h = 0.4 m se recomieda de 0.4 a 0.5 m
g = 9.81 m/s2
V = 2.24 m/s
dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q
V = 0.6 m/s
PERDIDA DE CARGA
h0 = 0.03 mHf = 0.37 m
L = 1.23 m
ANCHO DE LA PANTALL (b)
CALCULO DEL DIÁMETRO DE LA TUBERÍA DE ENTRADA (D)
CALCULO DE LA DISTANCIA ENTRE EL PUNTO DE AFLORAMIENTO Y LA CÁMARA HÚMEDA (L)
Qmax = 0.09324 m3/sCd = 0.8 de 0.6 a 0.8
h = 0.4 mA = 0.015 m2
D = 0.1375 mD = 13.75 cm
si dicho valor es mayor q el diámetro recomendado (menor o igual a 2") usar 2"
D = 2 pulgD = 0.0508 mD = 5.08 cm
CALCULO DEL NÚMERO DE ORIFICIOS (NA)
NA = 8.326186527
asumiéndose
NA = 8
CALCULO DEL ANCHO DE LA PANTALLA (b)
D = 2 pulg
b = 82 pulg
b = 2 m
ALTURA DE LA CÁMARA HÚMEDA (Ht)
A = 10 cm para la sedimentación de la aren
D = 3 cm mínimo
E = 30 cm de 10 a 30 cm
B = 3.81 cm
Q req = 0.06993 m3/sV = 2 m/s
H = 0.30 m recomendado mínimo 30 cm
Ht = 76.81 cm
se asume
Ht = 1.00 m
DIMENIONAMIENTO DE LA CANASTILLA
A salida = 0.035 m2Dc = 1.3 pulgDc = 1.5 pulgDc = 0.0381 mDcanast = 3 pulg
L = 0.11 mL = 0.23 m
L asumido = 20 cm
AREA DE LA RANUMRA (Ar)
Ar = 35 mm2Ar = 0.000035 m2
Ac = 0.001140094 m2
At = 0.00228 m2
NUMERO DE RANURAS
N° ranuras = 65
REBOSE Y LIMPIEZA
hf = 0.03 m/m de 1% a 1.5%
Q = 93.24 l/s
D = 8 pulg
RESUMEN
L = 1.23 m
b = 2 mD orificio = 0.0508 m
NA = 8 undA = 0.1 mD = 0.03 mH = 0.30 mB = 0.0381 mE = 0.30 m
Ht = 1.00 m
Dc = 0.0381 mD canast = 0.0762 m
L = 0.2 m
D = 0.2032 m
DISEÑO ESTRUCTURAL
Ys = 1.92 tn/m3Ø = 30°u = 0.42Yc = 2.4 tn/m3f = 140 kg/cm2σ = 1 kg/cm2
EMPUJE DEL SUELO SOBRE EL MURO (P) 0.60
0.2
h = 0.4981 mCah = 0.333
P = 79.31 kg
MOMENTO DE VUELCO
Y = 0.17 m
Mo = 13.48 kg-m
MOMENTO DE ESTABILIZACIÓN (Mr) Y EL PESO (W)
0.10
0.40
0.10
W W (kg) X (m) Mr (kg/m)W1 225.96 0.3766 85.10W2 200.00 0.6532 130.64W3 49.81 0.7282 36.27Wt 475.77 252.01
a = 0.501
POR VUELCO
Cdv = 18.70
MAXIMA CARGA UNITARIA
l = 0.75 m
P1 = 0.00057 kg/cm2
P2 = 0.126 kg/cm2
POR DESLIZAMIENTO
F = 199.82 kg
CHEQUEO = 2.52
0.10 0.10
TAPA METALICA
GRAVA0.10
TAPA METALICA 1.00 0.0508 0.0508
0.03
0.200.30 CONCRETO
0.4981
0.03810.2
0.101.23
0.15
0.60
0.6
0.3
0.15
0.15
0.60 0.10
CAPA IMPERMEABLE
0.10
0.60
2.00
GRAVA
CAMARA SECA
0.10
0.10
CAMARA HUMEDA
PLANILLA DE METRADOS - ACERO ESTRUCTURAL
PROYECTO :
CONTRATO :
Item DESCRIP. Diam. Detalle
01.00.00 ACERO fy = 4200
PANTALLADE PROTECCION Y TECHOPANTALLA
ACERO LONGITUDINAL 3/8 " 0.08
1.65
ACERO TRANSVERSAL 3/8 " 0.15
1.25
TECHO
ACERO LONGITUDINAL Y 3/8 " 12.95
ACERO LONGITUDINAL X 3/8 " 12.12
MURO
ACERO LONGITUDINAL 1/4 "1.52
ACERO TRANSVERSAL 1/4 "2.40
TAPA DE CONCRETO
ACERO LONGITUDINAL Y 1/4 " 0.52
ACERO LONGITUDINAL X 1/4 " 0.52
PLANILLA DE METRADOS - ACERO ESTRUCTURAL
Longitud # Veces Peso (Kg) Total (Kg)
