÑALIZACION NOCTURNA DIA 105
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO M 1 3,753.67
03.02 TRAZOS Y REPLANTEOS FINALES DE LA OBRA M 1 3,753.67
03.03 TRASLADO MAQ/EQUP. MATERIALES Y HERRAMIENTAS A OBRA VJE 2
04 MOVIMIENTO DE TIERRAS
04.01 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 3,904.57
04.03 EXCAV.C/EQ.P.AGUA T.NORMAL DN 110MM M 1.00 3,370.34 0.80
04.04 EXCAV.C/EQ.P.AGUA T.NORMAL DN 160MM M 1.00 383.33 0.80
04.05 REFINE Y NIVELACIÓN FONDO DE ZANJA TN P/TUBOS M 1.00 3,753.67
04.06 RELLENO ZANJA MAT.SELECC.COMPACT.C/EQUIPO P/TUB DN 110MM M 1.00 3,370.34 0.80
04.07 RELLENO ZANJA MAT.SELECC.COMPACT.C/EQUIPO P/TUB DN 160MM M 1.00 383.33 0.80
04.08 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 A(m2) L/H %esponj.
Por Tubería ø 110mm M3 1.00 0.0079 3,370.34 1.20
Por Tubería ø 160mm M3 1.00 0.0201 383.33 1.20
Por Tubería ø 20 mm M3 1.00 0.0003 980.07 1.20
Por Pavimento Flexible M3 1.00 3,063.30 0.05 1.30
Por Pavimento Flexible M3 1.00 3,063.30 0.30 1.25
Por Veredas M3 1.00 101.00 0.10 1.30
05 SUMINISTRO E INSTALACION DE TUBERIAS
05.02 TUBERIA PVC AGUA C-10 UF DN 110MM INC. ANILLOS M 1.00 3,370.34
05.01 TUBERIA PVC AGUA C-10 UF DN 160MM INC. ANILLOS M 1.00 383.33
06 SUMINISTRO E INSTALACION DE TUBERIAS
06.01 INSTALACION TUBERIA PVC C-10 UF DN 110 MM M 1.00 3,370.34
06.02 INSTALACION TUBERIA PVC C-10 UF DN 160 MM M 1.00 383.33
06.03 PRUEBA HIDRAULICA + DESINF. TUB. DN 110 MM M 1.00 3,370.34
06.04 PRUEBA HIDRAULICA + DESINF. TUB. DN 160 MM M 1.00 383.33
06.05 EMPALME DE TUBERIA A RED EXISTENTE DE 200MM (CA. BANGKOK CON CA. ICA) UND 1.00
06.06 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (AV. ANTENOR ORREGO CON CA. ICA) UND 1.00
06.07 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (AV. ROMA) UND 1.00
06.08 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. 19A CON CA. BANGKOK) UND 1.00
06.09 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. 17 CON CA. 19A) UND 1.00
06.10 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (AV. ANTENOR ORREGO CON CA. 7) UND 1.00
07 SUMINISTRO E INSTALACION DE ACCESORIOS
07.01 CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 6
07.02 CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 5
07.03 CODO PVC 90° INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 2
07.04 TEE PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM UND 26
07.05 CRUZ PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM UND 4
07.06 TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 2
07.07 TAPON PVC INYECTADO P/TUB.PVC PN10 UF DN160 MM UND 1
07.08 REDUCCION PVC INYECTADO DN160X110 P/TUB.PVC PN10 UF UND 2
07.09 TEE FFD DN200 MM P/TUB.PVC UF PN10 DN200 MM UND 1
07.10 CRUZ FFD DN200x160 MM P/TUB.PVC UF PN10 UND 1
07.11 REDUCCION FFD UF DN 200 X 100 MM P/TUB.PVC PN10 UF UND 1
07.12 VALVULA DE AIRE DOBLE FUNCION DE 1" (32MM) UND 10
07.13 VALVULA COMP. FFD P/TUB. PVC UF DN 110MM UND 18
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1285
ITEM DESCRIPCION UND N° VECESMEDIDAS
LONGITUD ANCHO Prof. (m)
07.14 GRIFO CONTRAINCENDIO ACERO TIPO POSTE 2 BOCAS DN 110MM H=1.55M UND 3
07.15 INSTALACION DE ACCESORIOS PVC UF DN(110-160)MM UND 48
07.16 INSTALACIÓN DE ACCESORIOS FFD DN(200-250)MM UND 3
07.17 INST.VALVULA COMPUERTA FFD CC-PVC DN(110-160)mm INC. REGISTRO UND 18
07.18 INSTALACIÓN DE VALVULA AIRE DOBLE EFECTO (1" - 2") UND 10
07.19 INSTALACIÓN DE GRIFOS CONTRA INCENDIO DE DOS BOCAS UND 3
08 OBRAS DE CONCRETO SIMPLE
08.01 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(63-90)MM UND 10
08.02 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(110-160)MM UND 69
08.02 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(200-250)MM UND 3
09 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
09.01 EXCAVACIÓN ZANJA 0.60*0.80 MPP M 532.07
09.02 REFINE Y NIVELACIÓN DE TUBOS CONEXIÓN AGUA M 532.07
09.03 RELLENO COMP. ZANJA 0.60*0.80 MPP M 532.07
09.04 SUM. E INSTAL.TUBO PVC De(20-32)mm M 532.07
09.05 SUM. E INSTAL. VALVULA CORPORATION 1/2" UND 101
09.06 SUMINISTRO ABRAZADERA PVC DN (110x20)mm UND 101
09.07 DESINFECCIÓN DE LA CONEXIÓN AGUA UND 101
09.08 SUMINISTRO CAJA DE REGISTRO AGUA UND 101
09.09 INSTALACIÓN CAJA REGISTRO AGUA UND 101
09.10 PRUEBA HIDRAULICA AGUA UND 101
09.14 LOSA DE C° 1.0 x 0.10 M UND 101 1.00 1.00
09.11 ROTURA Y REPOSICION DE VEREDAS M2 101
10 SUMINISTRO E INSTALACION DE MICROMEDIDORES
10.01 SUMINISTRO DE MEDIDORES DE 15MM (1/2") CHORRO UNICO Qn:1.5 l/s UND 101.00
10.02 SUMINISTRO DE ACCESORIOS PARA MEDIDORES DE 15MM UND 101.00
10.03 INSTALACION DE MEDIDORES DE 15 MM (1/2") UND 101.00
11 CONEXIONES DOMICILIARIAS DE AGUA POTABLE (EMPALMES)
11.01 EXCAVACIÓN ZANJA 0.60*0.80 MPP M 448.00
11.02 REFINE Y NIVELACIÓN DE TUBOS CONEXIÓN AGUA M 448.00
11.03 RELLENO COMP. ZANJA 0.60*0.80 MPP M 448.00
11.04 SUM. E INSTAL.TUBO PVC De(20-32)mm M 448.00
11.05 SUM. E INSTAL. VALVULA CORPORATION 1/2" UND 224
11.06 SUMINISTRO ABRAZADERA PVC DN (110x20)mm UND 197
11.07 SUMINISTRO ABRAZADERA PVC DN (160x20)mm UND 27
10 PRE-PAVIMENTACION
