4.00 OBRAS DE ARTE Y DRENAJE
4.06 PONTONES - LOSA DE CONCRETO
METRADO PONTÓN LOSA DE CONCRETO LUZ LIBRE = 5.00 m ANCHO = 6.50 m
PROGR. = 32+195.00
ITEM PARTIDA UND.LARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.06.02 TRAZO NIVELACION Y REPLANTEO (I) (II) (III) (IV) 101.64 DATOS
CIMENTACIÓN ESTRIBOS 2Le B (I)*(II)*(III) L = 5.00 m.
8.65 3.73 64.44 Lc = 7.85 m.
CIMENTACIÓN ALETAS 4(Bi+Bf)/2 La g = 0.40 m.
3.10 3.00 37.20 Le = 8.65 m.
4.06.03 EXCAVACION NO CLASIFICADA CON EQUIPO P/ESTRUCTURAS (I) (II) (III) (IV) 532.74 B = 3.73 m.
EXCAVACIÓN ESTRIBOS 2AREA AUTOCAD Le (I)*(II)*(III) Bi = 3.90 m.
21.00 8.65 363.30 Bf = 2.30 m.
EXCAVACIÓN ALETAS 4AREA AUTOCAD La (I)*(II)*(III) La = 3.00 m.
14.12 3.00 169.44 U = 0.80 m.
4.06.04 RELLENO CON MATERIAL PROPIO SELECCIONADO (I) (II) (III) (IV) 358.93 Aai = 7.82 m2
RELLENO ESTRIBOS 2AREA AUTOCAD Le (I)*(II)*(III) Aaf = 3.34 m2
14.82 8.65 256.39 A = 6.50 m.
RELLENO ALETAS 4AREA AUTOCAD La (I)*(II)*(III) Av = 0.65 m.
8.55 3.00 102.54 Pv = 0.60 m.
4.06.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M (Volumen Excavación)*1.25-(Volumen Relleno)*1.39 167.01 E = 0.35 m.
4.06.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO - HORMIGÓN (I) (II) (III) (IV) 64.44 C = 5.80 m.
SOLADO BASE ESTRIBOS 2B Le (I)*(II)*(III) G = 0.45 m.
3.73 8.65 64.44 J = 0.15 m.
4.06.07 CONCRETO CICLOPEO, CLASE G, 13.7 Mpa (f'c=140 KG/CM2) (I) (II) (III) (IV) 204.30 K = 0.20 m.
CIMENTACION, ALETAS 4(Bi+Bf)/2 La U (I)*(II)*(III)*(IV) A1 = 4.31 m2
3.10 3.00 0.80 29.76 a = 0.43 m.
MUROS, ALETAS 4(Aai+Aaf)/2 La (I)*(II)*(III) b = 0.38 m.
5.58 7.82 174.54 H = 5.00 m.
4.06.08 CONCRETO CLASE D, 20.6 Mpa (f'c=210 KG/CM2) (I) (II) (III) (IV) 0.91 L1 = 5.32 m.
GUARDERAS 2(J+K)/2 G C (I)*(II)*(III)*(IV) Vi = 4.70 m.
0.18 0.45 5.80 0.91 Vf = 2.50 m.
4.06.09 CONCRETO CLASE C, 27.4 Mpa (f'c=280 KG/CM2) (I) (II) (III) (IV) 17.72 Ci = 4.85 m.
LOSA 1A C E (I)*(II)*(III)*(IV) Cf = 2.57 m.
6.50 5.80 0.35 13.20 Ev = 0.25 m.
VIGA DE BORDE 2Av Pv C (I)*(II)*(III)*(IV) D = 5.80 m.
0.65 0.60 5.80 4.52 F = 0.64 m.
4.06.10 ENCOFRADO Y DESENCOFRADO (I) (II) (III) (IV) 346.45 Qi = 0.40 m.
ENCOF. Y DESENCOF. CARAS LATERALES, ESTRIBOS 2A1 a*b N° CARAS (I)*(IV)*((II)+(III)) Qf = 0.30 m.