48.70
29.21
1.73 5 1 0.560 4.84
1.40 6 1 0.560 4.70
12.95 1 1 0.994 12.87
12.12 1 1 0.560 6.79
17.07
1.52 9 1 0.560 7.66
2.40 7 1 0.560 9.41
2.42
0.52 3 1 0.994 1.55
0.52 3 1 0.560 0.87
# elemen. Estruc.
h = 0.4 m se recomieda de 0.4 a 0.5 m
g = 9.81 m/s2
V = 2.24 m/s
dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q
V = 0.6 m/s
PERDIDA DE CARGA
h0 = 0.03 mHf = 0.37 m
L = 1.23 m
ANCHO DE LA PANTALL (b)
CALCULO DE LA DISTANCIA ENTRE EL PUNTO DE AFLORAMIENTO Y LA CÁMARA HÚMEDA (L)
CALCULO DEL DIÁMETRO DE LA TUBERÍA DE ENTRADA (D)
Qmax = 0.01 m3/sCd = 0.8 de 0.6 a 0.8
h = 0.4 mA = 0.002 m2
D = 0.045 mD = 4.5 cm
si dicho valor es mayor q el diámetro recomendado (menor o igual a 2") usar 2"
D = 2 pulgD = 0.0508 mD = 5.08 cm
CALCULO DEL NÚMERO DE ORIFICIOS (NA)
NA = 1.784689069
asumiéndose
NA = 2
CALCULO DEL ANCHO DE LA PANTALLA (b)
D = 2 pulg
b = 34 pulg
b = 0.8636 m
ALTURA DE LA CÁMARA HÚMEDA (Ht)
A = 10 cm para la sedimentación de la aren
D = 3 cm mínimo
E = 30 cm de 10 a 30 cm
B = 3.81 cm
Q req = 0.0075 m3/sV = 1.5 m/s
H = 0.20 m recomendado mínimo 30 cm
H = 0.30 m
Ht = 76.81 cm
se asume
Ht = 1.00 m
DIMENIONAMIENTO DE LA CANASTILLA
A salida = 0.005 m2Dc = 0.5 pulgDc = 1.5 pulgDc = 0.0381 mDcanast = 3 pulg
L = 0.11 mL = 0.23 m
L asumido = 20 cm
AREA DE LA RANUMRA (Ar)
Ar = 35 mm2Ar = 0.000035 m2
Ac = 0.001140094 m2
At = 0.00228 m2
NUMERO DE RANURAS
N° ranuras = 65
REBOSE Y LIMPIEZA
hf = 0.03 m/m de 1% a 1.5%
Q = 10 l/s
D = 4 pulg
RESUMEN
L = 1.23 m
b = 0.86 mD orificio = 0.0508 m
NA = 2 undA = 0.1 mD = 0.03 mH = 0.30 mB = 0.0381 mE = 0.30 m
Ht = 1.00 m
Dc = 0.0381 mD canast = 0.0762 m
L = 0.2 m
D = 0.1016 m
DISEÑO ESTRUCTURAL
Ys = 1.92 tn/m3Ø = 30°u = 0.42Yc = 2.4 tn/m3f = 140 kg/cm2σ = 1 kg/cm2
EMPUJE DEL SUELO SOBRE EL MURO (P) 0.60
0.2
h = 0.4981 mCah = 0.333
P = 79.31 kg
MOMENTO DE VUELCO
Y = 0.17 m
Mo = 13.48 kg-m
MOMENTO DE ESTABILIZACIÓN (Mr) Y EL PESO (W)
0.10
0.40
0.10
W W (kg) X (m) Mr (kg/m)W1 84.41 0.3258 27.50W2 86.36 0.5516 47.64W3 21.51 0.6266 13.48Wt 192.28 88.62
a = 0.391
POR VUELCO
Cdv = 6.57
MAXIMA CARGA UNITARIA
l = 0.65 m
P1 = 0.01179 kg/cm2
P2 = 0.047 kg/cm2
POR DESLIZAMIENTO
F = 80.76 kg
CHEQUEO = 1.02
0.10 0.10
TAPA METALICA
GRAVA0.10
TAPA METALICA 1.00 0.0508 0.0508
0.03
0.100.30 CONCRETO