10.01 SUB BASE e=0.10 M (HORMIGON) M2 3,063.30
10.02 BASE CON AFIRMADO e=0.20M M2 3,063.30
11 VARIOS
11.01 REPARACIONES VARIAS (REDES AGUA,ELECT.,TELEF., ETC.) UND 2.00
11.02 COSTO AMBIENTAL EN OBRAS DE AGUA POTABLE DIA 105.00
12 VARIOS
12.01 BUZON Di=1.50m x 1.20 MPP UND 10.00
METRADO POR PRE-PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.80 3,753.67 3,002.94
CONEXIONES M2 0.40 150.90 60.36
TOTAL 3,904.57 3,063.30
PLANILLAS DE METRADOS - RED SECUNDARIA AGUA TRUPAL
MAYO - 2015
TOTAL
1.00
1.00
1.00
60.00
105.00
7,507.34
2.00
2.00
1.00
105.00
3,753.67
3,753.67
2.00
7,809.14
3,370.34
383.33
3,753.67
3,370.34
383.33
1,402.53
31.95
9.25
0.35
199.11
1,148.74
13.13
3,370.34
383.33
3,370.34
383.33
3,370.34
383.33
1.00
1.00
1.00
1.00
1.00
1.00
6.00
5.00
2.00
26.00
4.00
2.00
1.00
2.00
1.00
1.00
1.00
10.00
18.00
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO
TOTAL
3.00
48.00
3.00
18.00
10.00
3.00
10.00
69.00
3.00
532.07
532.07
532.07
532.07
101.00
101.00
101.00
101.00
101.00
101.00
101.00
101.00
101.00
101.00
101.00
448.00
448.00
448.00
448.00
224.00
197.00
27.00
3,063.30
3,063.30
2.00
105.00
10.00
PLANILLAS DE METRADOS - RED SECUNDARIA AGUA SAN VICENTE
OBRA:
FECHA: MAYO - 2015
ITEM DESCRIPCION UND N° VECESMEDIDAS
TOTALLONGITUD ANCHO Prof. (m)
01 OBRAS PROVISIONALES
01.01 CASETA DE GUARDIANIA Y ALMACEN UND 1 1.00
01.02 OFICINAS P/RESIDENTE-INSPECCION UND 1 1.00
01.03 CARTEL DE OBRA 2.40Mx4.80M UND 1 1.00
01.04 CERCO PERIMETRICO PROVISIONAL P/OBRA M 1 60.00 60.00
01.05 BAÑOS PORTATIL DIA 90 90.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2 2,059.33 4,118.66
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1 2.00 2.00
02.04 PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONAL UND 1 1.00 1.00
02.05 SEÑALIZACION NOCTURNA DIA 90 90.00
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO M 1 2,059.33 2,059.33
03.02 TRAZOS Y REPLANTEOS FINALES DE LA OBRA M 1 2,059.33 2,059.33
03.03 TRASLADO MAQ/EQUP. MATERIALES Y HERRAMIENTAS A OBRA VJE 2 2.00
04 MOVIMIENTO DE TIERRAS
04.01 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 2,923.93 5,847.86
04.02 EXCAV.C/EQ.P.AGUA T.NORMAL DN 110MM M 1.00 2,059.33 0.80 2,059.33
04.03 REFINE Y NIVELACIÓN FONDO DE ZANJA TN P/TUBOS M 1.00 2,059.33 2,059.33
04.04 RELLENO ZANJA MAT.SELECC.COMPACT.C/EQUIPO P/TUB DN 110MM M 1.00 2,059.33 0.80 2,059.33
04.05 CAMA DE APOYO C/MATERIAL DE PRESTAMO M3 1.00 2,059.33 0.80 0.20 329.49
04.06 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 A(m2) L/H %esponj. 998.75
Por Tubería ø 110mm M3 1.00 0.0079 2,059.33 1.20 19.52
Por Tubería ø 20 mm M3 1.00 0.0003 920.00 1.20 0.33
Por Pavimento Flexible M3 1.00 2,195.50 0.05 1.30 142.71
Por Pavimento Flexible M3 1.00 2,195.50 0.30 1.25 823.31
Por Veredas M3 1.00 99.00 0.10 1.30 12.87
05 SUMINISTRO DE TUBERIAS
05.01 TUBERIA PVC AGUA C-10 UF DN 110MM INC. ANILLOS M 1.00 2,059.33 2,059.33
06 SUMINISTRO E INSTALACION DE TUBERIAS
06.01 INSTALACION TUBERIA PVC C-10 UF DN 110 MM M 1.00 2,059.33 2,059.33
06.02 PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM M 1.00 2,059.33 2,059.33
06.03 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. LA PLANICIE CON CA. LA RIVERA) UND 1.00 1.00
06.04 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. LA PLANICIE CON CA. LA HERRADURA) UND 1.00 1.00
06.05 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. LAS CASCADAS) UND 1.00 1.00
06.06 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. LA RIVERA CON CA. LAS CASCADAS) UND 1.00 1.00
06.07 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (CA. JOSE JOAQUIN INCLAN) UND 1.00 1.00
06.08 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (AV. LA MARINA CON CA. VICTOR TAJARDO) UND 1.00 1.00
06.09 EMPALME DE TUBERIA A RED EXISTENTE DE 110MM (AV. LA MARINA CON CA. LA PLANICIE) UND 1.00 1.00
07 SUMINISTRO E INSTALACION DE ACCESORIOS
07.01 CODO PVC 11.25° INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 5 5.00
07.02 CODO PVC 22.5° INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 2 2.00
07.03 CODO PVC 45° INYECTADO P/TUB.PVC PN10 UF DN110 MM UND 3 3.00
07.04 TEE PVC DN110 MM INYECTADO P/TUB.PVC UF PN10 DN110 MM UND 19 19.00
07.05 VALVULA DE AIRE DOBLE FUNCION DE 1" (32MM) UND 5 5.00
07.06 VALVULA COMP. FFD P/TUB. PVC UF DN 110MM UND 12 12.00
07.07 GRIFO CONTRAINCENDIO ACERO TIPO POSTE 2 BOCAS DN 110MM H=1.55M UND 2 2.00
07.08 INSTALACION DE ACCESORIOS PVC UF DN(110-160)MM UND 24 24.00
07.09 INST.VALVULA COMPUERTA FFD CC-PVC DN(110-160)mm INC. REGISTRO UND 12 12.00
07.10 INSTALACIÓN DE VALVULA AIRE DOBLE FUNCION (1" - 2") UND 5 5.00
07.11 INSTALACIÓN DE GRIFOS CONTRA INCENDIO DE DOS BOCAS UND 2 2.00
08 OBRAS DE CONCRETO SIMPLE
08.01 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(63-90)MM UND 5 5.00
08.02 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(110-160)MM UND 38 38.00
09 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
09.01 EXCAVACIÓN ZANJA 0.60*0.80 MPP M 752.00 752.00
09.02 REFINE Y NIVELACIÓN DE TUBOS CONEXIÓN AGUA M 752.00 752.00