4.31 0.16 2 17.88
ENCOF. Y DESENCOF. CARA PRINCIPAL, ESTRIBOS 2H Le N° CARAS (I)*(II)*(III)*(IV)
5.00 8.65 1 86.50
ENCOF. Y DESENCOF. CARA POSTERIOR, ESTRIBOS 2Le L1 N° CARAS (I)*(II)*(III)*(IV)
8.65 5.32 1 92.04
ENCOF. Y DESENCOF. CARA LATERAL, ALETAS 4Aaf (I)*(II)
3.34 13.36
ENCOF. Y DESENCOF. CARA EXTERIOR, ALETAS 4(Vi+Vf)/2 La (I)*(II)*(III)
3.60 3.00 43.20
ENCOF. Y DESENCOF. CARA POSTERIOR, ALETAS 4(Ci+Cf)/2 La (I)*(II)*(III)
3.71 3.00 44.52
ENCOF. Y DESENCOF. FONDO, LOSA ARMADA 1L A+2*Av (I)*(II)*(III)
5.00 7.80 39.00
ENCOF. Y DESENCOF. FRISOS LATERALES, LOSA ARMADA 2L E (I)*(II)*(III)
5.00 0.35 3.50
ENCOF. Y DESENCOF. VEREDA 2(2C+2Av) Ev (I)*(II)*(III)
12.90 0.25 6.45
4.06.11 ACERO F'Y= 4200 KG/CM2 Kg 8062.12
ACERO F'Y= 4200 KG/CM2 , LOSA Kg VER HOJA ADJUNTA1286.86
ACERO F'Y= 4200 KG/CM2 , VIGA DE BORDE Kg VER HOJA ADJUNTA290.93
ACERO F'Y= 4200 KG/CM2 , GUARDERA Kg VER HOJA ADJUNTA187.06
ACERO F'Y= 4200 KG/CM2 , APOYO FIJO Kg VER HOJA ADJUNTA8.35
ACERO F'Y= 4200 KG/CM2 , APOYO MOVIL Kg VER HOJA ADJUNTA16.70
ACERO F'Y= 4200 KG/CM2 , ESTRIBOS Kg VER HOJA ADJUNTA6272.22
4.06.12 JUNTA DE CONSTRUCCIÓN CON TEKNOPORT (I) (II) (III) (IV) 23.76
UNIÓN ESTRIBOS - ALETAS 4A1 (I)*(II)
4.31 17.24
CAJUELA 2Lc+2a b (I)*(II)*(III)
8.70 0.38 6.52
4.06.13 JUNTAS ASFÁLTICAS, e=1" m 57.20
UNIÓN ESTRIBOS - ALETAS m 4Vi+Qi+Ci (I)*(II)
9.95 39.80
CAJUELA m 2Lc+2a (I)*(II)
8.70 17.40
N° VECES
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
METRADO PONTÓN LOSA DE CONCRETO LUZ LIBRE = 5.00 m ANCHO = 6.50 m
PROGR. = 32+195.00
ITEM PARTIDA UND.LARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
N° VECES
4.06.14 APOYO MOVIL - NEOPRENE 3.34
APOYO MOVIL 1Lc a
7.85 0.43 3.34
4.06.15 INSTALACIÓN DE LLORONAS, PVC SAL 3" und 22.00
ESTRIBOS und 2N° DE LLORONAS
9.00 18.00
ALETAS und 4N° DE LLORONAS
1.00 4.00
4.06.16 ENCOFRADO Y DESENCOFRADO CARAVISTA - GUARDERAS 10.79
ENCOF. Y DESENCOF. CARA EXTERIOR GUARDERA 2C G (I)*(II)*(III)
5.80 0.45 5.22
ENCOF. Y DESENCOF. CARA INTERIOR GUARDERA 2C (I)*(II)*(III)
0.453 5.80 5.25
ENCOF. Y DESENCOF. CARA LATERAL GUARDERA 4(J+K)/2 G (I)*(II)*(III)
0.18 0.45 0.32
4.06.17 BARANDA TUBO FºGº 2 1/2" - INCLUYE PINTURA m 20.53
TUBO FºGº 2 1/2", LONGITUDINAL m 2D
5.80 11.60
TUBO FºGº 2 1/2", PARANTES m 2F N° Parantes
0.64 7.00 8.92
4.06.18 PINTURA DE GUARDERAS 19.49
CARA EXTERIOR GUARDERA 2C G+Pv (I)*(II)*(III)
5.80 1.05 12.18
CARA INTERIOR GUARDERA 2C (I)*(II)*(III)
0.453 5.80 5.25
CARA LATERAL GUARDERA 4(J+K)/2 G (I)*(II)*(III)
0.18 0.45 0.32
CARA SUPERIOR 2J C
0.15 5.80 1.74
m2
m2
m2
m2
m2(G2+(K-J)2)1/2
m2
m2
m2
m2(G2+(K-J)2)1/2