0.4981
0.03810.2
0.101.23
0.15
0.50
0.6
0.3
0.15
0.15
CAPA IMPERMEABLE
0.50 0.10
0.10
0.60
0.86
GRAVA
CAMARA SECA
0.10
0.10
CAMARA HUMEDA
h = 0.4 m se recomieda de 0.4 a 0.5 m
g = 9.81 m/s2
V = 2.24 m/s
dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q
V = 0.6 m/s
PERDIDA DE CARGA
h0 = 0.03 mHf = 0.37 m
L = 1.23 m
ANCHO DE LA PANTALL (b)
CALCULO DE LA DISTANCIA ENTRE EL PUNTO DE AFLORAMIENTO Y LA CÁMARA HÚMEDA (L)
CALCULO DEL DIÁMETRO DE LA TUBERÍA DE ENTRADA (D)
Qmax = 0.038 m3/sCd = 0.8 de 0.6 a 0.8
h = 0.4 mA = 0.006 m2
D = 0.0878 mD = 8.78 cm
si dicho valor es mayor q el diámetro recomendado (menor o igual a 2") usar 2"
D = 2 pulgD = 0.0508 mD = 5.08 cm
CALCULO DEL NÚMERO DE ORIFICIOS (NA)
NA = 3.987181474
asumiéndose
NA = 4
CALCULO DEL ANCHO DE LA PANTALLA (b)
D = 2 pulg
b = 50 pulg
b = 1.27 m
ALTURA DE LA CÁMARA HÚMEDA (Ht)
A = 10 cm para la sedimentación de la aren
D = 3 cm mínimo
E = 30 cm de 10 a 30 cm
B = 3.81 cm
Q req = 0.0285 m3/sV = 1.5 m/s
H = 0.20 m recomendado mínimo 30 cm
H = 0.30 m
Ht = 76.81 cm
se asume
Ht = 1.00 m
DIMENIONAMIENTO DE LA CANASTILLA
A salida = 0.019 m2Dc = 1 pulgDc = 1.5 pulgDc = 0.0381 mDcanast = 3 pulg
L = 0.11 mL = 0.23 m
L asumido = 20 cm
AREA DE LA RANUMRA (Ar)
Ar = 35 mm2Ar = 0.000035 m2
Ac = 0.001140094 m2
At = 0.00228 m2
NUMERO DE RANURAS
N° ranuras = 65
REBOSE Y LIMPIEZA
hf = 0.03 m/m de 1% a 1.5%
Q = 38 l/s
D = 6 pulg
RESUMEN
L = 1.23 m
b = 1.27 mD orificio = 0.0508 m
NA = 4 undA = 0.1 mD = 0.03 mH = 0.30 mB = 0.0381 mE = 0.30 m
Ht = 1.00 m
Dc = 0.0381 mD canast = 0.0762 m
L = 0.2 m
D = 0.1524 m
DISEÑO ESTRUCTURAL
Ys = 1.92 tn/m3Ø = 30°u = 0.42Yc = 2.4 tn/m3f = 140 kg/cm2σ = 1 kg/cm2
EMPUJE DEL SUELO SOBRE EL MURO (P) 0.60
0.2
h = 0.4981 mCah = 0.333
P = 79.31 kg
MOMENTO DE VUELCO
Y = 0.17 m
Mo = 13.48 kg-m
MOMENTO DE ESTABILIZACIÓN (Mr) Y EL PESO (W)
0.10
0.40
0.10
W W (kg) X (m) Mr (kg/m)W1 133.81 0.3512 46.99W2 127.00 0.6024 76.50W3 31.63 0.6774 21.43Wt 292.44 144.92
a = 0.449
POR VUELCO
Cdv = 10.75
MAXIMA CARGA UNITARIA
l = 0.70 m
P1 = 0.00685 kg/cm2
P2 = 0.076 kg/cm2
POR DESLIZAMIENTO
F = 122.82 kg
CHEQUEO = 1.55
0.10 0.10
TAPA METALICA
GRAVA0.10
TAPA METALICA 1.00 0.0508 0.0508
0.03
0.150.30 CONCRETO
0.4981
0.03810.2
0.101.23
0.15
0.55
0.6
0.3
0.15
0.15
CAPA IMPERMEABLE