09.03 RELLENO COMP. ZANJA 0.60*0.80 MPP M 752.00 752.00
09.04 SUM. E INSTAL.TUBO PVC De(20-32)mm M 752.00 752.00
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1285
ITEM DESCRIPCION UND N° VECESMEDIDAS
TOTALLONGITUD ANCHO Prof. (m)
09.05 SUM. E INSTAL. VALVULA CORPORATION 1/2" UND 99 99.00
09.06 SUMINISTRO ABRAZADERA PVC DN (110x20)mm UND 99 99.00
09.07 DESINFECCIÓN DE LA CONEXIÓN AGUA UND 99 99.00
09.08 SUMINISTRO CAJA DE REGISTRO AGUA UND 99 99.00
09.09 INSTALACIÓN CAJA REGISTRO AGUA UND 99 99.00
09.10 PRUEBA HIDRAULICA AGUA UND 99 99.00
09.11 ROTURA Y REPOSICION DE VEREDAS M2 99 99.00
10 SUMINISTRO E INSTALACION DE MICROMEDIDORES
10.01 SUMINISTRO DE MEDIDORES DE 15MM (1/2") CHORRO UNICO Qn:1.5 l/s UND 99.00 99.00
10.02 SUMINISTRO DE ACCESORIOS PARA MEDIDORES DE 15MM UND 99.00 99.00
10.03 INSTALACION DE MEDIDORES DE 15 MM (1/2") UND 99.00 99.00
11 CONEXIONES DOMICILIARIAS DE AGUA POTABLE (EMPALMES)
11.01 EXCAVACIÓN ZANJA 0.60*0.80 MPP M 168.00 168.00
11.02 REFINE Y NIVELACIÓN DE TUBOS CONEXIÓN AGUA M 168.00 168.00
11.03 RELLENO COMP. ZANJA 0.60*0.80 MPP M 168.00 168.00
11.04 SUM. E INSTAL.TUBO PVC De(20-32)mm M 168.00 168.00
11.05 SUM. E INSTAL. VALVULA CORPORATION 1/2" UND 84 84.00
11.06 SUMINISTRO ABRAZADERA PVC DN (110x20)mm UND 84 84.00
12 PRE-PAVIMENTACION
12.01 SUB BASE e=0.10 M (HORMIGON) M2 2,195.50 2,195.50
12.02 BASE CON AFIRMADO e=0.20M M2 2,195.50 2,195.50
13 VARIOS
13.01 REPARACIONES VARIAS (REDES AGUA,ELECT.,TELEF., ETC.) UND 2.00 2.00
13.02 COSTO AMBIENTAL EN OBRAS DE AGUA POTABLE DIA 90.00 90.00
14 BUZON Y/O CAJA DE INSPECCIÓN
14.01 BUZON Di=1.50m x 1.20 MPP UND 5.00 5.00
METRADO POR PRE-PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.80 2,564.83 2,051.86
CONEXIONES M2 0.40 359.10 143.64
TOTAL 2,923.93 2,195.50
PLANILLAS DE METRADOS - RED PRIMARIA AGUA FLORENCIA
OBRA:
FECHA: MAYO - 2015
ITEM DESCRIPCION UND N° VECESMEDIDAS
TOTALLONGITUD ANCHO Prof. (m)
01 OBRAS PROVISIONALES
01.01 CASETA DE GUARDIANIA Y ALMACEN UND 1 1.00
01.02 OFICINAS P/RESIDENTE-INSPECCION UND 1 1.00
01.03 CARTEL DE OBRA 2.40Mx4.80M UND 1 1.00
01.04 CERCO PERIMETRICO PROVISIONAL P/OBRA M 1 60.00 60.00
01.05 BAÑOS PORTATIL DIA 30 30.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2 505.50 1,011.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1 2.00 2.00
02.04 PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONAL UND 1 1.00 1.00
02.05 SEÑALIZACION NOCTURNA DIA 30 30.00
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO M 1 505.50 505.50
03.02 TRAZOS Y REPLANTEOS FINALES DE LA OBRA M 1 505.50 505.50
03.03 TRASLADO MAQ/EQUP. MATERIALES Y HERRAMIENTAS A OBRA VJE 2 2.00
04 MOVIMIENTO DE TIERRAS
04.01 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 505.50 1,011.00
04.02 EXCAV.C/EQ.P.AGUA T.NORMAL DN 250MM M 1.00 471.70 0.80 471.70
04.03 EXCAV.C/EQ.P.AGUA T.NORMAL DN 315MM M 1.00 33.80 0.80 2.00 33.80
04.04 REFINE Y NIVELACIÓN FONDO DE ZANJA TN P/TUBOS M 1.00 505.50 505.50
04.05 RELLENO ZANJA MAT.SELECC.COMPACT.C/EQUIPO P/TUB DN 250MM M 1.00 471.70 0.80 471.70
04.06 RELLENO ZANJA MAT.SELECC.COMPACT.C/EQUIPO P/TUB DN 315MM M 1.00 33.80 0.80 33.80
04.07 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 A(m2) L/H %esponj. 208.84
Por Tubería ø 250mm M3 1.00 0.0490 471.70 1.20 27.74
Por Tubería ø 315mm M3 1.00 0.0780 33.80 1.20 3.16
Por Pavimento Flexible M3 1.00 404.40 0.05 1.30 26.29
Por Pavimento Flexible M3 1.00 404.40 0.30 1.25 151.65
05 SUMINISTRO DE TUBERIAS
05.01 TUBERIA PVC AGUA C-10 UF DN 250MM INC. ANILLOS M 1.00 471.70 471.70
05.01 TUBERIA PVC AGUA C-10 UF DN 315MM INC. ANILLOS M 1.00 33.80 33.80
06 SUMINISTRO E INSTALACION DE TUBERIAS
06.01 INSTALACION TUBERIA PVC C-10 UF DN 250 MM M 1.00 471.70 471.70
06.02 INSTALACION TUBERIA PVC C-10 UF DN 315 MM M 1.00 33.80 33.80
06.03 PRUEBA HIDRAULICA + DESINF. TUB. DN 250MM M 1.00 471.70 471.70
06.04 PRUEBA HIDRAULICA + DESINF. TUB. DN 315MM M 1.00 33.80 33.80
06.05 EMPALME DE TUBERIA A RED EXISTENTE - DETALLE 1 UND 1.00 1.00
06.06 EMPALME DE TUBERIA A RED EXISTENTE - DETALLE 2 UND 1.00 1.00
06.07 EMPALME DE TUBERIA A RED EXISTENTE - DETALLE 3 UND 1.00 1.00
07 SUMINISTRO E INSTALACION DE ACCESORIOS
07.01 TEE FFD DN200 MM P/TUB.PVC UF PN10 DN200 MM UND 1 1.00
07.02 CRUZ FFD DN250x160 MM P/TUB.PVC UF PN10 UND 1 1.00
07.03 CRUZ FFD DN300x200 MM P/TUB.PVC UF PN10 UND 1 1.00
07.04 REDUCCION FFD UF DN 250 X 200 MM P/TUB.PVC PN10 UF UND 1 1.00
07.05 REDUCCION FFD UF DN 300 X 250 MM P/TUB.PVC PN10 UF UND 1 1.00
07.06 TAPON FFD P/TUB.PVC PN10 UF DN200 MM UND 2 2.00
07.07 TAPON FFD P/TUB.PVC PN10 UF DN315 MM UND 1 1.00
07.08 VALVULA DE AIRE DOBLE FUNCION DE 1" (32MM) UND 1 1.00
07.09 VALVULA COMP. FFD P/TUB. PVC UF DN 63MM UND 1 1.00
07.10 VALVULA COMP. FFD P/TUB. PVC UF DN 160MM UND 4 4.00
07.11 VALVULA COMP. FFD P/TUB. PVC UF DN 200MM UND 2 2.00
07.12 VALVULA COMP. FFD P/TUB. PVC UF DN 250MM UND 2 2.00
07.13 INSTALACIÓN DE ACCESORIOS FFD DN(200-250)MM UND 5 5.00
07.14 INSTALACIÓN DE ACCESORIOS FFD DN(300-350)MM UND 3 3.00