m2
m2
4.06.11 ACERO F'Y=4200KG/CM2
ACERO F'Y= 4200 KG/CM2 , LOSA
Dimensiones de losa
Ancho C = 5.80
Largo A 6.50
CROQUIS
N°
DE
LO
SA
S LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
5.700
1 33 5.700 1" 188.100 @ 0.2
Acero Principalr 0.05
5.700
1 33 5.700 1/2" 188.100 @ 0.2
Repartición Acero Principalr 0.05
7.750
0.200 0.2001 30 8.150 1/2" 244.500 @ 0.2
Acero Negativor 0.025
7.750
0.200 0.2001 24 8.150 3/8" 195.600 @ 0.25
Repartición Acero Negativor 0.025
SUB TOTAL ( m ) 0.00 195.60 432.60 0.00 0.00 0.00 188.10 0.00
TOTAL ( m ) 0.00 195.60 432.60 0.00 0.00 0.00 188.10 0.00
TOTAL ( Kg ) 0.00 109.54 430.00 0.00 0.00 0.00 747.32 0.00
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
TOTAL DE ACERO ( Kg. ) 1286.86
4.06.11 ACERO F'Y=4200KG/CM2
ACERO F'Y= 4200 KG/CM2 , VIGA DE BORDE
Dimensiones de Viga
Ancho Av = 0.65
Alto Pv = 0.60
Largo C = 5.80
CROQUIS
N°
DE
VIG
AS LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
5.750
0.300 0.3002 6 6.350 5/8" 76.200
Acero Capa Superiorr 0.025
5.750
0.300 0.3002 2 6.350 5/8" 25.400
Acero Capa Centralr 0.025
5.750
0.300 0.3002 4 6.350 3/4" 50.800
Acero Capa Inferiorr 0.025
5.750
0.300 0.3002 1 6.350 5/8" 12.700
Acero Capa Inferiorr 0.025
SUB TOTAL ( m ) 0.00 0.00 0.00 114.30 50.80 0.00 0.00 0.00
TOTAL ( m ) 0.00 0.00 0.00 114.30 50.80 0.00 0.00 0.00
TOTAL ( Kg ) 0.00 0.00 0.00 177.39 113.54 0.00 0.00 0.00
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
TOTAL DE ACERO ( Kg. ) 290.93
4.06.11 ACERO F'Y=4200KG/CM2
ACERO F'Y= 4200 KG/CM2 , GUARDERA
CROQUIS
LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
0.100
0.750 2 31 0.950 5/8" 58.900
INTERIOR0.100
0.100
0.725 2 31 0.925 1/2" 57.350
EXTERIOR0.100
5.75 2 6 5.750 3/8" 69.000
SUB TOTAL ( m ) 0.00 69.00 57.35 58.90 0.00 0.00 0.00 0.00
TOTAL ( m ) 0.00 69.00 57.35 58.90 0.00 0.00 0.00 0.00
TOTAL ( Kg ) 0.00 38.64 57.01 91.41 0.00 0.00 0.00 0.00
TOTAL DE ACERO ( Kg. ) 187.06
N°
DE
G
UA
RD
ER
AS
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
4.06.11 ACERO F'Y=4200KG/CM2
ACERO F'Y= 4200 KG/CM2 , APOYO FIJO
CROQUIS
LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
0.60 1 14 0.600 1/2" 8.400
SUB TOTAL ( m ) 0.00 0.00 8.40 0.00 0.00 0.00 0.00 0.00
TOTAL ( m ) 0.00 0.00 8.40 0.00 0.00 0.00 0.00 0.00
TOTAL ( Kg ) 0.00 0.00 8.35 0.00 0.00 0.00 0.00 0.00
TOTAL DE ACERO ( Kg. ) 8.35
N°
DE
AP
OY
OS
F
IJO
S
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
4.06.11 ACERO F'Y=4200KG/CM2
ACERO F'Y= 4200 KG/CM2 , APOYO MOVIL
CROQUIS
LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
0.60 1 28 0.600 1/2" 16.800
