1. LIMPIEZA MANUAL DEL TERRENO 2. REPLANTEO Y NIVELACIN
REA TOTAL A REPLANTEAR Y NIVELAR : 1557,64 m2
REA TOTAL A LIMPIAR : 1557,64 m2
CONTIENE2-LIMPIEZA Y DESBROCE 3-REPLANTEO Y NIVELACION
PROGRAMACION DE OBRAS DIB: IC
DIS: IC
REV: ARQ. JP
LAMINA 2
NOVIEMBRE 2013
2. EXCAVACIN A MANO DE SUELO SIN CLASIFICAR (Prof. 0-2 m)
VOLUMEN EXCAVADO ZAPATAS : 20,21 m3
VOLUMEN EXCAVADO CADENAS: 7,70 m3
VOLUMEN EXCAVADO CANCHA : 109,20 m3
VOLUMEN EXCAVADO CONTRAPISO : 19,82 m3
VOLUMEN TOTAL EXCAVADO A MANO : 156,93 m3
CONTIENE
RUBROS
PROYECTO ESPACIO PBLICO COMUNIDAD DE CORRALN
DIB: IC HG MC
DIS: IC HG MC
REV: ARQ. LV
ESC: AJUSTADA
JULIO 2015