07.15 INST.VALVULA COMPUERTA FFD CC-PVC DN(63-90)mm INC. REGISTRO UND 1 1.00
07.16 INST.VALVULA COMPUERTA FFD CC-PVC DN(110-160)mm INC. REGISTRO UND 4 4.00
07.17 INST.VALVULA COMPUERTA FFD CC-PVC DN(200-250)mm INC. REGISTRO UND 4 4.00
07.18 INSTALACIÓN DE VALVULA AIRE DOBLE FUNCION (1" - 2") UND 1 1.00
08 OBRAS DE CONCRETO SIMPLE
08.01 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(63-90)MM UND 2 2.00
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1285
ITEM DESCRIPCION UND N° VECESMEDIDAS
TOTALLONGITUD ANCHO Prof. (m)
08.02 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(110-160)MM UND 4 4.00
08.02 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(200-250)MM UND 9 9.00
08.03 DADOS CONCRETO F'C=140 KG/CM2+ANCLAJE P/ACC.DN(315-355)MM UND 3 3.00
09 PRE-PAVIMENTACION
09.01 SUB BASE e=0.10 M (HORMIGON) M2 404.40 404.40
09.02 BASE CON AFIRMADO e=0.20M M2 404.40 404.40
10 VARIOS
10.01 REPARACIONES VARIAS (REDES AGUA,ELECT.,TELEF., ETC.) UND 2.00 2.00
10.02 COSTO AMBIENTAL EN OBRAS DE AGUA POTABLE DIA 30.00 30.00
11 BUZON Y/O CAJA DE INSPECCIÓN
11.01 BUZON Di=1.50m x 1.20 MPP UND 5.00 5.00
METRADO POR PRE-PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.80 505.50 404.40
TOTAL 505.50 404.40
PLANILLA DE METRADOS DE PAVIMENTACION RED AGUA HUAMAN
OBRA:
FECHA: MAYO-2015
PARTIDA DESCRIPCION UNDN° MEDIDAS
CANTIDADVECES A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 BAÑOS PORTATIL DÍA 5.00 5.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA Y MALLA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2.00 493.00 986.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1.00 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1.00 2.00 2.00
02.04 SEÑALIZACION NOCTURNA DÍA 5.00 5.00
03 PAVIMENTACION
03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA GLB 1.00 1.00
03.02 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 513.50 1,027.00
03.03 PREPARACION DE LA SUB-RASANTE M2 79.22 79.22
03.04 ESCARIFICADO DE BASE E=5CM M2 472.43 472.43
03.05 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA M2 472.43 472.43
03.06 IMPRIMACION ASFALTICA CON MC-30 M2 472.43 472.43
03.07 CARPETA ASFALTICA CON EMULSION, e=2" C/EQUIPO M2 472.43 472.43
03.08 BARRIDO Y LIMPIEZA C/EQUIPO PARA SLURRY SEAL M2 472.43 472.43
03.09 SLURRY SEAL, e=10 mm M2 472.43 472.43
03.10 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 29.27
Por Escarificado M3 1.00 472.43 0.05 1.20 28.35
Por Perfilado M3 1.00 14.17 0.05 1.30 0.92
METRADO POR PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.95 469.50 446.03
CONEXIONES M2 0.60 44.00 26.40
TOTAL 513.50 472.43
TOTAL PRE-PAVIME. 393.20
DIFERENCIA 79.22
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - EL PORVENIR CODIGO EXPEDIENTE: 1285
PLANILLA DE METRADOS DE PAVIMENTACION RED AGUA TRUPAL
OBRA:
FECHA: MAYO-2015
PARTIDA DESCRIPCION UNDN° MEDIDAS
CANTIDADVECES A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 BAÑOS PORTATIL DÍA 15.00 15.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA Y MALLA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2.00 3,753.67 7,507.34
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1.00 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1.00 2.00 2.00
02.04 SEÑALIZACION NOCTURNA DÍA 5.00 5.00
03 PAVIMENTACION
03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA GLB 1.00 1.00
03.02 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 3,904.57 7,809.14
03.03 PREPARACION DE LA SUB-RASANTE M2 593.23 593.23
03.04 ESCARIFICADO DE BASE E=5CM M2 3,656.53 3,656.53
03.05 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA M2 3,656.53 3,656.53
03.06 IMPRIMACION ASFALTICA CON MC-30 M2 3,656.53 3,656.53
03.07 CARPETA ASFALTICA CON EMULSION, e=2" C/EQUIPO M2 3,656.53 3,656.53
03.08 BARRIDO Y LIMPIEZA C/EQUIPO PARA SLURRY SEAL M2 3,656.53 3,656.53
03.09 SLURRY SEAL, e=10 mm M2 3,656.53 3,656.53
03.10 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 226.52
Por Escarificado M3 1.00 3,656.53 0.05 1.20 219.39
Por Perfilado M3 1.00 109.70 0.05 1.30 7.13
METRADO POR PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.95 3,753.67 3565.99
CONEXIONES M2 0.60 150.90 90.54
TOTAL 3,904.57 3,656.53
TOTAL PRE-PAVIME. 3,063.30
DIFERENCIA 593.23
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - EL PORVENIR CODIGO EXPEDIENTE: 1285
PLANILLA DE METRADOS DE PAVIMENTACION RED AGUA SAN VICENTE
OBRA:
FECHA: MAYO-2015
PARTIDA DESCRIPCION UNDN° MEDIDAS
CANTIDADVECES A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 BAÑOS PORTATIL DÍA 10.00 10.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA Y MALLA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2.00 2,059.33 4,118.66
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1.00 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1.00 2.00 2.00
02.04 SEÑALIZACION NOCTURNA DÍA 10.00 10.00
03 PAVIMENTACION
03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA GLB 1.00 1.00
03.02 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 2,923.93 5,847.86
03.03 PREPARACION DE LA SUB-RASANTE M2 456.54 456.54