0.55 0.10
0.10
0.60
1.27
GRAVA
CAMARA SECA
0.10
0.10
CAMARA HUMEDA
h = 0.4 m se recomieda de 0.4 a 0.5 m
g = 9.81 m/s2
V = 2.24 m/s
dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q
V = 0.6 m/s
PERDIDA DE CARGA
h0 = 0.03 mHf = 0.37 m
L = 1.23 m
ANCHO DE LA PANTALL (b)
CALCULO DE LA DISTANCIA ENTRE EL PUNTO DE AFLORAMIENTO Y LA CÁMARA HÚMEDA (L)
CALCULO DEL DIÁMETRO DE LA TUBERÍA DE ENTRADA (D)
Qmax = 0.016 m3/sCd = 0.8 de 0.6 a 0.8
h = 0.4 mA = 0.003 m2
D = 0.057 mD = 5.7 cm
si dicho valor es mayor q el diámetro recomendado (menor o igual a 2") usar 2"
D = 2 pulgD = 0.0508 mD = 5.08 cm
CALCULO DEL NÚMERO DE ORIFICIOS (NA)
NA = 2.258990018
asumiéndose
NA = 2
CALCULO DEL ANCHO DE LA PANTALLA (b)
D = 2 pulg
b = 34 pulg
b = 0.86 m
ALTURA DE LA CÁMARA HÚMEDA (Ht)
A = 10 cm para la sedimentación de la aren
D = 3 cm mínimo
E = 30 cm de 10 a 30 cm
B = 3.81 cm
Q req = 0.012 m3/sV = 1.5 m/s
H = 0.20 m recomendado mínimo 30 cm
H = 0.30 m
Ht = 76.81 cm
se asume
Ht = 1.00 m
DIMENIONAMIENTO DE LA CANASTILLA
A salida = 0.008 m2Dc = 0.6 pulgDc = 1.5 pulgDc = 0.0381 mDcanast = 3 pulg
L = 0.11 mL = 0.23 m
L asumido = 20 cm
AREA DE LA RANUMRA (Ar)
Ar = 35 mm2Ar = 0.000035 m2
Ac = 0.001140094 m2
At = 0.00228 m2
NUMERO DE RANURAS
N° ranuras = 65
REBOSE Y LIMPIEZA
hf = 0.03 m/m de 1% a 1.5%
Q = 16 l/s
D = 4 pulg
RESUMEN
L = 1.23 m
b = 0.86 mD orificio = 0.0508 m
NA = 2 undA = 0.1 mD = 0.03 mH = 0.30 mB = 0.0381 mE = 0.30 m
Ht = 1.00 m
Dc = 0.0381 mD canast = 0.0762 m
L = 0.2 m
D = 0.1016 m
DISEÑO ESTRUCTURAL
Ys = 1.92 tn/m3Ø = 30°u = 0.42Yc = 2.4 tn/m3f = 140 kg/cm2σ = 1 kg/cm2
EMPUJE DEL SUELO SOBRE EL MURO (P) 0.60
0.2
h = 0.4981 mCah = 0.333
P = 79.31 kg
MOMENTO DE VUELCO
Y = 0.17 m
Mo = 13.48 kg-m
MOMENTO DE ESTABILIZACIÓN (Mr) Y EL PESO (W)
0.10
0.40
0.10
W W (kg) X (m) Mr (kg/m)W1 84.41 0.3258 27.50W2 86.36 0.5516 47.64W3 21.51 0.6266 13.48Wt 192.28 88.62
a = 0.391
POR VUELCO
Cdv = 6.57
MAXIMA CARGA UNITARIA
l = 0.65 m
P1 = 0.01179 kg/cm2
P2 = 0.047 kg/cm2
POR DESLIZAMIENTO
F = 80.76 kg
CHEQUEO = 1.00
0.10 0.10
TAPA METALICA
GRAVA0.10
TAPA METALICA 1.00 0.0508 0.0508
0.03
0.100.30 CONCRETO
0.4981
0.03810.2
0.101.23
0.15
0.50
0.6
0.3
0.15
0.15
CAPA IMPERMEABLE
0.50 0.10
0.10
0.60
0.86
GRAVA
CAMARA SECA
0.10
0.10