SUB TOTAL ( m ) 0.00 0.00 16.80 0.00 0.00 0.00 0.00 0.00
TOTAL ( m ) 0.00 0.00 16.80 0.00 0.00 0.00 0.00 0.00
TOTAL ( Kg ) 0.00 0.00 16.70 0.00 0.00 0.00 0.00 0.00
TOTAL DE ACERO ( Kg. ) 16.70
N°
DE
AP
OY
OS
M
OV
IL
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
4.06.11 ACERO F'Y=4200KG/CM2
ACERO F'Y= 4200 KG/CM2 , ESTRIBOS
CROQUIS
N°
DE
ES
TR
IBO
S
LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
Elemento a
8.550.350
2 38 8.900 3/4" 676.400
Elemento b
3.630.350
2 88 3.975 3/4" 699.600
Elemento c 0.70
4.95 2 44 6.250 3/4" 550.000
0.60
Elemento d
4.88 2 44 5.480 3/4" 482.240
0.60
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
CROQUIS
N°
DE
ES
TR
IBO
S
LONGITUDES PARCIALES ( m )
Ø 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1" 1 3/8"
N°
DE
PIE
ZA
S D
E
AC
ER
O P
OR
E
ST
RU
CT
UR
A
LO
NG
ITU
D D
E
LA
PIE
ZA
DE
L
AC
ER
O
Elemento e
2.14 2 44 2.740 1/2" 241.120
0.60
Elemento f 0.10
0.68 2 44 0.775 1/2" 68.200
Elemento g 0.10
0.95 0.60 2 44 1.950 1/2" 171.600
0.30
Elemento h
8.55 2 43 8.550 3/8" 735.300
SUB TOTAL ( m ) 0.00 735.30 480.92 0.00 2408.24 0.00 0.00 0.00
TOTAL ( m ) 0.00 735.30 480.92 0.00 2408.24 0.00 0.00 0.00
TOTAL ( Kg ) 0.00 411.77 478.03 0.00 5382.42 0.00 0.00 0.00
TOTAL DE ACERO ( Kg. ) 6272.22
RESUMEN GENERAL METRADO DE PONTONES
ITEM PARTIDA UNIDADPONTON PONTON
TOTALKM. 32+195.00 KM. 60+064.00
04.06.01 DEMOLICIÓN ESTRUCTURAS DE CONCRETO, C/EQUIPO m3 - 42.00 42.00
04.06.02 TRAZO NIVELACIÓN Y REPLANTEO m2 101.64 81.73 183.37
04.06.03 EXCAVACION NO CLASIFICADA CON EQUIPO P/ESTRUCTURAS m3 532.74 319.33 852.07
04.06.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 358.93 202.18 561.11
04.06.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M m3 167.01 118.13 285.14
04.06.06 SOLADO DE 4" MEZCLA 1:12 CEMENTO - HORMIGÓN m2 64.44 52.33 116.78
04.06.07 CONCRETO CICLOPEO, CLASE G, 13.7 Mpa (f'c=140 KG/CM2) m3 204.30 44.89 249.19
04.06.08 CONCRETO CLASE D, 20.6 Mpa (f'c=210 KG/CM2) m3 0.91 0.76 1.67
04.06.09 CONCRETO CLASE C, 27.4 Mpa (f'c=280 KG/CM2) m3 17.72 12.79 30.51
04.06.10 ENCOFRADO Y DESENCOFRADO m2 346.45 255.52 601.97
04.06.11 ACERO F'Y= 4200 KG/CM2 Kg 8062.12 4948.49 13010.61
04.06.12 JUNTA DE CONSTRUCCIÓN CON TEKNOPORT m2 23.76 15.33 39.10
04.06.13 JUNTAS ASFÁLTICAS, e=1" m 57.20 49.04 106.24
04.06.14 APOYO MOVIL - NEOPRENE m2 3.34 3.34 6.67
04.06.15 INSTALACIÓN DE LLORONAS, PVC SAL 3" und 22.00 22.00 44.00
04.06.16 ENCOFRADO Y DESENCOFRADO CARAVISTA - GUARDERAS m2 10.79 8.98 19.77
04.06.17 BARANDA TUBO FºGº 2 1/2" - INCLUYE PINTURA m 20.53 17.10 37.63
04.06.18 PINTURA DE GUARDERAS m2 19.49 15.70 35.19