03.04 ESCARIFICADO DE BASE E=5CM M2 2,652.05 2,652.05
03.05 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA M2 2,652.05 2,652.05
03.06 IMPRIMACION ASFALTICA CON MC-30 M2 2,652.05 2,652.05
03.07 CARPETA ASFALTICA CON EMULSION, e=2" C/EQUIPO M2 2,652.05 2,652.05
03.08 BARRIDO Y LIMPIEZA C/EQUIPO PARA SLURRY SEAL M2 2,652.05 2,652.05
03.09 SLURRY SEAL, e=10 mm M2 2,652.05 2,652.05
03.10 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 164.29
Por Escarificado M3 1.00 2,652.05 0.05 1.20 159.12
Por Perfilado M3 1.00 79.56 0.05 1.30 5.17
METRADO POR PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.95 2,564.83 2,436.59
CONEXIONES M2 0.60 359.10 215.46
TOTAL 2,923.93 2,652.05
TOTAL PRE-PAVIME. 2,195.50
DIFERENCIA 456.54
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1285
PLANILLA DE METRADOS DE PAVIMENTACION RED AGUA FLORENCIA
OBRA:
FECHA: MAYO-2015
PARTIDA DESCRIPCION UNDN° MEDIDAS
CANTIDADVECES A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 BAÑOS PORTATIL DÍA 5.00 5.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA Y MALLA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2.00 505.50 1,011.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1.00 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1.00 2.00 2.00
02.04 SEÑALIZACION NOCTURNA DÍA 5.00 5.00
03 PAVIMENTACION
03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA GLB 1.00 1.00
03.02 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 505.50 1,011.00
03.03 PREPARACION DE LA SUB-RASANTE M2 75.82 75.82
03.04 ESCARIFICADO DE BASE E=5CM M2 480.22 480.22
03.05 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA M2 480.22 480.22
03.06 IMPRIMACION ASFALTICA CON MC-30 M2 480.22 480.22
03.07 CARPETA ASFALTICA CON EMULSION, e=2" C/EQUIPO M2 480.22 480.22
03.08 BARRIDO Y LIMPIEZA C/EQUIPO PARA SLURRY SEAL M2 480.22 480.22
03.09 SLURRY SEAL, e=10 mm M2 480.22 480.22
03.10 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 29.75
Por Escarificado M3 1.00 480.22 0.05 1.20 28.81
Por Perfilado M3 1.00 14.41 0.05 1.30 0.94
METRADO POR PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.95 505.50 480.22
TOTAL 505.50 480.22
TOTAL PRE-PAVIME. 404.40
DIFERENCIA 75.82
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1285
PF PAVIMENTO FLEXIBLEREDES DE ALCANTARILLADO SANITARIO PR PAVIMENTO RIGIDO
T TIERRAREDES ALCANTARILLADO
TramoNo. Buzón Cota Tapa Cota de Fondo Prof. Buzón Hp L Pavimento S S (%)
Del Al Del Al Del Al Del Al Hp (m) TIPO (m/m) (m/m)
1 0.000 0.000 0.000 0.000 0.0000
2 0.000 0.000 0.000 0.000 0.0000
3 0.000 0.000 0.000 0.000 0.0000
4 0.000 0.000 0.000 0.000 0.0000
5 0.000 0.000 0.000 0.000 0.0000
6 0.000 0.000 0.000 0.000 0.0000
7 0.000 0.000 0.000 0.000 0.0000
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
REDES DE ALCANTARILLADO SANITARIO PR PAVIMENTO RIGIDOT TIERRA
REDES ALCANTARILLADO
TramoNo. Buzón Cota Tapa Cota de Fondo Prof. Buzón Hp L Pavimento S S (%)
Del Al Del Al Del Al Del Al Hp (m) TIPO (m/m) (m/m)
59
60
61
62
63
64
65
66
67
68
69
70
0.00
TUBO PVC 160 MM (6") 0.00 M
Demolición de Buzón Nº TUBO PVC 200 MM (8") 0.00 M
BZ 65 TUBO PVC 250 MM (10") 0.00 M
TUBO PVC 315 MM (12") 0.00 M
TUBO PVC 355 MM (14") 0.00 M
TUBO PVC 400 MM (16") 0.00 M
TUBO PVC 450 MM (18") 0.00 M
∑ 65 TUBO PVC 500 MM (20") 0.00 M
Eliminación de Buzón 65 SUMATORIA 0.00 M
Rehabilitación de Buzón 0
PARA PAVIMENTACION
Profundidad P/exc.Prof. Longitud1.00 0.00 1.50 - 2.00 M 1.00 1.30 2.00 0.801.25 0.00 2.50 - 3.00 M 1.20 1.50 2.20 1.101.50 0.00 3.50 - 4.00 M 1.50 1.80 2.501.75 0.002.00 0.002.25 0.00
Profundidad P/exc.2.50 0.002.75 0.00 1.50 - 2.00 M 0.00 1.00 0.003.00 0.00 2.50 - 3.00 M 0.00 2.00 0.003.25 0.00 3.50 - 4.00 M 0.00 2.50 0.003.50 0.00 METRADO POR PRE-PAVIMENTACION3.75 0.00
4.00 0.00 CALLES Y/O AVENIDAS4.25 0.00 CALLES (1.00 - 2.00)M4.50 0.00 1.30 0.00 2.00 0.00 CALLES (2.25 - 3.00)M4.75 0.00 1.50 0.00 2.20 0.00 CALLES (3.25 - 4.00)M5.00 0.00 1.80 0.00 2.50 0.00 CONEXIONES
∑ 0.00 m
P/SELLO (M) METRADO POR PAVIMENTACIONDISTRITO CONEX
P/carp (m)
P/sello (m)
CONEX. DOMIC.
P/carp (m)
P/sello (m)
REDES DE ALCANTARILLADO SANITARIO PR PAVIMENTO RIGIDOT TIERRA
REDES ALCANTARILLADO
TramoNo. Buzón Cota Tapa Cota de Fondo Prof. Buzón Hp L Pavimento S S (%)
Del Al Del Al Del Al Del Al Hp (m) TIPO (m/m) (m/m)
T SOLO TRUJILLO 2.00 2.20 2.50 1.30 CALLES Y/O AVENIDASOD OTRO DISTRITO 1.30 1.50 1.80 1.10 CALLES (1.00 - 2.00)M
CALLES (2.25 - 3.00)MCALLES (3.25 - 4.00)MCONEXIONES
METRADO PARA SELLO
CALLES Y/O AVENIDAST CALLES (1.00 - 2.00)MT CALLES (2.25 - 3.00)MT CALLES (3.25 - 4.00)MT CONEXIONES
CAMBIAR T - OD
PAVIMENTO FLEXIBLEPAVIMENTO RIGIDO
REDES ALCANTARILLADO
Ø LONGITUDES METRADO METRADO DE ZANJA
" (m) ML 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25
8
0.00
0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
8 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAVIMENTO RIGIDO
REDES ALCANTARILLADO
Ø LONGITUDES METRADO METRADO DE ZANJA
" (m) ML 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 PROFUND. 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25