CAMARA HUMEDA
h = 0.4 m se recomieda de 0.4 a 0.5 m
g = 9.81 m/s2
V = 2.24 m/s
dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q
V = 0.6 m/s
PERDIDA DE CARGA
h0 = 0.03 mHf = 0.37 m
L = 1.23 m
ANCHO DE LA PANTALL (b)
CALCULO DE LA DISTANCIA ENTRE EL PUNTO DE AFLORAMIENTO Y LA CÁMARA HÚMEDA (L)
CALCULO DEL DIÁMETRO DE LA TUBERÍA DE ENTRADA (D)
Qmax = 0.041 m3/sCd = 0.8 de 0.6 a 0.8
h = 0.4 mA = 0.007 m2
D = 0.0912 mD = 9.12 cm
si dicho valor es mayor q el diámetro recomendado (menor o igual a 2") usar 2"
D = 2 pulgD = 0.0508 mD = 5.08 cm
CALCULO DEL NÚMERO DE ORIFICIOS (NA)
NA = 4.223014446
asumiéndose
NA = 4
CALCULO DEL ANCHO DE LA PANTALLA (b)
D = 2 pulg
b = 50 pulg
b = 1.27 m
ALTURA DE LA CÁMARA HÚMEDA (Ht)
A = 10 cm para la sedimentación de la aren
D = 3 cm mínimo
E = 30 cm de 10 a 30 cm
B = 3.81 cm
Q req = 0.03075 m3/sV = 1.5 m/s
H = 0.20 m recomendado mínimo 30 cm
H = 0.30 m
Ht = 76.81 cm
se asume
Ht = 1.00 m
DIMENIONAMIENTO DE LA CANASTILLA
A salida = 0.021 m2Dc = 1 pulgDc = 1.5 pulgDc = 0.0381 mDcanast = 3 pulg
L = 0.11 mL = 0.23 m
L asumido = 20 cm
AREA DE LA RANUMRA (Ar)
Ar = 35 mm2Ar = 0.000035 m2
Ac = 0.001140094 m2
At = 0.00228 m2
NUMERO DE RANURAS
N° ranuras = 65
REBOSE Y LIMPIEZA
hf = 0.03 m/m de 1% a 1.5%
Q = 41 l/s
D = 6 pulg
RESUMEN
L = 1.23 m
b = 1.27 mD orificio = 0.0508 m
NA = 4 undA = 0.1 mD = 0.03 mH = 0.30 mB = 0.0381 mE = 0.30 m
Ht = 1.00 m
Dc = 0.0381 mD canast = 0.0762 m
L = 0.2 m
D = 0.1524 m
DISEÑO ESTRUCTURAL
Ys = 1.92 tn/m3Ø = 30°u = 0.42Yc = 2.4 tn/m3f = 140 kg/cm2σ = 1 kg/cm2
EMPUJE DEL SUELO SOBRE EL MURO (P) 0.60
0.2
h = 0.4981 mCah = 0.333
P = 79.31 kg
MOMENTO DE VUELCO
Y = 0.17 m
Mo = 13.48 kg-m
MOMENTO DE ESTABILIZACIÓN (Mr) Y EL PESO (W)
0.10
0.40
0.10
W W (kg) X (m) Mr (kg/m)W1 133.81 0.3512 46.99W2 127.00 0.6024 76.50W3 31.63 0.6774 21.43Wt 292.44 144.92
a = 0.449
POR VUELCO
Cdv = 10.75
MAXIMA CARGA UNITARIA
l = 0.70 m
P1 = 0.00685 kg/cm2
P2 = 0.076 kg/cm2
POR DESLIZAMIENTO
F = 122.82 kg
CHEQUEO = 1.55
0.10 0.10
TAPA METALICA
GRAVA0.10
TAPA METALICA 1.00 0.0508 0.0508
0.03
0.150.30 CONCRETO
0.4981
0.03810.2
0.101.23
0.15
0.55
0.6
0.3
0.15
0.15
CAPA IMPERMEABLE
0.55 0.10
0.10
0.60
1.27
GRAVA
CAMARA SECA
0.10
0.10
CAMARA HUMEDA
h = 0.4 m se recomieda de 0.4 a 0.5 m
g = 9.81 m/s2
