Cerco de Proteccion Malla Olimpica

Post on 29-Sep-2015

100 views 16 download

description

dddd

Transcript of Cerco de Proteccion Malla Olimpica

cerco perimetrico

PLANILLA DE METRADOS

PROYECTO:INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE ALTO MANUGALI MARGEN DERECHA E IZQUIERDA, ZONAL IVOCHOTE - DISTRITO DE ECHARATE - LA CONVENCION - CUSCO

ESTRUCTURA:01.02.05 CERCO PERIMETRICO CON MALLA OLIMPICAPLANOCP-01PERIMETRO DEL CERCO :58.1MLANCHO DE LA PUERTA1ML

ItemDescripcionUndNoNoMedidasSubTotalMetrado PartidaElemVecesLargoAnchoAlturaTotalMetradox ML57.10TRAZO Y REPLANTEO PRELIMINAR58.101.018PERIMETROm21.001.0058.101.0058.10

EXCAVACIN EN TIERRAm38.410.147COLUMNAS DE ANCLAJE1.0015.000.400.400.601.44CIMIENTO CORRIDO1.001.0058.100.400.306.97

CONCRETO CICLOPEO 1:10+30%PMm38.410.147COLUMNAS DE ANCLAJE1.0015.000.400.400.601.44CIMIENTO CORRIDO1.001.0058.100.400.306.97

CONCRETO SOBRECIMIENTO F`C=175 KG/CM2m31.001.0058.100.150.201.741.740.031

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm21.002.0058.100.2023.2423.240.407

MALLA DE PROTECCION CERCO PERIMETRICOm21.001.0058.101.80104.58104.581.832

COLUMNAS TUBO NEGRO D=3"x1.5mm.ml1.0015.002.5037.5037.500.657

ANGULO 1 1/2"x1/8"Angulo 1 1/2"x1/8" (Longitudinal)ml15.002.004.00120.00228.003.993Angulo 1 1/2"x1/8" (Vertical)15.004.001.80108.00

PUERTA DE INGRESO CON ACCSESORIOSUnd.1.001.001.000.018