LONGITUD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXCAVACIONES Y RELLENOS1.00 0.833 1.50 1.431 2.00 1.931
1.167 1.667 2.167
1.25 1.171 1.75 1.671 2.25 2.171
1.429 1.925 2.423
BUZONES
1.20 0.800 2.00 1.700 3.00 2.700
1.299 2.199 3.199
1.50 1.300 2.50 2.200 3.50 3.2001.699 2.699 3.699
EXCAVACIONES Y RELLENOS1.00 0.80 2.00 1.60 3.00 2.80
1.19 2.20 3.20
1.50 1.20 2.50 2.21 3.50 3.211.59 2.79 3.79
METRADO POR PRE-PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTALCALLES (1.00 - 2.00)M M2 1.00 0.00 0.00CALLES (2.25 - 3.00)M M2 2.00 0.00 0.00CALLES (3.25 - 4.00)M M2 2.50 0.00 0.00CONEXIONES M2 0.80 0.00 0.00
TOTAL 0.00 0.00
METRADO POR PAVIMENTACION
PAVIMENTO RIGIDO
REDES ALCANTARILLADO
Ø LONGITUDES METRADO METRADO DE ZANJA
" (m) ML 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTALCALLES (1.00 - 2.00)M M2 1.30 0.00 0.00CALLES (2.25 - 3.00)M M2 1.50 0.00 0.00CALLES (3.25 - 4.00)M M2 1.80 0.00 0.00CONEXIONES M2 1.10 0.00 0.00
TOTAL 0.00 0.00
METRADO PARA SELLO
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTALCALLES (1.00 - 2.00)M M2 2.00 0.00 0.00CALLES (2.25 - 3.00)M M2 2.20 0.00 0.00CALLES (3.25 - 4.00)M M2 2.50 0.00 0.00CONEXIONES M2 1.30 0.00 0.00
TOTAL 0.00 0.00
METRADO DE ZANJA Altura BUZONES
3.50 3.75 4.00 4.25 4.50 4.75 5.00 Hprom. Cant Num Prof. 1.20 1.50 2.00 2.50
0.000 1
0.000 2
0.000 3
0.000 4
0.000 5
0.000 6
0.000 7
0.000 8
0.000 9
0.000 10
0.000 11
0.000 12
0.000 13
0.000 14
0.000 15
0.000 16
0.000 17
0.000 18
0.000 19
0.000 20
0.000 21
0.000 22
0.000 23
0.000 24
0.000 25
0.000 26
0.000 27
0.000 28
0.000 29
0.000 30
0.000 31
0.000 32
0.000 33
0.000 34
0.000 35
0.000 36
0.000 37
0.000 38
0.000 39
0.000 40
0.000 41
0.000 42
0.000 43
0.000 44
0.000 45
0.000 46
0.000 47
0.000 48
0.000 49
0.000 50
0.000 51
0.000 52
0.000 53
0.000 54
0.000 55
0.000 56
0.000 57
0.000 58
METRADO DE ZANJA Altura BUZONES
3.50 3.75 4.00 4.25 4.50 4.75 5.00 Hprom. Cant Num Prof. 1.20 1.50 2.00 2.50
0.000 59
0.000 60
0.000 61
0.000 62
0.000 63
0.000 64
0.000 65
0.000 66
0.000 67
0.000 68
0.000 69
0.000 70
71
3.50 3.75 4.00 4.25 4.50 4.75 5.00 PROFUNDIDADES 1.20 1.50 2.00 2.50
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL 0 0.00 0.00 0.00 0.00
2.50 2.421 3.00 2.921 3.50 3.421 4.00 3.921 4.50
2.667 3.167 3.667 4.174
2.75 2.671 3.25 3.171 3.75 3.671 4.25 4.171 4.75
2.922 3.421 3.920 4.420
4.00 3.700
4.199
4.50 4.2004.699
4.00 3.804.19
4.50 4.204.59
BUZONES EMPALMES TIPO DE SUPERFICIE DE RODADURA EN COLECTOR
3.00 3.50 4.00 4.50 Num-Buz Cantidad P. Flexible P. Rigido Tierra TOTAL0 1.00 0.00 0.00 0.00 0.00 0.000 1.25 0.00 0.00 0.00 0.00 0.000 1.50 0.00 0.00 0.00 0.00 0.000 1.75 0.00 0.00 0.00 0.00 0.000 2.00 0.00 0.00 0.00 0.00 0.000 2.25 0.00 0.00 0.00 0.00 0.000 2.50 0.00 0.00 0.00 0.00 0.000 2.75 0.00 0.00 0.00 0.00 0.000 3.00 0.00 0.00 0.00 0.00 0.000 3.25 0.00 0.00 0.00 0.00 0.000 3.50 0.00 0.00 0.00 0.00 0.000 3.75 0.00 0.00 0.00 0.00 0.000 4.00 0.00 0.00 0.00 0.00 0.000 4.25 0.00 0.00 0.00 0.00 0.000 4.50 0.00 0.00 0.00 0.00 0.000 4.75 0.00 0.00 0.00 0.00 0.000 5.00 0.00 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BUZONES EMPALMES TIPO DE SUPERFICIE DE RODADURA EN COLECTOR
3.00 3.50 4.00 4.50 Num-Buz Cantidad P. Flexible P. Rigido Tierra TOTAL0
0
0
0
0
0
0
0
0
0
0 Pavimento Rígido0 Redes 0.00 0.80 0.000 Conexiones 0.00 0.60 0.00
BE 0.00
3.00 3.50 4.00 4.50
0.00 0.00 0.00 0.00 TOTAL 0
4.421 5.00 4.921
4.673 5.172
4.671 5.25 5.171
4.920 5.419
CONEXIONES DOMICILIARIAS
CORTES
IZQUIERDA DERECHA
N° conexØ EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)
N° conexØ EXCAVACION DE ZANJA PAVIMENTO FLEXIBLE PAV. RIGIDO (VEREDA) PAV. RIGIDO (CONEXIONES)
CACHIMBA M. tuberia Total tub. M. Asf -0.4 Total Asf. Pav. Rig P. Rígido Conex Pav. Rig P. Rígido CACHIMBA M. tuberia Total tub. M. asf -0.4 Total Asf. Pav. Rig P. Rígido Conex Pav. Rig P. Rígido
1-1 6 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 6 0.00 -0.40 0.00 0.00 0.00 0.00
2-2 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 0.00 0.00 0.00 0.00 0.00 0.00
3-3 6 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 6 0.00 -0.40 0.00 0.00 0.00 0.00
4-4 6 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 6 0.00 -0.40 0.00 0.00 0.00 0.00
5-5 6 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 6 0.00 -0.40 0.00 0.00 0.00 0.00
6-6 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 0.00 0.00 0.00 0.00 0.00 0.00
7-7 6 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 6 0.00 -0.40 0.00 0.00 0.00 0.00
8-8 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 0.00 -0.40 0.00 0.00 0.00 0.00
9-9 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 0.00 -0.40 0.00 0.00 0.00 0.00
10-10 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 0.00 -0.40 0.00 0.00 0.00 0.00
11-11 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 0.00 -0.40 0.00 0.00 0.00 0.00
12-12 0.00 -0.40 0.00 0.00 0.00 0.00 0.00 0.00 -0.40 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CACHIMBAS