V = 2.24 m/s
dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q
V = 0.6 m/s
PERDIDA DE CARGA
h0 = 0.03 mHf = 0.37 m
L = 1.23 m
ANCHO DE LA PANTALL (b)
CALCULO DE LA DISTANCIA ENTRE EL PUNTO DE AFLORAMIENTO Y LA CÁMARA HÚMEDA (L)
CALCULO DEL DIÁMETRO DE LA TUBERÍA DE ENTRADA (D)
Qmax = 0.02 m3/sCd = 0.8 de 0.6 a 0.8
h = 0.4 mA = 0.003 m2
D = 0.0637 mD = 6.37 cm
si dicho valor es mayor q el diámetro recomendado (menor o igual a 2") usar 2"
D = 2 pulgD = 0.0508 mD = 5.08 cm
CALCULO DEL NÚMERO DE ORIFICIOS (NA)
NA = 2.57235802
asumiéndose
NA = 3
CALCULO DEL ANCHO DE LA PANTALLA (b)
D = 2 pulg
b = 42 pulg
b = 1.07 m
ALTURA DE LA CÁMARA HÚMEDA (Ht)
A = 10 cm para la sedimentación de la aren
D = 3 cm mínimo
E = 30 cm de 10 a 30 cm
B = 3.81 cm
Q req = 0.015 m3/sV = 1.5 m/s
H = 0.20 m recomendado mínimo 30 cm
H = 0.30 m
Ht = 76.81 cm
se asume
Ht = 1.00 m
DIMENIONAMIENTO DE LA CANASTILLA
A salida = 0.010 m2Dc = 0.7 pulgDc = 1.5 pulgDc = 0.0381 mDcanast = 3 pulg
L = 0.11 mL = 0.23 m
L asumido = 20 cm
AREA DE LA RANUMRA (Ar)
Ar = 35 mm2Ar = 0.000035 m2
Ac = 0.001140094 m2
At = 0.00228 m2
NUMERO DE RANURAS
N° ranuras = 65
REBOSE Y LIMPIEZA
hf = 0.03 m/m de 1% a 1.5%
Q = 20 l/s
D = 5 pulg
RESUMEN
L = 1.23 m
b = 1.07 mD orificio = 0.0508 m
NA = 3 undA = 0.1 mD = 0.03 mH = 0.30 mB = 0.0381 mE = 0.30 m
Ht = 1.00 m
Dc = 0.0381 mD canast = 0.0762 m
L = 0.2 m
D = 0.127 m
DISEÑO ESTRUCTURAL
Ys = 1.92 tn/m3Ø = 30°u = 0.42Yc = 2.4 tn/m3f = 140 kg/cm2σ = 1 kg/cm2
EMPUJE DEL SUELO SOBRE EL MURO (P) 0.60
0.2
h = 0.4981 mCah = 0.333
P = 79.31 kg
MOMENTO DE VUELCO
Y = 0.17 m
Mo = 13.48 kg-m
MOMENTO DE ESTABILIZACIÓN (Mr) Y EL PESO (W)
0.10
0.40
0.10
W W (kg) X (m) Mr (kg/m)W1 108.33 0.3385 36.67W2 106.68 0.577 61.55W3 26.57 0.652 17.32Wt 241.58 115.54
a = 0.422
POR VUELCO
Cdv = 8.57
MAXIMA CARGA UNITARIA
l = 0.68 m
P1 = 0.00928 kg/cm2
P2 = 0.062 kg/cm2
POR DESLIZAMIENTO
F = 101.46 kg
CHEQUEO = 1.28
0.10 0.10
TAPA METALICA
GRAVA0.10
TAPA METALICA 1.00 0.0508 0.0508
0.03
0.130.30 CONCRETO
0.4981
0.03810.2
0.101.23
0.15
0.53
0.6
0.3
0.15
0.15
CAPA IMPERMEABLE
0.53 0.10
0.10
0.60
1.07
GRAVA
CAMARA SECA
0.10
0.10
CAMARA HUMEDA
HOJA DE METRADOS
ABANCAY
PARTIDA ESPECIFICACIONES
01.00.00 CAPTACIÓN 01 - LUCMOS
01.01.00 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DEL TERRENO