RESUMEN 8"x6" (6) 8"x8" (8) 10"x6"(10) 12"x6" (12) 14"x6" (14) SUMA
CONEXIONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXCAVACION 0.00
P. FLEXIBLE 0.00P. RIGIDO 0.00EMPEDRADO 0.00
vereda RIGIDO 0.00
PLANILLAS DE METRADOS DE ALCANTARILLADO SANITARIO
OBRA:
FECHA: MARZO 2015
PARTIDA DESCRIPCION UNDMEDIDAS
A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 CASETA DE GUARDIANIA Y ALMACEN UND 1
01.02 OFICINAS P/RESIDENTE-INSPECCION UND 1
01.03 CARTEL DE OBRA 2.40Mx4.80M UND 1
01.04 CERCO PERIMETRICO PROVISIONAL P/OBRA M 1 60.00
01.05 BAÑOS PORTATIL DIA 120
02 SEÑALIZACION DE TRANSITO
02.01 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2 0.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1 8.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1 8.00
02.04 PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONAL UND 1 4.00
02.05 SEÑALIZACION NOCTURNA DIA 120
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO M 1 0.00
03.02 TRAZOS Y REPLANTEOS FINALES DE LA OBRA M 1 0.00
03.03 TRASLADO MAQ/EQUP. MATERIALES Y HERRAMIENTAS A OBRA VJE 2
04 BUZONES Y/O CAJAS DE INSPECCION
04.01 BUZON Di=1.20m x 1.20 MPP UND 0
04.02 BUZON Di=1.20m x 1.50 MPP UND 0
04.03 BUZON Di=1.20m x 2.00 MPP UND 0
04.04 BUZON Di=1.20m x 2.50 MPP UND 0
04.05 BUZON Di=1.20m x 3.00 MPP UND 0
04.06 BUZON C.A. Di=1.50m x 3.50 MPP UND 0
04.07 BUZON C.A. Di=1.50m x 4.00 MPP UND 0
04.08 DEMOLICION DE BUZON EXISTENTE UND 65
05 MOVIMIENTO DE TIERRAS
05.01 ROTURA DE PAVIMENTO FLEXIBLE M 2 0.00
05.02 ROTURA DE PAVIMENTO RIGIDO M 2 0.00
05.03 EXCAVACION /MAQ. T. NORMAL HASTA 1.25MPP M 1 0.00
05.04 EXCAVACION /MAQ. T. NORMAL HASTA 1.50MPP M 1 0.00
05.05 EXCAVACION /MAQ. T. NORMAL HASTA 1.75MPP M 1 0.00
05.06 EXCAVACION /MAQ. T. NORMAL HASTA 2.00MPP M 1 0.00
05.07 EXCAVACION /MAQ. T. NORMAL HASTA 2.25MPP M 1 0.00
05.08 EXCAVACION /MAQ. T. NORMAL HASTA 2.50MPP M 1 0.00
05.09 EXCAVACION /MAQ. T. NORMAL HASTA 2.75MPP M 1 0.00
05.10 EXCAVACION /MAQ. T. NORMAL HASTA 3.00MPP M 1 0.00
05.11 EXCAVACION /MAQ. T. NORMAL HASTA 3.50MPP M 1 0.00
05.12 EXCAVACION /MAQ. T. NORMAL HASTA 3.75MPP M 1 0.00
05.13 REFINE Y NIVELACION DE TUBOS EN OBRA M 1 0.00
05.14 RELLENO COMP.ZANJA T.NORMAL HASTA 1.25MPP M 1 0.00
05.15 RELLENO COMP.ZANJA T.NORMAL HASTA 1.50MPP M 1 0.00
05.16 RELLENO COMP.ZANJA T.NORMAL HASTA 1.75MPP M 1 0.00
05.17 RELLENO COMP.ZANJA T.NORMAL HASTA 2.00MPP M 1 0.00
05.18 RELLENO COMP.ZANJA T.NORMAL HASTA 2.25MPP M 1 0.00
05.19 RELLENO COMP.ZANJA T.NORMAL HASTA 2.50MPP M 1 0.00
05.20 RELLENO COMP.ZANJA T.NORMAL HASTA 2.75MPP M 1 0.00
05.21 RELLENO COMP.ZANJA T.NORMAL HASTA 3.00MPP M 1 0.00
05.22 RELLENO COMP.ZANJA T.NORMAL HASTA 3.50MPP M 1 0.00
05.23 RELLENO COMP.ZANJA T.NORMAL HASTA 3.75MPP M 1 0.00
05.24 BOMBEO DE AGUA SUBTERRANEA DIA 75
05.25 ENTIBADO Y DESENTIBADO ZANJA M2
Entibado y desentibado de zanja h=2.00m M 2 0.00 2.00
Entibado y desentibado de zanja h=2.25m M 2 0.00 2.25
Entibado y desentibado de zanja h=2.50m M 2 0.00 2.50
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1085
N° VECES
PARTIDA DESCRIPCION UNDMEDIDAS
A (m) L (m) Prof. (m)N°
VECES
Entibado y desentibado de zanja h=2.75m M 2 0.00 2.75
Entibado y desentibado de zanja h=3.00m M 2 0.00 3.00
Entibado y desentibado de zanja h=3.50m M 2 0.00 3.50
Entibado y desentibado de zanja h=3.75m M 2 0.00 3.75
A(m2) L/H %esponj.
05.26 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3
Buzones: Di=1.20m M3 3 2.011 1.20 1.20
Buzones: Di=1.20m M3 0 2.011 1.50 1.20
Buzones: Di=1.20m M3 0 2.011 2.00 1.20
Buzones: Di=1.20m M3 0 2.011 2.50 1.20
Buzones: Di=1.20m M3 0 2.011 3.00 1.20
Buzones: Di=1.50m M3 0 2.011 3.50 1.20
Buzones: Di=1.50m M3 0 2.011 4.00 1.20
Techo de buzón M3 65 2.011 0.20 1.30
Tuberías: DN 160mm M3 1 0.020 0.00 1.20
Tuberías: DN 200mm M3 1 0.031 0.00 1.20
Tuberías: DN 355mm M3 1 0.099 0.00 1.20
Tuberías: DN 400mm M3 1 0.126 0.00 1.20
Tuberías: DN 500mm M3 1 0.196 0.00 1.20
Por Pavimento Flexible M3 1 0.00 0.05 1.30
Por Pavimento Rigido M3 1 0.00 0.30 1.30
Por Veredas M3 1 0 0.10 1.30
Relleno de buzones desactivados (Vol exc - Vol rellenado) 65 V(m3)
Buzones: Di=1.20m M3 65 1.13 1.45 1.20
06 SUMINISTRO DE TUBOS COLECTOR
06.01 SUMINISTRO TUBO PVC SN4 UF DN 200 MM M 1 0.00
06.02 SUMINISTRO TUBO PVC SN4 UF DN 355 MM M 1 0.00
06.03 SUMINISTRO TUBO PVC SN4 UF DN 400 MM M 1 0.00
06.04 SUMINISTRO TUBO PVC SN4 UF DN 500 MM M 1 0.00
07 INSTALACION TUBOS COLECTOR/EMISOR
07.01 INSTALACION TUBO PVC UF DN 200 MM M 1 0.00
07.02 INSTALACION TUBO PVC UF DN 355 MM M 1 0.00
07.03 INSTALACION TUBO PVC UF DN 400 MM M 1 0.00
07.04 INSTALACION TUBO PVC UF DN 500 MM M 1 0.00
07.05 EMPALME A BUZON Y/O RED EXISTENTE UND 0
07.06 PRUEBA HIDRAULICA TUBO PVC DN 200 MM M 1 0.00
07.07 PRUEBA HIDRAULICA TUBO PVC DN 355 MM M 1 0.00
07.08 PRUEBA HIDRAULICA TUBO PVC DN 400 MM M 1 0.00
07.09 PRUEBA HIDRAULICA TUBO PVC DN 500 MM M 1 0.00
08 CONEXIONES DOMICILIARIAS DESAGUE L
08.01 SUMINISTRO TUBO PVC SN4 UF DN 160 MM M 1 0.00
08.02 EXCAVACION DE ZANJA T.NORMAL CONEX.DESAGUE M 1 0.00
08.03 REFINE Y NIVELACION DE ZANJA CONEXIÓN M 1 0.00
08.04 INSTALACION TUBO PVC S20 DN 160MM M 1 0.00
08.05 EMPALME A COLECTOR PVC DN 200 MM UND 0
08.06 EMPALME A COLECTOR PVC DN 355 MM UND 0
08.07 SUMINISTRO CAJA DE REGISTRO DESAGUE UND 0
08.08 INSTALACION CAJA DE REGISTRO/TARRAJEO UND 0
08.09 RELLENO Y COMP.DE ZANJA CONEXIÓN M 1 0.00
08.10 PRUEBA HIDRAULICA CONEX.DOMICILIARIA DESAGUE UND 0
08.11 ROTURA Y REPOSICION DE VEREDAS M2 1 0.00
09 PRE-PAVIMENTACION
09.01 SUB BASE e=0.10 M (HORMIGON) M2 0.00
09.02 BASE CON AFIRMADO e=0.20M M2 0.00
10 PAVIMENTO RIGIDO
10.01 SUB BASE e=0.10 M (HORMIGON) M2 0.00
10.02 BASE e=0.15 M (AFIRMADO) M2 0.00
10.03 REPOSICION DE PAVIMENTO RIGIDO F'C=175 KG/CM2, E=0.10 M2 0.00
11 VARIOS
PARTIDA DESCRIPCION UNDMEDIDAS
A (m) L (m) Prof. (m)N°
VECES
11.01 OBRAS CONEXAS (AGUA, ELECTRICAS, TELEFONO, ETC) UND 1.00
11.02 COSTO AMBIENTAL OBRAS DESAGUE DIA 120.00
METRADO POR PRE-PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES (1.00 - 2.00)M M2 1.00 0.00 0.00
CALLES (2.25 - 3.00)M M2 2.00 0.00 0.00
CALLES (3.25 - 4.00)M M2 2.50 0.00 0.00
CONEXIONES M2 0.80 0.00 0.00
TOTAL 0.00 0.00
METRADO POR PAVIMENTO RIGIDO
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES M2 0.80 0.00 0.00
CONEXIONES M2 0.60 0.00 0.00
TOTAL 0.00 0.00
PLANILLAS DE METRADOS DE ALCANTARILLADO SANITARIO
MARZO 2015
CANTIDAD
1.00
1.00
1.00
60.00
120.00
0.00
8.00
8.00
4.00
120.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
0.00
0.00
0.00
0.00
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO
CANTIDAD
0.00
0.00
0.00
0.00
-85.14
8.69
0.00
0.00
0.00
0.00
0.00
0.00
33.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127.80
127.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CANTIDAD
1.00
120.00
PLANILLA DE METRADOS DE PAVIMENTACION RED ALCANTARILLADO
OBRA:
FECHA: MARZO 2015
PARTIDA DESCRIPCION UNDN° MEDIDAS
CANTIDADVECES A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 BAÑOS PORTATIL DÍA 21.00 21.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA Y MALLA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2.00 0.00 0.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1.00 2.00 2.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1.00 2.00 2.00
02.04 SEÑALIZACION NOCTURNA DÍA 21.00 21.00
03 PAVIMENTACION
03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA GLB 1.00 1.00
03.02 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 0.00 0.00
03.03 PREPARACION DE LA SUB-RASANTE M2 0.00 0.00
03.04 ESCARIFICADO DE BASE E=5CM M2 0.00 0.00
03.05 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA M2 0.00 0.00
03.06 IMPRIMACION ASFALTICA CON MC-30 M2 0.00 0.00
03.07 CARPETA ASFALTICA CON EMULSION, e=2" C/EQUIPO M2 0.00 0.00
03.08 BARRIDO Y LIMPIEZA C/EQUIPO PARA SLURRY SEAL M2 0.00 0.00
03.09 SLURRY SEAL, e=10 mm M2 0.00 0.00
03.10 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 0.00
Por Escarificado M3 1.00 0.00 0.05 1.20 0.00
Por Perfilado M3 1.00 0.00 0.05 1.30 0.00
METRADO POR PAVIMENTACION
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES (1.00 - 2.00)M M2 1.30 0.00 0.00
CALLES (2.25 - 3.00)M M2 1.50 0.00 0.00
CALLES (3.25 - 4.00)M m2 1.80 0.00 0.00
CONEXIONES M2 1.10 0.00 0.00
TOTAL 0.00 0.00
TOTAL PRE-PAVIME. 0.00
DIFERENCIA 0.00
METRADO PARA SELLO
CALLES Y/O AVENIDAS UND ANCHO LONGITUD TOTAL
CALLES (1.00 - 2.00)M M2 2.00 0.00 0.00
CALLES (2.25 - 3.00)M M2 2.20 0.00 0.00
CALLES (3.25 - 4.00)M m2 2.50 0.00 0.00
CONEXIONES M2 1.30 0.00 0.00
TOTAL 0.00 0.00
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - TRUJILLO CODIGO EXPEDIENTE: 1085
PLANILLA DE METRADOS DE PAVIMENTACION
OBRA:
FECHA: MARZO 2015
PARTIDA DESCRIPCION UNDN° MEDIDAS
CANTIDADVECES A (m) L (m) Prof. (m)
01 OBRAS PROVISIONALES
01.01 BAÑOS PORTATIL DÍA 26.00 26.00
02 SEÑALIZACION DE TRANSITO
02.01 CINTA Y MALLA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA M 2.00 493.00 986.00
02.02 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR UND 1.00 4.00 4.00
02.03 CONO DE PVC FOSFORESCENTE P/SEÑALIZACION UND 1.00 4.00 4.00
02.04 SEÑALIZACION NOCTURNA DÍA 26.00 26.00
03 PAVIMENTACION
03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA GLB 1.00 1.00
03.02 ROTURA DE PAVIMENTO FLEXIBLE M 2.00 513.50 1,027.00
03.03 PREPARACION DE LA SUB-RASANTE M2 79.22 79.22
03.04 ESCARIFICADO DE BASE E=5CM M2 472.43 472.43
03.05 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA M2 472.43 472.43
03.06 IMPRIMACION ASFALTICA CON MC-30 M2 472.43 472.43
03.07 CARPETA ASFALTICA CON EMULSION, e=2" C/EQUIPO M2 472.43 472.43
03.08 BARRIDO Y LIMPIEZA C/EQUIPO PARA SLURRY SEAL M2 472.43 472.43
03.09 SLURRY SEAL, e=10 mm M2 472.43 472.43
03.10 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM M3 29.27
Por Escarificado M3 1.00 472.43 0.05 1.20 28.35
Por Perfilado M3 1.00 14.17 0.05 1.30 0.92
MEJORAMIENTO Y RENOVACION DE REDES SECUNDARIAS, CONEXIONES DOMICILIARIAS Y REDES PRIMARIAS DE AGUA PARA CONSUMO HUMANO DE TRUJILLO METROPOLITANO
UBICACIÓN GEOGRÁFICA: LA LIBERTAD - TRUJILLO - VICTOR LARCO HERRERA CODIGO EXPEDIENTE: 1062