01.01.02 TRAZO Y REPLANTEO
01.02.00 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL
01.02.02 REFINE NIVELACIÓN Y COMPACTACIÓN MANUAL
01.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE
01.02.04 RELLENO CON MATERIAL DE CANTERA
Piedra Chica
Grava
Gravilla
01.03.00 OBRAS DE CONCRETO SIMPLE
CONCRETO fc = 100 kg/cm2
Concreto para Solado e = 10 cm
Cámara Húmeda
Cámara Seca
Concreto para relleno
CONCRETO fc = 140 kg/cm2
Losa de Fondo
Cámara Húmeda
Cámara Seca
Muros
Muro Frontal
Muro Lateral
Dentellón
01.04.00 OBRAS DE CONCRETO ARMADO
CONCRETO fc = 210 kg/cm2
Muro Frontal
Muro Lateral
Losa Superior
Dentellón
01.05.00 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS
MUROS CAMARA SECA
MUROS CAMARA HUMEDA
PANTALLADE PROTECCIÓN
LOSA DE FONDO
LOSA SUPERIOR
01.06.00 ACERO DE REFUERZO
ACERO F'y = 4,200 kg/cm²
OBRA: CREACIÓN DEL SISTEMA DE BOMBEO E IMPULSIÓN DE AGUA PARA RIEGO PRESURIZADO DE LOS SECTORES DE RUMI RUMI Y LA UNION DEL DISTRITO DE CURAHUASI PROVINCIA DE ABANCAY, REGIÓN DE APURÍMAC
PROVINCIA:
01.06.00 ACCESORIOS
COMPUERTA METALICA
CANASTILLA DE BRONCE
TUBERIA DE 2"
TUBERÍA DE 1 1/2"
CODOS
VALVULAS
UNIONES
HOJA DE METRADOS
DISTRITO: CURAHUASI
UNDDIMENSIONES
PARCIAL TOTALLARGO ANCHO ALTO
m2 1 3.56 3.78 13.46 13.46
m2 1 3.56 3.78 13.46 13.46
m3 1 3.56 3.78 1.93 25.97 25.97
m2 1 3.56 3.78 13.46 13.46
m3 1 Esponjamiento 25% 1.25 32.46
m3 2.14
m3 1 AREA 0.71 0.49 0.35
m3 1 AREA 1.17 0.64 0.75
m3 1 AREA 1.41 0.74 1.04
m3 0.89
m3 1 2.20 0.60 0.10 0.13
m3 1 0.80 0.70 0.10 0.06
m3 1 2.20 AREA 0.32 0.70
0.60
m3
m3 1 2.20 0.60 0.15 0.20
m3 1 0.80 0.85 0.15 0.10
m3
m3 1 2.00 0.10 1.00 0.20
m3 1 0.60 0.10 0.60 0.04
m3 1 2.00 0.15 0.20 0.06
m3 1.27
m3 1 2.20 0.10 1.00 0.22
m3 2 1.36 0.10 2.09 0.57
m3 1 AREA 3.30 0.10 0.33
m3 1 2.20 0.15 0.45 0.15
m2 2 4.00 0.60 4.80 4.80
m2 2 8.20 1.00 16.40 16.40
m2 4 3.46 3.46 47.89 47.89
m2 2 11.40 0.15 3.42 3.42
m2 2 AREA 3.30 6.60 6.60
kg 48.70
CREACIÓN DEL SISTEMA DE BOMBEO E IMPULSIÓN DE AGUA PARA RIEGO PRESURIZADO DE LOS SECTORES DE RUMI RUMI Y LA UNION DEL DISTRITO DE CURAHUASI PROVINCIA DE ABANCAY, REGIÓN DE APURÍMAC
N° VEC.
und 2 2.00 2.00
und 1 1.00 1.00
ml 8 0.1 0.80 0.80
ml 1 1.20 1.20 1.20
und 1 1.00 1.00
und 2 2.00 2.00
und 2 2.00 2.00